B08_Attachment 0002_Price Matrix.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Maintenance and Repair of Manufacturing Equipment and Systems Used in Explosive and Non-Explosive Operational Environments
Solicitation number
W519TC-25-Q-MESE_V2
Issued by

About this file

This file is a Price Matrix Excel spreadsheet for a federal contract opportunity at Crane Army Ammunition Activity for maintenance and repair of manufacturing equipment. The solicitation (W519TC-25-Q-MESE) covers preventative maintenance and emergency repairs for multiple pieces of equipment across five contract periods, including a base year and four option years. Equipment includes various industrial machinery such as lathes, robots, CNC mills, waterjet machines, robotic welders, surface grinders, and specialized equipment like hazardous waste incinerators.

The contract uses Firm Fixed Price (FFP) and Not Separately Priced (NSP) contract line items (CLINs) for quarterly, semi-annual, and annual preventative maintenance and emergency repairs. The maintenance schedule covers 35+ different types of manufacturing and industrial equipment used in explosive and non-explosive operational environments. The NAICS code is 811310 with a small business size standard of $12,500,000, and vendors must be registered in the System for Award Management (SAM). The solicitation is issued by the Department of the Army Materiel Command Contracting Command Rock Island Arsenal, with maintenance periods running from date of award for 365 days.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

Crane Army Ammunition Activity
Maintenance and Repair of Manufacturing Equipment and Systems Used in Explosive and Non-Explosive Operational Environments
Contract Number: W519TC-25-Q-MESE
Contractor Name:Contractor NameDenotes Contractor Fill In
Proposal Version:DateFFPFirm Fixed Price
Proposal Date:VersionCRCost Reimburable
NSPNot Separetly Priced
CLIN #TypeCLIN DescriptionBase YearOption Year 1Option Year 2Option Year 3Option Year 4TOTAL
0001FFPQuarterly Preventative Maintenance
0002FFPSemi-Annual Preventative Maintenance
0003FFPAnnual Preventative Maintenance
0004TMEmergency Repair
0005NSPContractor Acquired Property List (CAP)NSP
Total Evaluated Price:$ - 0
**For all FFP CLINS, please provide a breakdown based on each piece of equipment and the Preventative Maintenance associated with that piece of equipment.**

**Blue coded CLINs will not be included in Technical Evaluations. The Government still requests vendors complete these CLINs in full.**

Base year

Crane Army Ammunition Activity
Maintenance and Repair of Manufacturing Equipment and Systems Used in Explosive and Non-Explosive Operational Environments
W519TC-25-Q-MESE
BASE YEAR
Total
QuantityTotal
HoursLabor
RateTotal
PM - Quarterly
Lathe1$ - 0
Robot1$ - 0
Powder Elevator1$ - 0
Total Quarterly Maintenace$ - 0
PM - Semi-Annual
Robomill4$ - 0
Lathe1$ - 0
Robot1$ - 0
Powder Elevator1$ - 0
Metal Detector1$ - 0
Strippit Punch Press1$ - 0
CNC Mill7$ - 0
Waterjet2$ - 0
CNC Fiber Laser1$ - 0
Shear1$ - 0
Finishing Machine1$ - 0
Horizontal Saw1$ - 0
Vertical Brandsaw2$ - 0
Laser Cutting Machine1$ - 0
Burr Masrer Rube Deburring Machine1$ - 0
Heat Treat Oven1$ - 0
Electric Furnace1$ - 0
Robotic Welder1$ - 0
Conventional Lathe2$ - 0
Surface Grinder3$ - 0
Power Press2$ - 0
Inkjet Printer1$ - 0
35 Ton Jack4
Total Semi-Annual Maintenance$ - 0
PM - Annual
Magneformer2$ - 0
Robomill4$ - 0
Lathe1$ - 0
Robot1$ - 0
Waterjet Robot1$ - 0
CNC Lathe7$ - 0
Strippit Punch Press1$ - 0
CNC Mill7$ - 0
Waterjet2$ - 0
Waterjet Intensifier1$ - 0
CNC Fiber Laser1$ - 0
Shear1$ - 0
Press Brake1$ - 0
Finishing Machine1$ - 0
Hydraulic Press2$ - 0
Vertical Bandsaw2$ - 0
Ciruclar Bandsaw1$ - 0
Vertical Saw1$ - 0
Burr Master Tube Deburring Machine1$ - 0
Heat Treat Oven1$ - 0
Electric Furnace1$ - 0
Furnace Box1$ - 0
Circular Saw2$ - 0
Robotic Welder1$ - 0
Conventional Lathe2$ - 0
Surface Grinder3$ - 0
Wire EDM1$ - 0
Drill Press2$ - 0
Hydraulic Draw Press1$ - 0
Hazardous Waste Incinerator - APE 1236
Deactivation Furnace: Annual Calibrations1$ - 0
Hazardous Waste Incinerator - APE 1236 Deactivation Furnace: Annual NFPA 86 Safety Checks1$ - 0
Metal Dector1$ - 0
Discharge Meter2$ - 0
Total Annual Maintenance$ - 0

Base Year Preventative Maintenance Total $ - 0

OY1

Crane Army Ammunition Activity
Maintenance and Repair of Manufacturing Equipment and Systems Used in Explosive and Non-Explosive Operational Environments
W519TC-25-Q-MESE
OPTION YEAR 1
Total
QuantityTotal
HoursLabor
RateTotal
PM - Quarterly
Lathe1$ - 0
Robot1$ - 0
Powder Elevator1$ - 0
Total Quarterly Maintenace$ - 0
PM - Semi-Annual
Robomill4$ - 0
Lathe1$ - 0
Robot1$ - 0
Powder Elevator1$ - 0
Metal Detector1$ - 0
Strippit Punch Press1$ - 0
CNC Mill7$ - 0
Waterjet2$ - 0
CNC Fiber Laser1$ - 0
Shear1$ - 0
Finishing Machine1$ - 0
Horizontal Saw1$ - 0
Vertical Brandsaw2$ - 0
Laser Cutting Machine1$ - 0
Burr Masrer Rube Deburring Machine1$ - 0
Heat Treat Oven1$ - 0
Electric Furnace1$ - 0
Robotic Welder1$ - 0
Conventional Lathe2$ - 0
Surface Grinder3$ - 0
Power Press2$ - 0
Inkjet Printer1$ - 0
Total Semi-Annual Maintenance$ - 0
PM - Annual
Magneformer2$ - 0
Robomill4$ - 0
Lathe1$ - 0
Robot1$ - 0
Waterjet Robot1$ - 0
CNC Lathe7$ - 0
Strippit Punch Press1$ - 0
CNC Mill7$ - 0
Waterjet2$ - 0
Waterjet Intensifier1$ - 0
CNC Fiber Laser1$ - 0
Shear1$ - 0
Press Brake1$ - 0
Finishing Machine1$ - 0
Hydraulic Press2$ - 0
Vertical Bandsaw2$ - 0
Ciruclar Bandsaw1$ - 0
Vertical Saw1$ - 0
Burr Master Tube Deburring Machine1$ - 0
Heat Treat Oven1$ - 0
Electric Furnace1$ - 0
Furnace Box1$ - 0
Circular Saw2$ - 0
Robotic Welder1$ - 0
Conventional Lathe2$ - 0
Surface Grinder3$ - 0
Wire EDM1$ - 0
Drill Press2$ - 0
Hydraulic Draw Press1$ - 0
Hazardous Waste Incinerator - APE 1236
Deactivation Furnace: Annual Calibrations1$ - 0
Hazardous Waste Incinerator - APE 1236 Deactivation Furnace: Annual NFPA 86 Safety Checks1$ - 0
Metal Dector1$ - 0
Discharge Meter2$ - 0
Total Annual Maintenance$ - 0

Base Year Preventative Maintenance Total $ - 0

OY2

Crane Army Ammunition Activity
Maintenance and Repair of Manufacturing Equipment and Systems Used in Explosive and Non-Explosive Operational Environments
W519TC-25-Q-MESE
OPTION YEAR 2
Total
QuantityTotal
HoursLabor
RateTotal
PM - Quarterly
Lathe1$ - 0
Robot1$ - 0
Powder Elevator1$ - 0
Total Quarterly Maintenace$ - 0
PM - Semi-Annual
Robomill4$ - 0
Lathe1$ - 0
Robot1$ - 0
Powder Elevator1$ - 0
Metal Detector1$ - 0
Strippit Punch Press1$ - 0
CNC Mill7$ - 0
Waterjet2$ - 0
CNC Fiber Laser1$ - 0
Shear1$ - 0
Finishing Machine1$ - 0
Horizontal Saw1$ - 0
Vertical Brandsaw2$ - 0
Laser Cutting Machine1$ - 0
Burr Masrer Rube Deburring Machine1$ - 0
Heat Treat Oven1$ - 0
Electric Furnace1$ - 0
Robotic Welder1$ - 0
Conventional Lathe2$ - 0
Surface Grinder3$ - 0
Power Press2$ - 0
Inkjet Printer1$ - 0
Total Semi-Annual Maintenance$ - 0
PM - Annual
Magneformer2$ - 0
Robomill4$ - 0
Lathe1$ - 0
Robot1$ - 0
Waterjet Robot1$ - 0
CNC Lathe7$ - 0
Strippit Punch Press1$ - 0
CNC Mill7$ - 0
Waterjet2$ - 0
Waterjet Intensifier1$ - 0
CNC Fiber Laser1$ - 0
Shear1$ - 0
Press Brake1$ - 0
Finishing Machine1$ - 0
Hydraulic Press2$ - 0
Vertical Bandsaw2$ - 0
Ciruclar Bandsaw1$ - 0
Vertical Saw1$ - 0
Burr Master Tube Deburring Machine1$ - 0
Heat Treat Oven1$ - 0
Electric Furnace1$ - 0
Furnace Box1$ - 0
Circular Saw2$ - 0
Robotic Welder1$ - 0
Conventional Lathe2$ - 0
Surface Grinder3$ - 0
Wire EDM1$ - 0
Drill Press2$ - 0
Hydraulic Draw Press1$ - 0
Hazardous Waste Incinerator - APE 1236
Deactivation Furnace: Annual Calibrations1$ - 0
Hazardous Waste Incinerator - APE 1236 Deactivation Furnace: Annual NFPA 86 Safety Checks1$ - 0
Metal Dector1$ - 0
Discharge Meter2$ - 0
Total Annual Maintenance$ - 0

Base Year Preventative Maintenance Total $ - 0

OY3

Crane Army Ammunition Activity
Maintenance and Repair of Manufacturing Equipment and Systems Used in Explosive and Non-Explosive Operational Environments
W519TC-25-Q-MESE
OPTION YEAR 3
Total
QuantityTotal
HoursLabor
RateTotal
PM - Quarterly
Lathe1$ - 0
Robot1$ - 0
Powder Elevator1$ - 0
Total Quarterly Maintenace$ - 0
PM - Semi-Annual
Robomill4$ - 0
Lathe1$ - 0
Robot1$ - 0
Powder Elevator1$ - 0
Metal Detector1$ - 0
Strippit Punch Press1$ - 0
CNC Mill7$ - 0
Waterjet2$ - 0
CNC Fiber Laser1$ - 0
Shear1$ - 0
Finishing Machine1$ - 0
Horizontal Saw1$ - 0
Vertical Brandsaw2$ - 0
Laser Cutting Machine1$ - 0
Burr Masrer Rube Deburring Machine1$ - 0
Heat Treat Oven1$ - 0
Electric Furnace1$ - 0
Robotic Welder1$ - 0
Conventional Lathe2$ - 0
Surface Grinder3$ - 0
Power Press2$ - 0
Inkjet Printer1$ - 0
Total Semi-Annual Maintenance$ - 0
PM - Annual
Magneformer2$ - 0
Robomill4$ - 0
Lathe1$ - 0
Robot1$ - 0
Waterjet Robot1$ - 0
CNC Lathe7$ - 0
Strippit Punch Press1$ - 0
CNC Mill7$ - 0
Waterjet2$ - 0
Waterjet Intensifier1$ - 0
CNC Fiber Laser1$ - 0
Shear1$ - 0
Press Brake1$ - 0
Finishing Machine1$ - 0
Hydraulic Press2$ - 0
Vertical Bandsaw2$ - 0
Ciruclar Bandsaw1$ - 0
Vertical Saw1$ - 0
Burr Master Tube Deburring Machine1$ - 0
Heat Treat Oven1$ - 0
Electric Furnace1$ - 0
Furnace Box1$ - 0
Circular Saw2$ - 0
Robotic Welder1$ - 0
Conventional Lathe2$ - 0
Surface Grinder3$ - 0
Wire EDM1$ - 0
Drill Press2$ - 0
Hydraulic Draw Press1$ - 0
Hazardous Waste Incinerator - APE 1236
Deactivation Furnace: Annual Calibrations1$ - 0
Hazardous Waste Incinerator - APE 1236 Deactivation Furnace: Annual NFPA 86 Safety Checks1$ - 0
Metal Dector1$ - 0
Discharge Meter2$ - 0
Total Annual Maintenance$ - 0

Base Year Preventative Maintenance Total $ - 0

OY4

Crane Army Ammunition Activity
Maintenance and Repair of Manufacturing Equipment and Systems Used in Explosive and Non-Explosive Operational Environments
W519TC-25-Q-MESE
OPTION YEAR 4
Total
QuantityTotal
HoursLabor
RateTotal
PM - Quarterly
Lathe1$ - 0
Robot1$ - 0
Powder Elevator1$ - 0
Total Quarterly Maintenace$ - 0
PM - Semi-Annual
Robomill4$ - 0
Lathe1$ - 0
Robot1$ - 0
Powder Elevator1$ - 0
Metal Detector1$ - 0
Strippit Punch Press1$ - 0
CNC Mill7$ - 0
Waterjet2$ - 0
CNC Fiber Laser1$ - 0
Shear1$ - 0
Finishing Machine1$ - 0
Horizontal Saw1$ - 0
Vertical Brandsaw2$ - 0
Laser Cutting Machine1$ - 0
Burr Masrer Rube Deburring Machine1$ - 0
Heat Treat Oven1$ - 0
Electric Furnace1$ - 0
Robotic Welder1$ - 0
Conventional Lathe2$ - 0
Surface Grinder3$ - 0
Power Press2$ - 0
Inkjet Printer1$ - 0
Total Semi-Annual Maintenance$ - 0
PM - Annual
Magneformer2$ - 0
Robomill4$ - 0
Lathe1$ - 0
Robot1$ - 0
Waterjet Robot1$ - 0
CNC Lathe7$ - 0
Strippit Punch Press1$ - 0
CNC Mill7$ - 0
Waterjet2$ - 0
Waterjet Intensifier1$ - 0
CNC Fiber Laser1$ - 0
Shear1$ - 0
Press Brake1$ - 0
Finishing Machine1$ - 0
Hydraulic Press2$ - 0
Vertical Bandsaw2$ - 0
Ciruclar Bandsaw1$ - 0
Vertical Saw1$ - 0
Burr Master Tube Deburring Machine1$ - 0
Heat Treat Oven1$ - 0
Electric Furnace1$ - 0
Furnace Box1$ - 0
Circular Saw2$ - 0
Robotic Welder1$ - 0
Conventional Lathe2$ - 0
Surface Grinder3$ - 0
Wire EDM1$ - 0
Drill Press2$ - 0
Hydraulic Draw Press1$ - 0
Hazardous Waste Incinerator - APE 1236
Deactivation Furnace: Annual Calibrations1$ - 0
Hazardous Waste Incinerator - APE 1236 Deactivation Furnace: Annual NFPA 86 Safety Checks1$ - 0
Metal Dector1$ - 0
Discharge Meter2$ - 0
Total Annual Maintenance$ - 0

Base Year Preventative Maintenance Total $ - 0

File details come from the government source that posted it. Updated .