YELL 310533 Rehabilitate and Improve Old Faithful Water Treatment System GAOA
Solicitation number
140P2024R0050
Issued by

About this file

This document is a Pre-Solicitation Notice for a federal contract opportunity to rehabilitate and improve the Old Faithful Water Treatment System in Yellowstone National Park. The National Park Service is soliciting proposals on a full and open basis for the construction of a new water treatment plant building, including new treatment equipment, piping, instrumentation, and other related infrastructure improvements. The project will address issues with the existing aging treatment plant, including challenges with consistent arsenic removal. The estimated price range is $10 million or more, with an estimated period of performance of 822 calendar days. A pre-proposal meeting is scheduled for September 26, 2024, and proposals are due on September 11, 2024. This is an unrestricted full and open competition, but small business participation is encouraged. The NAICS code for this requirement is 237110 Construction of Water Supply Facilities.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACTION: Pre-Solicitation Notice

PRE-SOLICITATION NUMBER: 140P2024R0050

CLASSIFICATION CODE: Y1NE – Construction of Water Supply Facilities

CONTRACTING OFFICER: Vicki Freese-Supler

CONTRACT SPECIALIST: Jeanna Manseau

DSC-CS Contracting Services Division National Park Service P.O. Box 25287 Denver, CO 80225

POINT OF CONTACT:

CONTRACTING OFFICER: Vicki Freese-Supler, vicki_l_freese-supler@nps.gov

CONTRACT SPECIALIST: Jeanna Manseau, Jeanna_manseau@nps.gov

PLACE OF PERFORMANCE: Old Faithful, Yellowstone National Park, Wyoming

PLACE OF PERFORMANCE COUNTRY: USA

Title of Project: Rehabilitate and Improve Old Faithful Water Treatment System – YELL 31053

GENERAL:

The National Park Service (NPS), Department of Interior (DOI), Denver Service Center (DSC), is soliciting proposals on a full and open basis from all interested businesses having the capability to perform the work described below. The solicitation will be issued electronically on the SAM website at sam.gov . Proposal documents will be available for download in Microsoft Word, HTML, Microsoft Excel, and Adobe PDF; Specifications will be available in Adobe PDF format;

and drawings will be available in PDF format. Please Note: Paper copies of the solicitation will not be made available.

Vendors can search for opportunities and award history on sam.gov without registering. The SAM.gov website has an Interested Vendors List and a Watchlist where you can add your company’s interest. Registering provides the opportunity to receive notifications; this is a tool of convenience only and does not serve as a guarantee of notification. Interested vendors and plan holders are required to visit the website periodically to check for amendments and other changes to the synopsis or solicitation documents.

http://www.fedbizopps.gov/

Prospective offerors desiring to conduct business with the DOI are required to have an active registration in the Systems for Awards Management (SAM) at www.sam.gov. You are also required to have a UEI number in order to conduct business with the Federal Government.

This pre-solicitation announcement is not a solicitation document, but pre-notice of an upcoming solicitation. Specific instructions on submitting your proposal will be contained in the solicitation documents to be issued on or after the date listed below.

Proposed Solicitation Issue Date: Estimated on/about September 11, 2024

This is currently an unfunded requirement with a high expectation that funds will be available.

When and if funds become available a contract will be awarded at that time.

The NAICS Code for this requirement is 237110 with a size standard of $45.0 million.

Description:

The existing Old Faithful Water Treatment Plant (OFWTP) was constructed in the early 1980s and much of the facility is past its useful life. It is the only potable water treatment system available within the Old Faithful developed area and supplies potable water for domestic services and fire protection. The water treatment plant is a conventional water treatment plant involving rapid mix, flocculation, sedimentation, filtration, and disinfection. The concentration of arsenic fluctuates seasonally and occasionally reaches high levels that are difficult for the plant to remove. The current design of the plant does not allow for consistent arsenic removal without continuous monitoring and adjustments by plant operators, which has led to issuance of an administrative order by the EPA for corrective action by NPS. Additionally, there are major concerns with the security and condition of the plant’s raw water intake structure that need immediate attention.

The project will include, but not limited to:

• Construction of all required features.

• Upon award, determine and provide an overall Project Schedule for the construction activities and proposed meetings.

• Provide as-constructed drawings.

Specific work details include:

• Construct new MCU water treatment plant building and roof including, but not limited to, a laboratory, control room, server room, break room, electrical room, process area, chemical rooms with containment areas, a below ground chlorine http://www.sam.gov/ contact basin and backwash supply wet well, an upper–level entrance and a lower-level loading dock.

• Provide interior and exterior piping, pipe supports, gates, gate operators, valves, valve operators, and valve supports.

• Provide instrumentation and analyzers including flow meters, pressure gages, pressure transmitters, level indicators and transmitters, turbidity analyzers, pH analyzers, and chlorine analyzers.

• Provide a Process Control System (PCS) including and not limited to the main plant PLC, SCADA servers, operator workstations, network switches and firewalls.

• Provide laboratory furnishings and equipment including sink, cabinets, refrigerator and desktop laboratory equipment.

• Provide water treatment package system including but not limited to:

1) 2nd stage rapid mix, flocculation, sedimentation and filtration tanks, and associated structural supports.

2) Walkway platforms, stairs and structural supports along the flocculation, sedimentation and filtration tanks.

3) Vertical rapid mixer, vertical flocculation mixers, sedimentation equipment, sludge removal equipment, filtration media, filtration equipment, two air scour blowers with sound enclosure, two vertical turbine backwash supply pumps, appurtenances, and controls.

4) Control panels and programming for the rapid mix flocculation, sedimentation and filtration system to control the treatment process and communicate with the plant PLC.

• Provide two vertical turbine house water pumps, appurtenances, and controls.

• Provide liquid chemical fill, storage, feed and control systems for sodium hypochlorite, sodium hydroxide, ferric chloride, coagulant, coagulant polymer, filer aid polymer and solids polymer.

• Provide dry chemical storage, feed and control system for sodium bicarbonate.

• Provide portable standby generator connection switchboard and manual transfer switch.

• Provide transfer pad and ground sleeve in accordance with Northwestern Energy

(NWE) standards. Provide meter house enclosure and current transformer enclosure. Provide raceway between transformer pad and current transformer enclosure. Provide raceway and conductors between current enclosure and meter enclosure. Provide raceway and conductors on the load side of the current transformer enclosure.

• Provide unit heaters, direct expansion split air conditioning systems, supply and exhaust fans, sump pump, two water heaters, and emergency safety eye wash and shower units.

• Construct dewatering pad and provide associated piping, valves, geotextile tubes, and roll off containers.

• Procure and have ready pipe and fittings needed to repair existing 12” raw water pipe or finished water pipe, made of Techite brand reinforced plastic mortar (fiberglass) material, in the event of a pipe leak or failure.

• Demolish existing septic tank and existing leach field and associated piping.

Remove unsuitable soils for preparation to construct the new septic tank and leach field.

• Provide new septic tank and construct new leach field.

• Demolish the existing storage building (old wooden shed).

• Provide underground propane storage tanks and associated valves and controls.

• Coordinate with telecom company to maintain existing service and provide telephone service through a landline to the new water treatment plant building location.

• Rehabilitate existing backwash waste ponds as shown including:

1. Demolish existing concrete in pond.

2. Demolish existing decant piping.

3. Provide new concrete ramp, bottom and wall.

4. Provide new decant piping in the pond.

5. Restore pond slope.

6. Provide new underdrain around the north backwash waste pond.

7. Demolish existing fence and gates.

8. Provide a new steel drill stem wire mesh fence and gates around the backwash ponds.

• Rehabilitate Backwash Pond Pumphouse including:

1. Demolish decant pump, sludge pump, piping, valves, valve operators, level instrument, and related appurtenances.

2. Patch concrete floor where valve operators were removed.

3. Provide new decant pump and controls, sludge pump and controls, piping, valves, valve operators, level instrument, and related appurtenances.

• Provide temporary utilities including

1. Demolish and temporarily reroute power, backwash waste, decant, and non-potable water piping to/from the existing Backwash Pond Pumphouse as needed to construct the new WTP Process Building.

2. Demolish temporary utilities when new WTP is complete.

• Pre-Sedimentation Pond Soil Nail Wall

1. Design and provide a soil nail wall along the west side of the Pre- Sedimentation Pond.

2. Demolish the section of fence along the Pre-Sedimentation Pond that is required to construct the Soil Nail Wall. Replace demolished section with new fence.

3. Confirm location of onsite utilities with potholing or other method.

Estimated Price Range: $10M or more

Estimated Period of Performance: 822 calendar days

Proposals are due on September 11, 2024 at 2:00 p.m. Mountain Time.

A pre-proposal meeting will be held on Thursday September 26, 2024 at 8:30am Mountain Time at Old Faithful District Yellowstone National Park, Wyoming. Specific meeting location will be posted with the full solicitation.

This procurement will be competed using an unrestricted Full and Open contracting method.

All responsible sources may submit an offer which, if submitted in a timely manner, will be considered. It is the policy of the government to provide maximum practicable opportunities in its acquisitions to small business, veteran-owned small business, small disadvantaged business, and women-owned small business concerns. Such concerns must also have the maximum practicable opportunity to participate as subcontractors in the contracts awarded by any executive agency, consistent with efficient contract performance. All offerors are strongly encouraged to contact their local Small Business Administration Office, to post their need for qualified subcontractors at http://www.sba.gov .