B08 Attachment 04 Inks Kettles 8 9 Bid Sched.pdf

PDF 69 KB Posted

Attached to
TX-INKS DAM NFH-REPLACE KETTLES 8 & 9 Federal contract opportunity
Solicitation number
140F0121R0036
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This document contains a bid schedule for replacing kettles 8 and 9 at the Inks Dam National Fish Hatchery. The bid schedule lists estimated quantities and unit costs for various construction items needed to replace the kettles, including demolition of existing structures, excavation and grading, concrete work, installation of PVC pipes and valves, construction of sluice gates, metal grating, guard rails, and materials testing. Bidders are instructed to take off quantities from project drawings and specifications. The related federal contract opportunity notices a solicitation to replace kettles 8 and 9 at the Inks Dam NFH issued by the U.S. Department of the Interior Fish and Wildlife Service.

View the file

Other files for this federal contract opportunity

Other files attached to TX-INKS DAM NFH-REPLACE KETTLES 8 & 9, newest first.
File Type Posted
Sol_140F0121R0036_Amd_0001.pdf PDF
Sol_140F0121R0036.pdf PDF
B03 Attachment 05 DOL Wage TX20210087 Heavy.pdf PDF
B08 Attachment 03 Past Performance Questionnaire InksKettles.docx DOCX document
A06 Attachment 02 Inks Replace Kettles 8 9 Drawings .pdf PDF
A04 Attachment 01 Inks Replace Kettles 8 9 Specs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

ITEM

NO. COST ITEMS

ESTIMATED

QUANTITY UNIT UNIT PRICE

ESTIMATED

AMOUNT

1 Mobilization & Demobilization Job -$ 2 Demolition Existing Kettles Hrs -$ 3 Excavate & Grade CY -$ 4 Compact Subgrade SF -$ 5 Concrete, including thrust blocks & deadmen CY -$ 6 12" PVC Drain Pipe LF -$ 7 Connect Drain Pipe to Existing Job -$ 8 8" PVC Supply Pipes LF -$ 9 Connect Supply Pipe to Existing Job -$ 10 Pressure test pipes Job -$ 11 8" Supply Valves, Butterfly & Gate Ea -$ 12 Sluice Gate Assembly, 12" Ea -$ 13 Screens SF -$ 14 Stop Logs - Not in Contract 0 SF -$ 15 Metal Grating SF -$ 16 Guard Rails/fence LF -$ 17 Materials Testing Days -$ 18 Haul Excess Material CY -$ 19 Reattach Liner - No liner - Not Needed 0 Hrs -$

Subtotal -$

OH&P -$

Bonds & Insurance -$

BASE BID TOTAL -$

INKS DAM NFH - KETTLES 8 & 9

Contractor shall take off quantities from drawings and specifications.

File details come from the government source that posted it. Updated .