This document provides specifications for a road reconditioning project. The project involves reconditioning several roads located in Klamath County, Oregon under the jurisdiction of the Bureau of Land Management Lakeview District. Work includes brushing, cleaning ditches, grading, rocking, installing rolling dips and culverts, and pothole repair. The specifications provide requirements for applicable standards, submittals, materials, execution, measurement, payment items and estimated quantities. Bidding opens under solicitation number 140L0621R0030 with an anticipated award date in January 2021.

View the file

Other files for this federal contract opportunity

Other files attached to KLAMATH FALLS ROCK REPLACEMENT, newest first.
File Type Posted
Sol_140L0621R0030_Amd_0001.pdf PDF
SF24-16d_(Example_Bid_Bond)_0001.pdf PDF
B09_A1_21R0030_At5_SV_Roster_0001.pdf PDF
B09_A1_21R0030_1442_Cont_Doc_A1_0001.pdf PDF
B09_A1_21R0030_At6_QAs_Amend_1_0001.pdf PDF
B08_21R0030_At3_WD_OR20210001.pdf PDF
Sol_140L0621R0030.pdf PDF
B08_21R0030_At4_Price_Breakout.xlsx XLSX spreadsheet
B08_21R0030_At1_Drawings.pdf PDF
B08_21R0030_1442_Cont_Doc_V3.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Klamath Falls Road Reconditioning January 3, 2021

TABLE OF CONTENTS

SPECIFICATIONS (from the Latest Version of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14)

DIVISION 100 GENERAL REQUIREMENTS

Section 101 Terms, Format, and Definitions Section 102 Bid, Award, and Execution of Contract Section 103 Scope of Work Section 104 Control of Work Section 105 Control of Material Section 106 Acceptance of Work Section 107 Legal Relation and Responsibility to the Public Section 108 Prosecution and Progress Section 109 Measurement and Payment

DIVISION 150 PROJECT REQUIREMENTS

Section 151 Mobilization Section 154 Contractor Sampling and Testing Section 155 Schedules for Construction Contracts Section 156 Public Traffic Section 157 Soil Erosion and Sediment Control

DIVISION 200 EARTHWORK

Section 207 Earthwork Geosynthetics

DIVISION 300 AGGREGATE AND BASE COURSES

Section 303 Road Reconditioning

DIVISION 400 ASPHALT PAVEMENTS AND SURFACE TREATMENTS

Section 403 Asphalt Concrete Section 412 Asphalt Tack Coat Section 413 Asphalt Pavement Milling Section 415 Paving Geotextiles

DIVISION 600 INCIDENTAL CONSTRUCTION

Section 601 Minor Concrete Structures Section 602 Culverts and Drains Section 635 Temporary Traffic Control

DIVISION 700 MATERIALS

Section 701 Cement Section 702 Asphalt Material Section 703 Aggregate Section 708 Plastic Pipe Section 718 Traffic Signing and Marking Material Section 725 Miscellaneous Material

SPECIAL CONTRACT

REQUIREMENTS FOR THE

CONSTRUCTION OF

KLAMATH FALLS ROAD

RECONDITIONING

RK – Rocking RC- Regrade Crown GRADE- Road Grade SPRK- Spot Rocking RT- Rutting MILL- Asphalt Milling WB- Wash boarding CMP – Corrugated Metal Pipe BR – Brushing PAVED – Chip Seal or Asphalt surface FDRC – Full Depth Reclamation TRN – Turnout CD – Clean Ditches WIDTH – Road Width PH – Potholes SE – Superelevated Curve FD – Concrete Ford OTSLP - Out slope Road

39-13E-11.0 (Round Valley Road)

Base Bid

ROUND VALLEY ROAD WORKLIST: BASE BID

MP BR RT CD RC WB RK SPRK WIDTH GRADE WORK ITEM

0.00 X X X 14'

BEGIN SUBGRADE

REINFORCEMENT,

ROCKING, REGRADE

CROWN

0.10 X 14' BEGIN CLEAN DITCHES

0.40 X 14' END CLEAN DITCHES

0.81 X 14' BEGIN BRUSHING

0.83 22' TURNOUT

1.28 X 14' END BRUSHING

1.50 X 14' BEGIN BRUSHING

1.93 X 22'

TURNOUT, BEGIN

WASHBOARD REPAIR

2.12 X 14' END BRUSHING

2.28 22' TURNOUT

2.38 X 14'

BEGIN BRUSHING, END

WASHBOARD REPAIR

2.41 22' TURNOUT

2.45 X X X X X 14'

END SUBGRADE

REINFORCEMENT,

WASHBOARD REPAIR,

ROCKING. BEGIN SPOT

ROCKING

2.50 14' INSTALL 18" CPP, 40'L

2.55 14' INSTALL 18" CPP, 40'L

2.60 14' 11%

2.62 X 14' BEGIN WASHBOARD REPAIR

3.08 14' INSTALL TURNOUT

3.15 14' 11% INTERSECTION/BLM GATE

3.34 X X 22'

TURNOUT, END

WASHBOARD REPAIR

3.62 X 14' BEGIN BRUSHING

4.13 14'

CHANGE IN EXISTING

AGGREGATE SURFACING

4.23 X 14' BEGIN WASHBOARD REPAIR

5.69 X 14' 11% END BRUSHING

6.38 X X X 14'

TURNOUT, END

WASHBOARD REPAIR, SPOT

ROCKING. BEGIN ROCKING

6.80 14' REPLACE 18" CULVERT, 40'L

6.90 X X X 14'

END CLEAN DITCHES,

CROWN, ROCKING

40-6E-1.2 (Copco/Big Bend Road)

COPCO/BIG BEND ROAD WORKLIST: BASE BID

MP BR RK SPRK CD RC WB WIDTH WORK ITEM

0.00 X X 14' BEGIN BRUSHING, SPOT ROCKING

0.45 14' INTERSECTION/STAGING AREA

2.09 X 14' BEGIN CLEAN DITCHES

2.19 22' TURNOUT

2.24 22' TURNOUT

2.25 22' TURNOUT

2.31 X 14' BEGIN WASHBOARD REPAIR

2.50 X 22' TURNOUT, BEGIN CROWN

2.65 14' REPLACE 24" CMP, 40' LONG

2.82 X X 14'

END SPOT ROCKING, BEGIN 4"

LIFT

3.27 22' TURNOUT

3.29 X X 14'

END 4" LIFT, BEGIN SPOT

ROCKING

3.60 14' BEGIN SEVERE WASHBOARD

3.64 22' TURNOUT

4.26 X X X x X 14'

END BRUSHING, SPOT ROCKING,

CLEAN DITCHES,

WASHBOARDING, CROWN

(Frain Ranch Road)

FRAIN RANCH ROAD WORKLIST: BASE BID

MP BR RK CD RC OTSLP WIDTH GRADE WORK ITEM

0.00 X X 14'

BEGIN BRUSHING, REGRADE CROWN,

BEGIN ROCKING

0.05 X 14' BEGIN OUTSLOPE

0.17 22' TURNOUT (EXISTING)

0.24 14' INSTALL ROLLING DIP

0.96 14' INSTALL 18" CPP

1.22 22'

TURNOUT (EXISTING), INSTALL

ROLLING DIP

1.34 14' INSTALL ROLLING DIP

1.39 14' INSTALL ROLLING DIP

1.47 14' 16% INSTALL ROLLING DIP

1.50 14' INSTALL ROLLING DIP

1.55 14' INSTALL ROLLING DIP

1.60 X X X 14'

END OUTSLOPE/BEGIN CROWN,

INSTALL ROLLING DIP

1.65 14' INSTALL ROLLING DIP

1.74 14' INSTALL ROLLING DIP

1.77 X X X 14'

END CROWN/BEGIN OUTSLOPE,

INSTALL ROLLING DIP

1.80 14' INSTALL ROLLING DIP

1.83 14' INSTALL ROLLING DIP

1.91 14' INSTALL ROLLING DIP

1.96 X X X 14' END BRUSHING, OUTSLOPE, ROCKING

39S-06E-7.01 (Onion Springs Road)

ONION SPRINGS ROAD WORKLIST: BASE BID

MP SURFACE BR CD RC WIDTH WORK ITEM

0.00 AGGREGATE X X X 14'

BEGIN BRUSHING, CLEAN

DITCHES, REGRADE CROWN,

BEGIN ROCKING

0.20 AGGREGATE 22' TURNOUT

0.90 AGGREGATE 22' TURNOUT

1.20 AGGREGATE 22' TURNOUT

1.60 AGGREGATE 22' TURNOUT

2.00 AGGREGATE X X X 22'

END BRUSHING, CLEAN DITCHES,

REGRADE CROWN, BEGIN

38S-06E-33.0 (Kakapo Road)

KAKAPO ROAD WORKLIST: BASE BID

MP SURFACE BR CD RC WIDTH WORK ITEM

0.00 AGGREGATE X X X 14'

BEGIN BRUSHING, CLEAN

DITCHES, REGRADE CROWN,

BEGIN ROCKING

0.08 AGGREGATE 22' TURNOUT

0.20 AGGREGATE 22' TURNOUT

0.40 AGGREGATE 22' TURNOUT

0.70 AGGREGATE 22' TURNOUT

0.80 AGGREGATE 22' TURNOUT

1.20 AGGREGATE 22' TURNOUT

1.40 AGGREGATE 22' TURNOUT

1.50 AGGREGATE 22' TURNOUT

2.00 AGGREGATE X X X 22'

END BRUSHING, CLEAN DITCHES,

REGRADE CROWN, BEGIN

40-6E-1.2 (Copco/Big Bend Road)

COPCO/BIG BEND ROAD WORKLIST: BID OPTION #1

MP BR RK SPRK CD RC PH OUTSLP WIDTH WORK ITEM

4.793 X X 14'

BEGIN SPOT ROCKING,

BRUSHING

4.899 14'

INTERSECTION (SPRING

ISLAND ACCESS)

5.099 22'

TURNAROUND (FOR SPRING

ISLAND ACCESS)

5.699 X X 14'

BEGIN REGRADE CROWN,

CLEAN DITCHES

5.927 X 14' POLTHOLE REPAIR

5.965 X X 14'

CLEAN OUT CULVERT, END

SPOT ROCKING, BEGIN 4" LIFT

5.976 14' INSTALL ROLLING DIP

6.244 14' TURNOUT

6.544 X X X 14'

INSTALL ROLLING DIP, END

CROWN, END CLEAN DITCHES,

BEGIN OUTSLOPE

6.774 22' TURNOUT

7.159 22' TURNOUT

7.351 14' INSTALL ROLLING DIP

7.637 14' INSTALL ROLLING DIP

7.708 22' INSTALL TURNOUT

7.715 14' BEGIN POTHOLES REPAIR

7.819 X X X 14'

END OUTSLOPE, BEGIN

CROWN

7.989 X X 14'

END POTHOLE REPAIR, BEGIN

CLEAN DITCHES

8.126 14' INSTALL ROLLING DIP

8.182 14' INSTALL ROLLING DIP

8.234 X X X 14'

END CROWN, BEGIN POTHOLE

REPAIR, OUTSLOPE

8.350 X X X X X 14'

INTERSECTION UPPER

KLAMATH RIVER

CAMPGROUND. END ROCKING,

OUTSLOPE, CLEAN DITCHES,

POTHOLE REPAIR

38S-06E-33.01 (National Knob Mainline Road)

NATIONAL KNOB MAINLINE ROAD WORKLIST: BID OPTION

MP SURFACE BR CD RC WIDTH WORK ITEM

0.00 AGGREGATE X X X 14'

BEGIN BRUSHING, CLEAN

DITCHES, REGRADE CROWN,

BEGIN ROCKING

0.19 AGGREGATE 22' TURNOUT

0.38 AGGREGATE 22' TURNOUT

0.57 AGGREGATE 22' TURNOUT

0.76 AGGREGATE 22' TURNOUT

0.95 AGGREGATE 22' TURNOUT

1.14 AGGREGATE 22' TURNOUT

1.33 AGGREGATE 22' TURNOUT

1.52 AGGREGATE 22' TURNOUT

1.71 AGGREGATE 22' TURNOUT

1.90 AGGREGATE 22' TURNOUT

2.09 AGGREGATE 22' TURNOUT

2.28 AGGREGATE 22' TURNOUT

2.47 AGGREGATE 22' TURNOUT

2.66 AGGREGATE 22' TURNOUT

2.85 AGGREGATE 22' TURNOUT

3.04 AGGREGATE 22' TURNOUT

3.23 AGGREGATE 22' TURNOUT

3.42 AGGREGATE 22' TURNOUT

3.61 AGGREGATE 22' TURNOUT

3.80 AGGREGATE 22' TURNOUT

4.00 AGGREGATE X X X 14'

END BRUSHING, CLEAN

DITCHES, REGRADE CROWN,

BEGIN ROCKING

41-14E-11.0 (CCC Road)

Bid Option #1

CCC ROAD WORKLIST: BID OPTION #3

MP BR RT CD RC RK FD WIDTH FEATURE

0.00 X X X X X 14'

GATE, BEGIN BRUSHING, SUBBASE

REINFORCEMENT, CLEAN DITCHES,

REGRADE CROWN, ROCKING

0.08 22' TURNOUT

0.37 14'

INTERSECTION (BARNES VALLEY BOAT

RAMP)

0.62 X 14' END BRUSHING

0.98 X 14' CONCRETE FORD

1.09 22' TURNOUT

1.14 X 14' CONCRETE FORD

1.21 X 14' BEGING BRUSHING

1.24 X 14' CONCRETE FORD

1.33 X 14' END BRUSHING

1.61 X 14' BEGING BRUSHING

1.68 X 14' END BRUSHING

2.03 22' TURNOUT

2.07 14'

PAVED APPROACH FOR WILD HORSE BRIDGE,

END BRUSHING, SUBBASE REINFORCEMENT,

CLEAN DITCHES, REGRADE CROWN,

ROCKING

2.69 14'

PAVED APPROACH FOR WILD HORSE BRIDGE,

BEGIN BRUSHING, SUBBASE

REINFORCEMENT, CLEAN DITCHES,

REGRADE CROWN, ROCKING

2.70 22' TURNOUT

2.98 X X X X 14'

END SUBBASE REINFORCEMENT, CLEAN

DITCHES, REGRAGE CROWN, ROCKING

Description of Work

The contractor shall provide all labor, transportation, materials, equipment, supervision, and incidentals necessary to:

1. Base Items:

• Work includes Road Reconditioning (Brushing, Cleaning Ditches, Grading, Rocking, installing rolling dips, and pothole repair), Subgrade reinforcement (with Geogrid), Culvert replacement and installation.

• Round Valley Road work includes subgrade reinforcement with geogrid, rocking, grading, brushing, cleaning ditches, one culvert replacement and two new culvert installations.

• Copco/Big Bend Road work includes rocking, grading, brushing, cleaning ditches, pothole repair and one culvert replacement.

• Frain Ranch Road work includes rocking, grading, brushing, cleaning ditches, and one culvert installation.

• Onion Springs, National Knob Mainline and Kakapo Roads work includes rocking, grading, brushing, and cleaning ditches.

• Road Reconditioning is intended to perform brushing and cleaning ditches for maintaining line of sight and drainage on the identified road systems. Limits for brushing are shown in the plans, as are standard dimensions for ditches.

• ‘Spot rocking’ is intended to add rock as needed to sections of road that have decent but worn aggregate surfaces and need more aggregate were the surface has thinned.

Average depths of surfacing were used to estimate quantities of rock to be placed on these sections.

• Estimated quantities for the base bid are shown on Sheet 5 of the attached plans.

2. Option Item 1: CCC Road work includes subgrade reinforcement with geogrid, rocking, grading, brushing, cleaning ditches, and replacement of three concrete fords.

Location: Work under this contract is located in Klamath County, Oregon, in the Klamath Falls Resource Area of the Lakeview District, Bureau of Land Management (BLM). The work location is shown on the drawings.

Applicable Standard Specifications

The General Requirements (Division 100) and the applicable sections of Divisions 150 through 700 of the Federal Highway Administration’s "Standard Specifications for Construction of Roads and Bridges on

Federal Highway Projects, FP-14, U.S. Customary Units" of the U.S. Department of Transportation, Federal Highway Administration apply to this project as modified by these Special Contract Requirements and Contract Clauses contained in the contract. Unless otherwise noted, all reference headings in these Special Contract Requirements refer to divisions, sections, subsections, articles or paragraphs of the Standard Specifications, FP-14. The Contractor shall keep a copy of FP-14 on site during all construction for this project.

The FP-14 is a separately published book by the Federal Lands Highway. To download FP-14 or to obtain a hard copy, visit:

http://flh.fhwa.dot.gov/resources/pse/specs/fp-14.htm http://flh.fhwa.dot.gov/resources/pse/specs/fp-14.htm

SHEET INDEX

SHEET

# DESCTRIPTION

1 COVER SHEET

2 SITE MAP: GERBER BLOCK

3 SITE MAP: N.W. KENO

4 SITE MAP: S.W. KENO

5 ESTIMATED QUANTITIES: BASE BID

6 ESTIMATED QUANTITIES: BID OPTIONS

7 BRUSHING DETAIL

8 CURVE BRUSHING DETAIL

9 CULVERT DETAIL

10 TYPICAL AGGREGATE SECTIONS

11 ROLLING DIP DETAIL

12 TYPICAL TURNOUT DETAIL

13 CONCRETE FORD DETAIL

14 PROJECT PHOTOS: FRAIN RANCH

15 PROJECT PHOTOS: COPCO/BIG BEND

16 PROJECT PHOTOS: ROUND VALLEY VALLEY/CCC ROADS

PREFACE

Delete the Preface and substitute the following:

These Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects are issued primarily for constructing roads and bridges on Federal Highway projects under the direct administration of the Bureau of Land Management. These specifications are cited as "FP-14" indicating "Federal Project" Standard Specifications issued in 2014 and contain both United States Customary and Metric units of measure.

When designated in a contract, the FP-14 becomes part of the contract and binding upon all parties to the contract. Construction contracts of the Bureau of Land Management are also governed by the following regulations:

● Federal Acquisition Regulation (FAR), Title 48, Code of Federal Regulations, Chapter 1

The FAR regulations are not included in the FP-14. A complete copy of the FAR is available from the Superintendent of Documents, Congressional Sales Office, U.S. Government Printing Office, Washington, DC 20402.

U.S. Customary units of measure are used in the FP-14 as provided in the November 25, 2008 Memorandum from Jeffrey F. Paniati entitled Update on Metric Use Requirements for FHWA Documents. Metric units are noted in parentheses following the U.S. Customary Units. The references to Metric or Metric units apply only when the project or portion of the project expressly calls for Metric units of measure.

DIVISION 100

GENERAL REQUIREMENTS

Section 101. – TERMS, FORMAT AND DEFINITIONS

101.01 Meaning of Terms. Add the following:

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03 Abbreviations. Add the following to (a) Acronyms:

AA

AAN

AAR

ABA

ACPA

ADA

AFPA

AI

AIA

ARA

AREA

ASCE

ASCII

ASLA

BLM

FTMS

GSA

IEEE

MIL

MSHA

NESC

NFPA

PCA

SAE

USFS

USGS

USPS

WCLIB

WWPI

Aluminum Association American Association of Nurserymen Association of American Railroad Architectural Barriers Act American Concrete Pavement Association Americans with Disabilities Act American Forest and Paper Association Asphalt Institute American Institute of Architects American Railway Association American Railway Engineering Association American Society of Civil Engineers American Standard Code for Information Interchange American Society of Landscape Architects Bureau of Land Management Federal Test Method Standard General Services Administration Institute of Electrical and Electronic Engineers Military Specifications Mine Safety and Health Administration National Electrical Safety Code National Forest Products Association Portland Cement Association Society of Automotive Engineers United States Forest Service United States Geological Survey United States Postal Service West Coast Lumber Inspection Bureau Western Wood Preservers Institute

Add the following to (b) U.S. Customary unit abbreviations and symbols:

hr mp ppm

Hour Milepost Part Per Million

101.04 Definitions. Delete the definitions for the following terms:

Bid Bidder

Modify the following definitions as follows:

Contract Time – Delete this definition and substitute the following:

Period of Performance (POP) – The specified time allowed for completion of contract work.

Notice to Proceed – Delete this definition and substitute the following:

Notice to Proceed – Written notice from the Contracting Officer to the Contractor to begin the contract work.

Right-of-Way – Delete this definition and substitute the following:

Right-of-Way – A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Maximum Particle Size – The smallest sieve opening through which all particles in the material will pass.

Neat Line – A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road – Temporary construction access built along the route of the project.

Protected Stream course – A drainage shown on the plans that requires designated mitigation measures.

Utilization Standards – The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Section 102. – BID, AWARD, AND

EXECUTION OF CONTRACT

Delete this section in its entirety.

Section 103. – SCOPE OF WORK

103.01 Intent of Contract Add the following:

The pictures in the plans are intended to further illustrate the existing condition.

103.02 Disputes. Delete in its entirety.

103.03 Value Engineering. Delete in its entirety.

103.04 Contractor Records. Delete in its entirety.

Section 104. – CONTROL OF WORK

104.01 Authority of the Contracting Officer (CO). Delete in its entirety.

104.02 Authority of Inspectors. Delete in its entirety.

104.03 Specifications and Drawings.

(c) As-built drawings. Modify the first sentence to read as follows: Use one set of Contractor-provided plans exclusively for as-built drawings.

(d) Submittals. Add this section:

(1) Initial, baseline and baseline construction schedule update Section 155

(2) Landfill receipt for all disposals (culverts, waste, per Section 203, 563)

(3) Documentation of water used for compaction per Section 303, 304, and 602.

(4) Documentation of field sampling and testing per tables 403-2, 407-3

(5) Traffic Control Plan - Section 635

(6) Erosion Control Plan- Section 157

(7) Submit the following for Section 207 Earthwork Geosynthetics

• Submit representative geocomposite product sample.

• Submit geocomposite product data sheet and certification from the Manufacturer that the geocomposite product supplied meets the requirements of 207.03.

• Submit Manufacturer's installation instructions and general recommendations.

104.04 Coordination of Contract Documents. Delete in its entirety.

Section 106. – ACCEPTANCE OF WORK

106.05 Statistical Evaluation of Work and Determination of Pay Factor.

Delete in its entirety, including all references to Statistical Evaluation. All references to Section 106.05 shall be replaced with references to Section

106.04 Measured or Tested Conformance.

Section 107. – LEGAL RELATIONS AND RESPONSIBILITY TO

THE PUBLIC

107.01 Laws to be Observed. Delete in its entirety.

107.03 Bulletin Board. Delete in its entirety.

107.05 Responsibility for Damage Claims. Delete in its entirety.

107.06 Contractor’s Responsibility for Work. Delete in its entirety.

107.09 Legal Relationship of the Parties. Delete in its entirety.

107.10 Environmental Protection Add the following: The in-stream work window is July 15 till September 30

Section 108. – PROSECUTION AND

PROGRESS

Delete this section in its entirety.

Section 109. – MEASUREMENT AND

PAYMENT

109.03 Weighing Procedures and Devices.

(c) Project weighing system. Add the following:

Manual scales may be used if approved in writing by the CO and if the method of weighing meets all other contract requirements. For aggregates weighed for payment, adjust scale weights of material to deduct the daily average moisture content in excess of 2 percentage points over optimum moisture as determined by AASHTO T 99 or the designated compaction method. If moisture determination is necessary, determine the daily average moisture content in accordance with AASHTO T 255, from not less than three representative samples of aggregate taken at random intervals each day that aggregate is being weighed.

109.06 Pricing of Adjustments. Delete in its entirety.

109.07 Eliminated Work. Delete in its entirety.

109.08 Progress Payments. Delete in its entirety.

109.09 Final Payment. Delete in its entirety.

Section 151. - MOBILIZATION

Payment

151.03 Delete in its entirety and substitute the following:

The bid schedule does not contain an estimated quantity for Soil Erosion Control (Section 157). This work will not be paid for directly but will be considered a subsidiary obligation of the Contractor under pay item 15101.

Payment will be made under:

Pay Item Pay Unit

15101 Mobilization Lump Sum

Section 154 - CONTRACTOR SAMPLING AND

TESTING

154.08 Delete in its entirety and substitute the following:

The bid schedule does not contain an estimated quantity for Contractor Sampling and Testing.

15401 Contractor Sampling and Testing Lump Sum

Section 155 – SCHEDULES FOR CONSTRUCTION

CONTRACTS

155.10 Delete in its entirety and substitute the following:

The bid schedule does not contain an estimated quantity for Schedules for Construction Contracts.

15501 Schedules for Construction Contracts Lump Sum

Section 156 – PUBLIC TRAFFIC

Construction Requirements

156.03 Delete this section in its entirety

The bid schedule does not contain an estimated quantity for Public Traffic (Section 156). This work will not be paid for directly but will be considered a subsidiary obligation of the Contractor under pay item 15101.

156.04 Maintaining Roadways During Work Delete in its entirety and substitute the following:

Perform roadway maintenance as follows:

(a) Maintain the roadway, detours, and diversions in a safe and acceptable condition. If corrective action is requested and the corrective action is not taken immediately, the condition may be corrected, and the cost of the corrective action deducted from monies due to the Contractor.

(b) Maintain intersections with roads, residences, ranches, and other features.

156.06 Limitations of Construction Operations. Delete (i) in its entirety and substitute the following:

(i) Limit construction caused delays to the public to a maximum of 30 minutes, except during active hunting seasons where maximum delay shall not exceed 15 minutes per passage through the project.

156.07 Nighttime Operations. Delete in its entirety.

156.08 Traffic and Safety Supervisor. Delete in its entirety.

Section 157. – SOIL EROSION CONTROL

157.18 Delete in its entirety and substitute the following:

The bid schedule does not contain an estimated quantity for Soil Erosion Control. This work will be considered a subsidiary obligation of the Contractor under pay item 15101 Mobilization.

Section 207. – EARTHWORK GEOSYNTHETICS

Delete in its entirety and substitute the following:

207.01 DESCRIPTION

A. The geocomposite shall consist of a geogrid heat bonded to a nonwoven geotextile for the purposes of aggregate stabilization, separation and filtration.

B. The geogrid shall be composed of a single layer and integrally formed with triangular apertures and high-profile ribs exhibiting significant dimensional stability through all ribs and junctions of the geogrid structure. The geogrid shall maintain its reinforcement and aggregate confinement capabilities under repeated dynamic loads while in service. The geogrid shall also be resistant to ultraviolet degradation, damage under normal construction practices and all forms of biological and chemical degradation normally encountered in road construction. Geogrid layers shall be placed as directed by the Engineer. The geogrid should be sized appropriately to interlock with the specified aggregate.

C. The geotextile shall be a needle-punched nonwoven geotextile made of 100% virgin polypropylene staple fibers, which are formed into a random network for dimensional stability. The geotextile must resist ultraviolet deterioration, rotting, biological degradation, naturally encountered alkalis and acids. The geotextile must be certified by the National Transportation Product Evaluation Program (NTPEP).

207.03 MATERIALS

A. The geocomposite should be lightly laminated between geogrid and geotextile to facilitate good quality interlock of aggregate. The geogrid should extend 3-6in outside the edges of geotextile to ensure interlock between aggregate and geogrid on the overlapped edge. Any geocomposites where the geotextile extends outside the edge of the geogrid will not be considered.

B. The geogrid shall be integrally formed through punching and drawing of extruded sheets of polypropylene. The geogrid shall be oriented in three substantially equilateral directions so the resulting ribs have a high degree of molecular orientation which continues at least in part through the mass of the integral node.

C. The resulting geogrid structure shall have apertures that are triangular in shape, and shall have ribs with depth-to-width ratios greater than 1.0.

D. The geocomposite shall have typical characteristics shown in the table below, and shall be certified in writing by the manufacturer to meet these characteristics.

Geogrid Properties(1) Longitudinal/Transverse Diagonal General Rib Pitch(2), mm (in) 40 (1.60) 40 (1.60) Mid-rib depth(2) ,mm (in) 1.4 (0.06) 1.6 (0.06) Mid-rib width(2), mm (in) 1.2 (0.05) 1.0 (0.04) Rib Shape Rectangular Aperture Triangular Junction Efficiency(3) 93% Isotropic Stiffness Ratio(4) 0.6 Radial stiffness at low strain (5), kN/m @ 0.5% strain (lb/ft @ 0.5% strain)

300 (20,580)

Resistance to chemical degradation(6) 100% Resistance to ultra-violet light and weathering(7) 70%

Geotextile Properties (2) Test Method English (MARV1)

Grab Tensile Strength ASTM D4632 160 lbs Grab Elongation ASTM D4632 50%

Trapezoid Tear Strength ASTM D4533 60 lbs

CBR Puncture Resistance ASTM D6241 410 lbs Permittivity ASTM D4491 1.5 sec-1 Water Flow ASTM D4491 110 gpm/ft2

Apparent Opening Size (AOS) ASTM D4751 70 Std. U.S. Sieve UV Resistance ASTM D4355 70% / 500 hrs

1. Unless indicated otherwise, values shown are minimum average roll values determined in accordance with ASTM D4759-02. Brief descriptions of test procedures are given in the following notes.

2. Nominal dimensions.

3. Load transfer capability determined in accordance with ASTM D6637-10 and ASTM

D7737-11 and expressed as a percentage of ultimate tensile strength.

4. The ratio between the minimum and maximum observed values of radial stiffness at

0.5% strain, measured on rib and midway between rib directions.

5. Radial stiffness is determined from tensile stiffness measured in any in-plane axis from testing in accordance with ASTM D6637- 10.

6. Resistance to loss of load capacity or structural integrity when subjected to chemically aggressive environments in accordance with EPA 9090 immersion testing.

7. Resistance to loss of load capacity or structural integrity when subjected to 500 hours of ultraviolet light and aggressive weathering in accordance with ASTM D4355-05.

207.04 ALTERNATE GEOGRID MATERIAL

Alternate geogrid materials may be considered if they meet or exceed the design criteria of the project. Such materials must be pre-approved in writing by the Engineer. For alternate geogrid materials not meeting all the requirements of Section 207.03, alternate material packages must be submitted meeting or exceeding the design criteria of the project to the Engineer a minimum of 14 days prior to the bid date, and must include, as a minimum, the following:

1. Validation in writing from the authors of the design methodology (Dr. Jie Han and / or

Dr. J.P. Giroud) that the specific geosynthetic is calibrated to the Giroud – Han (G-H) equation, through the review of the manufacturer’s calculations and full-scale testing by Drs. Giroud and Han. Comparison to another geosynthetic with similar index properties that has been calibrated and validated to G-H method will not be accepted as validation to the design method, as required by the authors of the methodology.

2. Test results from full-scale wheel and / or plate load testing performed on the specific product(s) to evaluate performance, evaluating ruts between 40mm and 100mm.

3. A design signed and sealed by a professional engineer registered to practice in the state that the project is located that incorporates the performance benefits of the submitted geogrid through full-scale wheel or plate load testing based on the site specific conditions of the project.

4. Five case histories, on the specific product being supplied, that demonstrate the product performs as intended in similar applications and holds up under normal construction activities.

5. A sample of the alternate geogrid material and certified specification sheets.

Recommended installation instructions and additional information as requested by the Engineer to fully evaluate the application.

6. In-air index testing of geogrid properties, or explanations of performance based on in-air index testing of geogrid properties are not sufficient to understand the complex mechanisms involved in soil/geogrid interaction and/or the performance of MSL’s.

Therefore, no acceptance of alternates based on material property comparisons or explanations of performance based on in-air testing of geogrid properties will be allowed.

7. No performance shall be attributed to the bond between the geogrid and geotextile.

207.05 MATERIALS

A. Storage and Protection

1. Prevent excessive mud, wet concrete, epoxy or other deleterious materials from coming in contact with and affixing to the geocomposite materials.

2. Store at temperatures above -20 degrees F (-29 degrees C).

3. Rolled materials may be laid flat or stood on end.

4. Geocomposite materials should not be left directly exposed to sunlight for more than

6 months or as recommended by the manufacturer.

B. Examination

1. The Contractor shall check the geocomposite upon delivery to verify the proper material has been received. The geocomposite shall be inspected by the Contractor to be free of flaws or damage occurring during manufacturing, shipping, or handling.

207.06 EXECUTION

A. Preparation

1. The subgrade soil shall be prepared as indicated on the construction drawings or as directed by the Engineer.

B. Installation

1. The geocomposite shall be installed with the geogrid facing up.

2. The geocomposite shall be installed at the proper elevation and alignment as shown on the construction drawings.

3. The geocomposite shall be installed in accordance with these plans and specifications and any installation guidelines provided by the manufacturer or as directed by the Engineer.

4. The geocomposite may be temporarily secured in place with ties, staples, pins, sand bags or backfill as directed by the Engineer.

5. Aggregate shall be placed and compacted in accordance with the local Department of Transportation standards. Aggregate shall be placed, spread and compacted in such a manner that minimizes the development of wrinkles in the geocomposite and/or movement of the geocomposite.

6. A minimum loose aggregate thickness of 6 inches is required prior to operation of tracked vehicles over the geocomposite. Turning of tracked vehicles should be kept to a minimum to prevent tracks from displacing the aggregate base material and damaging the geocomposite. When underlying subgrade is trafficable with minimal rutting, rubber-tired equipment may pass directly over the geocomposite reinforcement at slow speeds (less than 5 mph). Sudden braking and sharp turning movements shall be avoided.

C. Inspection and Repair

1. The Owner or Owner's representative may randomly inspect geocomposite before, during and after (using test pits) installation.

2. Any damaged or defective geocomposite (i.e. frayed coating, tears, etc.) will be repaired by removal of affected area and patching using new material with a minimum three foot overlap beyond the limits of the affected area.

3. Any roll of geocomposite damaged before, during and after installation shall be replaced by the Contractor at no additional cost to the Owner.

207.07 MEASUREMENT AND PAYMENT

This work will be measured and paid for by the square yard, completed in place. No allowance will be made for overlap, splices or material cut off or wasted. Different manufacturer's overlap and splicing requirements for the intended application may vary. Payment for Earthwork Geosynthetics will include furnishing the material, labor, and equipment required to furnish, place and anchor the geocomposite, and any hand work necessary to establish grades, make geocomposite splices, and repairs to protective coatings.

20701 Earthwork Geosynthetics Square Yard

Section 303. – ROAD RECONDITIONING

Construction Requirements

303.03-303.04 Work under this pay item includes: Removal of vegetation to the limits shown in the plans and cleaning debris and reshaping the ditches to the slopes and dimensions shown on the plans.

Add the following:

o This work shall consist of the removal of vegetation from the road prism-variable distance, and inside curves in accordance with these specifications and conforming to the lines, grades, dimensions, and typical cross sections shown on the Roadside Brushing Detail Sheet, at designated locations as shown in the plans or reference Standard Roadside Brushing Detail in plans.

o Roadside brushing may be performed mechanically with self-powered, self-propelled equipment and or manually with hand tools, including chain saws.

o Vegetation cut manually and or mechanically less than 7 inches in diameter at DBH shall be cut to a maximum height of 2 inches above the ground surface or above obstructions such as rocks or stumps on cut and fill slopes and all limbs below the 2 inch area will be severed from the trunk.

o Vegetation shall be cut and removed from the roadbed between the outside shoulder(s) and the ditch centerline and such vegetation shall be cut to a maximum height of 2 inches above the ground and running surface. Limbs below the 2-inch area will be severed from the trunk. Sharp pointed ends will not be permitted. Cuts shall be parallel to the ground line or running surface.

o Trees in excess of 7 inches in diameter at DBH shall be limbed, so that no limbs extend into the treated area or over the roadbed to a height of 14 feet above the subgrade of the roadway on cut and fill slopes, within the road prism-variable distance. Limbs shall be cut to within 1 inch of the trunk to produce a smooth vertical face. Removal of trees larger than 7 inches in diameter for sight distance or safety may be directed by the COR/PI.

o Inside curves shall be brushed out for a sight distance of 200 feet chord distance. Overhanging limbs and vegetation in excess of 1 foot in height, shall be cut within these areas.

o Self-propelled equipment shall not be permitted on cut and fill slopes or in ditches.

o Debris resulting from this operation shall be scattered downslope from the roadway. Debris shall not be allowed to accumulate in concentrations.

Debris in excess of 6 foot in length and 2 inches in diameter shall not be allowed to remain on cut slope, ditches, roadways, or water courses, or as directed by the COR/PI.

o Sections of roadway to have vegetation removed will be marked at start and stop points with pieces of red ribbon.

o Mechanical brush cutters shall not be operated when there are people or occupied vehicles within 400 feet of the immediate operating area.

o Traffic warning sign shall be required at each end of the work area. Signs shall meet the requirement of the Manual on Uniform Traffic Control Devices (MUTCD).

303.06 Gradations for surface aggregate shall conform to AASHTO T 27/11. Gradations meeting requirements of FP-14 and ODOT Standard Specifications are acceptable.

303.10 Add the following: Payment will be made under:

30301 Brushing Mile 30302 Ditch Cleaning Mile 30303 Grading Mile 30304 Rolling Dip Each 30305 Pothole Repair SQYD 30306 Aggregate Surface Ton

Estimated quantities clause applies to pay item 30306 Aggregate Surface

Section 601. – MINOR CONCRETE STRUCTURES

601.09. Add the following:

60101 Minor Concrete Structures Cubic Yard

Section 602. -CULVERTS AND DRAINS

602.2. Furnish and install non perforated 18- and 24-inch diameter dual wall (with smooth interior) HDPE pipe conforming to AASHTO M 294, and Section 708.02 FP-14. Pipe joints shall be soil and watertight.

Locations of culverts shall be according to worklists in specifications and/or as directed by COR.

602.10. Add the following:

60201 Culvert Replacement 24” Each 60202 Culvert Replacement 18” Each 60203 Culvert Installation 18” Each

Section 635. – TEMPORARY TRAFFIC CONTROL

Description

635.01 Add the following: Road segments may be closed as necessary for construction activities. Closed segments require a detour route to maintain access to public lands. Road closure and detour signs shall be placed at intersections of detours. Traffic control type/signage shall conform to MUTCD figure 6H-8 for road closures and 6H-11 for through traffic.

635.25. Add the following:

63501 Temporary Traffic Control Lump Sum

DIVISION 100 GENERAL REQUIREMENTS
207.03 MATERIALS
207.04 ALTERNATE GEOGRID MATERIAL
207.05 MATERIALS
207.06 EXECUTION
207.07 MEASUREMENT AND PAYMENT

File details come from the government source that posted it. Updated .