B08_Attach-4_Staff Matrix.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
USACE-Medical Surveillance Services
Solicitation number
W9126G24Q0037
Issued by

About this file

The document provided is a Staff Matrix template for a federal contract opportunity, specifically Solicitation Number W9126G24Q0037 for "USACE-Medical Surveillance Services." The Staff Matrix outlines the proposed personnel, by labor category, required to perform the tasks described in the Performance Work Statement (PWS). The matrix includes the estimated hours per labor category for the base period and option periods, if applicable. The PWS requires the contractor to perform medical testing services for employees at the Piney Woods Projects, including tasks such as medical history questionnaires, physician examinations, laboratory tests, and other medical evaluations. The solicitation is being issued by the Department of the Army Corps of Engineers Engineering District Fort Worth.

View the file

Other files

File Type Posted
B08_24Q0037_Amend0001_Final.pdf PDF
B08_Attach-1_PWS_9Apr2024.pdf PDF
B08_24Q0037_Combined-Synp-Sol.pdf PDF
B08_Attach-2_2015-5279_Rev25.pdf PDF
B08_Attach-3_Bid-Schedule_24Q0037.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Example

STAFF MATRIX EXAMPLE
List the type of personnel proposed, by Specific Task, within the PWS. Include the hours proposed per labor category. If the solicitation contains options, a matrix is required for each period of performance.

Begin with the second tab, identified as "Staff Matrix Base", to create your matrix for the base year. When applicable, prepare tabs for all Options Periods applicable for submission. All cells highlited in YELLOW on this sheet are your responsibility on the subsequent sheets

What is the baseline of hours used for a FTE? 1920

PWS, Specific TasksHours Per
Labor Category
Task #Task NamePMDRNPRNTotal
1.2.1Medical History Questionnaire2020
1.2.2Physician Examination5120134200459
1.2.3Physical & Vital Measurements515001505
1.2.4Laboratory Tests1020002010
1.2.5Electrocardiogram213001302
1.2.6Audiometry (hearing)5400405
1.2.7Spirometry (Pulmonary) Function Test0
1.2.8Chest X-Ray0
1.2.9Vision Testin0
1.2.10Health Profile Report0
0
0

Base Period Totals 47 2120 134 3400 0 5701

Labor Categories
PM=Program Manager
DR=Medical Doctor
NP=Nurse Practitioner
RN=Registered Nurse
LPN=Licensed Practical Nurse
NA=Nurse Aide

Staff Matrix Base

STAFF MATRIX BASE PERIOD
List the type of personnel proposed, by Specific Task, within the PWS. Include the hours proposed per labor category. If the solicitation contains options, a matrix is required for each period of performance.

What is the baseline of hours used for a FTE? 1920

PWS, Specific TasksHours Per
Labor Category
Task #Task NameTotal
0
0
0
0
0
0
0
0
0
0
0
0

Base Period Totals 0 0 0 0 0 0

Labor Categories Labor Categories

Staff Matrix Option 1

STAFF MATRIX OPTION PERIOD 1
List the type of personnel proposed, by Specific Task, within the PWS. Include the hours proposed per labor category. If the solicitation contains options, a matrix is required for each period of performance.

What is the baseline of hours used for a FTE?

PWS, Specific TasksHours Per
Labor Category
Task #Task NameTotal
0
0
0
0
0
0
0
0
0
0
0
0

OY1 Totals 0 0 0 0 0 0

Labor Categories Labor Categories

Staff Matrix Option 2

STAFF MATRIX OPTION PERIOD 2
List the type of personnel proposed, by Specific Task, within the PWS. Include the hours proposed per labor category. If the solicitation contains options, a matrix is required for each period of performance.

What is the baseline of hours used for a FTE?

PWS, Specific TasksHours Per
Labor Category
Task #Task NameTotal
0
0
0
0
0
0
0
0
0
0
0
0

OY2 Totals 0 0 0 0 0 0

Labor Categories Labor Categories

Staff Matrix Option 3

STAFF MATRIX OPTION PERIOD 3
List the type of personnel proposed, by Specific Task, within the PWS. Include the hours proposed per labor category. If the solicitation contains options, a matrix is required for each period of performance.

What is the baseline of hours used for a FTE?

PWS, Specific TasksHours Per
Labor Category
Task #Task NameTotal
0
0
0
0
0
0
0
0
0
0
0
0

OY3 Totals 0 0 0 0 0 0

Labor Categories Labor Categories

Staff Matrix Option 4

STAFF MATRIX OPTION PERIOD 4
List the type of personnel proposed, by Specific Task, within the PWS. Include the hours proposed per labor category. If the solicitation contains options, a matrix is required for each period of performance.

What is the baseline of hours used for a FTE?

PWS, Specific TasksHours Per
Labor Category
Task #Task NameTotal
0
0
0
0
0
0
0
0
0
0
0
0

OY4 Totals 0 0 0 0 0 0

Labor Categories Labor Categories

File details come from the government source that posted it. Updated .