This document is a Scope of Work (SOW) for the National Park Service's Gateway National Recreation Area, specifically for the Sandy Hook Unit. The project involves replacing bearings and end shafts on two Westech Aerotors (Trains #3 and #4) at the Sandy Hook Wastewater Treatment Plant located at 311 Atlantic Drive, Fort Hancock, New Jersey. The contractor will be required to provide all labor, parts, and materials to replace bearings and end shafts, conduct a full system inspection, and ensure operational functionality, with work to be completed within 14 weeks of contract award.

Key requirements include: providing and replacing bearings on both sides of the center shaft with all necessary mounting hardware; inspecting and potentially replacing end shafts; ensuring two Aerotor trains remain operational, with no more than 3 consecutive days offline for repairs; following Westech specifications and manufacturer guidelines; and having a primary contractor with appropriate mechanic licenses who will perform at least 51% of the labor. The work will be performed between 7 a.m. and 5 p.m., Monday through Friday, excluding federal holidays, with the government highly recommending a site visit for potential offerors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gateway National Recreation Area

Sandy Hook Unit

Replace Bearings and End Shafts of Aerotors Trains #3 and 4 at Sandy Hook Wastewater Treatment Plant Building 311

DATED:

April 2025

NATIONAL PARK SERVICE

NORTHEAST REGION

SCOPE OF WORK

Replace Bearings and End Shafts of Aerotors at Trains 3 & 4 at

Sandy Hook Wastewater Treatment Plant at Building 311 Gateway National Recreation Area - Sandy Hook Unit

Intent The intent of this contract is for the replacement of the bearings and end shafts of two (2) Westech Aerotors (Train #3 and Train #4) and to make the aerotor systems operational at the Sandy Hook Wastewater Treatment Plant.

The tasks will include, but not limited to, the replacement of the bearings and end shafts. This work will be conducted at 311 Atlantic Drive located in the Sandy Hook Unit of Gateway National Recreation Area, Fort Hancock, and Monmouth County, New Jersey 07732.

The Contractor shall:

Two AEROTOR TRAINS (Trains #3 and #4):

Provide and replace the bearings on both sides of the center shaft of the 2 Aerotors. This shall include all mounting hardware and fasteners necessary to secure the bearings. The gap of the bearings shall be installed as per Westech specifications.

Provide and Inspect the end shaft on both sides of the center shaft of the 2 Aerotors. Upon inspection, it will be determined by the Contractor, COR and the Plant Operations Supervisor whether the End Shaft shall be replaced. If deemed necessary, the contractor shall replace the End Shafts. In the case that the existing End Shafts are deemed adequate and not needed to be replaced, the contractor will turn over the End Shafts to the COR. This replacement shall include all mounting hardware and fasteners necessary to secure the end-shafts. The end shafts shall be installed as per Westech specifications.

Upon completion of work, each train shall be operationally tested and proven that it will function as designed.

ALL WORK:

All labor, parts, and materials shall be provided to replace the bearings and end shafts of the two Aerotors.

The Park will keep the least worn set parts removed. All removal and proper disposal of remaining removed parts shall be included.

All work shall be done by code. All manufactures guidelines and requirements shall be followed.

Complete an entire system inspection and start-up, of the new equipment to verify the entire system is working properly. Assure chains and motors are properly aligned.

Contractor shall be qualified to work equipment being installed. All parts/materials shall be from or approved by the manufacture of the system.

Two Aerotor Trains shall always remain operational. Two Aerotor trains can be offline for repair work for no more than 3 consecutive days.

The Primary Contractor Shall hold all required mechanic licenses to work on the waste-water treatment system, and the Primary Contractor shall perform a minimum of 51% of the labor.

Site Visit The government highly recommends all potential offerors schedule and complete a site visit. The site visit can be scheduled through the Park’s POC. If a Contractor does not complete a site visit, it does not relieve them of the accuracy of their pricing. The set days of the site visit will be specified, and the hours of the site visit will be between 9 am and 2 pm. The visit needs to be scheduled through the park POC.

Work Location The location of the work to be performed is at the Wastewater Treatment Plant of the Sandy Hook Unit of Gateway National Recreation Area, 311 Atlantic Drive, Fort Hancock, NJ 07732. Contractor shall contact COR and coordinate all onsite work to be performed.

Period of Performance All replacement work and system operation shall be completed within 14 weeks of Contract Award. Work shall be performed in between the hours of 7 a.m. and 5 p.m. during the work week of Monday thru Friday excluding Federal Holidays, unless prior approval is given by the COR.