This is a bid proposal and contract document issued by the Virginia Department of Transportation (VDOT) for an on-call bridge repair project located throughout the Bristol District. The project encompasses multiple bridge maintenance and repair services across various routes within the district-wide area, with work items including asphalt concrete, structural excavation, bridge deck grooving, reinforced steel placement, anchor bolt replacement, concrete patching, expansion joint work, bearing replacement, and traffic control devices. The bid proposal was submitted on September 23, 2026, at 10:00 AM, with a project completion date of November 1, 2029. The contract is identified as Order No. B07 with Contract ID C0000128606B15 and is federally funded under FHWA project number STP-BR01-(418). Bids must be submitted electronically through Bidx (https://bidx.com/site/home), and all bidders are required to meet VDOT prequalification requirements prior to bid submission.
The bid proposal contains over 150 line items with approximate quantities specified for each work element, requiring bidders to submit unit prices for all items listed. A proposal guaranty bond equal to five percent of the total bid dollar value must accompany each submission, with bonds conforming to Section 102.07 of the specifications. Bidders must complete and submit Form C-48 documentation detailing subcontractor and supplier solicitation, utilization, and vendor survey information with their bids. All bidders are required to have direct contact with named subcontractors and suppliers and must certify the accuracy of their solicitation efforts. The contract will be awarded to the lowest responsive and responsible bidder meeting all prequalification and compliance requirements established by VDOT.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF TRANSPORTATION
Stephen C. Brich, P.E. 1221 East Broad Street Commissioner Richmond, Virginia 23219
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
September , 2026
Order No.: B07 Project: 9999-961-936, B615, B617, N501
FHWA: STP-BR01-(418)
District: Bristol County: District-Wide Route: Various Bids: September 23, 2026
To Holders of Bid Proposals:
Please make the following changes in your copy of the bid proposal and plans for the captioned project:
BID PROPOSAL
- SOI has been revised to include items 512SD20-0023 TRUCK MOUNTED
ATTENUATOR, 512SD20-0024 GROUP 2 CHANNELIZING DEVICES, 512SD20-
0025 PORT.CHANGEABLE MESS. SIGN, 512SD20-0026 ELECTRONIC ARROW
BOARD, and 512SP20-0001 PORTABLE TEMPORARY RUMBLE STRIP ARRAY.
- SP512-000130-00 EMPLOYMENT OF PTRS has been added to the proposal on pg. 112.
- NPA Sealing and Signing sheet has been revised to show most recent signature on pg.
206.
- NPA Summary of Estimated Quantities has been revised to show added items from SOI on pg. 213.
- Tabe of contents has been updated to show addition of SP512-000130-00.
Sincerely, James L. Swanson, P.E.
State Contract Engineer Construction Division Enclosures
ORDER NO.: B07
CONTRACT ID. NO.: C0000128606B15
Form C-6a
Rev. 3-22-05
CNSP (F) 1-9-06
COMMONWEALTH OF VIRGINIA
BID PROPOSAL AND CONTRACT
ROUTE NUMBER: VARIOUS
FHWA NUMBER: STP-BR01-(418)
PROJECT NUMBER: 9999-961-936, B615, B617, N501
COUNTY: DISTRICT-WIDE
DISTRICT: BRISTOL
DESCRIPTION: ON - CALL BRIDGE REPAIR
LOCATION: VARIOUS
DATE BID SUBMITTED: 10:00 AM WEDNESDAY, SEPTEMBER 23, 2026
Form C-118 Rev. 8-10-2026
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
NOTICE TO BIDDERS
As a matter of information, the bidder’s attention is directed to the points noted herein. Every point enumerated below is fully covered by proposal documents that describe them in detail. Bidders should check their proposal against all requirements, as strict compliance with all provisions is mandatory.
1. Bids shall be filed electronically through Bidx (https://bidx.com/site/home) at the times designated in the Notice of Advertisement for Bids. For information see (https://cabb.virginiadot.org/)
2. Unless otherwise specified or permitted in the proposal, prices shall be submitted on all items shown in the proposal.
3. Proposals conditioned by proposed alternates, other than those specified or permitted, or by reserving the right to accept or reject an award or to enter into a contract pursuant to an award will not be considered.
4. A bid total shall be shown in each space provided.
5. Bid bonds shall conform to Section 102.07. The bid bond number shall be placed in the appropriate space in your electronic bid. As an alternative, you may complete the bottom line of Form C-24. The form may be emailed to the Construction Division at VDOTContracts@vdot.virginia.gov and must be received prior to the opening of bids.
6. Joint venture proposals shall show the Firm Name of each party and shall be signed by an authorized representative of each Firm. A letter shall be filed with the prequalification office describing responsibility of each firm and the amount of maximum capacity pledge by each firm of a joint venture.
https://bidx.com/site/home http://cabb.virginiadot.org/ mailto:VDOTContracts@vdot.virginia.gov
Form C-24
Rev. 7-6-05
COMMONWEALTH OF VIRGINIA
PROPOSAL GUARANTY
KNOW ALL MEN BY THESE PRESENTS, THAT WE _______________________________________ as principal, and ________________________________________ Surety, are held and firmly bound unto the
Commonwealth of Virginia as obligee, in the amount of FIVE PERCENT OF THE DOLLAR VALUE OF THE
BID, lawful money of the United States of America, for the payment of which, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally and firmly by these presents.
SIGNED, sealed and dated this Day of , 20
WHEREAS, the above said principal is herewith submitting its proposal for:
PROJECT NUMBER: 9999-961-936, B615, B617, N501
NOW, THEREFORE, the condition of the above obligee is such, that if the aforesaid principal shall be awarded the contract upon said proposal and shall within the time specified in the Specifications after the notice of such award enter into a contract and give bond for the faithful performance of the contract, then this obligation shall be null and void; otherwise to remain in full force and effect and the principal and surety will pay unto the obligee the difference in money between the amount of the bid of the said principal and the amount for which the obligee may legally contract with another party to perform the said work if the latter amount be in excess of the former; but in no event shall the liability exceed the penal sum hereof.
(Principal*) (Surety Company)
By: By:
(Officer, Partner or Owner) (Seal) (Attorney-in-Fact**) (Seal)
(Principal*) (Address)
(Officer, Partner or Owner) (Seal) (Surety Company)
(Principal*) (Attorney-in-Fact**) (Seal)
(Officer, Partner or Owner) (Seal) (Address)
*Note: If the principal is a joint venture, each party thereof must be named and execution made by same hereon. If there is more than one surety to the bid bond, each surety must be named and execution shall be made by same hereon.
Electronic Bid Only: In lieu of completing the above section of the Contract Performance Bond, the Principal shall file an Electronic Bid Bond when bidding electronically. By signing below the Principal is ensuring the identified electronic bid bond has been executed and the Principal and Surety are firmly bound unto the Commonwealth of Virginia under the same conditions of the bid bond as shown above.
Electronic Bid Bond ID# Company/Bidder Name Signature and Title
**Attach copy of Power of Attorney
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
Form C-48 Rev. 10-03-25
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION,
AND VENDOR SURVEY FORM (ALL VENDORS)
PROJECT NO. 9999-961-936, B615, B617,
N501
CONTRACT I.D. NO. C0000128606B15
FHWA NO. STP-BR01-(418) DATE SUBMITTED
All vendors submitting a bid as a Prime Contractor shall complete and submit with their bids the following information as requested for (1) Subcontractor/Supplier Solicitation, and Utilization, and (2) for Vendor Survey.
The vendor certifies this form accurately represents its solicitation and utilization or non-utilization, as indicated, of the firms listed below for performance of work on this contract. The vendor also certifies he/she has had direct contact with the named firms regarding participation on this project.
Vendor Signature:
Vendor ID No. Title:
Vendor’s Address: ____________________________________
City: __________________
State: __________________ Zip Code: _________
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION (ALL)
VENDOR
NUMBER
NAME OF SUBCONTRACTOR/SUPPLIER TELEPHONE
NUMBER
UTILIZED
(Y/N)
NOTE: ATTACH ADDITIONAL PAGES, IF NECESSARY.
BIDDER MUST SIGN EACH ADDITIONAL SHEET TO CERTIFY ITS CONTENT AND COMPLETION OF FORM.
FEDERAL LAW REQUIRES ALL VENDORS SUBMITTING BIDS OR OFFERS PROVIDE THE INFORMATION
REQUESTED IN THIS FORM.
Form C-48 Rev. 10-03-25
VENDOR SURVEY
WHEN SUBMITTING A BID OR OFFER AS A PRIME CONTRACTOR, THE BIDDER MUST SUBMIT A
VENDOR SURVEY FOR THEMSELVES AND A VENDOR SURVEY FOR EACH SUBCONTRACTOR
AND SUPPLIER WHO SUBMITTED A BID OR QUOTE TO THE BIDDER.
VENDOR’S FULL LEGAL NAME: ________________________________________
VENDOR ID NO.: __________________
ADDRESS: ____________________________________
CITY: ____________________________________
STATE: _______________ ZIP CODE: _________
VENDOR’S YEARS IN BUSINESS: _____________
VENDOR’S ANNUAL GROSS RECEIPTS: ____ $ 0 - 25 million ____ $ 25 - 50 million ____ $ 50 - 75 million ____ More than $75 million
THE UNDERSIGNED, ON BEHALF OF VENDOR IDENTIFIED ABOVE, ACKNOWLEDGES AND CERTIFIES THAT THIS FORM ACCURATELY STATES THE INFORMATION CONTAINED HEREIN TO THE BEST OF VENDOR’S
KNOWLEDGE.
Printed Full Legal Name of Person Signing for Vendor
Signature: ____________________________________________
Form C-7
Rev. 2-2-24
SHEET 1
TERMS OF THE PROPOSAL\CONTRACT
SUBMITTED: 10:00 AM WEDNESDAY, SEPTEMBER 23, 2026
PROJECT NUMBER: 9999-961-936, B615, B617, N501
ROUTE NUMBER: VARIOUS
FHWA NUMBER: STP-BR01-(418)
DESCRIPTION: ON - CALL BRIDGE REPAIR
LOCATION: VARIOUS
DISTRICT: BRISTOL COUNTY: DISTRICT-WIDE
I/we declare that no other person, firm or corporation is interested in this proposal; that I/we have carefully examined the plans, job specifications, current Road and Bridge specifications, and all other documents pertaining thereto and thoroughly understand the contents thereof; that I/we meet the prequalification requirements for bidding on this proposal;
that I/we understand that the plans and current Road and Bridge specifications, are a part of this proposal; that all of the quantities shown herewith are a part of this proposal; that all the quantities shown herewith are approximate only; that I/we have examined the location of the proposed work and source of supply of materials; and that I/we agree to bind myself/ourselves upon award by the Commonwealth under this proposal to a contract with necessary surety bond to start work according to project specifications, and to complete all work in accordance with the plans, job specifications and current Road and Bridge Specifications within the time limit set forth in the contract.
COMPLETION DATE: NOVEMBER 1, 2029
BID TOTAL $
Attached is a bond conforming to the requirements of the current Road and Bridge Specifications, it being understood that such bond is to be forfeited as liquidated damages if, upon acceptance of the terms of this proposal, I/we fail to execute the contract and furnish bond as provided in the current Road and Bridge Specifications.
(Names of Individual(S),Firm(S) Or Corporation)
Street Address City State Zip Code Vendor#/Fin#
Print Name Signature Title
In consideration of the commitments made as shown herein, the Commonwealth of Virginia by The Commonwealth Transportation Commissioner agrees to pay for all items of work performed and materials furnished at the unit price(s) and under the conditions set forth in this proposal, in witnessed by the affixing of the name below.
Contract Execution Date By
CHIEF ENGINEER
VIRGINIA DEPARTMENT OF TRANSPORTATION
Virginia Department of Transportation 09/01/2026Date Printed:
Schedule of Items Page: 2
Proposal ID: C0000128606B15 9999-961-936,B615,B617,N501
Order No.: B07
Oversight/State Project No.:
Federal Project No.: STP-BR01-(418)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0010 315SD20-0032
ASPH. CONC. TY. SM-12.5A
MAINT
TON
75.000
0020 401SD20-0003
POROUS BACKFILL CY
25.000
0030 401SD20-0009
STRUCTURE EXCAVATION
MAINT.
CY
20.000
0040 404SD20-0020
BRIDGE DECK GROOVING
MAINT.
SY
1,000.000
0050 406SD20-0011
CR REINF. STEEL CL. I SPR.
STRUCT. MAINT.
LB
250.000
0060 406SD20-0013
CR REINF. STEEL CL. III SPR.
STRUCT. MAINT.
LB
250.000
0070 412SD20-0010
ANCHOR BOLT
REPLACEMENT
EA
10.000
0080 412SD20-0011
REPLACE HIGH STRENGTH
GROUT
LF
10.000
0090 412SD20-0017
EMBEDDED GALVANIC
ANODES
EA
250.000
0100 412SD20-0034
H.E.S. PATCHING TYPE B SY
75.000
0110 412SD20-0036
H.E.S. PATCHING TYPE C SY
50.000
0120 412SD20-0037
DECK SLAB CLOSURE SY
100.000
0130 412SD20-0039
EXPANSION JOINT REMOVAL LF
25.000
REVISED 9-2-26
Schedule of Items Page: 3
Proposal ID: C0000128606B15 9999-961-936,B615,B617,N501
Order No.: B07
Oversight/State Project No.:
Federal Project No.: STP-BR01-(418)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0140 412SD20-0042
EXPANSION JOINT
RECONSTRUCTION HES
LF
25.000
0150 412SD20-0043
EXPANSION JOINT
PREPARATION
LF
25.000
0160 412SD20-0046
BACK WALL
RECONSTRUCTION HES
LF
25.000
0170 412SD20-0047
BEAM END REPAIR EA
1.000
0180 412SD20-0048
JACKING AND BLOCKING
BEAM
EA
5.000
0190 412SD20-0049
CONC. SUPERSTR. SURFACE
REPAIR
SY
30.000
0200 412SD20-0050
REPLACE CONCRETE CURB LF
5.000
0210 412SD20-0051
REPLACE CONCRETE RAILS
TYPE A
LF
5.000
0220 412SD20-0052
REPLACE CONCRETE RAILS
TYPE B
LF
5.000
0230 412SD20-0053
REPLACE CONCRETE POST EA
2.000
0240 412SD20-0061
CONCRETE SUBSTRUCT.
SURFACE REPAIR
SY
150.000
0250 412SX20-0006
CLEAN AND RESEAL
EXPANSION JOINT
LF
100.000
ATTD
Schedule of Items Page: 4
Proposal ID: C0000128606B15 9999-961-936,B615,B617,N501
Order No.: B07
Oversight/State Project No.:
Federal Project No.: STP-BR01-(418)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0260 416SD20-0003
WATERPROOFING – EPOXY
RESIN TYPE EP-3B/EP-3T
SY
500.000
0270 420SD20-0021
ADHESIVE BASED JT.
SEALER CL. I, 2-1/2" MAINT.
LF
100.000
0280 420SD20-0022
ADHESIVE BASED JT.
SEALER CL. I, 3" MAINT.
LF
100.000
0290 420SD20-0027
ADHESIVE BASED JT.
SEALER CL. III, 1/2" MAINT.
LF
100.000
0300 420SD20-0028
ADHESIVE BASED JT.
SEALER CL. III, 1" MAINT.
LF
100.000
0310 420SD20-0029
ADHESIVE BASED JT.
SEALER CL. III, 2" MAINT.
LF
150.000
0320 421SD20-0006
ELASTOMERIC EXPANS. DAM
0" TO 2" SPRSTR MAINT
LF
50.000
0330 421SD20-0008
ELASTOMERIC EXPANS. DAM
3+" TO 4" SPRSTR MAINT
LF
50.000
0340 421SD20-0009
ELASTOMERIC EXPANS. DAM
4+" TO 5" SPRSTR MAINT
LF
50.000
0350 425SD20-0004
TYPE A MILLING 1-1/2" SY
1,000.000
0360 425SD20-0014
PLC.HIGH EARLY
MOD.CONC.OVERLAY
SY
1,000.000
0370 425SD20-0022
TYPE A HYDRO-DEMOLITION
1/2"
SY
1,000.000
Schedule of Items Page: 5
Proposal ID: C0000128606B15 9999-961-936,B615,B617,N501
Order No.: B07
Oversight/State Project No.:
Federal Project No.: STP-BR01-(418)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0380 425SX20-0003
FURN. HIGH EARLY LATEX
MOD.CONC. 1 1/4"- 1 3/4"
CY
100.000
0390 426SD20-0001
REPLACE BEARING EA
2.000
0400 426SD20-0002
RESET EXIST. ROCKER
EXPN. BEARING
EA
2.000
0410 426SD20-0003
MODIFY EXIST. ROCKER
EXPANSION BEARING
EA
2.000
0420 426SD20-0004
MODIFY EXIST. FIXED
BEARING
EA
5.000
0430 427SD20-0001
SILICONE JOINT SEALANT 1" LF
75.000
0440 427SD20-0002
SILICONE JOINT SEALANT 1-
1/2"
LF
75.000
0450 431SD20-0002
EPOXY OVERLAY MAINT SY
1,000.000
0460 512SD20-0003
TRAFFIC BARRIER SERVICE
MB-11A
LF
100.000
0470 512SD20-0007
IMPACT ATTEN.SER. TY. 1 TL-
3, >=40 MPH
EA
1.000
0480 512SD20-0008
IMPACT ATTEN.SER. TY. I TL-
2, <40 MPH
EA
1.000
0490 512SD20-0013
TYPE 3 BARRICADE 8' EA
2.000
0500 512SD20-0014
TEMPORARY SIGN SF
750.000
Schedule of Items Page: 6
Proposal ID: C0000128606B15 9999-961-936,B615,B617,N501
Order No.: B07
Oversight/State Project No.:
Federal Project No.: STP-BR01-(418)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0510 512SD20-0023
TRUCK MOUNTED
ATTENUATOR
HR
200.000
0520 512SD20-0024
GROUP 2 CHANNELIZING
DEVICES
DAY
250.000
0530 512SD20-0025
PORT.CHANGEABLE MESS.
SIGN
HR
50.000
0540 512SD20-0026
ELECTRONIC ARROW BOARD HR
100.000
0550 512SD20-0027
FLAGGER SERVICE HR
500.000
0560 512SD20-0042
ERADICATE LINEAR PVMT
MRKG
LF
100.000
0570 512SD20-0061
TEMP. PVMT MRKG TY. D, CL.
III, 4"
LF
50.000
0580 512SD20-0062
TEMP. PVMT MRKG TY. D, CL.
III, 6"
LF
50.000
0590 512SD20-0063
TEMP. PVMT MRKG TY. D, CL.
III, 8"
LF
50.000
0600 512SD20-0064
TEMP. PVMT MRKG TY. D, CL.
III, 12"
LF
50.000
0610 512SD20-0065
TEMP. PVMT MRKG TY. D, CL.
III, 24"
LF
25.000
0620 512SP20-0001
PORTABLE TEMPORARY
RUMBLE STRIP ARRAY
DAY
10.000
ATTD
Schedule of Items Page: 7
Proposal ID: C0000128606B15 9999-961-936,B615,B617,N501
Order No.: B07
Oversight/State Project No.:
Federal Project No.: STP-BR01-(418)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0630 513SX20-0001
MOBILIZATION ON-CALL TASK
ORDER GREATER THAN
$250,000 (ABINGDON)
EA
1.000
ATTD
0640 513SX20-0001
MOBILIZATION ON-CALL TASK
ORDER GREATER THAN
$250,000 (LEBANON)
EA
1.000
ATTD
0650 513SX20-0001
MOBILIZATION ON-CALL TASK
ORDER GREATER THAN
$250,000 (WISE)
EA
1.000
ATTD
0660 513SX20-0001
MOBILIZATION ON-CALL TASK
ORDER GREATER THAN
$250,000 (WYTHEVILLE)
EA
1.000
ATTD
0670 513SX20-0001
MOBILIZATION ON-CALL TASK
ORDER LESS THAN $250,000
(ABINGDON)
EA
1.000
ATTD
0680 513SX20-0001
MOBILIZATION ON-CALL TASK
ORDER LESS THAN $250,000
(LEBANON)
EA
1.000
ATTD
0690 513SX20-0001
MOBILIZATION ON-CALL TASK
ORDER LESS THAN $250,000
(WISE)
EA
1.000
ATTD
0700 513SX20-0001
MOBILIZATION ON-CALL TASK
ORDER LESS THAN $250,000
(WYTHEVILLE)
EA
1.000
ATTD
0710 513SX20-0002
EMERGENCY MOBILIZATION EA
1.000
ATTD
0720 515SD20-0004
FLEXIBLE PAVE.PLANING 0"-
2"
SY
750.000
Schedule of Items Page: 8
Proposal ID: C0000128606B15 9999-961-936,B615,B617,N501
Order No.: B07
Oversight/State Project No.:
Federal Project No.: STP-BR01-(418)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0730 704SD20-0001
TYPE A PVMT LINE MRKG 4" LF
200.000
0740 704SD20-0002
TYPE A PVMT LINE MRKG 6" LF
200.000
0750 704SD20-0026
TYPE B CLASS VI PVMT LINE
MRKG 4"
LF
200.000
0760 704SD20-0027
TYPE B CLASS VI PVMT LINE
MRKG 6"
LF
200.000
Section: 0001 _________._____Total:
Total Bid: _________._____
Virginia Department of Transportation 08/10/2026Date Printed:
Page
Bid Items Eligible For Fuel Adjustment
C0000128606B15
B07
Contract ID:
Order No.:
Instructions: This form shall be completed in accordance with the Special Provision for Optional Adjustment for Fuel. If you choose to have Fuel Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.
FORM C-21B
Rev 12-21-05
0001 REGULAR BID ITEMSSECTION:
ltem Description Fuel Factor gal/unit Option Item
Number
_______ASPH. CONC. TY. SM-12.5A MAINT 3.500315SD20-0032
_______FLEXIBLE PAVE.PLANING 0"-2" 0.071515SD20-0004
Date:
Signature:
(Firm or Corporation)
(Vendor No.)
Bid Items Eligible For Steel Price Adjustment
C0000128606B15
B07
Contract ID:
Order No.:
Instructions: This form shall be completed in accordance with the Special Provision. If you choose to have Steel Price Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.
Rev 12-21-08
FORM C-21C
0001 REGULAR BID ITEMSSECTION:
ltem Description Option Item
Number
_______CR REINF. STEEL CL. I SPR. STRUCT. MAINT.406SD20-0011
_______CR REINF. STEEL CL. III SPR. STRUCT. MAINT.406SD20-0013
Date:
Signature:
(Firm or Corporation)
(Vendor No.)
Bid Items Eligible For Asphalt Adjustment within this Project
C0000128606B15
B07
Contract ID:
Order No.:
0001 REGULAR BID ITEMSSECTION:
ltem Description Item
Number
ASPH. CONC. TY. SM-12.5A MAINT315SD20-0032
FORMS and SCHEDULE OF ITEMS PRECEDE SPCNs, SPs and SUPPLEMENTAL SPECS.
CN100-000026-09 GEN. PROJ. REQUIRE., SSS/SPS/SPCNS 12-11-25 (SPCN) 1
CN103-000100-01 SEC 103.02—AWARD OF CONTRACT 6-17-25 (SPCN) 1
CN105-000140-00 SEC 105.14—MAINTENANCE DURING CONSTRUCTION 12-20-24 (SPCN) 2
CN105-000150-00 SECURITY REQUIREMENTS FOR PCMS 1-30-26 (SPCN) 2
CN245-000100-01 SEC 245.03—TESTING & DOCUMENTATION 1-10-24 (SPCN) 3
CN512-000120-00 SEC 512—MAINTAINING TRAFFIC (IMPACT ATTEN. SER.) 7-13-16 (SPCN) 5
CN522-000300-00 PROTECT NESTING BIRDS DURING BRIDGE MAINT. 7-24-20 (SPCN) 5
CQ107-000130-00 DRUG-FREE WORKPLACE 7-3-19 (SPCN) 5
CQ107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY 5-11-22 (SPCN) 5
CQ512-000321-00 CONTRACTOR MAINT. OF TEMP. MARKINGS 6-13-17 (SPCN) 6
CQ522-000100-03 PROTECTION OF BAT SPECIES 1-17-18 (SPCN) 6
COLLECTION OF PROCESS WATER DURING HYDRO-DEMOLITION 6-4-26 (SPCN) 7
EMERGENCY MOBILIZATION 6-27-24 (SPCN) 7
SP0F0-000100-00 PREDETERMINED MIN. WAGE RATES R-7-12-16 9
SP0F0-000130-03 FHWA 1273—CONTRACT PROVISIONS, FED-AID 7-9-26 46
SP0F0-000150-01 AFFIRMATIVE ACTION / EEO NOTICE 7-17-17 69
SP100-000120-01 RENEWABLE ON CALL CONTRACTS GENERAL PROVISIONS 11-4-20 75
SP102-000120-00 NON-DISCRIMIN. EMPLOY. & CONTRACT. PRACTICES (EO-61) 1-10-17 81
SP107-000110-00 C-45–SWPPP GEN. PERMIT–CONTRACTOR CERTIFICATION R-10-27-16 82
SP107-000120-00 ELEC. SUBMISSION OF DBE AND PAYROLLS 1/21/20 83
SP107-001510-06 INTERIM DBE REQUIREMENTS 1-26-26 85
SP107-003100-00 MADE IN THE USA REQUIREMENTS 10-03-25 89
SP109-000100-05 ASPHALT MATERIAL PRICE ADJUSTMENT 7-8-24 96
SP109-000110-00 OPTIONAL ADJUSTMENT FOR FUEL R-7-12-16 98
SP109-000120-01* PRICE ADJUSTMENT FOR STEEL 7-2-19 100
SP109-000130-01 ELECTRONIC OR PRINTED WEIGH TICKETS 3-10-25 105
SP404-000100-00 SEALING EXPANSION JOINTS R-7-12-16 111
*SP512-000130-00 EMPLOYMENT OF PTRS 1-24-19 112
SP801-000100-01 LANE CLOSE COORD (LCC)/LANE CLOSE IMPLEMENT (LCI) 9-20-17 114
SQ105-000611-01 SEC 105.06 — SUBCONTRACTING (FED FUNDED PROJECTS) 2-9-17 (SP) 116
SQ107-001310-00 PREVAILING WAGE RATES FOR RENEWABLE ON CALL CONTR. 10-12-23 117
SS109-002020-01 SEC 109 — MEASUREMENT AND PAYMENT 5-1-23 121
SS211-002020-03 SEC 211 – ASPHALT CONCRETE 3-18-24 124
SS220-002020-01 SEC 220 – CONCRETE CURING MATERIALS 8-28-20 129
SS223-002020-02 SEC 223 – STEEL REINFORCEMENT 4-4-23 130
SS234-002020-01 SEC 234 – GLASS BEADS AND RETROREFLECTIVE OPTICS 5-6-22 131
SS235-002020-01 SEC 235 – RETROREFLECTORS 5-6-22 132
SS236-002020-01 SEC 236 – WOOD PRODUCTS 5-14-21 133
SS246-002020-02 SEC 246 – PAVEMENT MARKING 5-6-22 137
SS248-002020-02 SEC 248 – STONE MATRIX ASPHALT CONCRETE 3-18-24 145
SS305-002020-02 SEC 305 – SUBGRADE AND SHOULDERS 12-20-23 147
SS308-002020-01 SEC 308 - SUBBASE COURSE 7-13-21 149
SS309-002020-01 SEC 309 - AGGREGATE BASE COURSE 7-13-21 150
SS315-002020-05 SEC 315 – ASPHALT CONCRETE PLACEMENT 5-27-25 151
SS317-002020-01 SEC 317— STONE MATRIX ASPHALT CONCRETE PLACEMENT 6-21-24 170
SS318-002020-01 SEC 318 — PAVEMENT INTERLAYERS 8-2-23 172
SS319-002020-02 SEC 319 – THIN HOT MIX ASPHALT CONCRETE OVERLAY 3-18-24 173
SS321-002020-02 SEC 321 – TRENCH WIDENING 5-4-23 177
SS407-002020-02 SEC 407 – STEEL & METAL STRUCT 11-01-22 179
SS411-002020-01 SEC 411 – PROT. COAT. OF METAL 11-01-22 181
TABLE OF CONTENTS FOR PROVISIONS
SS512-002020-03 SEC 512 – MAINTAINING TRAFFIC 7-1-22 182
SS704-002020-02 SEC 704 – PAVEMENT MARKINGS AND MARKERS 5-6-22 195
SECTION 105.08— COOPERATION WITH REGARD TO UTILITIES 2-14-24 201
LIMITATION OF OPERATIONS 7-29-26 202
TREE REMOVAL TIME OF YEAR RESTRICTION 7-3-24 204
NO PLAN ASSEMBLY 205
cn100-000026-09 December 11, 2025 (SPCN)
GENERAL PROJECT REQUIREMENTS, SUPPLEMENTAL SPECIFICATIONS (SSs), SPECIAL PROVISIONS (SPs) AND SPECIAL PROVISION COPIED NOTES (SPCNs)
This project shall be constructed according to: the Plans; the Virginia Department of Transportation Road and Bridge Specifications, dated 2020 and the Supplement thereto, dated 2022; the Virginia Department of Transportation Road and Bridge Standards, dated 2016, with revisions issued online as of the advertisement date for this project incorporated; the Virginia Work Area Protection Manual, version 11.0;
the Virginia MUTCD version 11.0; and the Supplemental Specifications, Special Provisions and Special Provision Copied Notes in this Contract. The status in the Contract of each of these documents will be according to Section 105.12 of the Specifications.
Special Provision Copied Notes in this Contract are designated with “(SPCN)” after the date.
The information at the top and left of each Special Provision Copied Note in this Contract is file reference information for Department use only. The information in the upper left corner above the title of each Supplemental Specification and Special Provision in this Contract is file reference information for Department use only.
cn103-000100-01 June 17, 2025 (SPCN)
SECTION 103.02—AWARD OF CONTRACT of the Specifications is replaced in its entirety with the following:
103.02 – Award of Contract
The Board, or the Commissioner as authorized under § 33.2-209 of the Code of Virginia, will award the Contract to the lowest responsive and responsible bidder without discrimination on the grounds of race, color, gender, national origin, status as a military family, or other basis prohibited by law. In the event of a tie bid, the tie will be decided by lot.
The award date will not be later than midnight on the 60th day after the opening of bids. If the Board, or the Commissioner where authorized by law, has not awarded the Contract within this period due to any circumstances not attributable to the bidder, the bidder may withdraw his bid without penalty or prejudice unless the time limit is extended by mutual consent.
After approval for the award of contracts, the Department will provide written notice of award to the successful bidder and will post the Ballots on the Department’s bidding webpage. The Ballot serves as public Notice of Award for a contract. The date of the Notice of Award is the “Approved” date appearing at the top of the Ballot that lists the Contract.
cn105-000140-00 December 20, 2024 (SPCN)
SECTION 105.14—MAINTENANCE DURING CONSTRUCTION of the Specifications is amended by the following:
Section 105.14(a)3 – Flagging Traffic is replaced with the following:
3. Flagging Traffic: Flaggers shall be able to communicate to the traveling public in English while performing the job duty as a flagger at the flagger station.
All flaggers shall possess a valid, current flagger certification card, be it a physical or electronic card, at all times while performing flagging duties.
Flaggers shall be certified by the VDOT Basic or Intermediate Work Zone Traffic Control Training course or by the ATSSA’s classroom Flagger Certification Program.
The following constitutes a valid flagger certification card:
• Cards issued by VDOT following completion of the Basic Work Zone course;
• Cards issued by VDOT following completion of the Intermediate Work Zone course;
• Cards issued by ATSSA following completion of a Flagger course;
• Cards issued by VDOT following completion of the Flagger-only course, provided the cards were issued on or before December 31, 2024, and have not yet reached the expiration date
(two years after date of issuance).
Flaggers who fail to possess a valid, current, flagger certification card, or refuse to allow inspection of same upon request, shall be removed from the flagging site, and operations requiring flagging shall be suspended by the Engineer. Suspended operations requiring flagging may resume once a certified flagger arrives on-site to perform flagging duties in accordance with applicable requirements. Flaggers improperly performing duties may be subject to flagger certification revocation at the sole discretion of the Engineer.
cn105-000150-00 January 30, 2026 (SPCN)
SECURITY REQUIREMENTS FOR PORTABLE CHANGEABLE MESSAGE SIGNS — The Contractor shall secure portable changeable message sign (PCMS) control cabinets with a grade 3 or stronger standard lock at all times unless maintenance is actively being conducted on the sign.
A password shall be required to change the PCMS message. The Contractor shall change the manufacturer's default password for ALL electronic signs. Electronic signs that support the use of complex passwords shall include at least 14 characters consisting of the following criteria:
• At least one special character
• At least one alphabetical character
• At least one numerical character
• A combination of upper-case and lower-case letters
Electronic signs that do not support the use of complex passwords shall be changed using the maximum number of characters and character types permitted by the manufacturer.
Password credentials are prohibited from being stored, displayed, or written on or within the sign. Any QR codes affixed to the sign shall be removed.
For all PCMS with remote or wireless accessibility, the Engineer will authorize remote access prior to this functionality being enabled. Prior to authorization, the Contractor shall update the PCMS to the most recent compatible software and firmware version available from the manufacturer. Following authorization and prior to use, the Contractor shall establish a remote connection to verify that access to the PCMS is password protected.
Electronic signs shall only post approved and documented messages. The Contractor shall log all messages posted with date and times for each public message.
The Contractor has the option for their signs to be connected to the Department’s Operations Technology (OT) network for management by Traffic Operations Center (TOC) staff. By using this method, messages are transmitted and posted by the TOC control room staff with all records and logging managed within the VDOT Advanced Traffic Management System (ATMS). Electronic message signs connected to the OT network shall follow the security requirements described below:
1. All electronic signs connected to the network shall be secured with a digital lock installed on the sign control cabinet.
2. Connected signs shall only be remotely accessible through secure communications that originated from the Department’s OT network.
3. Connected signs shall only be posted with messages from the Department’s ATMS systems or designated backup systems.
4. Community strings (both public and private strings) shall be changed from default settings.
5. All vendor cloud connections shall be removed from the connected sign. TOC system administration staff will configure VPN connections exclusively to the Department’s OT network.
6. All connected electronic signs shall adhere to the Cabinet Security Standards found in the
Department’s OT Cybersecurity Program Manual.
cn245-000100-01 January 10, 2024 (SPCN)
SECTION 245.03—TESTING AND DOCUMENTATION of the Specifications is amended by the following:
Section 245.03(e) – Prefabricated Geocomposite Pavement Underdrain is replaced by the following:
Prefabricated Geocomposite Pavement Underdrain: Prefabricated geocomposite pavement underdrain shall consist of a polymeric drainage core allowing water inflow from both sides, encased in a nonwoven filter fabric envelope having sufficient flexibility to withstand bending and handling without damage.
Prefabricated geocomposite pavement underdrain shall conform to the following:
1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the pavement environment and shall have a thickness of not less than 3/4 inch. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.
Physical Properties Test Method Requirements
Compressive strength ASTM D1621, D2412, and D6364
Min. 40 psi at 20% max.
deflection immediately after 24 hrs of specimen conditioning at 0 deg F and at 125 deg F
Physical Properties Test Method Requirements
Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 0.1)
ASTM D4716 Min. 15 gal/min/ft width for 12-in specimen length
2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over both sides of the core. Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of Section 245.03(c) of the Specifications.
Section 245.03(f) – Geocomposite Wall Drains is replaced by the following:
Geocomposite Wall Drains: Prefabricated geocomposite wall drain shall consist of a polymeric drainage core with a nonwoven filter fabric (single sided or double sided) having sufficient flexibility to withstand bending and handling without damage. Geocomposite wall drains shall conform to the following:
1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the roadway. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.
Physical Property Test Method Requirements
Compressive strength ASTM D1621, D2412, and D6364
Min. 40 psi at 20% max.
deflection immediately after 24 hrs of specimen conditioning at 0 degree F and at 125 degree F
Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 1.0)
ASTM D4716 Min. 15 gal/min/ft width (for 12-in specimen length)
2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over the core. Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of Section 245.03(c) of the Specifications.
Section 245.03(g) – Geomembrane Moisture Barrier is replaced by the following:
Geomembrane Moisture Barrier: Geomembrane moisture barrier shall be resistant to biological attack.
Geomembrane shall be constructed of PVC and shall conform to the requirements of ASTM D7176 for PVC 30 or higher grades. In addition, geomembrane shall comply with the requirements of ASTM D7408 for bond seam strength and peel strength.
cn512-000120-00 July 13, 2016 (SPCN)
SECTION 512—MAINTAINING TRAFFIC of the Specifications is amended as follows:
Section 512.03(i)—Impact Attenuator Service is amended to replace the second paragraph with the following:
Only Type 1 re-directive low-maintenance impact attenuators in accordance with Section 505 shall be used on highways with posted speed limits greater than 50 mph or with an ADT greater than 25,000 vehicles per day.
cn522-000300-00 July 24, 2020 (SPCN)
PROTECTION OF NESTING BIRDS DURING BRIDGE MAINTENANCE — If bird nests are found on a bridge included in the Contract, the Contractor shall immediately notify the Engineer and suspend all work in the immediate vicinity of the nests until authorized to continue. The Contractor may proceed with other work activities that do not result in removal of nests or nest contents.
CQ107-000130-00 July 3, 2019 (SPCN)
DRUG-FREE WORKPLACE – The Contractor shall:
• Provide a Drug-Free Workplace for the Contractor’s employees.
• Post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the Contractor’s workplace and specifying the actions that will be taken against employees for violations of such prohibition.
• State in all solicitations or advertisements for employees placed by or on behalf of the Contractor that the Contractor maintains a Drug-Free Workplace.
• Include the provisions of the foregoing clauses in every Subcontract or purchase order of over $10,000, so that the provisions will be binding upon each Subcontractor or vendor.
For the purposes of this provision, “Drug-Free Workplace” means a site for the performance of work done in connection with the Contract. The Contractors employees, and those of his Subcontractors, shall be prohibited from engaging in the unlawful manufacture, sale, distribution, dispensation, possession, or use of any controlled substance or marijuana during the performance of the Work.
CQ107-000150-00 May 11, 2022 (SPCN)
EQUAL EMPLOYMENT OPPORTUNITY
Section 107.14(a)1 – Required by §2.2-4201 and §2.2-4311 of the Code of Virginia is replaced with the following:
1. Required by §2.2-4201 and §2.2-4311 of the Code of Virginia: During the performance of this Contract, the Contractor agrees as follows:
https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn512-000120-00.docx https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2020%20Standard%20Specifications/cn522-000300-00.docx
a. The Contractor shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, or national origin, age, disability, or other basis prohibited by state law relating to discrimination in employment, except where religion, sex, or national origin is a bona fide occupational qualification reasonably necessary to the normal operation of the Contractor. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause, including the names of all contracting agencies with which the Contractor has contracts of over $10,000.
b. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that such contractor is an equal opportunity employer. However, notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this chapter.
c. If the Contractor employs more than five employees, the Contractor shall (i) provide annual training on the Contractor's sexual harassment policy to all supervisors and employees providing services in the Commonwealth, except such supervisors or employees that are required to complete sexual harassment training provided by the Department of Human Resource Management, and (ii) post the Contractor's sexual harassment policy in (a) a conspicuous public place in each building located in the Commonwealth that the Contractor owns or leases for business purposes and (b) the Contractor's employee handbook.
The Contractor shall include the provisions of subdivisions a, b, and c in every subcontract or purchase order of over $10,000, so that such provisions shall be binding upon each subcontractor or vendor.
Nothing contained in this chapter shall be deemed to empower any agency to require any contractor to grant preferential treatment to, or discriminate against, any individual or any group because of race, color, religion, sex, or national origin on account of an imbalance that may exist with respect to the total number or percentage of persons of any race, color, religion, sex, or national origin employed by such contractor in comparison with the total number or percentage of persons of such race, color, religion, sex, or national origin in any community or in the Commonwealth.
CQ512-000321-00 June 13, 2017 (SPCN)
CONTRACTOR MAINTENANCE OF TEMPORARY MARKINGS – The second, third, and fourth paragraphs of Section 512.03(k)3 of the Specifications will also apply to Sections 512.03(k)1 and 512.03(k)2 of the Specifications.
CQ522-000100-03 January 17, 2018 (SPCN)
PROTECTION OF BAT SPECIES — If bats are observed roosting on a structure, the Contractor shall immediately notify the Engineer and suspend work in the immediate vicinity of the bats until authorized to continue.
UPC: 128606 June 4, 2026 (SPCN)
COLLECTION OF PROCESS WATER DURING HYDRO-DEMOLITION—When hydro-demolition is used for deck surface preparation operations, the equipment employed shall ensure all hydro-demolition process water is collected on the project site. The hydro-demolition collection procedure shall capture and contain the process water. The Contractor shall not discharge process water into the environment. Once hydro-demolition is complete, the process water shall be transported offsite for proper disposal. In accordance with Section 425.03(a)3 of the Specifications, the Contractor shall be responsible for compliance with all environmental laws and regulations regarding the proper disposal of the process water.
UPC: 128606 June 27, 2024 (SPCN)
EMERGENCY MOBILIZATION shall consist of performing emergency preparatory operations, including moving personnel, materials, and equipment to the work site when emergency repair or replacement work is ordered by the Engineer.
The Contractor shall furnish the Engineer with the emergency contact information of the supervisory employee and a backup person of his company who shall be available for repair calls during all hours, including weekends and holidays. The emergency contact information shall include the employee’s name, phone numbers, and email address.
The following procedures shall be used when the Contractor is required to respond to an emergency situation:
1) The Engineer will notify the Contractor of the location for emergency mobilization. Notifications will be by phone.
2) The Contractor shall acknowledge receipt of the Engineer’s notification within thirty (30) minutes of being notified. The Contractor shall respond via the same means as the original notification or by another approved method. Upon acknowledgement of emergency mobilization, the Engineer will provide the Contractor a scope of work with estimated quantities.
3) The Contractor shall arrive at the work site within four (4) hours of the Engineer’s initial notification. The Contractor shall notify the Engineer upon arrival to the site.
4) The Contractor shall assess the situation and confirm the scope of work with the Engineer. The Contractor shall confirm in writing the scope of work by providing details of the issues, the labor, equipment, and materials necessary to complete the repair, and the estimated duration to complete the repair.
5) The Contractor shall immediately make the repairs or take other actions relative to the issue as directed by the Engineer.
At the time of notification or at any time while the Contractor is in route to the site, the Contractor may request additional time to mobilize to the designated location (site) due to inclement weather, or circumstances beyond the Contractor’s control. Approval of additional mobilization time will be at the Engineer’s discretion on a case-by-case basis.
If the Contractor is contacted for an emergency mobilization and the Contractor indicates he cannot respond within the specified 4 hour period, the Department may use other available resources.
If the Contractor is notified to respond to a designated site and arrives at the site fully prepared to work within the timeframe noted as described herein, and the Engineer determines once he has arrived at the site his services are no longer needed, the Contractor will be compensated in accordance with this pay item.
Once the emergency mobilization is declared, the Engineer will direct the Contractor as to allowable work hours and allowable lane closures.
If traffic control is already in place, the contractors shall coordinate with the Engineer to replace the existing traffic control with their own.
Repair or replacement work shall be a continuous operation, with multiple crews if necessary, until the roadway can be safely re-opened.
Emergency mobilization will be measured in units of each, per emergency mobilization notification, and will be paid for at the Contract each price. This price shall include mobilizing personnel, materials, and equipment to the project site, performing diagnostic tests, assisting in developing recommendations for the repairs, delivering materials required to perform the work, and demobilizing.
Payment will be made under:
Pay Item Pay Unit
Emergency mobilization Each
SP0F0-000100-00 July 12, 2016
PREDETERMINED MINIMUM WAGE RATES
"General Decision Number: VA20260093 05/18/2026
State: Virginia
Construction Types: Highway
Counties: Virginia Counties of Wise and Norton*
* Designates Independent City
Modification Number Publication Date
0 01/02/2026
1 05/18/2026
SUVA2016-029 07/02/2018
Rates Fringes
TRUCK DRIVER: SINGLE & MULTI AXLE...................$ 15.65 0.00
TRUCK DRIVER: HEAVY OVER 7 CY.....................$ 16.69 0.00
TRUCK DRIVER : HEAVY 7CY & UNDER....................$ 16.69 0.00
TRAFFIC CONTROL: FLAGGER..........................$ 12.09 0.00
PAVEMENT MARKING TRUCK DRIVER.......................$ 19.00 0.00
PAVEMENT MARKING OPERATOR...........................$ 19.40 0.00
OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR..........$ 15.95 0.00
OPERATOR: TRACTOR (UTILITY)........................$ 12.25 0.23
OPERATOR: ROLLER (FINISHING).......................$ 15.17 0.00
OPERATOR: ROLLER...................................$ 15.85 0.00
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND
CONCRETE)...........................................$ 16.80 0.00
OPERATOR: PAVEMENT PLANER GROUNDSMEN...............$ 14.81 0.29
OPERATOR: PAVEMENT PLANER..........................$ 17.28 0.00
OPERATOR: MILLING MACHINE..........................$ 21.13 0.00
OPERATOR: MECHANIC.................................$ 18.57 0.00
OPERATOR: LOADER...................................$ 19.36 0.00
OPERATOR: GRADER/BLADE, INCLUDES FINISHING.........$ 26.13 0.00
OPERATOR: CRANE....................................$ 26.68 0.00
OPERATOR: BULLDOZER................................$ 19.36 0.00
OPERATOR: BROOM/SWEEPER............................$ 12.25 0.23
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE...............$ 20.53 0.00
LABORER: PIPELAYER.................................$ 16.75 0.00
LABORER: COMMON OR GENERAL.........................$ 13.81 0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER,
SPREADER AND DISTRIBUTOR............................$ 15.90 0.00
IRONWORKER, REINFORCING.............................$ 20.80 0.00
CEMENT MASON/CONCRETE FINISHER......................$ 19.35 0.00
CARPENTER, INCLUDES FORM WORK.......................$ 16.52 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable
Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .