B027-28_Nov_20_26_solicitation_doc.pdf

PDF 16 KB Posted

Attached to
Evansville Water Treatment Plant Improvements
Solicitation number
B027-28
Issued by
New Haven County, Connecticut

About this file

This Invitation to Bid (ITB) document is issued by the City of Meriden, Connecticut for comprehensive electrical and mechanical infrastructure improvements at the Evansville Water Treatment Plant. The project involves replacing the facility's inefficient fixed-speed system with advanced Variable Frequency Drives (VFDs) and upgrading the supporting electrical distribution infrastructure. The plant, originally constructed in 1970, currently operates at a maximum flow rate of 2.0 million gallons per day with an average daily flow of 0.90 million gallons per day, serving as the primary water supply for the East Side Carpenter Pressure Zone and the Carpenter Avenue Tank through three greensand media pressure filters drawing from the East Well. The solicitation is open to all qualified contractors with vendor questions accepted from November 18, 2026 at 7:15 a.m. EST through December 2, 2026 at 4:00 p.m. EST, and bids are due December 9, 2026 at 11:00 a.m. EST. All bids must be submitted through the OpenGov ePortal at procurement.opengov.com/portal/meridenct.

The solicitation specifies Free On Board Destination delivery terms with vendor-specified payment terms. No set-aside programs are designated for this opportunity. The estimated total value is not provided in the solicitation document. Inquiries regarding the bid should be directed to Susan Martel, Procurement Officer for the City of Meriden, at 142 East Main Street, Room 210, Meriden, Connecticut 06450, by telephone at 203-630-4115 or by email at smartel@meridenct.gov.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: B027-28

Evansville Water Treatment Plant Improvements

Invitation to Bid (ITB)

Meriden, City of

November 18, 2026 - December 09, 2026

Page:2

General Header Information

This bid has no questions defined.

B027-28

No. B027-28 Title: Evansville Water Treatment Plant Improvements Start Date: November 18, 2026 at 7:00:00 AM EST End Date: December 09, 2026 at 11:00:00 AM EST Vendor Q&A Start Date: November 18, 2026 at 7:15:00 AM EST Vendor Q&A End Date: December 02, 2026 at 4:00:00 PM EST Estimated Total Value:

Who can respond to this bid? : All Vendors Description: The City of Meriden is seeking competitive bids from qualified contractors for comprehensive electrical and mechanical infrastructure improvements at the Evansville Water Treatment Plant.

Originally constructed in 1970, the facility operates at a maximum flow rate of 2.0 MGD (million gallons per day) and an average daily flow of

0.90 MGD. The plant serves as the primary water supply for the East Side Carpenter Pressure Zone and the Carpenter Avenue Tank, drawing water from the East Well through three greensand media pressure filters.

The primary goal of this modernization project is to replace the inefficient, fixed-speed system with advanced Variable Frequency Drives (VFDs) and fully upgrade the supporting electrical distribution infrastructure.

Delivery Terms: Free On Board Destination Delivery Notes: All Bid's MUST be submitted via OpenGov EPortal -https://procurement.opengov.com/portal/meridenct Payment Terms: Vendor Specified Contact Information: Meriden, City of

Susan Martel 142 East Main St Room 210 Meriden CT, 06450 United States Tel: 203-630-4115 Fax: 203-630-3852 smartel@meridenct.gov

Contact Details: If you have any questions, please contact:

Susan Martel 142 East Main St Room 210 Meriden CT, 06450 United States Tel: 203-630-4115 Fax: 203-630-3852 smartel@meridenct.gov

Selected Categories:

Page:3

Documents:

B027-28 Evansville Plant Improvements.pdf

Page:4

Item Specifications Solicitation has been designated as having no line items.

Page:5

File details come from the government source that posted it. Updated .