B08_A1_Statement_of_Work.pdf
PDF 208 KB Posted
- Attached to
- INSTALL DIRECT DIGITAL CONTROLS
- Solicitation number
- 140A2325R0039
About this file
This document is a Statement of Work (SOW) for the Direct Digital Control System Upgrade at the Cheyenne Eagle Butte BIE School in Eagle Butte, South Dakota. The project involves upgrading the building's Direct Digital Control (DDC) system in Building 2006, with a required completion timeline of 180 calendar days from the notice to proceed. The SOW includes two key attachments: the Great Plains DDC System Upgrade Design Cheyenne Eagle Butte HS Plan Set and the corresponding Specifications. The site map provided shows the school's campus layout, with the project location marked and surrounding buildings and infrastructure clearly depicted.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHEYENNE EAGLE BUTTE BIE SCHOOL
Eagle Butte, South Dakota
Direct Digital Control System Upgrade Building 2006 Project Statement of Work
March 2023
SCOPE
The Contractor shall perform all work as shown on the plan set and in conformance with the specifications for this project. The project shall be completed in 180 calendar days from the date of the notice to proceed. All contract requirements shall be performed as indicated in the project manual.
SECTION J ATTACHMENTS
Great Plains DDC System Upgrade Design Cheyenne Eagle Butte HS Plan Set Great Plains DDC System Upgrade Design Cheyenne Eagle Butte HS Specifications
SITE MAP
| CHEYENNE EAGLE BUTTE BIE SCHOOL |
| Statement of Work |
| March 2023 |
File details come from the government source that posted it. Updated .