B08_140P5124Q0042_Attach_0005_Price_Schedule_FRRI_Installation_of_ID_Sign.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Replace Equipment - Park Identification Sign - Fre
Solicitation number
140P5124Q0042
Issued by

About this file

This document is a Price Quote Solicitation Schedule for the fabrication and installation of a new identity sign and base for the Freedom Riders National Monument in Anniston, Alabama. The Solicitation Number is 140P5124Q0042, and the Contract Line Item Number (CLIN) details the required sign components, including painted aluminum sign panels, posts, and concrete footer. The contractor is required to provide a detailed cost breakdown for materials, labor, equipment, overhead, and other associated costs in their lump sum price quote. The National Park Service Southeast Region is the federal agency issuing this contract opportunity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Quote

SOLICITATION PRICE SCHEDULE
SOLICITATION NUMBER: 140P5124Q0038
PROJECT TITLE: Replace Equipment - Park Identification Sign - Freedom Riders National Monument
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1The fabrication and installation of one new identity sign and base which consists of Intaglio process painted aluminum sign panels (2), painted aluminum posts to match NPS Brown with baseplate bolted to concrete footer. Baseplates must be welded to posts. The sign structure is to be bolted to a concrete footer designed and engineered by the contractor according to local codes and site-specific ground/soil conditions. The NPS arrowhead shall consist of an outdoor grade, UV resistant vinyl transfer and non-reflective at for Freedom Riders National Monument Fort Anniston, Alabama per the attached statement of work (SOW).1LS
TOTAL PROPOSED PRICE
NOTE: PLEASE PROVIDE A DETAILED COST BREAKOUT OF YOUR LUMP SUM PRICE QUOTE WITH ATTACHMENT 0005. ALL COSTS ASSOCIATED WITH YOUR QUOTE SHALL BE INCLUDED.

PARK - PMIS

CPS - &P

Cost Breakdown

MaterialsMaterials CostLabor CategoryLabor HoursLabor Rate Per HourEquipment RentalEquipment Rental RatesMobililzation/DemobilizationOverheadProfitBonds & Insurance
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Totals: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

File details come from the government source that posted it. Updated .