B08 - ATTACHMENT 001 SOW_MPLF VACUUM TUBE.pdf

PDF 99 KB Posted

Attached to
Vacuum Fill Chambers Federal contract opportunity
Solicitation number
W52P1J-22-Q-3051
Issued by
Department of the Army Materiel Command Joint Munitions Command

About this file

This statement of work outlines requirements for eight vacuum chamber tubes to be manufactured for the Joint Munitions Command at McAlester Army Ammunition Plant. The aluminum tubes must achieve and maintain 28.5 inches of mercury vacuum for 10 minutes when assembled, with inside diameters of 58.13 inches and overall lengths of 194.5 inches without lids. Technical drawings must be submitted for approval within four weeks of award. The contractor will deliver the tubes along with operational, maintenance, and parts manuals in hard copy and electronic PDF or Word format. The contractor will also be responsible for transport and delivery to the McAlester Army Ammunition Plant in Oklahoma.

View the file

Other files for this federal contract opportunity

Other files attached to Vacuum Fill Chambers, newest first.
File Type Posted
B08 - Amendment 0001 Solicitatoin W52P1J-22-Q-3051.pdf PDF
B08 - ATTACHMENT 002 MPLF VACUUM TUBE_SK1477.pdf PDF
B08 - SOLICITATION W52P1J-22-Q-3051 Vacuum Fill Tubes FINAL.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW MCAAP Vacuum Chamber 2 June 2022

Statement of Work for MPLF Vacuum Chamber Tube

Scope

The following document provides the general requirements and design specifications for each vacuum chamber tube. Reference MCAAP Drawing SK1477. Quantity: 8

General Requirements

A. Must achieve and hold 28.5 in/HG of vacuum for 10 minutes when welded and assembled.

B. 58.13" inside minimum diameter.

C. 194.5" inside overall length without lid (chamber).

D. Lid must attach to vacuum tube using stainless steel 300 series swing bolts, handles and lifting eyelets (chamber lid). Swing bolts shall be adequate to maintain vacuum.

E. Aluminum construction on tube & lid.

F. 3/8" minimum material thickness on all components unless otherwise specified on drawing.

G. Lifting eyelets (qty. 6, equally spaced) around vacuum tube opening 48” down to support weight of vacuum tube.

H. (Qty. 6 equally spaced) 4"' x 4" x ½" thick tab welded around tube opening.

I. Build a polycarbonate fill plate to fit in the 24" diameter hole. 1/4" Viton O‐ring seals (fill plate).

J. Preliminary approval/technical drawings are required for approval prior to award. Build drawings to be submitted for approval within 4 weeks of award, including pressure summary, thickness summary, weight summary & vacuum summary (required).

K. Vacuum lid to meet diameters and heights specified on drawing, material thickness is determined by designer.

L. 40,000 lbs. will be applied to the bottom of vacuum chamber, MCAAP will supply the support structure underneath the tube.

M. Manufacture one fill plate per tube.

N. The contractor shall furnish under this purchase description two (2) sets of operational, maintenance, and parts manuals as necessitated by the equipment. The manuals shall be specific (not canned statements about the system in general) to the system supplied. There shall be a brief description concerning the purpose of the specific equipment supplied and the rated operating capacities. The manuals shall contain a complete parts list to include (at minimum) all information necessary (manufacturer's name, address, phone number, P/N, S/N, size, model number, type, etc.) to re‐order the part if necessary. The manuals shall include all preventative maintenance procedures/schedules specific the equipment supplied. These manuals shall be applicable to the equipment provided only and shall include all safety precautions/warnings associated with the operation. All manuals shall be authorized for reproduction and distribution to end users of the equipment. One set of hard copy versions of the manuals shall be provided with the equipment. One (1) set of the manuals shall be electronic in form (on cd) and must be capable of being read in either a “.pdf'" or a "'.doc" format.

O. 30%,60%,90% design/progress review required. JMMC‐OMP will validate and verify equipment before award is granted.

P. Contractor will be responsible for all transport and delivery to MCAAP in McAlester, OK.