B08_A04_Attwater_Rolloff_specifications_051424.pdf

PDF 313 KB Posted

Attached to
Attwater Prairie Chicken NWR - Rolloff Dumpsters
Solicitation number
140FGA24Q0011
Issued by

About this file

This document is an attachment detailing the requirements for a roll-off dumpster rental and disposal services to support a building demolition project at the Attwater Prairie Chicken National Wildlife Refuge (APC NWR) in Eagle Lake, Texas. The U.S. Fish and Wildlife Service is seeking a vendor to provide an estimated 500 cubic yards of building demolition material and 80 cubic yards of concrete debris removal during the period of June 2024 to August 2024. The contractor will be required to furnish top-load 20-yard, 30-yard, or 40-yard metal roll-off containers and swap out up to 6 containers per day on an on-call basis. Pricing is requested for initial delivery, per haul fee, and per ton fee for both concrete and construction/demolition (C&D) debris removal. This is in support of the federal contract opportunity Solicitation Number 140FGA24Q0011 for "Attwater Prairie Chicken NWR - GAOA-ROLLOFF DUMPSTERS" issued by the Department of the Interior Fish and Wildlife Service.

View the file

Other files

File Type Posted
Sol_140FGA24Q0011.pdf PDF
B03_Wage_Determinations.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

April 2024

U.S. FISH AND WILDLIFE SERVICE

ATTWATER PRAIRIE CHICKEN NWR

General Requirements

Attwater NPC NWR Roll Off Container

At 10,000 acres and encompassing one of the largest remnants of coastal prairie habitat remaining in southeast Texas, the Attwater Prairie Chicken National Wildlife Refuge is home to one of the last populations of critically endangered Attwater Prairie Chicken, a ground-dwelling grouse of the coastal prairie ecosystem. The Attwater Prairie Chicken National Wildlife Refuge (APC NWR) is seeking a vendor to provide roll off dumpsters for the removal and disposal services of construction material debris in support of a building demolition project.

Delivery / Pick up Address

Delivery location – Refuge Headquarters compound, Refuge entrance - 1206 Apc Nwr Road, Eagle Lake, TX 77434, Eagle Lake, Texas 77434.

Latitude/Longitude 29.667595, -96.267308

Delivery hours – 07:00am to 05:00pm CST Normal daytime work hours are 0730 to 1600 Monday through Friday excluding Federal Holidays.

GENERAL

To potentially provide the removal of an estimated 500 cubic yards of building demolition material and 80 cubic yards of concrete debris (metal reinforcement not removed) from the buildings and grounds at Attwater Prairie Chicken National Wildlife Refuge.

Period of Performance The expectation is that all containers necessary to complete the project will be coordinated and completed from June 2024 – August 2024.

https://www.bing.com/ck/a?!&&p=7193702e20f3dee8JmltdHM9MTcxMjAxNjAwMCZpZ3VpZD0wZjg3M2ViZC01MTQ0LTZiMDEtMzcxOC0yYWU4NTBjMjZhNWImaW5zaWQ9NTcwMQ&ptn=3&ver=2&hsh=3&fclid=0f873ebd-5144-6b01-3718-2ae850c26a5b&u=a1L3NlYXJjaD9xPVdlc3Rlcm4lMjBHdWxmJTIwY29hc3RhbCUyMGdyYXNzbGFuZHMlMjB3aWtpcGVkaWEmZm9ybT1XSUtJUkU&ntb=1 https://www.bing.com/ck/a?!&&p=76832260a8582ff4JmltdHM9MTcxMjAxNjAwMCZpZ3VpZD0wZjg3M2ViZC01MTQ0LTZiMDEtMzcxOC0yYWU4NTBjMjZhNWImaW5zaWQ9NTcwMg&ptn=3&ver=2&hsh=3&fclid=0f873ebd-5144-6b01-3718-2ae850c26a5b&u=a1L3NlYXJjaD9xPVRleGFzJTIwd2lraXBlZGlhJmZvcm09V0lLSVJF&ntb=1 https://www.bing.com/ck/a?!&&p=8ceba219446c3833JmltdHM9MTcxMjAxNjAwMCZpZ3VpZD0wZjg3M2ViZC01MTQ0LTZiMDEtMzcxOC0yYWU4NTBjMjZhNWImaW5zaWQ9NTcwNA&ptn=3&ver=2&hsh=3&fclid=0f873ebd-5144-6b01-3718-2ae850c26a5b&u=a1L3NlYXJjaD9xPUdyb3VzZSUyMHdpa2lwZWRpYSZmb3JtPVdJS0lSRQ&ntb=1 https://www.bing.com/ck/a?!&&p=c06a198318e65dd6JmltdHM9MTcxMjAxNjAwMCZpZ3VpZD0wZjg3M2ViZC01MTQ0LTZiMDEtMzcxOC0yYWU4NTBjMjZhNWImaW5zaWQ9NTcwNQ&ptn=3&ver=2&hsh=3&fclid=0f873ebd-5144-6b01-3718-2ae850c26a5b&u=a1L3NlYXJjaD9xPUVjb3N5c3RlbSUyMHdpa2lwZWRpYSZmb3JtPVdJS0lSRQ&ntb=1

Description of Work The contractor, as an independent agent and not as an employee of the government, shall provide all materials, equipment, and labor, unless otherwise stated as government provided, required to furnish roll offs for demolition debris collection and removal services. The expectation is that the project will be completed in a two-week phase over the time expressed above..

1) The roll offs provided shall be Top load 20-yard, 30-yard, 40-yard or larger all metal containers, which shall be in serviceable condition and without defects that prevent the full use of the container.

2) 20-yard containers will be for concrete removal, if required.

3) We may request have two to three containers on site at one time, the awarded vendor will be responsible for swapping out up to 6 containers per day.

4) All containers will be placed in locations designated by the Refuge employee on site.

5) Containers will be emptied on a On Call basis that will not exceed 2 business days.

An empty container may be brought at time the full container is picked up.

6) All waste material which spills out of the containers during pickup, removal and transport will be picked up by the contractor and removed.

BASE PRICE ITEMS:

1. DEBRIS REMOVAL FROM DEMOLITION PROJECT - C&D and CONCRETE.

as specified herein, the sum of:

40 yd containers Initial Delivery (if applicable):

Per Haul Fee (Concrete):

Per Ton Fee (Concrete):

Per Haul Fee (C&D):

Per Ton Fee (C&D):

30 yd containers

Initial Delivery (if applicable):

Per Haul Fee (Concrete):

Per Ton Fee (Concrete):

20 yd containers Initial Delivery (if applicable):

Per Haul Fee (Concrete):

Per Ton Fee (Concrete):

File details come from the government source that posted it. Updated .