B08_ATCH_1_SALIENTS.pdf

PDF 194 KB Posted

Attached to
Bank Operated Cableway IAW SALIENTS
Solicitation number
140G0125Q0013
Issued by

About this file

This document is a set of salient characteristics for a Bank Operated Cableway (BOC). The key details are:

The U.S. Geological Survey (USGS) has a requirement for the delivery of two (2) Bank Operated Cableways that must meet the following salient characteristics: 1) Capable of operating with a USGS B-56 Sounding Reel; 2) Include side post and back post assemblies of minimum 4-inch x 4-inch steel with back stays; 3) Include an idler wheel assembly for 3/4-inch to 1-inch cable; 4) Include main tow cable, pulleys, trolley, and required hardware; 5) Include vandal protection covers; 6) Capable of spanning a minimum of 150 feet; 7) Capable of a maximum capacity of 100 kg (220.5 lbs.).

The related federal contract opportunity is Solicitation Number 140G0125Q0013 issued by the USGS Office of Acquisitions and Grants. The solicitation is a total small business set-aside with a NAICS code of 333923 (Size Standard 1250 employees). Quotes are due by 11/25/2024 and the anticipated award date is 12/06/2024. Vendors must be registered in SAM.gov to be eligible for award.

View the file

Other files

File Type Posted
Sol_140G0125Q0013.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Salient Characteristics S24164

BANK OPERATED CABLEWAY (BOC)

SALIENT CHARACTERISTICS:

2 EA, Bank Operated Cableway (BOC):

1. Shall have a clutch mechanism that is capable of operating with USGS B-56 Sounding Reel.

2. Shall include side post assembly of a minimum of 4 inch X 4 inch, steel post with back stays.

3. Shall include back post assembly of a minimum of 4 inch X 4 inch, steel post with back stays.

4. Shall include idler wheel assembly for cable diameter ½ inch to 1 inch.

5. Shall include main tow cable, pulleys, trolley, and all required hardware.

6. Shall include vandal protection covers for system.

7. Shall be capable of spanning a minimum of at least 150 feet (45m).

8. Shall be capable of a maximum capacity of 100 kg (220.5 lbs.) weight or sampler.

9. Shall be capable of moving instruments across river and lower and raise instruments for collecting data/sample.

File details come from the government source that posted it. Updated .