This Performance Work Statement (PWS) details a telecommunications infrastructure relocation project for the Bureau of Land Management (BLM) in California. The primary objective is to relocate a 2-bay micro site Pepro communications shelter/vault, complete with a 20-foot tower, solar panels, and associated equipment from the Riverside Radio Shop to Old Woman's Peak in Essex, CA. The project involves transporting approximately 4,400 pounds of equipment across challenging terrain, including a site with no access road and potential environmental obstacles like wildlife, uneven surfaces, and variable weather conditions.

The contractor will be responsible for comprehensive site preparation, equipment transportation, installation, and documentation, including taking high-resolution photographs of the shelter, tower, and solar panel installation. The project requires strict adherence to safety protocols, compliance with various codes and standards, and a warranty covering materials and workmanship. The contract has a one-year period of performance, with final acceptance contingent upon a thorough government inspection and approval process. The equipment includes a Pepro aluminum shelter with Faraday Cage technology, four 200W Renogy monocrystalline solar panels, and a 20-foot tower, with a total site weight of approximately 4,400 pounds.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

Introduction

The Bureau of Land Management (BLM) aims to enhance its communication network by improving Communication Sites to meet minimum requirements for radio facility design and maintenance. This initiative is essential for supporting BLM's operational mission, which focuses on ensuring employee safety, public safety, and resource protection. A robust communication infrastructure is critical for effective operations, enabling timely response to emergencies and facilitating coordination among personnel.

Objective

BLM CA aims to ensure the successful relocation and setup of the Pepro shelter/vault, with tower, and solar panels from Radio Shop in Riverside, CA in Riverside County to Old

Woman’s Peak - Essex, CA, in San Bernadino County. This relocation is vital for supporting

BLM's operational mission effectively by enhancing the accessibility and functionality of communication equipment essential for mission-critical public safety tasks.

Tasks

1. Relocate the existing 2 bay micro site Pepro communications shelter/vault from

Riverside CA to Old Woman’s Peak - Essex, CA. (Address/GPS Coordinates are listed in the “Administrative Matters” Section)

2. Old Woman’s Peak does not have any access road to the site. Alternative methods of transportation may be required.

3. The contractor is responsible for all required transportation permits.

4. The weight of the 2-bay micro shelter / vault can be found in the “Additional

Information” section

5. The Solar panels that the contractor will be transporting can be found in the “Additional

Information” section

6. Transportation to and from the site(s) is the contractor’s sole responsibility

7. The contractor may have to drive off road to access the communications site named Old

Woman’s Peak.

8. Access to the site is via a dirt and gravel road, which may have snow present, rutting, erosion, rocks, holes, and washouts may be present on roads.

9. The use of 4WD may be needed to access site.

10. The contractor must be aware of the surrounding wildlife such as coyotes, rattle snakes, lizards, etc. at the communication site

11. The contractor is responsible for paying attention to surroundings such as rocks, and uneven surfaces near and or around the site.

12. The contractor must remain aware of changing weather conditions including high winds, thunderstorms, and tsunamis. Proper precautions should be taken to ensure safety and project integrity.

13. The contractor is responsible for removing all refuse/debris that must be transported and properly (legally) disposed of offsite.

14. The contractor is responsible for the proper disposal methods for hazardous materials, such as batteries or chemicals if needed.

15. It will be the contractor’s responsibility to transport the shelter/vault, components, and accessories to the appropriate location. All accessories are listed in the additional information section.

16. The contractor must comply with manufacturer’s instructions and recommendations for lifting points of products in the applications indicated

17. Lifting of the shelter/vault onto a method of transportation (i.ee trailer / truck, etc.) will be the contractor’s sole responsibility

18. It is the contractor’s responsibility to secure the tower per the manufacturers’ recommendation (Pepro) for transportation.

19. It is the contractor’s responsibility to investigate and observe prior to beginning work, investigate and verify the existence and location of mechanical and electrical systems

20. The contractor will schedule an in-person meeting with the BLM representative Technical

Point of Contact prior to removal of Vault/shelter:

A. Arrange and schedule in-person meeting prior to removal and installation call prior to beginning any work on the communications facility.

B. Agenda: Clarify questions in writing related to work to be performed, scheduling, coordination, etc. with the Telecommunications staff or Contracting officer.

C. All individuals, who will be in an on-site supervisory capacity, shall be required to attend the pre-removal and installation call. This includes project managers, site supervisor, and lead removers.

D. The contractor shall document the outcomes of the meeting, including action items, responsibilities, and timelines, and share these with the Government for review and confirmation.

E. The contractor will establish a plan for regular follow-up communication with the

Government to ensure that all parties remain aligned throughout the project.

21. The BLM Telecommunications Lead will provide access and oversight for any questions or concerns that may come up.

22. Work on site can only begin after confirmation between the BLM Telecommunications

Staff and the contractor.

23. The contractor must comply with the manufacturer’s instructions and recommendations for lifting points of products in the applications indicated.

24. It is the contractor’s responsibility to investigate and observe prior to beginning work, investigate and verify the existence and location of mechanical and electrical systems.

25. Prior to contractor acceptance of conditions: Examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for removal and relocation tolerances and other conditions affecting performance. Record observations.

26. Contractor shall review Existing Utility Information: Furnish information to Contracting

Officer and BLM TPOC that is necessary to adjust, move, or relocate existing utility structures, utility poles, lines, services, or other utility appurtenances located in or affected by the removal and relocation. Coordinate with authorities having jurisdiction.

27. Contractor shall Review Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to the Contracting Officer. Include a detailed description of problem encountered, together with recommendations for changing the Contract documents.

28. Any damage done to the shelter/vault in transport or installation will be the contractor’s sole responsibility to fix prior to final acceptance by the government.

29. All work must be done without disturbing operations of the facilities and BLM personnel

(Telecommunication Staff) and fire station staff or events such as but not limited to fires, border operations.

30. The contractor is responsible for transporting any required personnel, equipment, and materials to and from the sites

31. Upon on contract award, the contractor shall provide a notice of work at least 20 working days (Monday – Friday) prior to project start date, sent via email to BLM

Telecommunications Staff (Douglas Carter (drcarter@blm.gov), sstrizhevsky@blm.gov.

32. All accessories/parts needed to install the vault will be purchased by the contractor, unless otherwise specified in this contract and with written approval of the Government

(Contracting Officer)

33. It is the contractor's responsibility to erect the tower and install the solar panels (4) after the site has been set in place.

34. The contractor must take pictures of the site after the installation is completed. Pictures must be taken of all sides of the shelter/vault. Please refer to the “Additional

Information Section – Picture Requirements”

35. The contractor must take pictures of the erected tower. Pictures must be taken from the front and back of the tower. Please refer to the “Additional Information Section – Picture

Requirements” for picture requirements

36. Any work performed beyond the scope of the contract or done without the written authorization of the Government shall be deemed unauthorized. If required by the

Government, unauthorized work shall be remedied, removed, or replaced by the installation Contractor at the installation Contractor’s sole expense.

37. A final facility inspection by BLM Telecommunication Staff will be required before final acceptance.

Safety and Health

All work performed under this contract shall comply with applicable federal, state, and municipal safety and health codes and requirements. In cases where there is a conflict between applicable regulations, federal requirements shall take precedence.

1. Responsibility for Compliance:

The contractor assumes full responsibility and liability for compliance with all applicable regulations related to the health and safety of personnel during the execution of the work. The contractor shall hold the Government harmless for any actions taken by the contractor, its employees, or subcontractors that result in illness or death.

2. Provision of Safety Equipment:

mailto:drcarter@blm.gov mailto:sstrizhevsky@blm.gov

The contractor shall provide all necessary safety equipment, training, and personal protective equipment (PPE). This includes but is not limited to helmets, gloves, eye protection, and any other equipment deemed necessary for the safe execution of the work.

3. Adequacy of Safety Measures:

The contractor must ensure that all safety equipment and relevant safety procedures are adequate for the tasks being performed. All personnel involved in the work must be trained in the proper use of safety equipment and procedures.

4. Utilization of Safety Procedures:

The contractor shall ensure that all safety measures and equipment are utilized correctly and consistently throughout the duration of the project. Regular safety audits and training refreshers should be conducted to reinforce compliance.

5. Emergency Procedures:

The contractor must establish and communicate emergency procedures to all personnel on-site, including evacuation routes, first aid stations, and contact information for emergency services.

6. Incident Reporting:

Any incidents, accidents, or near-misses must be reported immediately to the designated BLM representative. An investigation should be conducted, and appropriate corrective actions implemented to prevent recurrence.

APPLICABLE SPECIFICATIONS, CODES, AND STANDARDS

A. The work shall be performed in compliance with applicable codes, and generally accepted standards as described in specification Sections included with this Solicitation as amended and adopted by BLM.

1. In the occurrence of conflicting codes and/or standards, the most stringent shall apply, unless otherwise specifically required by the Government.

B. The work shall be performed in compliance with applicable City, County, and State

Codes, including but not limited to building and environmental.

1. In the occurrence of conflicting codes and/or standards, the most stringent shall apply, unless otherwise specifically required by the Government’s engineer.

C. The work shall be performed in compliance with Occupational Safety and Health

Administration – Occupation (OSHA) Safety laws.

D. The work shall be performed in compliance with Prevailing Labor Laws and Wage Rates.

Tentative Schedule The contract will have a period of performance (POP) of one year.

Document Review

1. Contractor Document Review:

The contractor shall review all relevant documents, including those provided by the Government, to ensure a thorough understanding of project requirements.

2. Government Review and Approval:

The Government shall review and approve the contractor’s proposed schedule, plans, specifications, cost estimates, and any other submitted documents. The contractor must be prepared to adjust as needed based on feedback from the

Government.

3. Finalization:

The approved schedule and documents will serve as the foundation for the project, guiding all subsequent actions and ensuring alignment with the project objectives.

Project Closeout

The project will be considered complete once the following criteria have been met:

1. Relocation of the Shelter / vault:

The Pepro shelter/vault has been successfully relocated at the Riverside Radio

Shop.

2. Government Approval:

The removal and relocation must receive formal approval from the Government representative (BLM Telecommunications Lead) to ensure that all specifications and requirements have been met.

3. Final Documentation:

The contractor shall provide all necessary documentation, including:

▪ Removal and relocation reports

▪ Any warranties or maintenance information related to the shelter / vault and its components

4. Final Inspection:

A final inspection may be conducted by the Government to verify that the removal and relocation complies with all agreed-upon specifications and safety requirements.

5. Resolution of Outstanding Issues:

Any outstanding issues or deficiencies identified during the final inspection must be addressed and resolved before project closeout.

General BLM Responsibilities

• The BLM will provide a primary technical contact BLM Telecommunications Staff to operate as liaison with the contractor.

• BLM Telecommunications staff provide unlimited access to communications shelter/vault for project work during normal business hours.

• Provide 2-bay micro shelter/vault with 20-foot tower Pepro drawing

• Coordinate with contractor for a proposed project start date upon award of project.

• BLM Telecommunications staff will be available to address issues and or problems that come up before, during or after the project via phone or email.

• BLM Telecommunications staff will respond to issues or problems within one business day

• The BLM will provide a Google Earth image of the site (Old Woman’s Peak)

• To provide unlimited access to communications shelter / vault for project work during normal business hours

Administrative Matters

Locations

Pickup Site Information:

Riverside Radio Shop Two Bay Micro Site Pickup Location:

USFS Research Lab

4955 Canyon Crest Drive

Riverside, CA 92507

County: Riverside

Drop Off / Site Information:

Old Woman’s Peak (No Physical Address)

Site Size: 2-bay micro site with 20’ Tower

GPS: Latitude: 34° 33’ 29.9" N Longitude: 115° 11' 23.1" W

Elevation: 5225' (approximate)

City: Essex, CA

County: San Bernardino

Communications

“Time” for communications received after 3:00pm, after 12:00 pm locally on Fridays, or after

12:00 pm locally prior to a holiday will not start until the next business day. All times are local

Pacific Standard Time.

The following Federal Holidays are observed

Wednesday, January 01 New Year’s Day

Monday, January 20 Birthday of Martin Luther King, Jr.

Monday, January 20 * Inauguration Day

Monday, February 17 ** Washington’s Birthday

Monday, May 26 Memorial Day

Thursday, June 19 Juneteenth National Independence Day

Friday, July 04 Independence Day

Monday, September 01 Labor Day

Monday, October 13 Columbus Day

Tuesday, November 11 Veterans Day

Thursday, November 27 Thanksgiving Day

Thursday, December 25 Christmas Day

Additional Information

Government Furnished Equipment

2-bay Micro site Pepro and site accessories (Ballast Boxes, Solar Panels, concrete pads

(Concrete pads are not bolted to the ground) , solar bracket, 20’ tower, etc.)

Link FOR REFERENCE ONLY to PEPRO, LLC http://www.peprollc.com/ http://www.peprollc.com/

Aluminum Enclosure

A. Uni-Body Aluminum Enclosure

1. Material:

a. Wall, Roof, & Floor Sheathing: 3/16" Aluminum- 5052

b. Wall & Roof Studs: 2x2x0.25 Aluminum Tube- 6061 & 3x2x0.25 Aluminum

Tube- 6061

c. Floor Supports: I3x2.59 Aluminum I-Beam- 6061D.

B. Finish:

1. Exterior: 3/16" Aluminum with UV resistant Primer & Paint

2. Interior: Walls and Ceiling: 1/16”” FRP Paneling

C. Cabinet Exterior Color: The cabinet’s exterior color shall be PEPRO Clay

Weights

Enclosure: ≈ 900 lbs

20ft Tower Assembly: ≈ 1580 lbs

Tower Platform: ≈ 620 lbs

(8) Outriggers: ≈ 1096 lbs

(16) Ballast Baskets: ≈ 1600 lbs

(4) Concrete Pad: ≈ 880 lbs

Solar Bracket (Unistrut): ≈ 200 lbs

(4) Antenna Stand Offs: ≈ 100 lbs

Total shelter / vault Weight ≈ 4,400 lbs (Approximate)

*** Please review the attached 2-bay micro site for more information. ***

****Note: The Pepro shelter / vault is a unique patented system that does not require the ground to be disturbed at all. The self-contained shielded enclosure that sits on concrete pads placed on the ground. ****

Solar Panel Information Manufacturer: Renogy Size: 26.5 X 65

Model: RSP200D

Weight: 26.46lb (Approx)

*** Please review the attached RSP200D Spec Sheet for more information. ***

Final Inspection and Acceptance Criteria

1. Inspection Authority:

The Government reserves the right to conduct inspections and site visits during and after the performance of maintenance work to ensure compliance with contract requirements.

2. Demonstration Requirements:

The contractor must demonstrate, at a minimum, the following during the final inspection:

▪ Professional Inspection: All equipment and systems must be inspected and verified in a manner consistent with industry standards and applicable regulations.

▪ Equipment Accountability: Any BLM equipment that has been removed must be accounted for and placed together as designated by BLM at each site.

▪ Site Cleanliness: The work site must be clean and free of contractor debris and materials upon completion of the work.

3. Final Acceptance:

Final acceptance by the Government will only occur after:

▪ The satisfactory completion of all inspections and assessments of the facilities and their systems.

▪ Successful testing and reporting of the systems.

▪ Fulfillment of all other requirements outlined in the Performance Work

Statement (PWS).

4. Documentation:

The contractor must provide all necessary documentation related to inspections, testing results, and any corrective actions taken during the process.

Photo Documentation Requirements

• Contractor must provide clear, high-resolution digital photographs of the shelter/vault after installation.

• Images must show all four sides of the shelter/vault from appropriate distances and angles.

• Images must show inside of shelter

• Images must show any grounding done to shelter.

• Ensure the site is free from obstructions in each photo (e.g., tools, vehicles, people).

• Use a camera or smartphone with a minimum 12MP resolution to capture detail.

• Images must be well-lit, in focus, and free from motion blur or glare.

• The contractor must avoid digital zoom. Physically move closer if necessary.

• Additional photos must include:

- Solar panel installation

- Tower erection

- Any identifying features or serial numbers on installed equipment

• Submit images in .JPG or .PNG format.

• Label all photos clearly and email them to drcarter@blm.gov and sstrizhevsky@blm.gov within 5 business days of installation completion.

Warranty & Guarantee The contractor shall guarantee that all inspected parts, components, and systems meet the minimum requirements and specifications outlined in this document, unless explicitly noted otherwise in the contractor’s reports.

1. Coverage:

The warranty shall cover all materials and workmanship associated with the removal and relocation of any maintenance performed during the contract period.

2. Duration:

The warranty period shall be defined and communicated clearly to the

Government at the time of project completion.

3. Exclusions:

Any exclusions or limitations to the warranty must be explicitly detailed in the contractor’s reports and communicated to the Government prior to acceptance.

4. Remedies:

If any parts, components, or systems fail to meet the specified requirements during the warranty period, the contractor shall be responsible for:

▪ Promptly addressing and rectifying the issues at no additional cost to the

Government.

▪ Providing any necessary replacements or repairs to ensure compliance with specifications.

5. Documentation:

The contractor shall provide documentation of the warranty terms, including any specific conditions, duration, and process for claiming warranty coverage.

BLM TELECOMMUNICATIONS (TELECOM) STAFF

No questions will be directed to the BLM Radio Staff until after the contract has been awarded.

All inquiries prior to the solicitation must go through the contracting officer or contract specialist assigned to the requirement.

Stanislav “Stan” Strizhevsky (Primary Contact) - 530-310-3535 Cell

Email: sstrizhevsky@blm.gov

Jacob West (Secondary Point of Contact) – 951-214-9050 Cell

Email: jwest@blm.gov

Douglas Carter (Final Report Only) -951-202-1497 Cell

Email: drcarter@blm.gov

DEFINITIONS

A. Government - For the purposes of this section, Government refers to the Contracting

Officer (CO) or the Contracting Officer’s Technical Representative (COTR).

B. Ballast - heavy material, such as gravel, sand, iron, or lead, placed low on the side of the box(es) to improve the shelter / vault stability

C. Contractor - A company contracted by the Government to complete the relocation of a shelter / vault.

D. Government Furnished Equipment (GFE) – equipment/property owned by the government and delivered to or made available to a contractor.

E. Shelter / Vault – Pepro Two Bay Micro site

Performance Requirements Summary (PRS)

Work Tasks to be Performed

Acceptable Quality

Level

Method of

Surveillance

Consequences, Remedies, and/or

Deduction(s)

Task(s) 1-37

No more than 1 unsatisfactory inspection result per week.

The COR or another

Government

Representative will inspect the facilities in-person at the prior to moving equipment and afterwards.

For 1 unsatisfactory inspection, the COR will document this and inform the Contractor what must be improved.

For 2 unsatisfactory inspections, a

5% deduction from the invoice for that Period of Performance.

For 3 unsatisfactory inspections, a

10% deduction.

mailto:jwest@blm.gov

Existing Site Photos

Existing Site Photos Continued

Bay 2

10 9 8 7 6 5 4 3 2 1

Enclosure Wgt: ~900 lbs 20ft Tower Assembly Wgt: ~200 lbs Tower Platform Wgt: ~620 lbs

(16) Steel Ballast Plate Wgt: ~1600 lbs

H (4) Concrete Pad Wgt: ~880 lbs Solar Bracket Wgt: ~200 lbs Total Site Weight: ~4400 lbs

Installation of antennas, solar panels, or any other equipment to the outside of the enclosure shall be followed up with a structural analysis to verify the overall stability of the system from overturning.

Jack footing to be placed on and anchored to PEPRO supplied concrete pad (P/N 670-0071) or equivalent.

A. Protection Shelter:

All PEPRO shelters feature our Faraday Cage Technology. Protects against EMP & Reduces PIM. This product is covered under patents #5,749,178 - #7,046,521 - #7,385,147 - #7,688,595.

Technical Specifications| Independent Laboratory-Tested Protection Levels RFI: 70dB rating from 20MHz to 3.29 GHz EMI: 40dB Magnetic Field Lightning: 1MV; 82KA Direct strike on enclosure with less than 10 mirco-joules penetration inside.

B. Uni-Body Aluminum Enclosure

132"

126"

H

G Passive Air

Exhaust

Material:

- Wall, Roof, & Floor Sheathing: 3/16" Aluminum- 5052

- Wall & Roof Studs: 2x2x0.25 Aluminum Tube- 6061 & 3x2x0.25 Aluminum Tube- 6061

- Floor Supports: I3x2.59 Aluminum I-Beam- 6061

C. Finish Exterior:

- All outside surfaces: UV resistant Primer & Paint - PEPRO Clay

Interior:

- Walls & Ceiling: 1/16" FRP Paneling

F Insulation:

- Walls & Ceiling: R-13 Foil faced Foam Board Insulation

D. Door & Openings Door:

- CLP Doors: (4) 23 3/4" x 49 3/16" (opening) - 3/16" Aluminum - 5052, R-13 Insulation, Adjustable and Lockable Bar Lock

Cable Entry :

- (5) 3 1/2" Cable Entry Ports that fit PEPRO Shielding Cable Entry Glands and/or PEPRO Telecom Entry Enclosure

Intake

Shielded

Power Entry

Bay 1

Battery

Bay 2

Cable Entry

F

Shielded Gland:

- (1) Shielded RF Cable Entry Gland.

- (4) Blank Cable Entry Gland Covers.

E. Electrical Power Service:

- MU-80 shielded Power Entry Enclosure w/ (4) 100amp filters

Surge Suppression:

- (2)12VDC Surge Suppressor

Solar Package:

- (2) 140W Solar Panels

- (1) 60Amp Charge Controller

- (1) 12V 183Ah Gel Cell Battery

F. Heating/Ventilation

- Passive Air

H. Grounding

- PEPRO's Patented Faraday Cage design

D

- EGB

I. Anchoring

- Ufer grounding pads

20ft Tower

TOP VIEW

(Roof not shown)

E x2 Surge

Suppressors D x4 100A Filters

C x2 140W Solar Panels

C

Shielded Power

B

Intake

Charge Controller (Mounted to inside wall) x16 Ballast Plates

(4) each corner

Concrete Ufer Ground Pads

Bay 1

19" Rack

19" Rack Cable

Exhaust

MATERIAL:

DRAWN BY: GR

DATE: 10/03/2018

B

UNLESS OTHERWISE SPECIFIED:

DIMENSIONS ARE IN INCHES

TOLERANCES:

FRACTIONAL 1/8

PROPRIETARY AND CONFIDENTIAL TWO PLACE DECIMAL .01

THREE PLACE DECIMAL .005

TITLE: 2-Bay Micro Solar BLM

12V 185Ah

G

E

A 96" Gel Cell Battery

132" Tower Ground Bar

THE INFORMATION CONTAINED IN THIS

DRAWING IS THE SOLE PROPERTY OF

PEPRO LLC. ANY REPRODUCTION IN

PART OR AS A WHOLE WITHOUT THE

WRITTEN PERMISSION OF PEPRO LLC. IS

ANGULAR: MACH 0.5 STRUCT 1

C

SIZE DWG. NO

04-0303

REV

A

10 9 8 7 6

PROHIBITED.

5 4 3

SCALE: 1:50

WEIGHT: SHEET 1 OF 1

I 11

1'I''

I I 11..

I I

I lllilENOGY

1 ..

,1-. 1 .1.1.

9 ,,. .

-1il _

1 1

11 _

1 I 11

I i I

11' I

I. I I

--�', I 1 ' l-11 ! I Ii · ............................................... ""ILi!

RSP200D

200W Monocrystalline Solar Panel

Key Features Sleek desgn and a durable frame, the Renogy

200 Watt 12 Volt Monocrystalline Panel provides you with the highest efficiency per area and is the perfect item for off-grid applications.

• High module conversion efficiency

• Top ranked PTC rating

• Quick and inexpensive mounting

• 100% EL testing on all Renogy modules

• No hot spots guaranteed

Potential Uses

The Renogy 200 Watt Monocrystalline Panel can be used in various off-grid applications that include 12 and 24 volts arrays, water pumping systems, signaling systems and other off-grid applications.

Power Output Warranty

@ Material and Workmanship Warranty

Renogy I www.renogy.com I support@renogy.com IT: 909-287-7111

5050 S. Archibald Ave, Ontario, CA 91762 http://www.renogy.com/ mailto:support@renogy.com

IP Rating IP 67 Temperature Coefficient of Isc 0.048%/ºC

Maximum AWG Size Range 10 AWG Temperature Coefficient of Pmax -0.37%/ºC

Solar Cell Type Monocrystalline (6.25 x 6.25in)

Operating Module Temperature -40ºC to +80ºC Rated Current 30A

RSP200D

200W Monocrystalline Solar Panel

Electrical Data Mechanical Data

Open Circuit Voltage (V ) 27 V Number of Cells 40 (4 x 10)

Optimum Operating Voltage (Vmp) 22.6 V Weight 12 kg / 26.46 lb

Module Efficency 18.1% Frame Anodized Aluminium Alloy

Maximum Series Fuse Rating 15 A Fire Rating Class C

Thermal Characteristics MC4 Connectors

Nominal Operating Cell Temerature (NOCT) 47±2ºC Maximum Voltage 1000VDC

Temperature Coefficient of Voc -0.28%/ºC Temperature Range -40ºF to 194ºF

Junction Box

Diode Type HY 10SQ050

Output Cables 14 AWG (2.95 ft long)

Module Diagram

Certifications

IV-Curve

RSP200D Characteristics Versus Voltage

Voltage (V)

*All specifications and data described in this data sheet are tested under Standard Test Conditions (STC - Irradiance: 1000W/m2 , Temperature: 25 ºC, Air Mass: 1.5) and may deviate marginally from actual values. Renogy and any of its affiliates has reserved the right to make any modifications to the information on this data sheet without notice. It is our goal to supply our customers with the most recent information regarding our products. These data sheets can be found in the downloads section of our website, www.renogy.com

Number of Diodes 2 Diode(s)

IP Rating IP 65

Connectors MC4 Connectors Maximum System Voltage 600 VDC UL

Front Glass Tempered Glass 0.13 in (3.2 mm) Optimum Operating Current (Imp) 8.85 A

Dimensions 1650 x 670 x 35 mm / 64.96 x 26.38 x 1.38 in Short Circuit Current (Isc) 9.66 A

Maximum Power at STC 200 W

C u rr e n t (A

P o w e r (W oc

Renogy I www.renogy.com I support@renogy.com IT: 909-287-7111

5050 S. Archibald Ave, Ontario, CA 91762 mailto:support@renogy.com

File details come from the government source that posted it. Updated .