B08_A1_Statement_of_Work.pdf

PDF 208 KB Posted

Attached to
INSTALL DIRECT DIGITAL CONTROLS
Solicitation number
140A2325R0039
Issued by

About this file

This document is a Statement of Work (SOW) for the Direct Digital Control System Upgrade at the Cheyenne Eagle Butte BIE School in Eagle Butte, South Dakota. The project involves upgrading the building's Direct Digital Control (DDC) system in Building 2006, with a required completion timeline of 180 calendar days from the notice to proceed. The SOW includes two key attachments: the Great Plains DDC System Upgrade Design Cheyenne Eagle Butte HS Plan Set and the corresponding Specifications. The site map provided shows the school's campus layout, with the project location marked and surrounding buildings and infrastructure clearly depicted.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHEYENNE EAGLE BUTTE BIE SCHOOL

Eagle Butte, South Dakota

Direct Digital Control System Upgrade Building 2006 Project Statement of Work

March 2023

SCOPE

The Contractor shall perform all work as shown on the plan set and in conformance with the specifications for this project. The project shall be completed in 180 calendar days from the date of the notice to proceed. All contract requirements shall be performed as indicated in the project manual.

SECTION J ATTACHMENTS

Great Plains DDC System Upgrade Design Cheyenne Eagle Butte HS Plan Set Great Plains DDC System Upgrade Design Cheyenne Eagle Butte HS Specifications

SITE MAP

CHEYENNE EAGLE BUTTE BIE SCHOOL
Statement of Work
March 2023