B08_Attachment_1_Epoxy_Floor_SOW_A3_Wet_Lab.docx

DOCX document 58 KB Posted

Attached to
CERC A3 Epoxy Floor Finish Federal contract opportunity
Solicitation number
140G0122Q0157
Issued by
Department of the Interior US Geological Survey Office of Acquisitions and Grants

View the file

Other files for this federal contract opportunity

Other files attached to CERC A3 Epoxy Floor Finish, newest first.
File Type Posted
B08_Attachment_6_Payroll_WH-347.pdf PDF
B08_Attachment_2_Epoxy_Floor_Plan_Marked_Yellow.pdf PDF
B08_Attachment_5_Form_DI-137_Release_of_Claims.pdf PDF
B08_Attachment_4_Statement_and_Acknowledgement_of_Subcontractor_SF1413-13e.pdf PDF
B08_Attachment_3__WD_MO20220036.pdf PDF
Sol_140G0122Q0157.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

U. S. GEOLOGICAL SURVEY

Columbia Environmental Research Center (CERC) 4200 New Haven Road Columbia, Missouri 65201

Statement of Work CERC Epoxy Floor Finishing

1. General Information.

a. Background. The Columbia Environmental Research Center (CERC), located at 4200 New Haven Road in Columbia Missouri, conducts research needed to address national and international environmental contaminant issues and effects of habitat alterations on aquatic and terrestrial ecosystems. The A3 Main Building at the CERC is a 34,019 square foot research laboratory building that houses several research laboratories, office space, and a 6,000 square foot research wet laboratory.

b. Applicable Documents.

i. Attachment 2 Epoxy Floor Plan Marked Yellow

c. Scope. USGS-CERC requires refinished concrete flooring for the footprint of the main building’s wet lab. The existing floor is concrete with grating over piping raceways. A 100% solids epoxy coating is required.

2. Work Requirements.

a. Technical Requirements.

i. Refinish existing concrete floor area 56’ x 40’ and 25’x15’ (nominally 2,615 square feet).

1. Reference Epoxy Floor Plan Attachment 2 for area marked in yellow.

ii. Floor is crossed by several grates that must be maintained intact and operable.

iii. Floor will need to be prepped by shot blasting to remove all residue. Epoxy filler will be required to level, fill cracks and some holes per manufactured specifications. Grinding may be needed to level and prepare the surface.

iv. Epoxy Topping will be a trowel-applied Low VOC flooring system consisting of 100% solids epoxy resin and selected aggregates providing heavy-duty protection at 3/16″-1/4″ (up to any) thickness.

1. Designed for heavy-duty industrial use

2. High impact, wear and thermal shock resistance

3. Solution for resurfacing damaged or spalled floors

4. None slip additive

v. Prep work must apply efforts to minimize dust production.

3. Supporting Information.

a. Place of Performance: CERC, 4200 New Haven Road, Columbia, Missouri 65201

b. Period of Performance: 45 days from award date

c. Government Furnished Property (GFP): None

d. Special Considerations:

i. The CERC normal facility business hours are 7:00 AM to 4:30 PM, Monday thru Friday.

ii. Utility/Service Interruptions: The Contracting Officer Representative (COR) shall be notified not less than 3 calendar days in advance of any interruptions of building utility/services. The contractor shall describe in writing the work to be done and the time and duration of the interruption. No work shall be done until approval is received from the COR.

iii. The contractor shall be responsible for complying with all National, Federal, State and local laws, codes and regulations in connection with the execution of the work.

iv. Contractor is responsible for visiting the worksite to verify measurements and to ascertain the nature and location of the work to be performed and the general and local conditions which can affect the work or the cost thereof. Failure to do so will not relieve the contractor of his responsibility for estimating properly the difficulty or cost of successfully performing the work.

v. Occupancy: During construction the Government will occupy the existing facility. The contractor shall not restrict nearby pedestrian or vehicular traffic to this facility and shall coordinate construction with the Contracting Officer to minimize conflicts and to facilitate usage. The contractor shall perform the work so as not to interfere with ongoing operations.

vi. Any changes affecting the scope of work shall be originated from and approved by the Contracting Officer.

vii. All materials and workmanship shall be subject to the inspection and approval of the Project Manager. All work unsatisfactorily performed shall be promptly corrected and made acceptable to the Government at no additional Cost.

viii. Final inspection and acceptance shall be performed with the contractor and COR upon completion of job performance.

ix. MATERIALS. The contractor shall furnish all supplies, materials, and equipment necessary for performance of the work included in this contract unless otherwise specified. Materials and supplies to be used shall be commercially available products of reputable manufacturers or suppliers and shall be of a quality to conform to applicable Federal Specifications.

x. SPECIFICATIONS. In any case of discrepancy in the specifications, the matter shall be immediately submitted to the Contracting Officer, without whose decision said discrepancy shall not be adjusted by the Contractor, save only at his own risk and expense. Any changes affecting the scope of the work shall originate from and be approved by the Contracting Officer.

xi. SCHEDULING CONTRACT WORK. The contractor shall schedule work with the COR. There shall be a minimum amount of interference with government activities at the site.

xii. USE OF BUILDING FACILITIES. The contractor may use utility services and toilet facilities of the building subject to approval of the COR.

xiii. CONDITIONS AFFECTING THE WORK. It will be the responsibility of the contractor to inspect the site, determine quality of work involved. Compare the specifications with the work to be done, and inform themselves as to all conditions, including other work, if any, being performed. Failure to do so will in no way relieve the successful contractor from the necessity of furnishing any materials or performing any work that may be required to carry out the contract in accordance with the true intent and meaning of the specifications without additional cost to the Government.

xiv. EMPLOYEES. The contractor shall be responsible at all times for the supervision and control of the employees that may be assigned to render services under the contract. Fully qualified work personnel shall be available for work on the date this purchase order begins and shall be maintained throughout the period of performance.

xv. LICENSES-PERMITS. The contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses or permits, and for complying with any Federal, State, and Municipal laws, codes and regulations in connection with the execution of the work.

xvi. ACCIDENT PREVENTION AND FIRE HAZARDS. The contractor shall take all necessary precautions to prevent fires or injury to the public, building occupant(s), or damage to property of others during the performance of this contract. For the purpose of this contract, the public or building occupant shall include all persons not employed by the contractor or a subcontractor working under his/her direction. If welding is required, permission shall be obtained from the Project Manager.