B08_Attachment_1_Price_Schedule.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- YOSE-ROAD STRIPING BOF AND HWY 41
- Solicitation number
- 140P8526Q0083
About this file
This is a Price Schedule attachment for a road striping project at Yosemite National Park. The schedule details seven line items for various types of reflectorized road markings and associated services across multiple park roads and highway segments. Line items include centerline double yellow with black divide-reflectorized markings (69,985 linear feet), centerline broken white 4" reflectorized markings (39,400 linear feet), single solid yellow 4" shoulder reflectorized markings (39,000 linear feet), centerline broken yellow 4" reflectorized markings (7,200 linear feet), single solid white 4" shoulder line reflectorized markings (139,900 linear feet), and solid white 8" reflective markings (600 linear feet). The schedule also includes line items for sweeper costs and traffic control, both quoted on a lump sum (LS) basis. Specific road segments are identified for each marking type, including Curry Lane, Awahnee Road, Village Drive, Highway 41, Tioga Road, Chilnualna Falls Road, Hodgdon Meadow Road, Big Oak Flat tunnels, Southside Drive, Northside Drive, River Straight, and Happy Isle Loop.
The price schedule is associated with solicitation 140P8526Q0083, a Small Business set-aside Request for Quote issued by the National Park Service under NAICS code 237310 with a $45.0 million size standard. The construction magnitude is between $100,000 and $250,000. The contractor must provide all mobilization, labor, supervision, materials, equipment, transportation, site rehabilitation, cleanup, and demobilization. Proposals are due at 12:00 p.m. Pacific Standard Time on Thursday, August 20, 2026, via email only. Questions must be submitted to Brian Roppolo at brian_roppolo@nps.gov by August 13, 2026, with answers posted on SAM.gov.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| UNIT OF MEASURE | QUANTITY | UNIT PRICING | COST | |||
| 1. | CENTERLINE DOUBLE YELLOW | |||||
| WITH BLACK DIVIDE-REFLECTORIZED | 69,985.00 | |||||
| Curry 4-Way to Stables | LF | 3,200.00 | ||||
| Awahnee Road | LF | 2,600.00 | ||||
| Village Drive | LF | 3,400.00 | ||||
| Oak Lane and Lost Arrow Road | LF | 1,100.00 | ||||
| Highway 41 (Tunnel down to Valley Loop) | LF | 5,300.00 | ||||
| Tioga Road (Hwy 120) Starting at Crane Flat | LF | 13,200.00 | ||||
| Hodgdon Meadow Road | LF | 5,500.00 | ||||
| Chilnualna Falls To Boundary (Highway 41) | LF | 28,500.00 | ||||
| Chilnualna Falls Road | LF | 4,500.00 | ||||
| Big Oak Flat Tunnel #3 (Upper) | LF | 2,087.00 | ||||
| Big Oak Flat Tunnel #2 (Middle) | LF | 227.00 | ||||
| Big Oak Flat Tunnel #1 (Lower) | LF | 371.00 |
| 2. | CENTERLINE BROKEN WHITE 4" REFLECTORIZED | 39,400.00 | |
| Southside Drive El Cap Cross to Curry 4-Way | LF | 18,500.00 | |
| River Straight/Curry 4-Way to Roundabout | LF | 3,400.00 | |
| Northside Drive/ Sentinel Dr to El Cap Cross | LF | 17,500.00 |
| 3. | SINGLE SOLID YELLOW 4" SHOULDER REFLECTORIZED | 39,000.00 | |
| Southside Drive El Cap Cross to Curry 4-Way | LF | 16,500.00 | |
| River Straight/Curry 4-Way to Roundabout | LF | 4,000.00 | |
| Northside Drive/ Sentinel Dr to El Cap Cross | LF | 17,000.00 | |
| Highway 41 (Wawona Road) | LF | 1,500.00 |
| 4. | CENTERLINE BROKEN YELLOW 4" REFLECTORIZED | 7,200.00 | |
| Happy Isle Loop | LF | 7,200.00 |
| 5. | SINGLE SOLID WHITE 4" SHOULDER LINE REFLECTORIZED | 139,900.00 | |
| Southside Drive El Cap Cross to Curry 4-Way | LF | 18,500.00 | |
| River Straight/Curry 4-Way to Roundabout | LF | 4,000.00 | |
| Awahnee Road | LF | 5,500.00 | |
| Village Drive | LF | 1,400.00 | |
| Northside Drive/ Sentinel Dr to El Cap Cross | LF | 17,500.00 | |
| Highway 41 (Tunnel down to Valley Loop) | LF | 10,600.00 | |
| Tioga Road (Hwy 120) Starting at Crane Flat | LF | 26,400.00 | |
| Chilnualna Falls To Boundary (Highway 41) | LF | 56,000.00 | |
| Big Oak Flat Tunnel #3 (Upper) | LF | 4,174.00 | |
| Big Oak Flat Tunnel #2 (Middle) | LF | 454.00 | |
| Big Oak Flat Tunnel #1 (Lower) | LF | 742.00 |
| 6 | SOLID WHITE 8" REFLECTIVE | 600.00 | |
| Crane Flat Tioga Road Intersection | LF | 600.00 |
7 SWEEPER COSTS LS 1
8 TRAFFIC CONTROL LS 1
TOTAL $0