B08_A1_Statement_of_Work__Temp_AC_2026.pdf

PDF 267 KB Posted

Attached to
TEMPORARY AC COFFIN - HINU
Solicitation number
140A2326Q0085
Issued by

About this file

This is a Statement of Work (SOW) for temporary air conditioning installation services at Haskell Indian Nations University's Coffin Sports Complex in Lawrence, Kansas.

The Contractor shall provide temporary air conditioning services to cool the approximately 27,000 square-foot gymnasium at Building 129 from May 8-10, 2026 (4 days), with capacity to accommodate up to 2,000 spectators at maximum occupancy. The work includes providing properly sized AC unit(s) with low noise output, condensate drainage systems, power supply, and installation/configuration to achieve comfortable temperatures during peak occupancy. Installation must be completed by May 7, 2026, and a technician must be onsite from 8:00 a.m. to 12:00 p.m. on May 8, 2026 to monitor equipment for failures. Upon completion of the temporary conditioning period, the Contractor shall remove all temporary measures except those HINU determines should remain. The scope includes building inspection to verify existing conditions, provision of installation documents and plans/specifications as needed, condensate drain system design, surface damage assessment, and repair and refinishing of any interior surfaces affected by installation and removal. The Contractor must comply with NFPA 5000, National Electrical Codes, Uniform Plumbing and Mechanical Codes, ASHRAE Standards, ADA/ABAAG accessibility guidelines, OSHA regulations, EPA environmental regulations, and National Environmental Protection Act (NEPA) and National Historic Preservation Act (NHPA) Section 106 requirements. Deliverables include installation documents for the temporary AC equipment and samples/product data submitted to HINU Facilities and the Contracting Officer's Representative (COR) Karla Van Noy at karla.vannoy@bie.edu. The contract line item (CLIN #001) must be priced separately, with the period of performance running from May 7 through May 11, 2026. No work may proceed without Contracting Officer approval.

View the file

Other files

File Type Posted
Sol_140A2326Q0085.pdf PDF
B08_A2__Wage_Determination_SCA_2015-5335.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2/23/24 v1.0

Statement of Work

HASKELL INDIAN NATIONS UNIVERSITY

Temporary AC Building 129 Coffin Sports Complex

March 2026

A. GENERAL

1. Purpose:

Haskell Indian Nations University is requesting temporary air conditioning services (4 days) in the gymnasium at Coffin Sports Complex, from May 8 through May 10, 2026. The gym is approximately 27,000 SF and can accommodate up to 2,000 spectators. The Contractor shall provide all services required including, but not limited to providing ac unit(s) properly sized, with proper performance (low noise, and condensate drainage systems), power supply, and configuration to temporarily provide cooling in the space to a comfortable temperature when the facility is at maximum occupancy. The installation should be completed at least one by May 7, 2026 in order to get the space cooled. The contractor will provide a technician to be onsite from 8am to 12pm on May 8, 2026 to ensure no failures of equipment.

The contractor is to provide construction, installation, and Engineering services to accomplish the tasks in accordance with this statement of work, contract terms, conditions, specifications, and any special requirements. After the temporary conditioning period has expired, the contractor is to remove any temporary measures except any that HINU determines should remain. Design and construction shall follow NFPA 5000 and all applicable codes for mechanical, electrical, plumbing, and other applicable codes as determined by BIA. Refer to Codes and Standards below.

The purpose of this Statement of Work is an invitation for Proposals, “Not an Award”, or a “Commitment to Award” for work at this location.

2. Project Location:

Building 129, Coffin Sports Complex was built in 1980 at Haskell Indian Nations University located in Lawrence, Kansas.

3. The following specifications/guidelines shall be utilized work described.

Definitions and Acronyms:

“ADAABAAG” means “Americans with Disabilities Act and Architectural Barriers Act Accessibility Guidelines”.

“A-E” refers to the Architectural and/or Engineering firm.

“AHJ” refers to the Authority Having Jurisdiction

“BIA” refers to the Bureau of Indian Affairs.

“BIE” refers to the Bureau of Indian Education.

“CO” refers to the BIA or BIE Contracting Officer.

“COR” refers to the Contracting Officer’s Representative.

“Design Handbook” refers to the current edition of the BIA School Facilities Design Handbook.

“DOI” refers to the U.S. Dept. of the Interior.

“DSRM” refers to the “Division of Safety and Risk Management” which is the AHJ and located in Albuquerque, NM.

“HINU” refers to Haskell Indian Nations University, located in Lawrence, Kansas.

“Plan Review Procedure” refers to the May 2020 “Safety, Health and Accessibility Design Guidelines for Architects, Engineers and Design Firms”.

B. CODES AND STANDARDS

The Contractor shall provide a multi-disciplined team to furnish services required to complete the work. Each responsible team member must be knowledgeable of and provide work in compliance with the most current editions of all applicable codes, standards, design handbooks, plan review procedures, and guidelines as adopted by BIA.

• NFPA 5000 Building Construction - Life Safety and Fire Codes

• National Electrical Codes

• Uniform Plumbing and Mechanical Codes

• ASHRAE Standards, Handbooks, Journals and Publications

• Americans with Disabilities Act and Architectural Barriers Act Accessibility

Guidelines (ADAABAAG)

• Occupational Safety Health Administration (OSHA) - Federal Regulations

• EPA - Tribal, State, Federal Regulations

• Value Engineering DOI OMB Circular A-131

• DOI – Guiding Principles for Sustainable Federal Buildings

Where applicable, the Contractor shall adhere to all federal and state statutes pertaining to archaeological, historical, and environmental clearances which may affect this project. Strict adherence to the National Environmental Protection Act (NEPA) and the National Historic Preservation Act (NHPA), Section 106, will be mandatory.

Haskell Indian Nations University utilizes an Environmental Management System (EMS) to follow regulations concerning environmental laws. The Contractor shall follow all applicable environmental laws.

C. SCOPE OF WORK

1. Meet with HINU staff as directed by the HINU Facilities Manager and/or COR to discuss specific requirements.

2. Upon request and if available, existing drawings and other relevant building information may be provided for informational purpose only.

3. Field verify all existing building conditions, utilities, finishes, dimensions, and clearances impacted by the work -notify COR of any deficiencies.

4. The materials used shall conform to the historical status requirements of the building in relation to the work to be performed under this SOW.

5. The Contractor shall determine the quantity and type of work to provide all labor and materials required to complete the project as stated in this Statement of Work (SOW) -refer to Section D, TASK DESCRIPTION.

6. Provide all mechanical, electrical, and plumbing work required for the new construction or remodeling.

7. All waste materials shall be removed and disposed of in a manner as specified by local, State, and Federal regulations.

8. All salvageable materials shall be turned over to HINU or lawfully disposed of as directed by the COR.

9. After all work is complete, provide testing, analysis, and a report to assure proper operation of all replaced piping. This report shall be submitted as part of project close-out documentation to the COR and Contracting Officer.

10. The Contractor shall perform its own final inspection of the installation with appropriate checklists and submit this to the COR before the government’s final approval.

11. The Contractor’s inspection checklist report shall include how noted items have been addressed and are to be submitted to the COR prior to securing the government’s final approval.

12. The Contractor shall provide all close out documents as required by the contract.

Submit deliverables to:

Contracting Officer Representative (COR):

Karla Van Noy Haskell Indian Nations University karla.vannoy@bie.edu

D. TASK DESCRIPTION

mailto:karla.vannoy@bie.edu

1. The following contract line-item numbers (CLIN) shall be priced separately and as a total.

The Government reserves the right to accept any or all contract line-item numbers.

See other sections of this Statement of Work for additional requirements.

NOTE: No work may proceed without approval by the Contracting Officer.

CLIN #001 (Building 129 Provide installation Documents and install and remove temporary AC in Gymnasium

a. The Contractor shall engage a qualified person to inspect the building, to verify existing conditions, and provide plans and specifications if needed to install temporary AC unit in the building.

b. The contractor shall provide a technician to check the unit and ensure no failures from 8am to 12 pm on May 8, 2026.

c. Design shall include install and de-install AC unit to cool the Coffin sports complex gym during the dates of May 08 to May 10, 2026.

d. Provide condensate drain system as necessary.

e. Uninstall and remove all temporary components.

f. Check existing surfaces for sources of dampness, mold or cracking. -Remediate, repair, and /or replace as required.

g. Repair and refinish all interior surfaces, lines or fixtures that are affected as a result of the installation and removal of the system.

E. DELIVERABLES

1. Contractor shall provide installation documents for the installation and removal of

Temporary AC equipment. Install and remove temporary system as presented.

2. The Contractor shall submit samples, product data, and other submittals and share with HINU Facilities and the COR regarding details, materials and equipment that will be used as part of the project.

F. PERIOD OF PERFORMANCE

The Contractor shall have the temporary AC operational by May 7, through May 11 2026..

End of SOW

NFPA 5000 Building Construction - Life Safety and Fire Codes
National Electrical Codes
Uniform Plumbing and Mechanical Codes
ASHRAE Standards, Handbooks, Journals and Publications
Americans with Disabilities Act and Architectural Barriers Act Accessibility Guidelines (ADAABAAG)
Occupational Safety Health Administration (OSHA) - Federal Regulations
EPA - Tribal, State, Federal Regulations
Value Engineering DOI OMB Circular A-131
DOI – Guiding Principles for Sustainable Federal Buildings
Where applicable, the Contractor shall adhere to all federal and state statutes pertaining to archaeological, historical, and environmental clearances which may affect this project. Strict adherence to the National Environmental Protection Act (NEPA)...

File details come from the government source that posted it. Updated .