B08-Attach-4-Price_Sheet.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- TX-INKS DAM NFH-SHADE STRUCTURE REHAB Federal contract opportunity
- Solicitation number
- 140FC124R0054
About this file
This document is a price sheet template for RFP 140FC124R0054, which is a solicitation for the INKS DAM NFH Shade Structure Electric Mods in Burnet County, Texas. The price sheet includes the following bid items: new electrical service, electrical equipment and installation, wiring, electrical testing and commissioning, and PV design and installation. The total award price is calculated based on direct costs, indirect costs like mobilization/demobilization, overhead, and insurance, as well as profit. The solicitation is being issued by the U.S. Department of the Interior Fish and Wildlife Service for the rehabilitation of the shade structure at the INKS Dam National Fish Hatchery in Texas.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FC124R0054_Amd_0001.pdf | ||
| B08-Attach-2-Specifcations.pdf | ||
| Sol_140FC124R0054.pdf | ||
| B08-Attach-5_Clauses_and_Evaluation_Factors.pdf | ||
| B08-Attach-1-Drawings.pdf | ||
| B08-Attach-3-DBA_Min__Wage_Rates.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 INKS DAM NFH 2023 Shade Structure Electric Mods Burnet County, TX
| B08-Attach-4-Price Sheet RFP 140FC124R0054 | ||||||
| ITEM | ||||||
| NO. | Direct Cost Bid Item Description | Unit | Est QTY | Unit Price | AMOUNT | |
| 1 | New Elec Service | JOB | $ - | |||
| 2 | Elec Equip & Install: ATS,Trnsfmr, Switches, Panel | JOB | $ - | |||
| 3 | Wiring | JOB | $ - | |||
| 4 | Electrical Testing / Commissioning | JOB | $ - | |||
| 5 | PV Design and Installation | JOB | $ - | |||
| $ - | ||||||
| $ - | ||||||
| $ - | ||||||
| $ - | ||||||
| Direct Cost SUBTOTAL | $ - |
| Indirect Cost Item Description | |||
| M | Mobilization & Demobilization | % | $ - |
| O | Overhead Cost | % | $ - |
| I | Insurance, Payment & Performance bonds | % | $ - |
| Indirect Cost SUBTOTAL | $ - |
| P | Profit | % | $ - |
| Total Award Price | $ - |
File details come from the government source that posted it. Updated .