The document is a Statement of Work (SOW) for the NV-LAS VEGAS NWR-PARKING LOT RENOVATION solicitation. The SOW outlines the requirements for renovating the parking lot at the Las Vegas National Wildlife Refuge. Key details include:

The contractor shall provide all labor, materials, equipment, and supervision necessary to perform parking lot resurfacing, restriping, and other site improvements as specified. The work includes asphalt milling, paving, restriping, signage, and other related tasks. The contractor must possess a valid State of Nevada Contractor's License and comply with all relevant federal, state, and local regulations. The period of performance is 120 calendar days from the notice to proceed. The government estimates the cost range for this requirement is between $500,000 and $1,000,000. Small business set-aside is anticipated. The solicitation number is 140FC124R0051, and the contracting agency is the Department of the Interior Fish and Wildlife Service.

View the file

Other files

File Type Posted
B08-Attach-2-Price_Sheet.xlsx XLSX spreadsheet
Sol_140FC124R0051.pdf PDF
B08-Attach-3--DBA_Min__Wage_Rates.pdf PDF
B08-Attach-4-_Clauses_and_Evaluation_Factors.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications/Statement of Work Parking lot Renovation Las Vegas NWR San Miguel County, NM Asset # 10059269

United States Fish and Wildlife Service Division of Engineering 500 Gold Ave. S.W.

Albuquerque, New Mexico 87103

Approvals

Refuge Manager/Project Leader

Refuge/Program Supervisor

Regional Engineer

Project Manager

Environmental Compliance

Cultural Resources

Energy Compliance

ROBERT RAYNER

Digitally signed by ROBERT

RAYNER

Date: 2024.05.09 10:50:24 -06'00'

ERIC SPADGENSKE Digitally signed by ERIC SPADGENSKE Date: 2024.05.09 11:40:55 -06'00'

JENNIFER OWEN-WHITE Digitally signed by JENNIFER OWEN-WHITE Date: 2024.05.09 13:07:27 -06'00'

ROBERT

RAYNER

Digitally signed by ROBERT

RAYNER

Date: 2024.05.09 13:59:36 -06'00'

GEORGE MACDONELL

Digitally signed by GEORGE

MACDONELL

Date: 2024.05.13 08:08:33 -06'00' rrayner Typewritten Text N/A

STATEMENT OF WORK

Parking Lot Renovations Las Vegas NWR

San Miguel County, New Mexico April, 2024

TABLE OF CONTENTS

PART 1: GENERAL

1.1 SERVICES & SCOPE

1.2 CONTRACTOR RESPONSIBILITY

1.3 CURRENT DESIGN LEVEL

1.4 PERIOD OF PERFORMANCE

1.5 PROJECT MANAGER

1.6 GOVERNMENT FURNISHED INFORMATION

1.7 CONTRACTOR SUBMITTAL REQUIREMENTS

1.8 DEFINITIONS

PART 2: CONSTRUCTIN SERVICES

2.1 GENERAL

2.2 PAYMENT PROCEDURES

2.3 PROJECT SAFETY

2.4 WORK HOURS

2.5 PROTECTIONS

2.6 CLOSEOUT PROCEDURES

2.7 CLOSEOUT DOCUMENTS

PART 3: GOVERNMENT RESPONSIBILITIES

3.1 DUTY TO COOPERATE

PART 3: SCHEDULE

4.1 CONSTRUCTION SCHEDULE

PART 1: GENERAL

1.1 SERVICES AND SCOPE: The services required will include the renovation of approximately 54,101 SF of parking lot and entrance drive.

A. The work includes:

1. Thoroughly cleaning the parking lot and entrance drive to include transition areas between Asphalt and concrete curbs and sidewalk areas.

2. Removing loose pieces of asphalt.

3. Filling the cracks with a “GATORPAVE” by SealMaster (or equal) in accordance with manufacturer’s recommendations.

4. Seal entire parking lot and entrance drive with a polymer-modified Mastersea’ (PMM) sealer by “Masterseal” (or equal) in accordance with manufacturer’s recommendations.

NOTE: Wheel stops must be removed and re-installed after seal coat has been applied.

5. Repaint parking lot striping to match existing layout to include HC spaces and stencil work.

6. Provide 5 year warranty on materials and craftsmanship.

7. Station will apply a long lasting herbicide in all cracks to prevent the growth of vegetation.

B. Location: Work under this Contract is located approximately 7 miles South and East of Las Vegas, NM on Route1, Las Vegas NM at the Las Vegas National Wildlife Refuge.

1.2 CONTRACTOR RESPONSIBILITY: The contractor shall be responsible for construction of the renovation in accordance with the attached construction documents. All work shall be completed in accordance with all state and local codes.

1.3 CURRENT DESIGN LEVEL: The current design level has been developed to 100% completion consisting of the attached site map indicating damaged areas.

1.4 PERIOD OF PERFORMANCE: 30 days

1.5 PROJECT MANAGER: The FWS Engineering Project Manager/Contracting Officer Representative for this project is Robert Rayner. Email: Robert_rayner@fws.gov. Any questions regarding the scope of work and technical matters shall be directed to Robert Rayner, Architect, U.S. Fish and Wildlife Service, 500 Gold SW, Albuquerque, NM 87102. Telephone

(505) 248-7960.

1.6 GOVERNMENT FURNISHED INFORMATION: Attached site plan indicating damaged areas.

1.7 CONTRACTOR SUBMITTAL REQUIREMENTS:

1.7.1 Submit for approval of the Contracting Officer within 10 days of Notice of Award, a Construction Management Plan for this project that includes a schedule of construction submittals. The Contracting Officer may revise this schedule in consultation with the Contractor and FWS Engineering Project Manager and when approved, this will become the schedule for the Construction of the project.

1.7.2 In addition to submitting the reports required in Section H, the contractor shall submit monthly status reports to the FWS Engineering Project Manager (Contracting Officer’s Representative.)

1.7.3 Submittals during the construction phase are discussed in Part 3 Construction Services.

1.8 DEFINITIONS

1.8.1 Construction is defined as, but not limited to, constructing (giving form by combining the parts), altering, repairing, adding to, subtracting from, improving, restoring, moving, wrecking or demolishing any building, highway, road, excavation or other structure, project, or improvement attached to real estate.

1.8.2 Contracting Officer (CO) is defined as a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the United States of America. The term includes certain authorized representatives of the Contracting Officer such as the Contracting Officer's Representative and Construction Inspector acting within the limits of their authority as delegated by the Contracting Officer.

1.8.3 COR means Contracting Officer's Representative and for this project is the Project Manager and is the Point of Contact for all technical questions and issues.

1.8.4 CI means the Government Construction Inspector.

1.8.5 Day or Days shall mean calendar days unless otherwise specifically noted.

1.8.6 Service or FWS means United States Department of Interior, Fish and Wildlife Service, Region 2 (Southwest Region).

1.8.7 Government may also be referred to as the Owner, Contracting Officer, Contracting Officer's Representative, the Service, or Fish and Wildlife Service (FWS).

1.8.8 Incident Rate (IR) is the number of recordable incidents resulting in days away from work for each 100 full-time employees per year, based on 2,000 hours worked per employee per year.

1.8.9 Local Authority Having Jurisdiction: Fish and Wildlife Service- for this project.

1.8.10 Management Plan: The Contractors project approach for planning, and construction and includes, at a minimum, but is not limited to the following:

1.8.10.1 Schedule (construction activities)

1.8.10.2 Project Staffing Plan

1.8.10.3 Subcontracting Plan

1.8.11 Notice to Proceed (NTP): Notice to Proceed issued by the Contracting Officer (CO). The NTP will identify any qualifications, limitations, or exceptions to the work under the Contract.

1.8.12 Open Book Accounting is the allowance of the government to have free and open access to financial and accounting documents that the Design/Builder has associated with the project being designed and constructed.

1.8.13 Project Specifications are specifications that state what the required results will be with observable criteria for verifying compliance. This may include the use of specific product cut sheets in addition to specifications.

1.8.14 Schedule is a chronological layout of the work to be performed prepared using commercially available scheduling software.

1.8.15 Subcontractor is any person or entity retained by CONTRACTOR as an independent contractor to perform a portion of the Work and shall include materialmen and suppliers.

1.8.16 Sub-Subcontractor is any person or entity retained by a Subcontractor as an independent contractor to perform any portion of a Subcontractor's work and shall include material, men and suppliers.

1.8.17 Work is comprised of all CONTRACTOR's permitting, construction and other services required by the Contract Documents, including procuring and furnishing all materials, equipment, services and labor reasonably inferable from the Contract Documents.

PART 2 CONSTRUCTION SERVICES

2.1 GENERAL

2.1.1 Possess and maintain, for the duration of this project, a state license as a contractor.

2.1.2 Provide supervision, labor, materials, equipment, tools, construction equipment and machinery, inspection, testing, start-up, water, heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work.

2.1.3 Have at least one qualified supervisor capable of reading, writing, and conversing fluently in the English language on the job site during working hours.

2.1.4 Perform all construction activities efficiently and with the requisite expertise, skill, and competence to satisfy the requirements of the Contract Documents. At all times exercise complete and exclusive control over the means, methods, sequences, and techniques of construction.

2.1.5 Utilize Subcontractors who are duly licensed and qualified to perform the Work consistent with the Contract Documents. Government may reasonably object to

CONTRACTOR's selection of any Subcontractor based on its information with respect to the subcontractor’s past performance and technical qualifications.

2.1.6 RFIs: During construction, FWS Engineering will provide supplemental information and answer questions to clarify the design as required. This information will be documented on Request for Information (RFI) forms. The Contractor may use any format they choose for the Request for Information form but all shall be identified with the words “Request for Information” at the top of the form along with the Government Contract Number, Project Location, Project Title and the Contractor’s Name. RFI’s shall be logged and filed and shall be part of the Closeout Documents submitted to the Government. As RFI’s are generated and answered, submit copies to the COR and CO for information.

2.1.7 Product and Material Submittals: During construction, Contractor shall provide FWS Engineering with product and material submittals for all items requiring submittals in the contract specifications. Those items specified on a proprietary basis, by manufacture and/or model number, or with product stamps allowing inspectors to verify compliance with the specifications, do not require submittals, unless the Contractor elects to do so. This information shall be documented on submittal forms. The Contractor shall use the government furnished submittal forms and shall be identified with the words "Submittal" at the top of the form along with the Government Contract Number, Project Location, Project Title, Specification Section and/or Drawing reference, and the Design-Build Contractor’s Name. Submittals shall be logged and filed and shall be part of the Closeout Documents submitted to the Government. As product submittals are generated and answered, submit copies to the COR and CO for information.

2.1.8 Assume responsibility for the proper performance of the Work of Subcontractors and all acts and omissions in connection with such performance. Nothing in the Contract Documents is intended or deemed to create any legal or contractual relationship between Government and any Subcontractor or Sub Subcontractor.

2.1.9 Government buildings and other facilities are not available for storage of Contractor’s materials, equipment, and tools except for designated staging areas.

Government owned equipment is not available for Contractor’s use to accomplish any Work.

2.1.10 Housing for workers and campsites are not available on site.

2.1.11 Contractor shall furnish and pay for temporary facilities and utilities needed including heat, light, telephone, sanitary facilities, job offices, material-handling equipment, temporary construction aids, and storage enclosures. Water and power will be available on site for contractors use.

2.1.12 Contractor is encouraged to purchase construction materials and supplies locally.

2.2 PAYMENT PROCEDURES

2.2.1 Payment shall be made in accordance procedures outline in FAR 52.232-27.

2.2.2 Construction progress payments will be made on a monthly basis based on the work completed per the approved Schedule of Values, as agreed to by the Construction Inspector and the CONTRACTOR Superintendent or Project Manager.

2.2.3 Retainage will not be implemented unless the Contracting Officer determines that construction progress and/or quality are not satisfactory.

2.3 PROJECT SAFETY

2.3.1 The CONTRACTOR shall have the ultimate responsibility for safety on the project site at all times, from issuance of the Notice to Proceed until final completion and acceptance of the project by the Contracting Officer. See Section H of the solicitation /contract and Federal Acquisition Regulation 52.236-13.

2.3.2 Initiate and maintain, throughout the performance of this contract, an effective safety and health program that provides adequate policies, procedures, and practices to protect employees from, and allow them to recognize, job-related safety and health hazards. The program shall include provisions for the identification, evaluation, prevention and control of general work site hazards, specific job hazards, and potential hazards that may arise from foreseeable construction methods and conditions, as well as providing a competent person to conduct frequent and regular inspections. Each employee (Contractor and subcontractors) must be instructed in the recognition and avoidance of unsafe conditions and the regulations applicable to the work environment.

2.3.3 Provide barricades and warning devices as necessary to safeguard the public, workers, and government personnel. Where project work affects public roads, provide signage in accordance with the current edition of the Manual on Uniform Traffic Control Devices (MUTCD) as published by the US Department of Transportation, Federal Highway Administration.

2.3.4 Rollover Protection and Seat Belts: In addition to the Safety and Health requirements of clause FAR 52.236-13 of Part 2, Section I of this Contract, rollover protection and seat belts required by 29CFR 1926 (OSHA) shall be extended to include equipment regardless of the year of manufacture.

2.4 WORK HOURS: See specifications section 01009

2.5 PROTECTIONS

2.5.1 Comply with all applicable federal, state, and local environmental laws and regulations. This condition applies to, but is not limited to, laws and regulations governing noise levels, air and water quality standards, erosion control, surface runoff, and cultural resources.

2.5.2 Provide erosion control methods (such as watering dry soils) and appurtenances (such as silt fence) as necessary to prevent wind-borne dust and water-borne silt from leaving the immediate work area.

2.5.3 If paleontological, archaeological or historical remains (including burials or skeletal material) are encountered, immediately stop the work and notify the Construction Representative, COR, or Contracting Officer. The Contracting Officer will notify the Regional Archaeologist so the provisions of 36 CFR 800.7 (Resource Discovered During Construction) and other relevant laws are followed. Work will cease in the immediate vicinity until permitted to resume by written order from the Contracting Officer. Work in other areas may proceed as approved by the Contracting Officer.

2.5.4 Heavy equipment operated on FWS roads and parking areas shall comply with highway-legal load limits unless explicitly approved otherwise.

2.5.5 Clearing and working limits shall be no greater than 100 feet from the affected construction areas and no greater than 50 feet from road edges. Any additional clearing needed to complete the project in excess of the outlined limits, will require approval by the COR.

2.5.6 Vehicle and equipment parking should not occur in vegetated areas. Any damage (including tire rutting) to vegetation in the surrounding jobsite shall be repaired thru raking and reseeding with native grass seed mix.

2.6 CLOSEOUT PROCEDURES

2.6.1 Maintenance Materials: Deliver maintenance materials to Station Manager;

coordinate location of storage. (Provide consumable items in such quantities as needed for the first year of operation.)

2.6.2 Final Inspection: Notify the COR at least 10 calendar days prior to the anticipated date of completion of all work. The COR will proceed with Final Inspection as promptly as practicable. The time required for such Final Inspection and for making any corrections as a result thereof shall be included in the contract performance time. The CONTRACTOR representative responsible for the work shall be present at the Final Inspection and shall submit a preliminary list of unfinished work prior to Final Inspection. See Section E of the solicitation /contract.

2.7 CLOSEOUT DOCUMENTS

2.7.1 Submit fully executed manufacturer's standard material, product, and equipment warranties, assigned to the Government without any requirement that the Government incur any costs to maintain the warranties in force.

2.7.2 After completion of the work and prior to final payment, submit the Release of Claims (Form DI-137 provided by the Contracting Officer), properly executed by the CONTRACTOR, releasing claims against the United States arising out of this contract, other than claims specifically excepted from the operation of the release. See Section I of the solicitation /contract.

PART 3 GOVERNMENT RESPONSIBILITIES

3.1 DUTY TO COOPERATE

3.1.1 The Station will remove all items in each work area that will hinder completion of the project such as lab equipment, personal items, books and furniture. This relocation will occur prior to the date of Mobilization by the Contractor.

3.1.2 Government will, throughout the performance of the Work, cooperate with CONTRACTOR and perform its responsibilities, obligations, and services in a timely manner to facilitate CONTRACTOR's timely and efficient performance of the Work and to not unreasonably delay or interfere with CONTRACTOR's performance of its obligations under the Contract Documents.

3.1.3 Government will provide timely reviews and approvals of interim design submissions and Construction Documents consistent with the turnaround times set forth in CONTRACTOR's approved schedule. Contractor agrees to revise the design submittals and construction documents at no cost to the Government until the documents are acceptable to the Government in its reasonable judgment.

PART 4 SCHEDULE

4.1 CONSTRUCTION SCHEDULE: shall commence upon Government’s

Notice to Proceed, and shall not exceed 30 days.

LAS VEGAS NWR 2024 PARKING LOT

SAN MIGUEL COUNTY, NM RENOVATION

GENERAL INFORMATION AND REQUIREMENTS 01009 - 1

SECTION 01009 - GENERAL INFORMATION AND REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. Description of Work: Project consists of the renovation of approximately 54,101 SF of parking lot and entrance drive.

The Work includes:

1. Thoroughly cleaning the parking lot and entrance drive.

2. Removing loose pieces of asphalt.

3. Filling the cracks with a “GATORPAVE” by SealMaster (or equal) in accordance with manufacturer’s recommendations.

4. Seal entire parking lot and entrance drive with a polymer-modified masterseal (PMM) sealer by “Masterseal” (or equal) in accordance with manufaturer’s recommendations.

5. Repaint parking lot striping to match existing layout to include HC spaces and stencil work.

6. Provide 5 year warranty on materials and craftsmanship.

7. Station will apply a long lasting herbicide in all cracks to prevent the growth of vegetation.

B. Location: Work under this Contract is located approximately 7 miles South and East of Las Vegas, NM on Route1, Las Vegas NM at the Las Vegas National Wildlife Refuge.

1.2 REFERENCES

A. Referenced Specifications/Standards with Abbreviations and/or Acronyms: Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor, from the following:

ACI American Concrete Institute

P.O. Box 19150 Detroit, MI 48219

ASTM American Society for Testing and Materials

100 Barr Harbor Dr.

West Conshohocken PA 19428-2959

EPA Environmental Protection Agency

401 M St., SW Washington, DC 20460

OSHA Occupational Safety and Health Administration

US Department of Labor 200 Constitution Ave., NW

Washington DC 20210

GENERAL INFORMATION AND REQUIREMENTS 01009 - 2

AASHTO American Association of State Highway and Transportation Officials

444 North Capitol Street, N.W., Suite 249 Washington, DC 20001

1.3 DEFINITIONS

A. Approvals: Approval of the submittals is an indication that the Contractor's submittals have been reviewed and that there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Contracting Officer's attention in writing. After approval of an item, submit a substitute for approval when the approved item cannot be purchased or delivered in time to avoid delay in completion of the project. Approval of submittals does not relieve the Contractor of errors, omissions, or from complying with the Contract’s requirements.

1.4 SUBMITTALS

A. Scope: Submittals including manufacturer’s literature, testing reports, and samples.

B. Requirements: Refer to specifications for submittals required. Allow at least 10 working days for review. Submittals shall be delivered to the Contracting Officer’s Representative, Division of Engineering, via Email to Robert Rayner (Robert_Rayner@fws.gov).

C. The Contractor shall review and approve all submittals required under the Contract. The

Contractor shall submit 1 copy of drawings, schedules, brochures, catalogs, and other data required for the work before proceeding with the work. Submittals that do not indicate the Contractor's review and approval will be returned without review. Submittals shall come directly from the Contractor with their stamp and signature of approval; submittals will not be accepted from sub-contractors or suppliers. The Government will require 10 working days for review of each submittal, plus transmittal time back and forth. Required submittals are listed in the section of work for which the submittal is required.

D. As-built Drawings: Not Required

E. Identification of Submittals: Completely identify each submittal by showing at least the following information:

1. Name and address of submitter, plus name and telephone number of the individual to contact for further information.

2. Name of project as it appears in these specifications.

3. Contract number, drawing number, and specification section number to which the submittal applies.

4. Whether this is an original submittal or re-submittal.

5. Each item shall clearly note the manufacturer's name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.

1.5 QUALITY ASSURANCE

A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates

GENERAL INFORMATION AND REQUIREMENTS 01009 - 3

materials, applications, and tests by reference, with the same force and effect as if they were given in full text. Contractor is responsible for quality control and testing as set forth in the individual sections of these specifications.

B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern. In the event of a conflict, it is the Contractors responsibility to notify the COTR as soon as possible.

C. Measurements: Where approved manufacturer's diagrams and shop drawings give specific measurements or rough-in dimensions for equipment, these dimensions shall take precedence over dimensions indicated on the drawings.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Delivery: Protect products incorporated into the work from damage while in transit to the site.

Products must be delivered in original unopened containers with manufacturer's name, brand designation, and contents legibly indicated.

B. Storage: Provide temporary storage facilities for products. Storage shall comply with the manufacturer's instructions. The storage area shall permit access for inspection and handling.

C. Handling: Load and unload products protecting them from damage.

Note: The Government will not be assumed to assist with loading, unloading, transportation, or storage of materials.

1.7 PROJECT CONDITIONS

A. Access to the Work: The Contractor shall coordinate the use of the premises with the Contracting

Officer and Refuge Manager to avoid interruption of station operations. The Contractor is responsible for protection and safekeeping of the site and all furnished or constructed items until final acceptance by the Government. The Contractor may use existing roads for access to the site.

The Contractor shall maintain existing roads and access ways affected by the Contractor’s operations. Any damage done by the Contractor’s operations shall be repaired or restored at the Contractor's expense.

B. Housekeeping: Routinely, or upon notice by the Government, the Contractor shall clean up and remove from the job site all waste, debris, equipment and surplus material resulting from operations. In the event he fails to complete the requested clean-up of any specific area within seven calendar days following notification, the Government may cause this work to be performed at the Contractor’s expense.

C. Staging Areas: All operations of the Contractor, including storage of materials, on Government premises shall be confined to areas authorized or approved by the Government. Government premises adjacent to the construction area may be made available for use by the Contractor without cost whenever such use will not interfere with other Government uses or purposes. Areas used for staging shall be delineated by the Refuge Manager prior to commencement of work.

D. Availability of Utilities: Power and potable water for construction is available at the site. The

Contractor shall coordinate use with the Refuge Manager.

GENERAL INFORMATION AND REQUIREMENTS 01009 - 4

1.8 SEQUENCING AND SCHEDULING

A. Work Schedule: The schedule shall be submitted at the pre-work conference. When requested, submit an updated schedule within 3 calendar days. As a minimum, the estimated start and completion dates shall be shown in the estimate.

B. The Contractor’s normal work schedule shall be 7:30 a.m. to 4:00 p.m., Monday through Friday.

No work shall be performed on Saturdays, Sundays, or federal holidays, unless authorized in writing by the Contracting Officer.

1.9 SAFETY

A. The Contractor shall comply with all applicable safety codes and regulations including but not limited to Occupational Safety and Health Administration regulations, 29 CFR, Part 1926. The Contractor shall perform his operations so as to ensure safety of his workers, the public, and Government personnel.

PART 2 - PRODUCTS

A. “GATORPAVE” by SealMaster (or equal) B. “SealMaster” polymer-modified masterseal (PMM) sealer (or equal) C. “Sherwin-Williams” PRO-PARK waterborne traffic marking paint (or equal). White and blue.

PART 3 - EXECUTION

3.1 PROJECT MEETINGS

A. Pre-Work Conference:

1. Will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date and place (most likely phone conference). The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.

2. The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.

3. Be prepared to summarize and explain procedures planned for the project.

B. Progress Meetings:

1. To be held at the project site, or as determined by the Contracting Officer.

2. May be called by either the Contracting Officer or the Contractor. Request shall state who should attend and include an agenda.

C. Final Inspection:

1. To be held at the project site, or as determined by the Contracting Officer.

2. Notify the Contracting Officer in writing at least 10 working days before the completion date to allow the Government to schedule a final inspection.

GENERAL INFORMATION AND REQUIREMENTS 01009 - 5

3.2 DISPOSAL OF DEBRIS

A. Requirements: Items or debris not designated as salvage shall be disposed of by the Contractor off station grounds in a legal manner and in accordance with applicable local codes.

3.3 WARRANTY

A. Requirements: Materials and equipment furnished under this Contract shall be covered by the most favorable commercial warranties given to customers for such materials or equipment. The rights or remedies provided herein are in addition to and do not limit rights afforded to the Government by other clauses of this Contract. With respect to warranties, expressed or implied, from manufacturers or suppliers for materials or equipment furnished under the Contract the Contractor shall:

1. Obtain warranties that would be given in normal commercial practices.

2. Require warranties to be executed, in writing, for the benefit of the Government.

3. Submit warranties to the Contracting Officer prior to the final inspection.

PART 4 - MEASUREMENT AND PAYMENT

4.1 MEASUREMENT

A. All items associated with complying with this section will not be measured for payment.

4.2 PAYMENT

A. Payment for all work associated with complying with this section shall be included in the prices bid in the schedule for other items of work. No separate payment will be made to the Contractor for work required in this section.

END OF SECTION 01009

Area #1 Area #2

Area #3 Area #4

Area #5 Area #6

Area #7

Area #8 Area #9

Area #10 Area #11

Area #12 Area #13

Area #14 Area #15

Area #15

2024-05-13T09:30:36-0600