B08_Attachment_1_Statement_of_Work.pdf
PDF 321 KB Posted
- Solicitation number
- 140P8524Q0032
About this file
This solicitation is requesting quotes for walk-in refrigerator repair services at Sequoia and Kings Canyon National Parks. The National Park Service requires a contractor to replace the condenser, fans, copper tubing, and refrigerant at the Arrowhead Hotshots' Swale Work Center refrigeration unit. Quotes are due by March 28, 2024. The contractor must be licensed for industrial refrigeration and complete the repairs between April 1 and May 3, 2024. The award will be a firm-fixed-price contract for commercial services to the responsible offeror with the most advantageous combination of price and past performance. This is a 100% small business set-aside with a size standard of $19 million average annual receipts.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ #140P8524Q0024 - Walk-In Refrigerator Repair Page 1 of 1
Statement of Work
WALK-IN REFRIGERATOR REPAIR
Sequoia and Kings Canyon National Parks
Objective:
Sequoia and Kings Canyon National Parks has a requirement for the repair of a walk-in refrigerator.
Background:
Sequoia and Kings Canyon National Parks is the home unit for the Arrowhead Hotshots. The Arrowhead Hotshots’ Swale Work Center is in the Grant Grove district of Kings Canyon National Park, California. Currently the walk-in refrigerator is non operable do to an old leaking condenser and weak fan motors. Upon inspection, it has been determined that the condensing unit and fans need to be replaced and upgraded with new components.
Make and Model of Current Walk-In Refrigerator Components:
Condenser: Heatcraft Inc. Model #ISL0075H22 Fan Box: Heatcraft Inc. Model #ACP864AJ
Requirement:
The Contractor must be qualified/licensed to service and install industrial refrigeration equipment. The Contractor shall perform all the work and furnish all the necessary supplies, equipment, labor, materials, supervision, and inspection necessary for completion to fulfill the following requirements:
1. Install a new condenser and appropriate hoses and electrical in the attic.
2. Install new fan box in the walk-in unit with appropriate hoses and electrical.
3. Install all new copper tubing and electrical wiring as needed to connect the condenser in the attic to the fan box in the walk-in unit.
4. Provide new Refrigerant to recharge system.
5. Conduct necessary testing to ensure there are no leaks and to verify that everything is in working order. A final inspection will be scheduled with the Contractor upon completion of all work.
6. Upon completion, the work area shall be left clean of debris and trash associated with the work.
Place of Performance:
Work will be performed on-site at the Swale Work Center, 84350 Swale Rd, Kings Canyon, CA 93633.
Period of Performance:
Work will begin at time of awarded purchase order, which is anticipated to begin around 04/01/2024 and be completed no later than 05/03/2024. Contractor shall schedule and execute in the minimum time necessary.
File details come from the government source that posted it. Updated .