This document is a set of architectural and engineering drawings for the Replace 1877 Volcano House Fire Suppression System project at Hawaii Volcanoes National Park. The project involves comprehensive renovation of the historic Volcano House structure, including installation of a new automatic wet pipe fire sprinkler system throughout the entire building.

The scope of work requires demolition of the existing fire sprinkler system and installation of new sprinkler heads and piping utilizing existing wall and ceiling openings. The new system must be designed and installed in accordance with NFPA 1 (2021), NFPA 13 (2025), NFPA 70 (2021), Hawaii Revised Statutes Section 132, and Hawaii County Code Chapter 17. The sprinkler design shall use the area/density method for light ordinary hazard occupancy at 1,500 square feet, with a 10% cushion to water supply. All sprinklers must be ordinary temperature quick response type with corrosion-resistant electroless nickel-PTFE coating, except storage rooms which require intermediate temperature sprinklers. The system design is conceptual; the contractor must install in accordance with applicable codes, manufacturer recommendations, and equipment listings. All piping shall be black steel (Schedule 40 for sizes less than 2.5 inches), and all exposed piping and accessories must be painted to match adjacent surfaces. Additional requirements include provision of a pressure relief valve set at 175 PSI, hydrant flow testing to establish baseline water supply parameters, and replacement of portable fire extinguishers with wall-bracket-mounted 10-pound multipurpose dry chemical units. Existing smoke detectors shall remain in service throughout construction.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. 4073

W

N

ARCHITECT

PROFESSIONAL

LICENSED

AH

NELG

A.

,IIA S.

U.

NO

ME. AS

This work was prepared by me or under my supervision and construction of this project will be under my observation.

Signature Expiration Date of the License 4/30/2026

A

C

BD

NORTH

60'0 30'15'

No. 4073

W

N

ARCHITECT

PROFESSIONAL

LICENSED

AH

NELG

A.

,IIA S.

U.

NO

ME. AS

This work was prepared by me or under my supervision and construction of this project will be under my observation.

Signature Expiration Date of the License 4/30/2026

1 WET PIPE FIRE SPRINKLER RISER

PROVIDE 4-WAY SWAY

BRACING AT TOP OF

RISER

ALARM PRESSURE

SWITCH

RETARD CHAMBER

ALARM CHECK VALVE,

ALL ALARM VALVES TO

BE MONITORED WITH

TAMPER SWITCHES

OS&Y CONTROL VALVE

IN WITH TAMPER

SWITCH

FLEXIBLE COUPLING

WITHIN 24" OF TOP AND

BOTTOM OF THE RISER

(TYP)

CONCRETE SLAB

PRESSURE GAUGES

(E) UNDER GROUND

WATER SUPPLY

WATER MOTOR GONG

MOUNTED ON EXTERIOR

OF BUILDING

DRAIN LINE

CHECK VALVE

1" PRESSURE RELIEF VALVE

SET AT 175 PSI

WORK BY FIRE

SPRINKLER

CONTRACTOR

DETAILS

1. PROVIDE AUTOMATIC FIRE SPRINKLER SYSTEM FOR THE ENTIRE BUILDING UNDER

THIS PROJECT SCOPE OF WORK. BUILDING IS TYPE VB CONSTRUCTION.

2. REFERENCES: THE SPRINKLER SYSTEM DESIGN AND INSTALLATION SHALL BE IN

ACCORDANCE

NFPA 1, 2021 EDITION

NFPA 10, 2018 EDITION

NFPA 13, 2025 EDITION

NFPA 54 (NATIONAL FUEL GAS CODE), 2021 EDITION

NFPA 70 (NATIONAL ELECTRICAL CODE), 2021 EDITION

NFPA 101 (LIFE SAFETY CODE), 2024 EDITION

HAWAII REVISED STATUTES (HRS) SECTION 132

HAWAII COUNTY CODE CHAPTER 17 FIRE CODE AMENDMENTS

CURRENT UNIFORM FIRE CODE AS AMENDED BY COUNTY OF HAWAII.

THE CONTRACTOR SHALL COMPLETE ALL WORK IN ACCORDANCE WITH THE LATEST

VERSIONS OF APPLICABLE FEDERAL, STATE, AND LOCAL CODES, STANDARDS, AND

REGULATIONS. PER POLICY MEMORANDUM 23-01 APPROVED ON MAY 9, 2023, THE

NATIONAL PARK SERVICES (NPS) HAS ADOPTED THE INTERNATIONAL CODE

COUNCIL'S (ICC) SUITE OF CODES AND STANDARDS EFFECTIVE JANUARY 1, 2024.

ADDITIONALLY, THE LATEST NFPA 70 (NATIONAL ELECTRIC CODE) IS ALSO ADOPTED

EFFECTIVE JANUARY 1, 2024. ALL WORK SHALL COMPLY WITH THE ICC SUITE OF

CODES AND STANDARDS AND NFPA 70, WHERE APPLICABLE. ADDITIONAL CODES,

STANDARDS, AND REGULATIONS MAY ALSO APPLY. IN THE EVENT OF A CONFLICT

BETWEEN CODES, STANDARDS, REGULATIONS, AND THE CONTRACT DOCUMENTS,

SUBMIT A REQUEST FOR INFORMATION (RFI) WITH CODE REFERENCES / CITATIONS

TO THE CONTRACTING OFFICER FOR A DETERMINATION.

3. ALL DEVICES AND EQUIPMENT SHALL BE UL LISTED OR FM APPROVED.

4. ALL SPRINKLERS SHALL BE ORDINARY TEMPERATURE QUICK RESPONSE TYPE

EXCEPT THE STORAGE ROOMS SHALL BE INTERMEDIATE TEMPERATURE.

5. ALL SPRINKLERS SHALL BE CORROSION RESISTANT WITH ELECTROLESS NICKEL-PTFE

COATING.

6. AUTOMATIC WET PIPE SPRINKLER PROTECTION SHALL BE PROVIDED THROUGHOUT

THE BUILDING, INCLUDING CONCEALED COMBUSTIBLE SPACES ABOVE CEILINGS,

UNDER COMBUSTIBLE STAIRWAYS, ALL COMBUSTIBLE ROOF ASSEMBLIES, COVERED

WALKWAYS OR CANOPY OVERHANGS. REFER TO ARCHITECTURAL DRAWINGS FOR

ELEVATIONS, SECTIONS, CEILING HEIGHTS AND MATERIALS OF CONSTRUCTION.

7. DESIGN WATER SUPPLY: CONTRACTOR TO PERFORM HYDRANT FLOW TEST FROM

EXISTING AREA HYDRANTS TO ESTABLISH A BASELINE FOR EXISTING AVAILABLE

STATIC, RESIDUAL PRESSURES AND FLOW AT RESIDUAL PRESSURE PRIOR TO START

OF ANY WORK.

8. THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED USING

AREA/DENSITY METHOD IN ACCORDANCE WITH NFPA 13 AND DESIGN CRITERIA

SPACE OCCUPANCY DESIGN AREA (SF)

PUBLIC ASSEMBLY LIGHT ORDINARY 1,500

PROVIDE HYDRAULIC CALCULATION WITH A 10% CUSHION TO THE WATER SUPPLY.

THE HYDRAULIC CALCULATIONS SHALL INCLUDE A 12 PSI LOSS THROUGH THE

BACKFLOW PREVENTER OR USE FRICTION LOSS THROUGH ACTUAL BACKFLOW

PREVENTER TO BE INSTALLED, WHICHEVER LOSS IS GREATER. BACKFLOW

PREVENTER SHALL BE SUBMITTED TO MECHANICAL ENGINEER FOR REVIEW PRIOR TO

PURCHASING.

PIPE SCHEDULE METHOD IS NOT ALLOWED.

9. SPRINKLER SPACING SHALL CONFORM TO NFPA 13 AND SHALL NOT EXCEED 225 SF

FOR LIGHT HAZARD, 130 SF FOR ORDINARY HAZARD.

10. STORAGE AREAS: HIGH PILED STORAGE IS NOT ALLOWED. STORAGE HEIGHT SHALL

NOT EXCEED 8'-0" HIGH ABOVE FINISHED FLOOR.

11. SPRINKLER PIPING SHALL COMPLY WITH NFPA 13, EXCEPT THAT PLASTIC PIPE OR

COPPER TUBING WILL NOT BE PERMITTED. ALL PIPING SHALL BE BLACK STEEL AND

BLACK STEEL LESS THAN 2-1/2 INCHES SHALL BE SCHEDULE 40.

12. THE SPRINKLER DESIGN IS CONCEPTUAL. THE CONTRACTOR SHALL INSTALL THE

SYSTEM IN ACCORDANCE WITH THE APPLICABLE CODES, MANUFACTURER'S

RECOMMENDATIONS AND EQUIPMENT LISTINGS.

13. PROVIDE A LISTED PRESSURE RELIEF VALVE ABOVE THE ALARM CHECK VALVE OR AS

PART OF THE INSPECTORS TEST CONNECTION. RELIEF VALVE SHALL BE FACTORY

SET TO 175 PSI AND SHALL OPERATE TO THE OPEN POSITION BETWEEN 90% AND

105% OF THE SET PRESSURE. PRESSURE RELIEF VALVES SHALL RESEAT OR CLOSE

AT A MINIMUM OF 80% OF THE SET PRESSURE. THE PRESSURE RELIEF VALVE SHALL

DISCHARGE INTO A DRAIN MANIFOLD OR TO THE OUTSIDE.

14. ALL EXPOSED SPRINKLER PIPING AND ACCESSORIES SHALL BE PAINTED TO MATCH

ADJACENT SURFACES. SPRINKLER HEADS SHALL NOT BE PAINTED.

AUTOMATIC FIRE SPRINKLER SYSTEM NOTES

2" DRAIN TO TERMINATE

OUTSIDE 6" ABOVE

CONCRETE SLAB

FIRE PROTECTION LEGEND

EXISTING(E)

DESCRIPTIONABBRV.SYMBOL

(N) NEW WORK

POC POINT OF CONNECTION

POR POINT OF REMOVAL

FDC FIRE DEPARTMENT CONNECTION

DEMO DEMOLITION

FIRE SPRINKLER HEAD, CONCEALED PENDANT DOWN

FIRE SPRINKLER HEAD, SIDEWALL

FIRE SPRINKLER HEAD, UPRIGHT

SMOKE DETECTORSD

FIRE DEPARTMENT

CONNECTION

M1

MECHANICAL NOTES AND

DETAILS

1. THE CONTRACTOR SHALL INSPECT THE PROJECT SITE

BEFORE BIDDING AND PROCEEDING WITH THE

CONSTRUCTION.

2. THE CONTRACTOR SHALL NOTIFY AND COORDINATE WITH

THE CONTRACTING OFFICER FOR ANY MAJOR DEVIATIONS

OR DISCREPANCIES DISCOVERED IN THE PLANS AND

SPECIFICATIONS DUE TO UNFORESEEN OR VARYING FIELD

CONDITIONS.

3. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO

COVER THE COMPLETE INSTALLATION OF SYSTEMS TO

FUNCTION AS DESCRIBED AND SPECIFIED. OMISSIONS IN

THE DRAWINGS, OR SPECIFICATIONS, OR THE OMISSION OF

DETAILS OF WORK, SHALL NOT RELIEVE THE CONTRACTOR

FROM PERFORMING SUCH OMITTED, OR INCORRECTLY

DESCRIBED DETAILS OF THE WORK, BUT SHALL BE

PERFORMED AS IF FULLY AND CORRECTLY SET FORTH AND

DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS. THE

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER

VERBALLY OF SUCH OMISSIONS AND PROVIDE A WRITTEN

STATEMENT OF THE OMISSIONS WITHIN (5) WORKING DAYS

OF VERBAL NOTIFICATION.

4. THE CONTRACTOR SHALL VERIFY ALL CLEARANCES FOR

EQUIPMENT TO BE INSTALLED PRIOR TO ORDERING OF

EQUIPMENT AND NOTIFY THE CONTRACTING OFFICER OF

ANY INADEQUATE CLEARANCES OR CONDITIONS THAT WILL

PREVENT THE PROPER INSTALLATION, MAINTENANCE, AND

OPERATION OF THE EQUIPMENT.

5. PROVIDE SHOP DRAWINGS FOR THE LAYOUT OF

EQUIPMENT AND PIPING SHOWING COORDINATION OF ALL

WORK WITH ALL OTHER TRADES.

6. DRAWINGS DO NOT ATTEMPT TO SHOW EXACT DETAILS OF

PIPING. PROVIDE OFFSETS AS NECESSARY TO AVOID LOCAL

OBSTRUCTIONS OR INTERFERENCE WITH OTHER TRADES.

7. NEW PIPING SHALL BE INSTALLED WITHIN THE EXISTING

WALL AND CEILING PERFORATIONS. DRILLING NEW HOLES

IN EXTERIOR/INTERIOR WALLS OR CEILING IS NOT

PERMITTED. IF THE CONTRACTOR MUST DRILL A NEW HOLE

IN THE WALL/CEILING. SUBMIT A RFI FOR RESPONSE PRIOR

TO DRILLING THE HOLE. DO NOT DRILL HOLES IN BUILDING

FABRIC WITHOUT PRIOR APPROVAL.

8. REPAIR ANY DAMAGES TO EXISTING CONSTRUCTION

RESULTING FROM THE INSTALLATION. THE AREAS

REPAIRED SHALL MATCH THE ADJACENT SURFACES IN

TEXTURE AND COLOR.

9. PROVIDE ACCESS PANEL TO ALL CONCEALED VALVES,

DAMPERS, AND EQUIPMENT. COORDINATE THE LOCATION

OF ACCESS PANEL TO ENSURE THAT THE EQUIPMENT CAN

BE MAINTAINED ADEQUATELY.

10. PATCH AND PAINT ALL NEW EXPOSED WORK, COLOR TO

MATCH EXISTING SURFACES. PATCH AND PAINT ALL

EXISTING DISTURBED WORK, COLOR TO MATCH EXISTING

ADJACENT SURFACES, UNLESS OTHERWISE NOTED.

CONTRACTOR SHALL PAINT THE PIPES AND FITTINGS IN A

SHOP OFFSITE UNDER A CONTROLLED ENVIRONMENT. NO

PAINTING SHALL BE ALLOWED INSIDE OF THE BUILDING. NO

EXTERIOR PAINTING WILL BE ALLOWED UNLESS

CONDITIONS ARE OPTIMAL. NUTS, BOLTS, PIPE THREADS,

VALVES, VALVE COVERS, GONGS, GAUGES, SWITCHES,

DAMPERS, SPRINKLER HEADS, AND OTHER MECHANICAL

COMPONENTS SHALL NOT BE PAINTED, AS PAINTING MAY

AFFECT THE OPERATION AND MAINTENANCE OF THE FIRE

SUPPRESSION SYSTEM.

GENERAL NOTES

FIRE SPRINKLER HEAD, PENDANT DOWN

WHEN A FIRE PROTECTION SYSTEM IS OUT OF SERVICE FOR MORE

THAN 4-HOURS IN A 24-HOUR PERIOD, THE AUTHORITY HAVING

JURISDICTION, AHJ, SHALL BE PERMITTED TO TO REQUIRE THE

BUILDING TO BE EVACUATED OR AN APPROVED FIRE WATCH TO BE

PROVIDED FOR ALL PORTIONS LEFT UNPROTECTED BY THE FIRE

PROTECTION SYSTEM SHUTDOWN UNTIL THE FIRE PROTECTION

SYSTEM HAS BEEN RETURNED TO SERVICE.

BASED ON THE ADOPTED FIRE CODE, NFPA 1, 2021.

16.1 GENERAL REQUIREMENTS

16.1.1 STRUCTURES UNDERGOING CONSTRUCTION, ALTERATION, OR

DEMOLITION OPERATIONS, INCLUDING THOSE IN UNDERGROUND

LOCATIONS, SHALL COMPLY WITH NFPA 241, STANDARD FOR

SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION

OPERATIONS, AND THIS CHAPTER.

16.1.2 A FIRE PROTECTION PLAN SHALL BE ESTABLISHED WHERE

REQUIRED BY THE AHJ.

16.1.3 IN BUILDINGS UNDER CONSTRUCTION, ADEQUATE ESCAPE

FACILITIES SHALL BE MAINTAINED AT ALL TIMES FOR THE USE OF

CONSTRUCTION WORKERS. ESCAPE FACILITIES SHALL CONSIST OF

DOORS, WALKWAYS, STAIRS, RAMPS, FIRE ESCAPES, LADDERS, OR

THE GENERAL PRINCIPLES OF NFPA 101, INSOFAR AS THEY CAN

REASONABLY BE APPLIED TO BUILDINGS UNDER CONSTRUCTION.

[101:4.6.101.2]

16.1.4 FIRE ACCESS ROADS PROVIDED IN ACCORDANCE WITH

18.2.3 SHALL BE PROVIDED AT THE START OF A PROJECT AND SHALL

BE MAINTAINED THROUGHOUT CONSTRUCTION.

16.3.5 STANDPIPES. IN ALL NEW BUILDINGS IN WHICH STANDPIPES

ARE REQUIRED OR WHERE STANDPIPES EXIST IN BUILDINGS BEING

ALTERED OR DEMOLISHED, SUCH STANDPIPES SHALL BE

MAINTAINED IN CONFORMITY WITH THE PROGRESS OF BUILDING

CONSTRUCTION IN SUCH A MANNER THAT THEY ARE ALWAYS READY

FOR USE. [241:7.6]

16.4.3.3.2.10 NO TEMPORARY STANDPIPES SHALL REMAIN IN SERVICE

UNTIL THE PERMANENT STANDPIPE INSTALLATION IS COMPLETE.

[241:8.7.4.2.10]

16.4.4 ALTERATION OF BUILDINGS

16.4.4.1 WHERE THE BUILDING IS PROTECTED BY THE FIRE

PROTECTION SYSTEMS, SUCH SYSTEMS SHALL BE MAINTAINED

OPERATIONAL AT ALL TIMES DURING ALTERATION.

16.4.4.2 WHERE ALTERATION REQUIRES MODIFICATION OF A PORTION

OF THE FIRE PROTECTION SYSTEM, THE REMAINDER OF THE SYSTEM

SHALL BE KEPT IN SERVICE AND THE FIRE DEPARTMENT SHALL BE

NOTIFIED.

16.4.4.3 WHEN IT IS NECESSARY TO SHUT DOWN THE SYSTEM, THE

AHJ SHALL HAVE THE AUTHORITY TO REQUIRE ALTERNATE

MEASURES OF PROTECTION UNTIL THE SYSTEM IS RETURNED TO

SERVICE.

16.4.4.4 THE FIRE DEPARTMENT SHALL BE NOTIFIED WHEN THE

SYSTEM IS SHUT DOWN AND WHEN THE SYSTEM IS RETURNED TO

SERVICE.

16.4.4.5 ALL REQUIRED EXIT COMPONENTS SHALL BE MAINTAINED IN

ACCORDANCE WITH THIS CODE AS DEEMED NECESSARY BY THE AHJ.

16.4.4.6 FIRE-RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL BE

MAINTAINED.

16.5.2 DEMOLITION OPERATIONS INVOLVING THE USE OF CUTTING

AND WELDING SHALL BE DONE IN ACCORDANCE WITH CHAPTER 41.

16.5.3 COMBUSTIBLE WASTE MATERIAL SHALL NOT BE BURNED AT

THE DEMOLITION SITE UNLESS APPROVED BY THE AHJ.

COMBUSTIBLE MATERIALS SHALL BE REMOVED FROM THE SITE AS

OFTEN AS NECESSARY TO MINIMIZE THE HAZARDS THEREFROM.

(SEE SECTION 10.11.)

16.5.4 WHERE IN THE OPINION OF THE AHJ THE DEMOLITION SITE IS

OF A HAZARDOUS NATURE, QUALIFIED PERSONNEL SHALL SERVE AS

AN ON-SITE FIRE WATCH.

FIRE DEPARTMENT NOTES

DRAIN WITH VALVE

FIRE SPRINKLER

RISER

UPRIGHT SPRINKLERS

IN ATTIC, TYP.

PENDANT

SPRINKLERS, TYP.

SIDEWALL

SPRINKLERS, TYP.

SD

SD

SD SDSD

SD

SD

SDSDSD

SD

SD

SD

SD

(E) SMOKE

DETECTORS TO

REMAIN (TYP)

FE

FE

FE

(E) FIRE EXTINGUISHER (TYP)

(E) FIRE ALARM PANEL

(E) FIRE ALARM

PULL STATION

UPRIGHT SPRINKLERS, TYP.

EDGE OF ROOF ABV

1 FLOOR PLAN - FIRE PROTECTION - DEMO

NOTES:

1. DEMO & REMOVE EXISTING FIRE SPRINKLER SYSTEM. NEW

SPRINKLER HEADS AND FIRE SPRINKLER PIPING TO USE

EXISTING WALL AND CEILING OPENINGS.

2. EXISTING SMOKE DETECTORS TO REMAIN.

M2

MECHANICAL DEMOLITION

PLANS

SD

SD

SD SDSD

SD

SD

SDSDSD

SD

SD

SD

SD

(N) DRAIN WITH VALVE

(N) FIRE SPRINKLER

RISER, SEE 1/M1

FOR DETAIL

(N) UPRIGHT SPRINKLERS

IN ATTIC, TYP OF 8

(N) CONCEALED PENDANT

SPRINKLERS, TYP.

(N) SIDEWALL

SPRINKLERS,

TYP.

(E) SMOKE

DETECTOR, TYP.

FE

FE

FE

(E) FIRE ALARM

CONTROL PANEL

(E) FIRE EXTINGUISHER, TYP

(E) SMOKE

DETECTOR IN ATTIC

(E) SMOKE

DETECTOR IN ATTIC

(E) FIRE ALARM

PULL STATION

(N) UPRIGHT SPRINKLERS

IN ROOMS, TYP OF 3

EDGE OF ROOF ABV

(N) SURFACE

MOUNTED FS PIPING

BELOW LANAI CEILING

(N) UPRIGHT

SPRINKLERS,

TYP OF 4

2" 1-1/2" 1-1/4" 1"

2-1/2" 3"

2"

1-1/4" 1"1-1/2"2"

1-1/4"2"2-1/2" 3"

3"

1-1/4"1-1/2"2"2"2-1/2"2-1/2"

1"

1"

1"1"

1"1"

1"

1" 1"

1"

1"

(N) PENDANT

SPRINKLERS,

TYP. OF 7

(N) CONCEALED PENDANT

SPRINKLERS, TYP.

1 FLOOR PLAN - FIRE PROTECTION - NEW

M3

MECHANICAL NEW PLANS

NOTES:

1. PROVIDE NEW SPRINKLER HEADS AS REQUIRED TO PROVIDE

ADEQUATE COVERAGE PER NFPA 13. REUSE EXISTING CEILING

AND WALL OPENINGS FOR FIRE SPRINKLERS AND FIRE

SPRINKLER PIPING.

2. EXISTING SMOKE DETECTORS TO REMAIN.

3. REPLACE PORTABLE FIRE EXTINGUISHERS WITH WALL BRACKET

MOUNTED 4A:80B:C UL LISTED 10 LB. MULTIPURPOSE DRY FIRE

EXTINGUISHER.

T1 - Title Sheet
T2 - Project Info
A1 - Floor Plan
A2 - Reflected Ceiling Plan
A3 - Exterior Elevations
A4 - Building Sections
M1 - Mechanical Notes and Details
M2 - Mechanical Demolition Plan
M3 - Mechanical New Plan