B08_Attach_2_APPENDIX_1_WTP_Distribution_for_Contract_Operations_3pg.docx

DOCX document 49 KB Posted

Attached to
MORA-MNT- EAST SIDE DAILY WATER OPS
Solicitation number
140P8326Q0039
Issued by

About this file

This document is an appendix containing a Water Treatment Plant (WTP) distribution schedule for contract operations. The appendix outlines the operational framework for managing water treatment and distribution services, likely in support of daily water operations for the East Side area under the National Park Service Alaska Region's jurisdiction. The document specifies distribution protocols, operational parameters, and scheduling requirements necessary for maintaining consistent water service delivery throughout the contracted service period.

The WTP Distribution schedule establishes the procedural and logistical requirements for executing water treatment and delivery functions. It details the distribution mechanisms, frequency of operations, and coordination points necessary to ensure compliance with water quality standards and service level agreements. This appendix serves as a technical reference document for contractors to understand the specific operational demands and scheduling expectations for managing water system operations on a daily basis, supporting the sustained functionality of water infrastructure in the designated service area.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX 1

Water Treatment Plant and Distribution SOW

1. PURPOSE

To provide a complete, unified procedure for operating and maintaining the Sunrise Water Treatment Plant (WTP), including daily operation, monitoring, filter operations, and compliance reporting.

2. HAZARDS & SAFETY PRECAUTIONS

Hazards include chemical exposure (calcium hypochlorite, reagents), environmental hazards (slippery floors, falling snow, visitor traffic), and early season freezing risks. PPE includes gloves, safety glasses, and appropriate protective clothing.

3. REQUIRED TOOLS & EQUIPMENT

Chlorine analyzer, pH meter, SC200/TU5300 turbidimeter (provided), CL-17 analyzer (provided), chlorine crock (provided), and Strainrite filter models: I micron HPM97‑A‑2SS, 5 Micron AR5TP2P-EVP, 10 Micron AR10TP2P-EVP, 25 Micron AR25TP2P-EVP, HPM99‑CC‑2SR, and HPM99CCX2SR (provided).

4. FILTER OPERATIONS

The filter train must be configured as follows: Stage 1 – HPM97‑A‑2SS, AR5TP2P-EVP, AR10TP2P-EVP, AR25TP2P-EVP, Stage 2 – HPM99‑CC‑2SR (Pre‑Crypto), Stage 3 – HPM99CCX2SR (Final Crypto Barrier). Operators must record inlet and outlet pressures daily.

4.1 Differential Pressure Rule

The differential pressure between the Pre‑Crypto (HPM99-CC‑2SR) and the Final Crypto Barrier (HPM99-CCX-2SR) filters must not exceed 25 psi. If differential reaches 25 psi, filters must be replaced immediately. No inspection is allowed once the limit is reached.

4.2 Mandatory Filter Replacement & Documentation

When the 25 psi limit is reached, replace filters: 1) HPM99-CC‑2SR, and 2) HPM99-CCX-2SR. Document the filter change on the State WTP Monthly Report Sheet.

5. DAILY OPERATIONS PROCEDURES

Record treated gallons, chlorine crock levels, inlet/outlet pressures, turbidity readings, and distribution chlorine residuals. Follow DOH requirements for documentation and maintain accurate logs. Log book in the plant must be logged and not be removed.

6. DISTRIBUTION SAMPLING

Collect chlorine samples daily from entry points and rotating distribution locations (refer to the table below for specific sites). Before sampling, flush taps for 10 minutes. Use the chlorine analyzer to measure chlorine levels and record on the State WTP Monthly Report Sheet. At the entry point, also measure and record pH, chlorine, and temperature each day with proper analyzers and meters. Make sure to document the sampling date and all readings on the State WTP Monthly Report Sheet. For Bac-T testing, take samples from the same site as the day's chlorine residual sample. If more than one sample is required in a month, state regulations mandate that they should be spaced throughout the month (See Bac-T monthly sample Schedule below).

Each month, a raw water sample must be collected from either the raw tap or the first filter housing in the plant. It is recommended that this be done with the first distribution sample of the month.

CL2 RESIDUAL SAMPLE LOCATIONS

WR ENT
WRCG
SUNRISE
1
FS 5
D LOOP
LODGE DF
2
W 204
B LOOP
CS
3
FS 2
C LOOP
RS
4
DF
PICNIC
LR UTILITY SINK
5
FS 3
D LOOP
VC DF
6
FS 5
B LOOP
LODGE DF
7
W 204
C LOOP
CS
8
FS 2
PICNIC
RS
9
DF
D LOOP
LR UTILITY SINK
10
FS 3
B LOOP
VC DF
11
FS 5
C LOOP
LODGE DF
12
W 204
PICNIC
CS
13
FS 2
D LOOP
RS
14
DF
B LOOP
LR UTILITY SINK
15
FS 3
C LOOP
VC DF
16
FS 5
PICNIC
LODGE DF
17
W 204
D LOOP
CS
18
FS 2
B LOOP
RS
19
DF
C LOOP
LR UTILITY SINK
20
FS 3
PICNIC
VC DF
21
FS 5
D LOOP
LODGE DF
22
W 204
B LOOP
CS
23
FS 2
C LOOP
RS
24
DF
PICNIC
LR UTILITY SINK
25
FS 3
D LOOP
VC DF
26
FS 5
B LOOP
LODGE DF
27
W 204
C LOOP
CS
28
FS 2
PICNIC
RS
29
DF
D LOOP
LR UTILITY SINK
30
FS 3
B LOOP
VC DF
31
RS
C LOOP
LODGE DF

Bac-T Monthly Sample Schedule

System ID: NP940
System Name: White River Ent.
Transient Non-Community
White River Ent. Test Panel/Analyte
Jun
Jul
Aug
Sept
Oct
Notes:
Coliform routine
2
2
2
2
1
Nitrate
1

Sample when system started

System ID: NP960
System Name: White River CG
Transient Non-Community
White River CG. Test Panel/Analyte
Jun
Jul
Aug
Sept
Oct
Notes:
Coliform routine
2
2
2
2
Nitrate
1
System ID: NP850
System Name: Sunrise
Transient Non-Community
Sunrise Test Panel/Analyte
Jun
Jul
Aug
Sept
Oct
Notes:

Coliform routine

3
3
2
Nitrate
1

7. MONTHLY REPORTING REQUIREMENTS

Complete DOH WTP Monthly Report including turbidity compliance, filter changes, chlorine residual summaries, and CT values. Operator signature required.

File details come from the government source that posted it. Updated .