This is an Invitation to Bid (ITB) document issued by the City of Meriden Purchasing Department for the construction of a splash pad facility at Hubbard Park in Meriden, Connecticut. The project, identified as B026-45, solicits a qualified contractor to furnish all labor and materials necessary for complete splash pad construction. The solicitation was released on March 24, 2026, with a mandatory pre-bid meeting scheduled for April 1, 2026, at 10:00 AM at Hubbard Park Pool Parking Area (999 West Main Street, Meriden, CT 06451). Sealed electronic bids must be submitted via the City eProcurement Portal by April 24, 2026, at 11:00 AM, with a question submission deadline of April 17, 2026, at 4:00 PM. Bidders are required to examine all documents and conduct a site visit to familiarize themselves with existing conditions, requirements, and project difficulties. No specific contract term or renewal options are identified in the bid documents.

The City of Meriden is exempt from federal excise taxes and Connecticut sales and use taxes, which should not be included in bid pricing. Each bid must be accompanied by a bid bond equal to 10 percent of the bid amount. The successful bidder will be required to provide Labor and Material Payment Bonds and Performance Bonds for 100 percent of the contract price with an approved corporate surety. This project is funded through the federal Community Development Block Grant program, making it subject to Davis-Bacon prevailing wage requirements and the Build America Buy America Act, which mandates domestic content for all iron, steel, manufactured products, and construction materials. State of Connecticut prevailing wage rates apply to all laborers and mechanics. The City reserves the right to reject any or all bids and to award the contract based on which bid best meets specifications and serves the City's interests. Payment will be made not less than 30 days following completion of services. Disadvantaged, minority, small, and women business enterprises are encouraged to respond.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/meridenct

City of Meriden

Purchasing Department

142 East Main St. Room 210

Meriden, CT 06450

B026-45 HUBBARD PARK SPLASH PAD

Project ID: B026-45

RELEASE DATE: March 24, 2026

RESPONSE DEADLINE: April 24, 2026, 11:00 am

Please refer to the project timeline in this document for all important deadlines.

Invitation To Bid #B026-45

Title: B026-45 Hubbard Park Splash Pad

Table Of Contents

1. LEGAL NOTICE

2. INFORMATION TO BIDDERS

3. SCOPE OF WORK

4. PRICING PROPOSAL

5. VENDOR SUBMISSION FORMS

Attachments:

AA - Splash Pad Spec's

CC - Splash Pad Design Submission 2.10.26

DD - B026-43_HubbardParkSplashPad_HeavySchedule

EE - Prevailing Wage Info Packet

FF - Construction Contract-Sample

HH - EJCDC General & Supplemental

JJ - General Insurance

KK - Sample Payment Bond

LL - Sample Performance Bond

LEGAL NOTICE

INVITATION TO BID

The City of Meriden is accepting sealed electronic bids for:

B026-45 Hubbard Park Splash Pad

The City of Meriden is soliciting bids in seeking the services of a contractor to furnish labor and materials for the construction of a Splash Pad located in Meriden's Hubbard Park..

Bids shall be submitted as sealed electronic bids per specifications obtained via the City eProcurement Portal:

https://procurement.opengov.com/portal/meridenct and on the State of Connecticut Department of

Administrative Services website (https://webprocure.proactiscloud.com).

Bids may be received up to but not later than 11:00 am, Friday, April 24, 2026 via the City eProcurement

Portal located at https://procurement.opengov.com/portal/meridenct. The City eProcurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties. Please submit electronic responses via the City eProcurement Portal: https://procurement.opengov.com/portal/meridenct by way of the eProcurement Portal, responses will be locked and digitally encrypted until the submission deadline passes.

A Mandatory Pre-Bid Meeting will be held on Wednesday, April 1, 2026, 10:00 am @ Hubbard Park

Pool Parking Area, 999 West Main Street, Meriden, CT 06451.

Each bid shall be accompanied by a Bid Bond in the amount of Ten (10%) percent of the amount bid.

The right is reserved to reject any or all bids, in whole or in part, to award any item, group of items, or total bid, and to waive informality or technical defects, if it is deemed to be in the best interest of the City of Meriden. No bidder may withdraw its bid within ninety (90) days of the date of the bid opening.

Labor and Material Payment Bond and a Performance Bond for One Hundred Percent (100%) of the contract price, with a corporate surety approved by the City of Meriden, will be required of the lowest responsible bidder.

This project is funded by the federal Community Development Block Grant program. State of Connecticut prevailing wage rates, Davis/Bacon and related acts apply.

The City of Meriden is an Affirmative Action/Equal Opportunity Employer. Disadvantaged, minority, small, and women business enterprises are encouraged to respond.

Rawle Dummett Purchasing Officer City of Meriden, CT 06450-8022 Dated: March 24, 2026 https://procurement.opengov.com/po1tal/meridenct https://webprocure.proactiscloud.com/

INFORMATION TO BIDDERS

1. SUMMARY

The City of Meriden is looking for a contractor to furnish labor and materials for the construction of a Splash

Pad located in Meriden's Hubbard Park.

2. TIMELINE

Project Release Date: March 24, 2026

Pre-Bid Meeting (Mandatory): April 1, 2026, 10:00am

Hubbard Park (Pool Area) Parking Lot 999 West Main Street Meriden, CT 06451

Question Submission Deadline: April 17, 2026, 4:00pm

Submission Deadline: April 24, 2026, 11:00am

3. BIDDING PROCEDURES

The City will only be accepting electronic submissions of bids and proposals. Please submit electronic responses via the City eProcurement Portal: https://procurement.opengov.com/portal/meridenct. By way of the eProcurement Portal, responses will be locked and digitally encrypted until the submission deadline passes.

Bids are due for submission no later than 11:00 am, Friday, April 24, 2026.

4. BIDS

Bids are to be submitted as follows:.

a. Bids must be made out and signed in the corporate, or other, name of Bidder, and must be fully and properly executed by an authorized person.

b. The City of Meriden, CT will only be accepting electronic submissions of the enclosed bid sheet via the City eProcurement portal partner, OpenGov: https://procurement.opengov.com/portal/meridenct.

c. Bids received later than the time and date specified will not be considered.

d. Amendments to or withdrawal of bids received later than the date and time set forth in the bid opening will not be considered.

5. EXAMINATION OF BIDDING DOCUMENTS

Bidders are to examine all documents and visit the site in order to make a thorough examination of the conditions so that the bidder may familiarize itself with all of the existing requirements, conditions, and difficulties that will affect the execution of the work in order to determine the amount of work necessary to carry out the true intent of the specifications and work shown on the drawings.

The City of Meriden and its agents do not have any responsibility for the accuracy, completeness, or sufficiency of any bid document obtained from any other source other than from the City eProcurement Portal:

https://procurement.opengov.com/portal/meridenct. Obtaining documents from any other source(s) may result in obtaining incomplete and inaccurate information. Obtaining documents from any other source may also result in failure to receive any addenda, corrections, or other revisions to the documents that may be issued.

No request shall be honored if such request is made less than seven (7) calendar days prior to the date fixed for the opening of bids. Any and all such interpretations, and any supplementary instructions, will be in the form of a written addenda to the specifications which, if issued, will be made available via the City eProcurement

Portal, located at https://procurement.opengov.com/portal/meridenct for addenda. Failure of any bidder to receive any such addenda shall not relieve any bidder from any obligations under its bid as submitted.

Bidders shall submit all inquiries regarding this bid via the City eProcurement Portal, located at https://procurement.opengov.com/portal/meridenct. Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the City eProcurement Portal. Bidders may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries.

6. BIDS TO REMAIN OPEN

No bidder may withdraw its bid within ninety (90) days of the date of the bid opening. Should there be reason why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the City of Meriden and the successful bidder.

7. PREVAILING WAGES

It is determined prevailing wages are required it is expressly understood and agreed they are the responsibility and obligation of the Contractor to secure and maintain any/all prevailing wages rates.

8. TIME

Inasmuch as the contract concerns a public improvement, the provisions of the contract relating to the time of performance and completion of the work are of the essence of the contract. Accordingly, the successful bidder/contractor (“Contractor”) shall begin work on the day specified in paragraph 2.04 of the General

Conditions and shall perform the work diligently so as to permit full use not later than the first day following the construction period established in the Contract. (See paragraph 10 entitled “Liquidated Damages” of the

Construction Contract between City of Meriden, as owner, and the Contractor).

9. TAXES

The City of Meriden is exempt under Connecticut General Statutes from the payment of the excise taxes imposed by the federal government and the Sales and Use Tax of the State of Connecticut; such taxes should not be included in the bid price. Upon request, exemption certificates will be furnished to the successful bidder.

10. FAIR EMPLOYMENT PRACTICES

The Contractor shall agree that neither it or its subcontractors, except in the case of a bona fide occupational qualification or need, to refuse to hire or employ or to bar or to discharge from employment any individual or to discriminate against such individual in compensation or in terms, conditions or privileges of employment because of the individual's race, color, religious creed, age, sex, gender identity or expression, marital status, national origin, ancestry, present or past history of mental disability, intellectual disability, learning disability, physical disability, including, but not limited to, blindness or status as a veteran. The aforementioned terms are obtained from Connecticut General Statutes Section 46a-60, et seq., entitled “Discriminatory employment practices prohibited,” as amended.

11. DAVIS-BACON ACT

All laborers and mechanics employed by contractors and subcontractors in the performance of construction work financed in whole or in part with assistance received under this title shall be paid wages at rates not less than those prevailing on similar construction in the locality as determined by the Secretary of Labor in accordance with the Davis Bacon Act, as amended (40 U.S.C. 276a-276a-5); Provided, That this section shall apply to the rehabilitation of residential property only if such property contains not less than 8 units. The

Secretary of Labor shall have, with respect to such labor standards, the authority and functions set forth in

Reorganization Plan Numbered 14 of 1950 (15 F.R. 3176; 64 Stat. 1267) and section 2 of the Act of June 13, 1934, as mended (48 Stat. 948; 40 U.S.C. 276(c)).

12. FORM OF AGREEMENT BETWEEN CITY OF MERIDEN AND CONTRACTOR

The Agreement for the work will be via Purchase Order and Standard Construction Agreement including

EJCDC.

13. LOCAL SUBCONTRACTORS, SUPPLIERS, etc.

Local subcontractors, material suppliers, and labor in the City of Meriden should be considered and sought out insofar as it is practical in the performance of this project.

14. BUILD AMERICA BUY AMERICA

This bid is subject to: The Build America Buy America Act, enacted as part of the Infrastructure Investment and Jobs Act on November 15, 2021, established a domestic content procurement preference for all Federal financial assistance obligated for infrastructure projects after May 14, 2022. The domestic content procurement preference requires that all iron, steel, manufactured products, and construction materials used in covered infrastructure projects are produced in the United States.

15. CITY OF MERIDEN CODE OF ETHICS

The City of Meriden has adopted a Code of Ethics located in Chapter 21 of the Code of the City of Meriden, sections 21-1 through 21-15, inclusive, which are expressly incorporated herein by reference. The terms of the

Code of Ethics shall constitute a part of any contract or agreement entered into by the City of Meriden as a result of this bid as if those terms were fully set forth in such contract or agreement.

Bidders are specifically advised that the Code of Ethics prohibits public officers and employees, as well as their immediate families and businesses, with which they are associated from participating in any transaction which https://www.hud.gov/sites/dfiles/GC/documents/Build%20America,%20Buy%20America%20Act%20Provisions.pdf is incompatible with the proper discharge of official duties or responsibilities. Bidders are also advised that the

Code of Ethics contain provisions with respect to paid contractors and former employees and officials.

BIDDERS SHOULD NOTE THAT BIDS, CONTRACTS, AND AGREEMENTS ENTERED INTO OR

AWARDED IN VIOLATION OF THE CODE OF ETHICS ARE VOIDABLE BY RESOLUTION OF

THE CITY COUNCIL OF THE CITY OF MERIDEN.

Copies of the Code of Ethics may be obtained from the office of the City Clerk or may be found online on the

City of Meriden’s website.

16. NON-COLLUSION STATEMENT

Each bidder submitting a bid to the City of Meriden for any portion of the work contemplated by the documents on which bidding is based shall execute and attach thereto the sworn Non-Collusive Bid Statement, to the effect that the bidder has not colluded with any other person, firm, or corporation in the submission of the bid.

17. AWARD IN CASE OF A TIE

In the event there are two or more responsive bidders, the decision to award will be based by the following criteria and in the following order:

a. The incumbent will be awarded the bid over that of another bidder.

b. In the case of a multi-item bid, if one bidder has been awarded other items from the same bid and the other bidder has not, the bidder with the multiple awards will be awarded the bid over that of another bidder.

c. The bidder located in the State of Connecticut will be awarded the bid over that of another bidder.

d. The winner of a coin toss will be awarded the bid over that of another bidder.

The above-referenced provisions do not apply to those situations in which more than one City-based business responsible bidder has submitted bids not more than ten (10) percent higher than the lowest bid and has agreed to accept the award of the bid at the amount of the lowest bid. Under such circumstances, the provisions of the

Code of the City of Meriden, section 3-14, are controlling, as set forth under Section 8 of this ‘Information to

Bidders.’

18. AWARD OF CONTRACT

The Purchasing Officer reserves the right to make an award on the bid which, by the Purchasing Officer’s judgment and recommendation from the Parks following bid evaluations, best meets the specifications and is deemed to be in the best interest of the City of Meriden.

The contract will not be awarded to any corporation, firm, or individual which/who is in arrears to the City of

Meriden by debt or contract, or who is in default as security or otherwise by any obligation to the City of

Meriden.

The right is reserved to reject any or all bids, in whole or in part, to award any item, group of items, or total bid, and to waive informality or technical defects, if it is deemed to be in the best interest of the City of Meriden.

19. BID PROTEST PROCEDURE

In the event that any bidder wishes to protest the potential award of a bid, or any procedure of act in the advertising or soliciting of the bids, said bidder must make said protest in writing, which shall state the reason therefore and request a conference with respect thereto. Said protest must be received in the City Purchasing

Office within FIVE (5) business days after the delivery of bid results or decisions. A conference with respect to said protest shall be scheduled by the Purchasing Officer forthwith and shall be attended by him or his designee and such other persons as the Purchasing Officer and the City Manager shall require to attend. The subject matter of said conference shall be limited to the reasons for the protest specified in the written request for said conference. Said conference shall also include a discussion of all possibilities for a resolution of dispute. The

City shall make a decision in writing within three (3) business days after said conference and forward the same to the protesting bidder forthwith. In the event that any protesting bidder wishes to take legal action against the

City, they must fully comply with all of these instructions to bidders.

20. ASSIGNMENT OF CONTRACT

No contract may be assigned without the written consent of the Purchasing Officer or designee.

21. PERMITS

The Contractor shall be responsible for obtaining any and all necessary permits required by the City of Meriden prior to the commencement of work. The Contractor may contact the City of Meriden Building Department for permit information at (203) 630-4091. For all other required permits, contact the City of Meriden Engineering

Department at (203) 630-4018. Please note-This is a City of Meriden Building therefore City permit fees will be waived BUT the State Training and Education Fund Fees/Permit will NOT be waived.

22. BID PRICE AND PAYMENT

The City of Meriden is exempt from the payment of the excise taxes imposed by the Federal government and the Sales and Use Tax of the State of Connecticut under Connecticut General Statutes; accordingly, such taxes shall not be included in the bid price.

The City of Meriden, unless stated otherwise in the bidding documents or Contract, will make payment to the

Contractor not less than thirty (30) days following completion of services.

23. QUALITY

All materials, equipment, supplies, and services shall be subject to rigid inspection. If defective material, equipment, supplies, or services are discovered, the Contractor shall remove or make good such material, equipment, or supplies without extra compensation. It is expressly understood and agreed that any inspection by the City of Meriden will in no way lessen the responsibility of the Contractor or release Contractor from the obligation to perform and deliver to the City sound and satisfactory materials, equipment, supplies, or allow the cost to be deducted from any monies due it from the City of Meriden. All services will be performed in a workmanlike manner.

24. LICENSES AND CERTIFICATIONS

The successful firm(s) shall ensure that any appropriate licenses or certifications required by the State of

Connecticut are maintained for the duration of the project. The firm must meet all municipal, state and federal affirmative action and equal employment opportunity practices.

25. INSURANCE

The successful bidder shall be required to provide a Certificate of Insurance denoting general liability, automobile liability, workers compensation liability, and other coverage required by the City’s Risk Manager.

SCOPE OF WORK

SCOPE OF WORK - PROJECT DETAILS - PROJECT INFORMATION

1. SECTION 02100 - SITE PREPARATION

PART 1 -GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following items:

• Site layout lines and levels

• Project Sign.

• Clearing and grubbing.

• Demolition and removals.

• Debris and waste material removal.

• Disposals.

• Tree pruning.

• Tree protection.

• Temporary construction fence.

B. Related Sections include the following:

• Division 2 Section 02300 “Earthwork”.

• Division 2 Section 02820 “Fencing”.

1.3 REFERENCES

A. State of Connecticut Department of Transportation Standard Specifications for Roads, Bridges and Incidental Construction.

B. American Society for Testing and Materials (ASTM).

C. National Arborist Association (AAA).

1.4 DEFINITIONS

A. Topsoil: Natural or cultivated surface-soil layer containing organic matter and sand, silt, and clay particles; friable, pervious, and black or a darker shade of brown, gray, or red than underlying subsoil;

reasonably free of subsoil, clay lumps, gravel, and other objects more than 2 inches (50 mm) in diameter; and free of weeds, roots, and other deleterious materials

1.5 SUBMITTALS

A. Submit credentials for the following in accordance with the Conditions of Contract and Division 1 Section “Submittals".

• Arborist credentials of the ‘person’ who will perform the Work specified under this Section; include the

State of Connecticut license information and at least three (3) references.

1.6 COORDINATION

A. Thoroughly coordinate and schedule the Work of this Section with all trades involved to prevent interferences and in order to allow adequate time at the proper stage of construction to properly perform all the Work of this Section.

1.7 PROJECT CONDITIONS

A. Thoroughly coordinate all street and/or parking space closings and/or obstructions, including pavement and curbing removals with all governing authorities and utility companies.

B. The existing property lines and topographic contours noted on the drawings are given for the convenience of the Contractor. The Landscape Architect or Engineer and the Owner will not be responsible for interpretations or conclusions drawn by the Contractor. Notify the Landscape Architect or Engineer immediately of any discrepancies in the existing property lines or existing topographic elevations.

C. The location of existing structures, utilities, storm drainage structures and piping are noted on the drawings but should not be relied upon. Check and verify the location of all existing structures, utilities and piping prior to commencing work.

D. Call 811 (Call Before You Dig) and register before beginning any excavation at least two (2) working days prior to the start of construction.

E. Locate and identify existing underground and overhead electrical services and other utilities within contract limits. Provide adequate means of protection of utilities and services designated to remain.

Repair utilities damaged during site work operations.

F. Perform site work operations and the removal of debris and waste materials to assure minimum interference with the streets.

G. Provide a temporary and lockable portable toilet for use by the workmen. Clean the sanitary facility once every two (2) weeks during the entire construction period. Remove the facility upon project completion.

H. Obtain written permission from governing authorities when required to obstruct the street or parking lot or parking spaces. Provide alternate routes around obstructed traffic ways when required by governing authorities. Provide traffic control when and as required by the City of Meriden. All fees associated with permits and traffic control (police detail) shall be paid for by the contractor.

I. Remove all encumbrances which interfere with the proper fulfillment of the work without additional cost to the Owner.

J. Salvable Improvements: Carefully remove items indicated to be salvaged and store on Owner's premises where indicated.

K. Control dust caused by work operations. Dampen surfaces with water, as required, to control all dust.

Comply with air pollution control regulations of governing authorities. Exercise every reasonable precaution throughout the life of the contract to minimize dust arising from construction operations, hauling, storage or demolition.

L. Protect existing and adjacent structures, pavement and utilities to remain from damage caused by work operations. Cost of repair or restoration of damage at the Contractor’s expense. Protect all bench marks, control points and Landscape Architecting reference points; re-establish if damaged or disturbed.

M. Protect and maintain benchmarks and survey control points from disturbance during construction.

N. Failure on the part of the Landscape Architect or Engineer or his representative to disapprove work, in the course of work operations or during observation of the work, is not to be interpreted as acceptance of the work not in conformance with the specifications. Improper work and/or materials are to be corrected whenever discovered.

PART 2 -PRODUCTS AND

MATERIALS

2.1 SEDIMENTATION CONTROL BALES, SEDIMENT CONTROL FENCE, PROJECT SIGNS AND

SAFETY FENCE

A. Sedimentation Control Bales and Sediment Control Fence shall conform to the requirement s of Section

2.18, 2.19 and 7.55 and Article M.04 of the State of Connecticut Department of Transportation

“Standard Specifications for Roads, Bridges and Incidental Construction”, including any supplements.

B. Safety Fence shall be 6’ high, Chain Linked Fence per Section 02820 Fencing of these specifications.

Posts shall be as specified by the manufacturer or as approved by the Landscape

Architect.

PART 3 -EXECUTION

3.1 EXAMINATION- SITE PREPARATION

A. Examine the areas and conditions where the site preparation is to be provided. Notify the Landscape

Architect or Engineer, in writing, of conditions detrimental to the proper and timely completion of the work. Do not proceed with the work until unsatisfactory conditions have been corrected in an acceptable manner.

3.2 SITE LAYOUT AND LEVELS

A. Before removals, excavation, filling or rough grading operations are started; the work and site areas are to be completely staked out for the work of this Contract. Site layout lines and levels for the Work of this Contract are to be performed by a professional surveyor licensed by the State of

Connecticut. Establish and maintain control points and benchmarks.

B. Site layout, lines and levels may be subject to possible modifications, whether by inaccuracies in existing grades or by other conditions. Except in the case of substantial increases in quantity of materials, authorized in writing by the Landscape Architect or Engineer, such modifications will not entitle the Contractor to additional compensation.

3.3 PROJECT AND CONSTRUCTION SIGNS

A. Before removals, excavation, filling or rough grading operations are started, construction signs conforming to Section 02100 site preparation of the specification shall be installed as shown on the plans or as approved by the Landscape Architect.

3.4 TEMPORARY CONSTRUCTION FENCE

A. Before removals, excavation, filling or rough grading operations are started, the Contractor shall install a temporary construction gate around the project area as noted on the drawings. Install gate for direct access of of the Parking lot of the Hubbard Park Playground.

B. Before removals, excavation, filling or rough grading operations are started; install a safety fence as shown on the Site Preparation Plans or as approved by the Landscape Architect or Engineer and as per the manufacturer’s recommendation.

3.5 CLEARING AND GRUBBING

A. As soon as the work has been staked out, notify the Landscape Architect or Engineer so that their representative can designate and review all existing trees and vegetation to remain. Supply suitable tags of a permanent nature for identification purposes. Do not use paint for trees to remain.

B. Before removals, excavation, filling or rough grading operations are started; provide sedimentation erosion-control measures to prevent soil erosion and discharge of soil-bearing water runoff or airborne dust to adjacent properties, roadways and walkways before beginning clearing and grubbing activities.

C. Clear all areas within the contract limits of trees, shrubs, saplings, stumps, ground and tree vines, roots, brush, rubbish, stone walls and any other objectionable materials with the exception of those trees and

D. Removal of trees and shrubs to include all grubbing and excavating, as necessary, to take out the entire root system. Do not bury stumps on the Owner’s property. Legally dispose of all stumps off of the

Owner’s property.

E. Depressions caused by removal of stumps or roots shall be filled and compacted with material suitable for refilling and compacted as specified.

F. Use hand methods for grubbing brush, grass, weeds or vines inside the drip line of trees to remain.

3.6 TOPSOIL STRIPPING

A. Remove sod and grass before stripping topsoil.

B. Strip topsoil to whatever depths are encountered in a manner to prevent intermingling with underlying subsoil or other waste materials.

• Strip surface soil of unsuitable topsoil, including trash, debris, weeds, roots, and other waste materials.

C. Stockpile topsoil materials away from edge of excavations without intermixing with subsoil. Grade and shape stockpiles to drain surface water. Cover to prevent windblown dust.

• Limit height of topsoil stockpiles to 72 inches (1800 mm). .

• Do not stockpile topsoil within drip line of remaining trees.

• Dispose of excess topsoil as specified for waste material disposal.

• Stockpile surplus topsoil and allow for re-spreading deeper topsoil

3.7 DEBRIS AND WASTE MATERIAL REMOVAL

A. Remove and properly dispose of all existing debris and waste materials including, but not limited to, metal, cars, garbage, tires, containers and their contents and any other materials deemed to be debris or waste materials by the Owner within the limits of the project.

3.8 SITE DEMOLITION AND REMOVALS

A. Remove existing pavements, curbing and fencing where noted on the drawings for the completion of the

Work of this Contract. Completely remove all existing foundations, abandoned utilities and all other items that interfere with new construction.

B. Existing construction features are to be removed as required for the execution of the Work of this

Contract. Such work is to be done in a manner to avoid any damage to the construction and finishes that are to remain and not to be demolished. Where new work is required to be built adjacent to or connected with existing construction, the existing construction is to be cut or removed and replaced with new construction to the extent required to solidly build and anchor the new work in place.

3.9 DISPOSALS

A. Properly dispose of all materials and debris resulting from the clearing, demolition and removal operations.

B. Legally dispose of all materials and debris off of the Owner’s property.

C. Maintain all disposal routes clear, clean and free of debris. Keep all streets clean along the disposal routes.

D. On-site burning of combustible materials is not permitted.

E. Accumulation of materials for disposal is not permitted. Disposal is to be made as fast as materials accumulate.

F. Obtain all required and necessary permits or approvals for off-site disposals. All associated fees to be paid for by the contractor.

3.10 TREE PRUNING

A. All pruning work to be performed by an experienced arborist licensed by the State of Connecticut.

B. Prune all existing deciduous trees along were noted on the drawings.

C. Pruning to follow Class 1 - Fine Pruning Standards of the National Arborist Association.

D. Prune each tree of all dead, dying, diseased, weak, interfering and objectionable branches, as well as selective thinning to lessen wind resistance. Removal of branches to include those on the main trunk, as well as those inside the leaf area. Include removal of lower branches as directed by the Landscape

Architect.

3.11 TREE PROTECTION

A. Equipment or materials are not to be parked or repaired within twenty feet (20') of the drip line (outer limit of branches) of any existing tree to remain. Do not stockpile or dump oil, grease, gasoline, concrete or other debris within thirty feet (30') of the drip line of any tree to remain.

B. Do not excavate within drip line of trees, unless otherwise indicated.

C. Where excavation for new construction is required within drip line of trees, hand clear and excavate to minimize damage to root systems. Use narrow-tine spading forks, comb soil to expose roots, and cleanly cut roots as close to excavation as possible.

• Cover exposed roots with burlap and water regularly.

• Temporarily support and protect roots from damage until they are permanently relocated and covered with soil.

• Coat cut faces of roots more than 1-1/2 inches (38 mm) in diameter with emulsified asphalt or other approved coating formulated for use on damaged plant tissues.

• Cover exposed roots with wet burlap to prevent roots from drying out. Backfill with soil as soon as possible.

D. Any tree damaged during construction is to be repaired by an Arborist licensed by the State of Connecticut. Should any existing tree to remain be severely damaged or scarred during the construction process, such tree is to be replaced with a similar species of tree with a caliper of eight inches (8”) at breast height.

2. SECTION 02300 -EARTHWORK

PART 1 -GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following:

• Preparing subgrades for walks, pavements, lawns, and plantings.

• Granular fill base for concrete sidewalks, concrete slabs,

• Subsurface drainage backfill for walls and trenches.

• Excavating and backfilling trenches for buried mechanical and electrical utilities and pits for buried utility structures.

B. Related Sections include the following:

• Division 2 Section "Site Preparation" for site stripping, grubbing, removing topsoil, and protecting trees to remain.

1.3 UNIT PRICES

A. Rock Measurement: Volume of rock actually removed, measured in original position, but not to exceed the following:

• 24 inches (600 mm) outside of concrete forms other than at footings.

• 18 inches (450 mm) outside of concrete forms at footings.

• 6 inches (150 mm) outside of minimum required dimensions of concrete cast against grade.

• Outside dimensions of concrete walls indicated to be cast against rock without forms or exterior waterproofing treatments.

• 12 inches (300 mm) beneath pipe in trenches, and the greater of 24 inches (600 mm) wider than pipe or

42 inches (1065 mm) wide.

B. Unit prices for rock excavation include replacement with approved materials.

1.4 DEFINITIONS

A. Backfill: Soil materials used to fill an excavation.

• Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.

• Final Backfill: Backfill placed over initial backfill to fill a trench.

B. Processed Aggregate Base Course: Layer placed between the subbase course and concrete pavement.

C. Granular Fill: Layer placed between the excavated subgrade and the concrete pavement.

D. Bedding Material Course: Layer placed over the excavated subgrade in a trench before laying pipe.

E. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

F. Drainage Course: Layer supporting slab-on-grade used to minimize capillary flow of pore water.

G. Excavation: Removal of material encountered above subgrade elevations.

• Additional Excavation: Excavation below subgrade elevations as directed by Landscape Architect or

Engineer. Additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.

• Bulk Excavation: Excavations more than 10 feet in width and pits more than 30 feet in either length or width.

• Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated dimensions without direction by Landscape Architect or Engineer. Unauthorized excavation, as well as remedial work directed by Landscape Architect or Engineer, shall be without additional compensation.

H. Fill: Soil materials used to raise existing grades.

I. Rock: Rock material in beds, ledges, unstratified masses, and conglomerate deposits and boulders of rock material exceeding 1 cu. yd. for bulk excavation or 3/4 cu. yd. for footing, trench, and pit excavation that cannot be removed by rock excavating equipment equivalent to the following in size and performance ratings, without systematic drilling, ram hammering, ripping, or blasting, when permitted:

• Excavation of Footings, Trenches, and Pits: Late-model, track-mounted hydraulic excavator; equipped with a 42-inch- wide, short-tip-radius rock bucket; rated at not less than 120-hp flywheel power with bucket-curling force of not less than 25,000 lbf and stick-crowd force of not less than 18,700 lbf measured according to SAE J-1179.

• Bulk Excavation: Late-model, track-mounted loader; rated at not less than 210-hp flywheel power and developing a minimum of 45,000-lbf breakout force; measured according to SAE J-732.

J. Rock: Rock material in beds, ledges, unstratified masses, and conglomerate deposits and boulders of rock material 3/4 cu. yd. or more in volume that when tested by an independent geotechnical testing agency, according to ASTM D 1586, exceeds a standard penetration resistance of 100 blows/2 inches.

K. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface.

L. Structural Fill: Layer placed over subgrade supporting footings and foundations where unsuitable materials exist.

M. Subbase Course: Layer placed between the subgrade and the Processed Aggregate base course for bituminous concrete roadway pavement and bituminous concrete parking areas.

N. Subgrade: Surface or elevation remaining after completing excavation, or top surface of a fill or backfill immediately below subbase, drainage fill, granular fill or topsoil materials.

O. Degree of compaction: The degree of compaction is expressed as a percentage of maximum density obtained by test procedures according to AASHTO T 180, Method D.

P. Utilities include on-site underground pipes, conduits, ducts, and cables, as well as underground services within buildings.

Q. 3/8” Stone: Layer placed under manholes and catch basins.

R. 3/4” Stone: Pipe bedding and other miscellaneous uses.

1.5 SUBMITTALS

A. Product Data: For the following:

• Each type of plastic warning tape.

• Drainage fabric.

• Separation fabric.

B. Samples: For the following:

• 30-lb samples, sealed in airtight containers, of each proposed soil material from on-site or borrow sources.

• 12-by-12-inch sample of drainage fabric.

• 12-by-12-inch sample of separation fabric.

C. Material Test Reports: From a qualified testing agency indicating and interpreting test results for compliance of the following with requirements indicated:

• 1. Classification according to ASTM D 2487 of each on-site or borrow soil material proposed for fill and backfill.

• Laboratory compaction curve according to AASHTO T 180, Method D for each on-site or borrow soil material proposed for fill and backfill.

1.6 QUALITY ASSURANCE

A. Geotechnical Testing Agency Qualifications: An independent testing agency qualified according to ASTM E 329 to conduct soil materials and rock-definition testing, as documented according to ASTM D 3740 and ASTM E 548.

1.7 PROJECT CONDITIONS

A. Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted in writing by the Landscape Architect or Engineer and then only after arranging to provide temporary utility services according to requirements indicated:

• Notify Landscape Architect or Engineer not less than two days in advance of proposed utility interruptions.

• Do not proceed with utility interruptions without Landscape Architect's written permission.

• Contact utility-locator service for area where Project is located before excavating.

B. Demolish and completely remove from site existing underground utilities indicated to be removed.

Coordinate with utility companies to shut off services if lines are active.

1.8 BUILDING AREA

A. The area within limits of a minimum of 5 feet or to such greater dimensions as indicated on the drawings outside the exterior face of the building is herein defined as the building area. All requirements for structure excavation and for fills and refills within the building area shall extend to these lines.

1.9 PROTECTION

A. Dewater when excavations are to some extent below existing groundwater levels and the site is subject to surface water and groundwater flow during the course of construction.

• Control and pitch the grading to prevent water from running into the excavated areas or to prevent damage to other structures or work already accomplished.

• The Contractor shall furnish all pumping and other dewatering equipment necessary to keep excavated area dry during construction. The groundwater shall be pumped adequately so that the water table is maintained a minimum of 2 feet below the bottom of the excavation at all times. Filters shall be used on the dewatering devices to prevent the removal of fines from the soil. Water shall not be conducted onto adjacent property except in existing water courses.

• Operations and Performance: Operate the dewatering system continuously, twenty-four (24) hours per day, seven (7) days per week, until such time as construction work below existing water levels is complete, unless directed otherwise. Measure and record the performance of the dewatering system at the same time each day by use of suitable observation wells or piezometers installed in conjunction with the dewatering system. After placement of initial slabs and backfill, the water level may be allowed to rise, but at no time allow it to be higher than 1 foot below the prevailing level of excavation or backfill.

1.10 ENGINEERING AND SURVEY WORK

A. The Contractor shall engage the services of a Land Surveyor licensed in the state of Connecticut to stake the location and elevation of all site improvements, parking areas, catch basins, curbing, etc.

B. Upon completion of the work the Contractor’s Land Surveyor shall furnish a certified topographic As-

Built drawing showing the as-built location and elevation of all buildings, parking areas, driveways, landscape areas, utility locations, etc.

PART 2 -PRODUCTS

2.1 SOIL MATERIALS

A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations.

B. Satisfactory Soils: ASTM D 2487 soil classification groups GW, GP, GM, SW, SP, and SM, or a combination of these group symbols; free of rock or gravel larger than 3 inches (75 mm) in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter.

C. Unsatisfactory Soils: ASTM D 2487 soil classification groups GC, SC, ML, MH, CL, CH, OL, OH, and

PT, or a combination of these group symbols.

• Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of optimum moisture content at time of compaction.

D. Backfill and Fill: Satisfactory soil materials.

E. Processed Aggregate Base: Conforming to the requirements of Sub Articles M.05.01-1, M.05.01-2 and

M.05.01-3 of the State of Connecticut Department of Transportation “Standard Specifications for Roads, Bridges and Incidental Construction”, Form 819, including current supplemental.

F. Subbase: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; conforming to the requirements of Sub Articles M.02.02, M.02.06 and sized to meet the requirements of Grading “A” of the State of Connecticut Department of Transportation “Standard

Specifications for Roads, Bridges and Incidental Construction”, Form 819, including current supplemental.

G. Granular Fill: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; conforming to the requirements of Sub Articles M.02.01-1, M.02.01-2, M.02.06 and sized to meet the requirements of Grading “C” of the State of Connecticut Department of Transportation

“Standard Specifications for Roads, Bridges and Incidental Construction”, Form 819, including current supplemental.

H. Structural Fill: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; conforming to the requirements of ASTM D 422 and ASTM D 1140; with 50 to 100 percent passing a ¾” sieve and not more than 10 percent passing a No. 200 (0.075-mm) sieve.

I. Engineered Fill: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 90 percent passing a 1-1/2-inch (38-mm) sieve and not more than 12 percent passing a No. 200 sieve.

J. Bedding Material: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; conforming to the requirements of Sub Articles M.01.01 for No. 6 stone of the State of

Connecticut Department of Transportation “Standard Specifications for Roads, Bridges and Incidental

Construction”, Form 819, including current supplemental.

K. Drainage Fill: Washed, narrowly graded mixture of crushed stone, or crushed or uncrushed gravel; ASTM D

448; coarse-aggregate grading Size 57; with 100 percent passing a 1-1/2- inch (38-mm) sieve and 0 to 5 percent passing a No. 8 sieve.

L. Filter Material: Narrowly graded mixture of natural or crushed gravel, or crushed stone and natural sand;

ASTM D 448; coarse-aggregate grading Size 67; with 100 percent passing a 1-inch (25-mm) sieve and 0 to 5 percent passing a No. 4 sieve.

M. Impervious Fill: Clayey gravel and sand mixture capable of compacting to a dense state.

N. 3/8” Stone: Conforming to the requirements of Section M.01.01 for No.8 stone of the State of Connecticut

Department of Transportation “Standard Specifications for Roads, Bridges and Incidental Construction”, Form

819, including current supplemental

O. 3/4" Stone: Conforming to the requirements of Section M.01.01 for No.6 stone of the State of Connecticut

Department of Transportation “Standard Specifications for Roads, Bridges and Incidental Construction”, Form

819, including current supplemental.

P. Gravel shall be composed of hard, durable stone and coarse to fine sand, not frozen and free form loam and undesirable organic matter, containing no stone having any dimension greater than two-thirds (2/3) of the depth of layer to be compacted. Gravel borrow or bank-run gravel shall conform to Article M.02 of the CONNDOT

Standard Specification Form 819 and the following gradation requirements:

% PASSING BY WEIGHT U.S. STANDARD SIEVE SIZE

3½" 100

1½" 55-100

No. 4 25-60

No.40 5-25

No. 200 0-5

Q. Processed aggregate shall conform to the applicable requirements of CONNDOT Standard Specifications

Form 814 section M.05 and shall have the following gradation:

% PASSING BY WEIGHT U.S. STANDARD SIEVE SIZE

2¼" 100

2" 95-100

¾" 50-75

¼" 25-45

No. 40 5-20 No. 100 2-12

No. 200 0-8

R. Material for use as pipe bedding shall conform to the following requirements:

• It shall be sand or sandy soil all of which passes a 3/8" sieve and not more than ten percent (10%) passes a No. 200 sieve.

2.2 ACCESSORIES

A. Detectable Warning Tape: Acid-and alkali-resistant polyethylene film warning tape manufactured for marking and identifying underground utilities, minimum 6 inches wide and 4 mils thick, continuously inscribed with a description of utility, with metallic core encased in a protective jacket for corrosion protection, detectable by metal detector when tape is buried up to 30 inches deep; colored as follows:

• Red: Electric.

• Yellow: Gas, oil, steam, and dangerous materials.

• Orange: Telephone and other communications.

• Blue: Water systems.

• Green: Sewer systems.

PART 3 -EXECUTION

3.1 PREPARATION

A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations.

B. Protect subgrades and foundation soils against freezing temperatures or frost. Provide protective insulating materials as necessary.

C. Provide erosion-control measures to prevent erosion or displacement of soils and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways.

3.2 DEWATERING

A. Prevent surface water and ground water from entering excavations, from ponding on prepared subgrades, and from flooding Project site and surrounding area.

B. Protect subgrades from softening, undermining, washout, and damage by rain or water accumulation.

• Reroute surface water runoff away from excavated areas. Do not allow water to accumulate in excavations. Do not use excavated trenches as temporary drainage ditches.

• Install a dewatering system to keep subgrades dry and convey ground water away from excavations.

Maintain until dewatering is no longer required.

3.3 EXPLOSIVES

A. Explosives: Do not use explosives.

3.4 EXCAVATION, GENERAL

A. Unclassified Excavation: Excavation to subgrade elevations regardless of the character of surface and subsurface conditions encountered, including rock, soil materials, and obstructions.

• If excavated materials intended for fill and backfill include unsatisfactory soil materials and rock, replace with satisfactory soil materials.

B. Classified Excavation: Excavation to subgrade elevations classified as earth and rock. Rock excavation will be paid for by adjusting the Contract Sum according to unit prices included in the Contract Documents.

• Earth excavation includes excavating pavements and obstructions visible on surface; underground structures, utilities, and other items indicated to be removed; together with soil, boulders, and other materials not classified as rock or unauthorized excavation.

A. Intermittent drilling; blasting, if permitted; ram hammering; or ripping of material not classified as rock excavation is earth excavation.

• Rock excavation includes removal and disposal of rock.

A. Do not excavate rock until it has been classified and cross-sectioned by Landscape Architect or Engineer.

3.5 EXCAVATION FOR FOUNDATION AND STRUCTURES

A. Excavate to indicated elevations and dimensions within a tolerance of plus or minus 1 inch. Extend excavations a sufficient distance from structures for placing and removing concrete formwork, for installing services and other construction, and for inspections.

• Excavations for Footings and Foundations: Do not disturb bottom of excavation. Excavate by hand to final grade just before placing concrete reinforcement. Trim bottoms to required lines and grades to leave solid base to receive other work.

B. All soft, yielding materials, organic materials or other materials deemed to be unsuitable for subgrade below footings and foundations shall be removed and replaced with structural fill to the bottom of footing and foundation elevation. Holes and depressions made by the removal of material shall be compacted uniformly.

The structural fill shall be compacted, in 8” lifts, to ninety-five percent (95%) maximum dry density at optimum moisture content.

3.6 EXCAVATION FOR WALKS AND PAVEMENTS

A. Excavate surfaces under walks and pavements to indicated cross sections, elevations, and grades. See

Sections 02741 and 02751 for details on subbase and granular fill preparation.

3.7 EXCAVATION FOR UTILITY TRENCHES

A. Excavate trenches to indicated gradients, lines, depths, and elevations.

• Beyond building perimeter, excavate trenches to allow installation of top of pipe below frost line.

B. Excavate trenches to uniform widths to provide a working clearance on each side of pipe or conduit.

Excavate trench walls vertically from trench bottom to 12 inches higher than top of pipe or conduit,…