This document is a Statement of Work (SOW) for a federal contract opportunity to provide trash removal services at the Imperial Dam Recreation Area in Yuma, Arizona. The contract requires the contractor to furnish all labor, materials, supplies, and equipment to collect and dispose of trash from multiple locations according to a specified schedule. Key details include:
The contract is for a one-year base period with four one-year option periods. Trash must be collected from 5-cubic yard bins at sites such as Quail Hill, K Kreek, South Mesa, Senator Wash Boat Ramp, T.K. Jones, and Mittry Lake Boat Ramp. Collection frequency ranges from 2-3 times per week depending on the site. The contractor must participate in single-stream recycling. The government may utilize inspection, sampling, and complaint-based methods to assess the contractor's performance. The SOW includes a map showing the bin locations. The related federal contract opportunity has the solicitation number 140L6424Q0046 and is being issued by the Department of the Interior Bureau of Land Management Arizona Region.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_3_Value_Bid_Schedule.xlsx | XLSX spreadsheet | |
| B03_Attachment_4_Wage_Determination_2015-5475_RV_22.pdf | ||
| Attachment_6_-_Instructions_to_Offerors.pdf | ||
| Sol_140L6424Q0046.pdf | ||
| B08_Attachment_1_Combined_Synopsis_and_Solicitation.pdf | ||
| B08_Attachment_5__Contract_Clauses___Provisions.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Bureau of Land Management
Yuma Field Office
STATEMENT OF WORK
IMPERIAL DAM RECREATION AREA
TRASH REMOVAL CONTRACT
05/13/24
1.1 REQUIREMENT
It is required that trash collection services be performed at the recreation sites indicated in paragraph 1.3. The Contractor is required to furnish all labor, material, supplies, and equipment including trash bins and vehicles needed to perform in accordance with these specifications.
Bins will have hinged lids that cover the entire opening, will be painted at least once per year, and maintained in proper working condition at all times. Paragraph 1.3 shows the location, number, and schedule for bins to be serviced. Paragraph 1.5 describes the unscheduled collections. The number of bins as shown in paragraph 1.3 is based upon bins of 5 cubic yards in size. Bins of 5 cubic yards or greater may be used provided the total holding capacity for each location is equal to the amount of the bins indicated in paragraph 1.3.
1.2 LOCATION
The bins will be placed at locations in the quantities indicated in paragraph 1.3. The scheduled collection, removal, and transport of solid waste from Bureau of Land Management Public locations, as follows:
1.3 COLLECTION LOCATIONS, SCHEDULES, AND OTHER SPECIFI ATIONS
Location
Pickup Schedule
Required Number of
5-Yard Bins
Required Collection Days
Quail Hill
Oct 1 - April 30
Sept 1- Sept 30
MON & FRI
(2x per week)
K Kreek
Oct 1 -April 30
Sept 1- Sept. 30
South Mesa
May 1– Aug 30
Oct 1 - April 30
Sept 1 – Sept 30
MON, WED, FRI
(3x per week)
Senator Wash
Boat Ramp
Oct 1 -Sept 30
1.4 GENERAL DESCRIPTION OF WORK
Collection of trash from the bins will be according to schedule as described in paragraph 1.3. The
Contractor will be responsible for the cleanup of any spillage caused by his/her operation.
Disposal of the trash will be only at approved sanitary landfills. Contractor must participate in the single stream recycle process. It is anticipated that bagged refuse will at times be stacked alongside trash bins when bins are full. The Contractor is required to pick up bagged refuse stacked alongside trash bins.
1.5 UNSCHEDULED TRASH COLLECTION
If additional trash collection is required due to heavier use than anticipated, the Contractor shall provide the requested service at the unit price. It is estimated that four unscheduled trips for each work location may be required. Unscheduled collections for the purpose of this contract are defined as additional trips to the work locations on days or at times other than those specified in
Paragraph 1.3
1.6 DELIVERABLES/PERIOD OF PERFORMANCE
The performance period for the contract is for one year from the date of the award of the contract, with a four 1-year Option Periods subject to acceptable contractor performance.
1.7 RESTRICTIONS
Only authorized BLM personnel can make on-call services.
Any weigh or dump charges must be documented. (Weight tickets, etc.).
Any performance of services outside the scope of work or in excess of funding is at the contractor’s risk. Services must be in accordance with any applicable local, state, or federal regulations.
1.8 PAYMENT TERMS
Payments are to be made via monthly itemized invoice.
Price is based upon established commercial pricing for similar services to other organizations.
Government Furnished Property: None.
1.9 QUALITY ASSURANCE PLAN
T.K. Jones
May 1 – Aug 30
T.K. Jones
Oct 1-April 30
Sept 1- Sept 30
MON, WED, & FRI
3x per week
Mittry Lake
May 1 – Sept 30
Total 2
1 At Ramada Site, 1 At Paved Parking
Lot Near Restroom
Mittry Lake
Oct 1 – April 30
Total 3
2 At Ramada Site, 1 At Paved Parking
Lot Near Restroom
2x per week
Introduction: The quality assurance plan is intended to measure the quality of goods and services purchased from the Contractor. To accomplish quality assurance the Government may utilize assessment measures to ensure that the Contractor’s Performance is acceptable. The criteria for determining task performance is timeliness, work omissions, and any re-work needed. The quality assurance plan will need to be submitted no later than 14 days after award of contract.
1.10 METHODS OF ASSESSMENT
100% inspection: Monthly or weekly observation and recorded reports indicating satisfactory or unsatisfactory performance may be used.
Planned Sampling: The Government may utilize scheduled evaluations resulting in an assessment of the Contractor’s performance.
Validated Complaints: Validated complaints may be recorded to indicate any deficient work.
Complaints must be verified by authorized BLM Personnel.
1.11 GENERAL CRITERIA FOR TASKS
Work Omissions: A major omission is a work requirement that if omitted or performed unsatisfactory would have a significant impact on the overall work requirement.
Minor work omissions do not have a significant effect on the work requirement.
Timeliness: Daily, weekly, bi-weekly, and/or monthly tasks shall be completed in accordance with the delivery schedule.
Re-work needed: The Contractor is allowed a reasonable time to perform any work that is identified as unsatisfactory or has not been performed.
1.12 LEVEL OF ASSESSMENT
The level of assessment shall be determined by the Contracting Officer’s Representative (COR).
If reporting indicates performance below an acceptable level, increased assessment of performance may be required by scheduled evaluations.
!7 !7
!7
!7
!7
!7
!7
T.K. Jones Bins (Boat Ramp) (-114.477221) (32.901917)
T.K. Jones Bins (Camp Host) (-114.477251) (32.903393)
Senator Wash Boat Ramp Bins (-114.487096) (32.905117)
South Mesa Bins (-114.494133) (32.901112)
K Kreek Bin (-114.487087) (32.888532)
Quail Hill Bins (-114.482478) (32.873816)
Mittry Lake Bins (-114.470712) (32.820288)
USGS The National Map: National Boundaries Dataset, National Elevation Dataset, Geographic Names Information System, National Hydrography Dataset, National Land Cover Database, National Structures Dataset, and National Transportation Dataset; U.S. Census Bureau - TIGER/Line; HERE Road Data
Legend !@ Contact stations
!7 Trash Bins roads arc Routes
LTVA
BLM
BR
Indian Lands Military Private ¯
0 1 20.5 Miles
Imperial Dam Bin Locations
Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri
S24
S24
La gu na Da m Rd
E Imperial Dam Rd
Senator Wash Rd
File details come from the government source that posted it. Updated .