B08_Attachment_02_Specifications_PORE_Lumber.pdf
PDF 238 KB Posted
- Solicitation number
- 140P8425Q0054
About this file
This document is a Supply Specifications solicitation from the National Park Service for Point Reyes National Seashore (PORE), seeking a vendor to supply and deliver specific lumber and hardware materials. The procurement includes 12 line items encompassing cedar split posts and rails, dimensional lumber of various specifications (Douglas Fir), hardware components like Simpson hangers and angles, rebar, lag screws, nails, and ready-mix concrete, totaling approximately 250 individual pieces/units.
The materials will be used for boardwalk, fencing, and trail puncheon projects at three specific locations: Sea Lion Overlook Split Rail Fence, Estero Trail Boardwalk Replacement, and Abbotts Lagoon Trail Reconstruction. Delivery is required to the Roads and Trails equipment yard at 1 Bear Valley Rd, Point Reyes Station, CA, with strict delivery parameters: Monday through Thursday between 6:30 AM and 4:00 PM PT, with load weight restrictions of 6,020 lbs at 24" center load height. The anticipated delivery timeframe spans from the time of award through December 30, 2025, with specific delivery dates to be coordinated post-award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
NATIONAL PARK SERVICE
CONTRACTING OPERATIONS - WEST
1849 C Street
NW Washington, DC 20240
Supply and Delivery Specified Lumber/hardware
Point Reyes National Seashore 1 Bear Valley Rd, R&T Equipment Yard
Point Reyes Station Ca, 94956 Solicitation #140P8425Q0054
Supply Specifications
Introduction Point Reyes National Seashore (PORE), a division of the National Park Service, requires a vendor to supply and deliver specified lumber and Hardware. The materials provided will be utilized in Boardwalks, fencing & trail puncheons.
Objective The vendor shall supply and deliver the specified lumber to the designated location. Delivery and offloading schedules must be coordinated with the Contracting Officer (CO) or Contracting Officer's Representative (COR).
Lumber Specifications The vendor is required to supply the following lumber:
line Item material QTY Needed
Lumber/Hardware
50 Split Posts, 130 Split Rails (cedar) (*See note below)
2 8”x12”x20’ DF #1 RGH ACZA .6 INCISED 10
3 2”x6”x10’ #1 DF .60 PT (Cross supports 8
4 3”x12”x6’ #1 DFDF #1 RGH ACZA .6 INCISD 94
5 4"x4"x20' #1DF .60 PT 8
6 Simpson adjustable U hangers LSSU28Z 16
7 Simpson HL – HEAVY ANGLES HL55HDG 20
8 Rebar 1/2x20' 20
9 1/2"x2" HDG lag screws 160
10 10D x 1-1/2" HDG hangers nails 5lb box 1
11 Ready mix concrete bags 60lb 120
12 Delivery 1
*Note: Sea Lion Overlook Split Rail Fence Replacement Project Suppled with- 50, 6' long by approximately 20" in circumference cedar split fence posts, un-notched and 130, 10' long by 13" in circumference cedar split fence rails, un-notched.
Estero Trail: Boardwalk Replacement Project dimensional lumber and Hardware Abbotts Lagoon Trail: Reconstruction Project & (Boardwalk) dimensional lumber and Hardware
Deliver to R&T Yard, 1 Bear Valley Rd, Point Reyes Station, CA 94956 Deliveries accepted Monday through Thursday, 6:30AM -4:00PM PT.
Place and Delivery Dates All materials supplied by the vendor shall be delivered to the designated drop location within PORE.
The anticipated Delivery Dates shall commence and be completed between the Time of Award and December 30, 2025. Delivery dates and times will be provided to the vendor post-award.
Delivery Locations The vendor shall deliver the specified quantity of material to the following specified location within the coordinated delivery date and time:
Drop Location Coordinates (Lat /Long)
Roads and Trails equipment yard - 38° 2'43.36"N / 122°48'1.59"W
Hauling Restrictions The vendor shall comply with all legal load restrictions in the hauling of materials.
Requirements and Limitations
• Deliveries shall occur during normal business hours: Monday – Thursday, between the hours of 0630-1600 PT.
• Loads will be split into sections weighing > max capacity of 6,020 lbs at 24" center load height
Prevention of Invasive Species Introduction For equipment.
Government-Furnished Property No Government-furnished property will be provided to the contractor for this project.
Contacts Shawn Maloney, COR Brady Greene– Field Inspector Trails Supervisor Trails Maintenance Worker shawn_maloney@nps.gov brady_greene@nps.gov
(415) 464-5154 (415) 464-5242 mailto:shawn_maloney@nps.gov mailto:brady_greene@nps.gov
File details come from the government source that posted it. Updated .