B08 0040532865 Trail Paving Price Schedule Sheet 4-20-21.pdf
PDF 68 KB Posted
- Solicitation number
- 140P5321R0024
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIONAL PARK SERVICE
GREAT SMOKY MOUNTAINS NATIONAL PARK
JOHN OLIVER CABIN - HANDICAP TRAIL PAVING
CONTRACTOR TO CONSTRUCT PAVED TRAIL ON A PREPARED BASE
(PARK TO DO ALL CLEARING, STRIPPING, GRADING AND SEEDING)
Price Schedule Sheet
CONNECTOR TRAIL FROM WEST PARKING LOT TO EAST PARKING LOT
EST.
ITEM DESCRIPTION QTY UNIT
Mobilization LS
2 Mineral Aggregate Base Course, Type A, 4" 116 TONS
3 Bituminous Prime Coat 265 GAL
4 Bituminous Concrete Surface Course, Grading E, 2" 62 TONS
5 Fine Grading (5 ft each side of trail) 556 SY
6 Thermoplastic Pavement Markings LS
7 Traffic Control LS
NEW TRAIL FROM EAST PARKING LOT
EST.
ITEM DESCRIPTION QTY UNIT
Mineral Aggregate Base Course, Type A, 4" 242 TONS
2 Bituminous Prime Coat 675 GAL
3 Bituminous Concrete Surface Course, Grading E, 2" 141 TONS
4 Traffic Control LS
OPTION ITEM
An option to be priced is an asphalt overlay of the exising westerly parking area.
This \IK9rk will include milling the butt joints, placing a tack coat and placing a 1-inch asphalt overlay.
PARKING LOT OVERLAY OPTION
Asphalt Milling at Butt Joints 38 SY
1 Bituminous Tack Coat 37 GAL
Bituminous Concrete Surface Course, Grading E, 1" 22 TONS
Quote FORM
DATE:
UNIT
PRICE
Sub-Total - A:
UNIT
PRICE
Sub - Total - B:
Total A + B:
Option Total:
Project Total:
TOTAL
PRICE
TOTAL
PRICE
File details come from the government source that posted it. Updated .