About this file
This document is a market survey form and sources sought notice for a river repairs single award task order contract. The U.S. Army Corps of Engineers, Memphis District is seeking information from contractors interested in a future acquisition to establish an indefinite delivery/indefinite quantity contract valued at a ceiling of $49 million over four ordering periods. The contract will be used to support upper bank paving and maintenance of structures in the Mississippi River through the issuance of task orders for work such as stone dike and revetment repairs, hardpoint and bendway weir construction, riprap placement, and bank grading. Task orders will specify locations and timelines for placing approximately 1.25 million tons of stone. Interested contractors are requested to provide company and bonding information by March 26, 2024. The notice also seeks feedback on the consolidation of requirements and potential participation in a multiple award task order contract.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MARKETSURVEY
Memphis District (MVM) River Repairs
Contractor Name: --------------------------
Contractor Address: _______________________
Contractor Point of Contact:
Contractor Phone/Email:
DUNS Number:
CAGE Code:
1. NAICS: This market survey applies to work associated with NAICS 237990, Other
Heavy and Civil Engineering Construction, as described in the sources sought posting.
Please indicate below whether your company is currently registered under this code in the
System for Award Management (SAM), https://www.sam.gov/
YES
NO
2. BUSINES SIZE: NAICS Code 237990 has a size standard of$45M. Check all of which apply to your firm:
__ 8(a) Participant
Hubzone Small Business
__ Veteran Owned Small Business (VOSB)
__ Service Disabled Veteran Owned Small Business (SDVOSB)
__ Small Disadvantaged Business (SDB)
__ Women-Owned Small Business (WOSB)
Small Business
__ Large Business
3. BONDING CAPABILITY: ______________ Per Project*
______________ Aggregate*
* As evidenced by submission of Surety Company letter stating bonding capacity
4. GEOGRAPHIC/CAPABILITY:
a. Please select the appropriate geographical area(s) where your company has the capability to perform work:
__ Memphis District (Tennessee, Arkansas, Kentucky, Missouri and
Mississippi)
UEI Number: ________________
b. Of the geographical areas listed above, please check the areas below that your company has executed projects simultaneously:
__ Memphis District
c. Please submit projects (maximum of 5) in which your company served as the
Prime Contractor. Projects submitted need to be relevant (fall within the basic scope and task order value) and recent (completed within the last 5 years). Project details to be submitted include:
• Project Title
• Project Description
• Contract/Task Order Number
• Dollar Value
• Location
• Completion Date
5. CONSOLIDATION:
a. What negative impacts, if any, will your firm experience as a result of the consolidation of these specific requirements into a SA TOC?
b. Will consolidating this requirement impact your ability to participate in this type requirement with the specified locations?
6. PROJECT LABOR AGREEMENTS (PLAs):
a. Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation.
b. Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible.
c. Do you have knowledge that a PLA has been used in the local area on project? If so, please elaborate and provide supporting documentation where possible.
d. Are you aware of time sensitive issues/scheduling requirements that would affect the rate which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible.
e. Identify specific reasons why you do not believe a PLA advance the Federal Governments interest in achieving economy and efficiency in federal procurement.
f. Identify any additional information you believe should be considered on the use of a PLA on the referenced project.
g. Identify any additional information you believe should be considered on the non use of a PLA on the referenced project.
(ii) The information gathered in this exercise should include the following information on project completed in the last 2-5 years:
1. Project Name and Location
11. Detailed Project Description
111. Initial Cost Estimate vs. Actual final cost
1v. Was the project completed on time?
v. Number of craft trade present on the project v1. Was a PLA used?
v11. Were there any challenges experienced during the project?