About this file

This performance work statement outlines repairs required for three fish crowders located at the Trinity River Fish Hatchery. The Bureau of Reclamation seeks a contractor to repair each crowder to a fully operational state over a 12-month period. Crowder #45 must be repaired first within 4 months of award, followed by repairs to Crowder #44 within 8 months and Crowder #46 within 12 months of award. Repairs include replacing components such as gates, hoses, pumps, engines, tanks, axles, and painting. The contractor must provide round trip transportation and completed work must pass inspection by the contracting officer representative and hatchery manager.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT PERFORMANCE WORK STATEMENT

Trinity River Hatchery Fish Crowder Repair

1.0 SCOPE

Acquire professional mechanical services to repair three fish crowders located at Trinity River

Fish Hatchery (TRH). Each crowder should be repaired to a like-new state. Transportation to and from the hatchery will be required.

2.0 BACKGROUND

The Bureau of Reclamation (Reclamation), Department of the Interior, under the authority of the

Act of August 12, 1955 (Public Law 84-386), acquired lands and provided funds for the construction of Trinity and Lewiston Dams, features of the Central Valley Project's Trinity River

Division. Reclamation finished the construction of Trinity and Lewiston Dams in 1963. Because of the dams’ construction, upstream anadromous fish spawning areas were rendered inaccessible.

Therefore, the Trinity River Hatchery (TRH) was constructed and equipped by Reclamation to produce juvenile salmonids which would mitigate for the loss of upstream habitat and fish production potential. The TRH produces spring- and fall-run races of Chinook Salmon

Oncorhynchus tshawytscha, steelhead O. mykiss, and the federally threatened Coho Salmon O.

kisutch. These three species are highly significant for economic, recreational, and cultural values of the region. Reclamation has maintained ownership of the grounds and infrastructure of the

TRH and has funded California Department of Fish and Wildlife (CDFW) to operate and maintain (O&M) TRH since the hatchery’s construction and the completion of Trinity and

Lewiston Dams in 1963. Currently, the hatchery’s annual goal is to produce approximately 5 million juvenile salmonids.

Raceway and Crowder Operations

Fish are transferred from the hatchery building troughs to the concrete raceways to allow for grow out. TRH has a total of 40 cast-in-place raceways. The first 30 were built in 1987, and 10 more were added in 1990. The raceways were built in pairs and share a common center wall.

Each raceway is 10 feet wide, 200 feet long, and 3.5 feet high. Screen and dam board guides are provided in the raceways for partitioning that allow the length of the rearing area to be adjusted.

The partitions allow for lengths of 50, 75, 100, 150, and 200 feet. The water level within the raceways can also be adjusted using dam boards. The raceways, at a typical 2.65 foot water depth, have a total rearing volume between screens of 5,000 cubic feet (37,400 gallons), which is the volume used by hatchery staff. Maximum flow through each raceway is limited to about

1,200 gpm at the point overtopping could occur. Typically, the raceways are operated at 643 gpm for a 100-feet long rearing area and 1,189 gpm for a 200-feet long rearing area.

The hatchery is set up to utilize three hydrologically powdered mechanical crowders for moving, transporting, and coded wire tagging operations during their grow out period. The crowders where manufactured in 1989 (#44 and #45) and 1999 (#46) to accommodate the rearing moderation that replaced the original earthen rearing ponds with concrete raceways. The crowders were custom made to TRH raceway specifications that allow the machinery to roll on the top of the raceway wall for moving fish. They were manufactured to be lightweight with a specified width, length, and height. These specifications allow for confined transportation into the raceways by way of a forklift. Crowders must fit into raceways perfectly and securely to not only effectively crowd fish, but to ensure the safety of fish and hatchery staff during operation.

3.0 TASKS

The raceway fish crowders have slipped into various states of disrepair, which has led to inefficient aquaculture practices and personal health and safety concerns. These problems put strain for TRH operations based on their two Biological Opinions (BiOps; NMFS 2018a, 2020) and a Hatchery and Genetics Management Plan (HGMP) for TRH Coho Salmon (Reclamation and CDFW 2017). The current state of the fish crowders do not meet the needs of the hatchery.

TRH fish crowders are in need of repair to meet the increasing demands of contemporary aquaculture and bring the facility and its partners back to full operability.

The main components of concern are the gaskets, gas-powered engine, hydraulics, wheels and tires, general cleanliness and maintenance, and the actuator for the screening tubes and pivots.

Crowders #45 and #46 are currently inoperable due to engine and/or hydrologic failure, while

Crowder #44 has been in operation with broken components.

• Crowder #44’s engine, hydraulics, and tires are currently operable, however, all 4 of the forklift’s stop wheel protectors are missing/broken, tabs that control the louvers and swivels need repair, all 4 inner rubber guide covers for the wheels are missing, and the hydraulic fluid and filters needs to be serviced /replaced.

• Crowder #45’s engine is not operating due to a possible bad coil, broken or missing parts include a missing fuel tank, a tire (the crowder currently only has 3), all 4 of the forklift’s stop wheel protectors are missing/broken, many plastic louver swivels are missing/or broken and need to be replaced, and all 4 inner guide wheel rubber is missing. The status to the hydraulic system is unknown, however it is implied that the fluid and filter will need to be replaced/serviced.

• Crowder #46’s engine is operable, but the hydraulic system intermittently functions and is unreliable with occasional hydraulic pump failure. The fluid and filters will need to be replaced and serviced in addition to the repairs. Crowder #46 needs a new battery, all four wheels, four stop/wheel protectors, all new plastic louver swivels, and four inner guide wheel rubbers.

3.1 Task List – Crowder #45 should be repaired first to allow for uninterrupted operation for hatchery employees. Crowder #44 and #46 will follow accordingly. The crowders shall be repaired in accordance with terms and conditions listed below. All work listed below should be completed with parts to be sourced by the contractor:

3.1.1 Replace gate hydraulic cylinder and mounting pattern.

3.1.2 Install lock valve to prevent down creeping.

3.1.3 Replace hoses.

3.1.4 Replace O-ring chain, brash bushings.

3.1.5 Replace hydraulic gauge, hydraulic valves and add new operation labels on control panel.

3.1.6 Replace drive motor, hoses, chain, midship bearing.

3.1.7 Replace hydraulic pump, electric valve, hydraulic hoses.

3.1.8 Hydraulic tank drain and clean replace, refill with food grade oil.

3.1.9 Replace filter inlet and outlet, sight gauge, outlet internal screen and lid gasket.

3.1.10 Replace Engine with 25 HP Kohler, manifold, spark arrestor, drive coupler, add oil change line with valve.

3.1.11 Replace ignition switch, harness, choke and throttle cables.

3.1.12 Replace hour meter & ammeter.

3.1.13 Replace retaining tray with drain line and valve.

3.1.14 Repair engine housing with new hinge and lid stopper, increase access for oil filter replacement.

3.1.15 Replace gasoline tank with removable lid outlet port with valve and new fuel line.

3.1.16 Replace axle bearings, tires, and guide wheels.

3.1.17 Fabricate and install forklift guards at each side of fish crowder.

3.1.18 Weld repairs to floor deck, screen tower safety mech guards

3.1.19 Crowder screen replace screen tubes upper and lower pivots, hardware replace perimeter rubber gasket.

3.1.20 Paint all steel items forest green.

3.1.21 Include 1 additional sets of screen tubes and pivots.

4.0 PERIOD OF PERFORMANCE

This project will be completed over a 12-month period following the award date.

4.1 Milestones/Timeline/Schedule:

Period Start Date Completion Date

Contract Award Date Award Date plus 12 months

Deliverable per Task Schedule

Task 1 – Crowder Repair #45 Award Date + 4 months

Task 2 - Crowder Repair #44 Award Date + 8 months

Task 3 - Crowder Repair #46 Award Date + 12 months

5.0 DELIVERABLES

The contractor shall provide round trip transportation from the following address: Trinity River

Fish Hatchery, 1000 Hatchery Rd., Lewiston, CA, 96052. The contractor shall repair fish crowders to a fully operable state. The work must be inspected by Reclamation’s contracting officer representative (COR) and the Trinity River Hatchery Manager upon completion.