About this file
This is a Synopsis Pre-Solicitation Notice for RFP 140P2026R0086 issued by the National Park Service (NPS), Denver Service Center, Contracting Services Division for the Knife River Elbee Bend Bank Stabilization project. The formal RFP solicitation is anticipated to be issued on or after July 6, 2026, via SAM.gov. The project is located at Knife River Indian Village National Historic Site in Mercer County, North Dakota, and requires construction services to stabilize approximately 1,200 linear feet of actively eroding riverbank that threatens 64 archeological sites, County Road 37, utility poles, and park infrastructure. Work includes installing self-healing riverbank protection through riprap placement, compacted filling along the protection area, strategic vegetation planting, and bioengineering measures. The construction site is 25-50 miles from nearest suppliers and lodging facilities, remains open to visitors during construction, and involves seasonal and potential winter construction activities.
The contract is Firm-Fixed-Price (FFP) with an estimated construction magnitude of $5 million to $10 million and a period of performance of 365 calendar days from Notice to Proceed, including potential weather shutdowns. The solicitation will be evaluated using a best-value trade-off process considering Technical, Past Performance, and Price factors per FAR Parts 15 and 36. Bid, Performance, and Payment Bonds are required. The NAICS code is 237990 (Other Heavy and Civil Engineering Construction), PSC code is Y1QA (Construction of Restoration of Real Property), and size standard is $45 million. No set-aside applies. Prospective offerors must maintain active SAM.gov registration and a UEI number. Points of contact are Contracting Officer Stormy Gallagher (stormy_gallagher@ios.doi.gov) and Contract Specialist Kristin Tauber (kristin_tauber@ios.doi.gov).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B01 Page 1 of 2 v1 Mar2025 Synopsis Pre-Solicitation Notice
United States Department of the Interior
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
CONTRACTING SERVICES
1 DENVER FEDERAL CENTER, BUILDING 50
P.O. BOX 25287
DENVER, COLORADO 80225-0287
File Code: B01
D5217 (DSC-CS)
KNRI 257081
140P2026R0086
Date: June 22, 2026
To: General Public via SAM.gov
From: National Park Service (NPS), Denver Service Center (DSC), Contracting Services (CS) Division
Subject: Pre-Solicitation Notice (PSN) – Request for Proposal (RFP) 140P2026R0086
Reference: KNRI 257081 KNIFE RIVER ELBEE BEND BANK STABILIZATION This pre-solicitation announcement is to advise the Industry that NPS DSC intends on issuing an RFP Solicitation for the Construction Services described below, in support of the above referenced project requirement at Elbee Bend is in the Knife River Indian Village National Historic Site (park), Mercer County, North Dakota.
This PSN is not a formal Solicitation in itself, but rather a Synopsis of forthcoming RFP 140P2026R0086.
Specific instructions on submitting your proposal will be contained in the solicitation documents to be issued on or after 07/06/2026.
General Project Description and Scope:
This project is located at Knife River Indian Village National Historic Site (park), Mercer County, North Dakota. Elbee Bend is in the Knife River Indian Village National Historic Site (park) and contains 64 archeological sites. The Knife River, a tributary to the Missouri River downstream of the Garrison Dam, runs the length of the park in Mercer County, North Dakota. The Elbee Bend Site on the Knife River is actively eroding, creating a threat to archeological resources, a utility pole approximately 130 feet from the migrating bend, and County Road 37. The cut bank is approximately 20 feet high. The purpose of this project is to stabilize the Elbee Bend site to protect archeological resources in the park.
The surrounding area is urban with limited staging on site.
Note any unique material delivery requirements.
The construction site is 25 -50 miles from nearest suppliers and lodging facilities.
The Park will remain open during construction, thus contract activities and logistics must be structured and scheduled to minimize visitor impact.
The site requires protective measures to ensure the surrounding area remains undisturbed.
The structure is a natural/cultural resource.
The anticipated period of performance of 356 calendar days includes any potential weather shutdown.
There are seasonal/other shutdowns mandated through the construction season.
Winter construction may be required.
Work to be performed under this Construction Services project requirement includes:
This project will stabilize the Elbee Bend of the Knife River by installing self-healing riverbank protection in combination with strategic planting of vegetation. Riprap will be placed at the base of the steep eroding bank to provide toe protection and to prevent excessive bank contact and scouring of the bend. Additional material and riprap
B01 Page 2 of 2 v1 Mar2025 will be buried in the bank at one or both the ends of the protection structure, forming keys that further prevent water from scouring behind the riverbank. Construction will also include compacted filling along the protection area and up to the full height of the riverbank, which ensures there are no voids or trenches behind the protection structure.
Vegetation or other bioengineering will be planted on the stabilization as appropriate.
This project will stabilize approximately 1200 linear feet of bank along the Knife River. The most important measurable result of this stabilization is preventing further destruction and loss of the Elbee Village Archeological Site. Knife River Indian Villages NHS preserves and protects archeological resources related to the lifestyles of Northern Great Plains Indian peoples, and the preservation Elbee Village is fundamental to maintaining this park purpose.
Stabilizing the riverbank will also protect infrastructure including County Road 37, electric utility poles, parking for fishing access, and park boundary fencing. County Road 37 is the only access for the National Park Service to the northern portion of the park and also provides public access to private property. The USACE estimates that at current rates of erosion, the road will be lost in the next 10 years. Of course, the archeological site and associated resources would be long gone before that time.
The completion of this project will be an important step in the implementation of the Archeological Resources Management Plan EIS (2018). The EIS defined a process for comprehensive archeological resources management, including a measured and strategic process for riverbank stabilization. The Elbee Bend has been identified as the highest priority stabilization need for the park and is quickly becoming an emergency. The EIS defined indicators and standards that any more than 0% additional loss would trigger action. That standard has been surpassed and action must be taken. Unpredictable weather events could result in catastrophic loss of resources and infrastructure.
Addressing the need for stabilization as soon as possible will avert this outcome and costly emergency actions.
In addition to the protection of resources, preservation of infrastructure, and plan implementation, this stabilization will increase recreational opportunities for visitors. The stabilization itself will become a trail for visitor use along the river. Stabilization will connect from the Elbee Bend to the fishing hole and then to the Sakakawea stabilization/trail.
This will allow visitors to hike, recreate, and fish in a location that they were not previously able to access.
North American Industry Classification System (NAICS) Code for this requirement is: 237990 – “Other Heavy and Civil Engineering Construction.”
Set-Aside: No Set-Aside Used
Size Standard: $45 Million.
Product Service Code (PSC): Y1QA – “Construction of Restoration of Real Property.”
Magnitude of Construction: $5 Million - $10 Million
Anticipated Period of Performance: 365 calendar-days from Notice to Proceed (NTP).
Contract-Type Vehicle: Firm-Fixed-Price (FFP)
Bonding: Bid, Performance and Payment Bonds will be required.
Additional Information: RFP 140P2026R0086 will be issued electronically via the System for Award Management website (https://sam.gov). Specific instructions on submitting Proposals will be contained in the formal Solicitation documents, which is anticipated to be issued July 6, 2026. Documents will be made available for download purposes in Microsoft Word, Microsoft Excel, Adobe PDF, and/or HTML formats; Specifications available in Adobe PDF; and Drawings available in Adobe PDF. Paper Copies of the referenced documents will not be made available.
Prospective offerors desiring to conduct business with the NPS DSC are required to have an active registration in the Systems for Awards Management (SAM) at www.sam.gov, and required to have a UEI number in order to conduct business with the Federal Government. The SAM.gov website has a “Contract Opportunities” area and “Watchlist” option, where you can add your company’s interest. Registering provides the opportunity to receive notifications, which is a tool of convenience only; and does not serve as a guarantee of notification. Interested Parties are required to visit the SAM.gov website periodically to check for Amendments and other changes to the Synopsis or Solicitation documents.
Federal Acquisition Regulations (FAR) Procedures: FAR Part 15 – “Contracting by Negotiation,” and FAR Part 36 – “Construction and Architect-Engineer Contracts,” in conjunction with FAR 6.203 and FAR 19.502-2. Award shall be made to the responsible Offeror whose offer conforms to requirements and represents the Best Value to the Government, considering Technical, Past Performance, and Price factors. Evaluation of interested firms will be based on the following in the Solicitation:
B01 Page 3 of 2 v1 Mar2025
Trade-off: The basis of award will utilize the best value continuum – Trade-off process in accordance with FAR 15.101-1 to result in an award to the responsible Offeror pursuant to FAR 9.1.
NPS DSC CS Division Point-of-Contact:
Contracting Officer, Stormy Gallagher– stormy_gallagher@ios.doi.gov Contract Specialist, Kristin Tauber – Kristin_tauber@ios.doi.gov