This is a Pre-Solicitation Notice for a federal construction project issued by the Bureau of Land Management (BLM) under Solicitation #140L0626R0011.

The BLM seeks a design-build contractor to perform bank stabilization and parking area expansion work at the Conant Bank site in Swan Valley, Idaho, approximately 300 linear feet upstream from the primary concrete boat ramp on the South Fork of the Snake River. The project scope includes four major components: riverbank stabilization system design and construction, restoration or relocation of the raft launch/take-out area, parking area expansion design (Additive 1), and parking area expansion construction (Additive 2). The contract is valued between $500,000 and $1,000,000, with an estimated performance period of 743 calendar days following notice to proceed. The work is classified under NAICS code 237990 (Other Heavy and Civil Engineering Construction) with a Product Service Code of Y1PZ (Construction of Other Non-Building Facilities). This solicitation is set aside exclusively for small businesses meeting the $45.0M size standard. The BLM anticipates issuing the formal Request for Proposals in June 2026, with proposals due 30 days after RFP issuance. Prospective offerors must maintain an active System for Award Management (SAM) profile with a Unique Entity ID (UEI) and completed representations and certifications. A mandatory site visit will be scheduled approximately 1-2 weeks after RFP issuance. Interested parties should contact Quinndora Byrd, Contracting Specialist, at quinndora_byrd@ios.doi.gov.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

BUREAU OF LAND MANAGEMENT

National Operations Center Building 85, Denver Federal Center

P.O. Box 2547 https://www.blm.gov

Contant Bank Stabilization & Parking Area Expansion

SOLICITATION #140L0626R0011

Pre-Solicitation Notice

Solicitation Number: 140L0626R0011 Project Identification: Contant Bank Stabilization & Parking Area Expansion Point of Contact: Quinndora Byrd, Contracting Specialist, quinndora_byrd@ios.doi.gov Project Location: The proposed area is in Swan Valley, Idaho, approximately 300 linear feet from the west bank of the South Fork of the Snake River upstream of the primary concrete boat ramp.

Magnitude of Construction: Between $500,000 - $1,000,000.00 Estimated Period of Performance: 743 calendar days after issuance of the notice to proceed.

North American Industry Classification System (NAICS) code: 237990 - Other Heavy and Civil Engineering Construction Produce Service Code: Y1PZ - Construction of Other Non-Building Facilities Small Business Size Standard: $45.0M Solicitation Set-Aside: Total Small Business – Only companies that qualify as a small business under the applicable size standard will be considered.

Solicitation Issuance Date: The BLM anticipates issuing a subsequent request for proposals (RFP) in June 2026.

Proposal Submission Deadline: Exact date unknown at this time / 30-days after the issuance of the RFP.

Registration Requirements: Perspective offerors must have a Unique Entity ID (UEI) and an active System for Award Management (SAM) profile to included completed representations and certifications.

https://sam.gov/content/home Site Visit: Yes – Approximately 1-2 weeks after the issuance of the RFP. Refer to FAR provision 52.236-27 within the subsequent solicitation.

Project Description: The Bureau of Land Management (BLM) requires a design-build contractor to furnish all labor, materials, equipment, and supervision necessary to deliver fully integrated design and construction services for the Conant Bank Stabilization and Parking Area Expansion project in Swan Valley, Idaho. The scope of work includes the following major components:

1. Riverbank stabilization system

2. Restoration or relocation of the raft launch/take-out

3. Parking area expansion design (Additive 1)

4. Parking area expansion construction (Additive 2)