Statement of Work

Connection to municipal water main, installation of meter, installation of new water line to building, replacement of a galvanized interior pipe, installation of new water heater, and disposal of old water heater at the Bureau of Land Management’s Ford City Inspection Office, 330

Crooked Creek Dam Road, Ford City, Pennsylvania 16226. Conduct all work according to the specifications attached.

1. Connection to water main and meter installation

• Obtain from local utility and install ¾" meter pit.

• Replace existing connection to house via pulled pipes through existing damaged piping, a single curb valve on the north side of the road, and two (2) curb valves on the south side of the road – one to serve the occupied building and the other to serve the other, unoccupied building.

• Fill, restore to original grade, and reseed any disturbed areas with a BLM-approved turfgrass mix.

2. Upgrade galvanized interior pipe

• Replace a single interior galvanized supply pipe with PEX and reconnect branching copper pipes. Fixtures to connect and their accessibility are as follows:

▪ Washer hookup, basement – exposed connection

▪ Utility sink, basement – exposed connection

▪ Water heater, basement – exposed connection

▪ Kitchen sink, first floor – connection behind removable panel

▪ Spigot, garage – exposed connection in basement

▪ Sink, second floor – connection behind removable panel

▪ Toilet, second floor – connection behind removable panel

▪ Shower, second floor – connection behind removable panel

• Remove and dispose of basement toilet and shower; plug outgoing pipes from those fixtures.

3. Replace water heater

• Install new water heater (30 gallon) in location to be determined through consultation between contractor and Government.

• Connect water heater to plumbing and power.

• Dispose of old water heater.

4. Remove all replaced materials and job-related trash.

Permits

The Contractor shall obtain all special permits and licenses and give all notices required for the performance and completion of Statement of Work.

Contractor Qualifications and Licenses

All required certifications must be current at time of contract award. This list is not all inclusive and is subject to change as new Federal, State, and local laws and regulations are implemented and existing Federal, State, and local laws are revised.