This bid abstract outlines pricing for various construction and maintenance services required at Lake Shelbyville facilities under a USACE St. Louis District IDIQ contract. It includes unit pricing for over 150 line items such as concrete work, earthwork, utilities, fencing and gates, drainage, and turf establishment. Pricing is provided by four incumbent contractors for the base period and first option year. Responses were due by December 19th, 2023 with a public bid opening held on that date. Award decisions and total contract values are not stated. The document focuses on pricing details rather than general statement of work or contract requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: W912P923B0009 Date Issued: 20 OCT 2023

Amendment 0001: 7 NOV 2023 Amendment 0002: 20 NOV 2023 Amendment 0003: 28 NOV 2023 Contracting Officer Amendment 0004: 12 DEC 2023 Rebekah Lamb

Bids Due: 19 DEC 2023, 9 AM CST Public Bid Opening: 2pm CST 19 DEC 2023

Priced Line Description

Quantity Unit Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount KTR Calculation Ext Unit Price Extended Amount

0001 Concrete Slab: 4-inch 200 SF 24.40$ 4,880.00$ 14.00$ 2,800.00$ 71.13$ 14,226.00$ 14,226.76$ 47.40$ 9,480.00$ 0002 Concrete Slab: 6-inch 200 SF 25.60$ 5,120.00$ 16.00$ 3,200.00$ 78.70$ 15,740.00$ 15,740.24$ 49.41$ 9,882.00$ 0003 Concrete Slab: 8-inch 100 SF 27.10$ 2,710.00$ 18.00$ 1,800.00$ 102.92$ 10,292.00$ 10,291.70$ 102.83$ 10,283.00$ 0004 Concrete Slab: 10-inch 100 SF 28.50$ 2,850.00$ 20.00$ 2,000.00$ 118.05$ 11,805.00$ 11,805.18$ 106.84$ 10,684.00$ 0005 Concrete Ditch: 4-inch 200 SF 24.40$ 4,880.00$ 20.00$ 4,000.00$ 86.27$ 17,254.00$ 17,253.73$ 67.60$ 13,520.00$ 0006 Barrier Concrete Curb & Gutter 1000 LF 53.60$ 53,600.00$ 21.00$ 21,000.00$ 143.78$ 143,780.00$ 143,781.08$ 75.40$ 75,400.00$ 0007 Mountable Concrete Curb & Gutter 1000 LF 42.40$ 42,400.00$ 21.00$ 21,000.00$ 121.08$ 121,080.00$ 121,078.80$ 75.40$ 75,400.00$ 0008 Reinforcement 500 LB 1.80$ 900.00$ 3.00$ 1,500.00$ 4.54$ 2,270.00$ 2,270.23$ 7.80$ 3,900.00$ 0009 Miscellaneous Concrete Work TBD TBD TBD TBD -$ $ - TBD 0010 Clearing and Grubbing: Light 5000 SY 1.90$ 9,500.00$ 1.00$ 5,000.00$ 15.13$ 75,650.00$ 75,674.25$ 3.12$ 15,600.00$ 0011 Clearing and Grubbing: Heavy 5000 SY 4.50$ 22,500.00$ 3.00$ 15,000.00$ 30.27$ 151,350.00$ 151,348.50$ 5.15$ 25,750.00$ 0012 Fill Material 1000 CY 37.70$ 37,700.00$ 33.00$ 33,000.00$ 127.13$ 127,130.00$ 127,132.74$ 49.92$ 49,920.00$ 0013 Earthwork - Light Field/Site Grading 2000 CY 22.80$ 45,600.00$ 16.00$ 32,000.00$ 22.70$ 45,400.00$ 45,404.55$ 72.50$ 145,000.00$ 0014 Earthwork - Heavy Field/Site Grading 2000 CY 24.50$ 49,000.00$ 19.00$ 38,000.00$ 30.27$ 60,540.00$ 60,539.40$ 53.66$ 107,320.00$ 0015 Earthwork - Pavement Subgrade 1000 CY 33.80$ 33,800.00$ 16.00$ 16,000.00$ 45.40$ 45,400.00$ 45,404.55$ 62.40$ 62,400.00$ 0016 Excess Earthwork Disposal 200 CY 36.00$ 7,200.00$ 14.00$ 2,800.00$ 127.13$ 25,426.00$ 25,426.55$ 42.64$ 8,528.00$ 0017 Top Soil 800 CY 41.30$ 33,040.00$ 35.00$ 28,000.00$ 90.81$ 72,648.00$ 72,647.28$ 104.00$ 83,200.00$ 0018 Geotextile Installation - Woven 100 SY 1.50$ 150.00$ 5.00$ 500.00$ 22.70$ 2,270.00$ 2,270.23$ 41.60$ 4,160.00$ 0019 Geotextile Installation - Non Woven 100 SY 5.00$ 500.00$ 5.00$ 500.00$ 28.76$ 2,876.00$ 2,875.62$ 41.60$ 4,160.00$ 0020 Concrete Removal 200 CY 122.00$ 24,400.00$ 72.00$ 14,400.00$ 355.67$ 71,134.00$ 71,133.80$ 208.00$ 41,600.00$ 0021 Concrete Removal Structures & Foundations 200 CY 139.00$ 27,800.00$ 100.00$ 20,000.00$ 370.80$ 74,160.00$ 74,160.77$ 260.00$ 52,000.00$ 0022 Asphalt Removal 200 CY 56.70$ 11,340.00$ 12.00$ 2,400.00$ 249.73$ 49,946.00$ 49,945.01$ 88.40$ 17,680.00$ 0023 Removal of Aggregates 200 CY 45.50$ 9,100.00$ 11.00$ 2,200.00$ 227.02$ 45,404.00$ 45,404.55$ 83.20$ 16,640.00$ 0024 Disposal of Misc. 500 LB 7.20$ 3,600.00$ 3.00$ 1,500.00$ 24.22$ 12,110.00$ 12,107.88$ 20.80$ 10,400.00$ 0025 Landscape Timbers Installation 50 LF 23.50$ 1,175.00$ 25.00$ 1,250.00$ 66.59$ 3,329.50$ 3,329.67$ 234.00$ 11,700.00$ 0026 Landscape Timber Removal 20 LF 11.00$ 220.00$ 4.00$ 80.00$ 60.54$ 1,210.80$ 1,210.79$ 156.00$ 3,120.00$ 0027 Sand Supply 100 TN 32.40$ 3,240.00$ 31.00$ 3,100.00$ 68.11$ 6,811.00$ 6,810.68$ 29.64$ 2,964.00$ 0028 Beach Sand Supply & Install 200 TN 44.50$ 8,900.00$ 38.00$ 7,600.00$ 171.02$ 34,204.00$ 34,204.76$ 78.00$ 15,600.00$ 0029 Dam West Beach - Maintenance 1 JB 3,680.00$ 3,680.00$ 500.00$ 500.00$ 105,943.95$ 105,943.95$ 105,943.95$ 7,280.00$ 7,280.00$ 0030 Sullivan Beach - Maintenance 1 JB 6,320.00$ 6,320.00$ 500.00$ 500.00$ 172,537.29$ 172,537.29$ 172,537.29$ 7,280.00$ 7,280.00$ 0031 Wilbourn Creek Beach - Maintenance 1 JB 3,630.00$ 3,630.00$ 500.00$ 500.00$ 99,890.01$ 99,890.01$ 99,890.01$ 7,280.00$ 7,280.00$ 0032 Lithia Springs Beach - Maintenance 1 JB 2,660.00$ 2,660.00$ 500.00$ 500.00$ 27,242.73$ 27,242.73$ 27,242.73$ 4,420.00$ 4,420.00$ 0033 Wolf Creek Beach - Maintenance 1 JB 2,830.00$ 2,830.00$ 500.00$ 500.00$ 64,323.11$ 64,323.11$ 64,323.11$ 3,900.00$ 3,900.00$ 0034 Coon Creek Beach Maintenance 1 JB 1,760.00$ 1,760.00$ 500.00$ 500.00$ 12,107.88$ 12,107.88$ 12,107.88$ 3,900.00$ 3,900.00$ 0035 Entrance Gate - Double Arm Installation 2 EA 2,260.00$ 4,520.00$ 3,550.00$ 7,100.00$ 6,053.94$ 12,107.88$ 12,107.88$ 5,720.00$ 11,440.00$ 0036 Entrance Gate - Single Arm Installation 2 EA 1,760.00$ 3,520.00$ 3,210.00$ 6,420.00$ 6,053.94$ 12,107.88$ 12,107.88$ 5,200.00$ 10,400.00$ 0037 Entrance Gate - Double Arm Replacement 2 EA 3,680.00$ 7,360.00$ 3,625.00$ 7,250.00$ 6,053.94$ 12,107.88$ 12,107.88$ 8,840.00$ 17,680.00$ 0038 Entrance Gate - Single Arm Replacement 2 EA 2,450.00$ 4,900.00$ 3,285.00$ 6,570.00$ 6,053.94$ 12,107.88$ 12,107.88$ 8,320.00$ 16,640.00$ 0039 Entrance Gate - Painting Double Arm 5 EA 575.00$ 2,875.00$ 750.00$ 3,750.00$ 756.74$ 3,783.70$ 3,783.71$ 2,288.00$ 11,440.00$ 0040 Entrance Gate - Painting Single Arm 5 EA 396.00$ 1,980.00$ 750.00$ 3,750.00$ 756.74$ 3,783.70$ 3,783.71$ 3,120.00$ 15,600.00$ 0041 Concrete Dome Post Installation 5 EA 953.00$ 4,765.00$ 220.00$ 1,100.00$ 4,540.46$ 22,702.30$ 22,702.28$ 4,160.00$ 20,800.00$ 0042 Decorative Boulder Supply and Placement 3 EA 519.00$ 1,557.00$ 565.00$ 1,695.00$ 2,270.23$ 6,810.69$ 6,810.68$ 4,160.00$ 12,480.00$

Sign Removal, Post Replacement, and Sign Installation Double 4" x 4" 10 EA 895.00$ 8,950.00$ 230.00$ 2,300.00$ 756.74$ 7,567.40$ 7,567.43$ 5,720.00$ 57,200.00$

Sign Removal, Post Replacement, and Sign Installation Double 6" x 6" 10 EA 1,080.00$ 10,800.00$ 280.00$ 2,800.00$ 756.74$ 7,567.40$ 7,567.43$ 7,540.00$ 75,400.00$

0045 Seamless Epoxy Coatings - Flooring 100 SF 27.80$ 2,780.00$ 12.00$ 1,200.00$ 104.43$ 10,443.00$ 10,443.05$ 468.00$ 46,800.00$ 0046 Seamless Epoxy Coatings - Walls & Ceiling 100 SF 12.90$ 1,290.00$ 12.00$ 1,200.00$ 104.43$ 10,443.00$ 10,443.05$ 572.00$ 57,200.00$ 0047 Pavement Raising Portland Cement 200 LB 40.50$ 8,100.00$ 12.00$ 2,400.00$ 1,513.49$ 302,698.00$ 302,697.00$ 67.60$ 13,520.00$ 0048 Stockpiling - Fine Aggregate FA-2 100 TN 35.90$ 3,590.00$ 30.00$ 3,000.00$ 100.00$ 29.64$ 2,964.00$ 0049 Stockpiling - Coarse Aggregate CA-1 100 TN 37.10$ 3,710.00$ 31.00$ 3,100.00$ 79.06$ 7,906.00$ 7,906.45$ 36.50$ 3,650.00$ 0050 Stockpiling - Coarse Aggregate CA-6 100 TN 36.50$ 3,650.00$ 30.00$ 3,000.00$ 88.43$ 8,843.00$ 8,843.29$ 35.88$ 3,588.00$ 0051 Stockpiling - Coarse Aggregate CA-7 100 TN 37.70$ 3,770.00$ 32.00$ 3,200.00$ 81.15$ 8,115.00$ 8,115.31$ 37.13$ 3,713.00$ 0052 Stockpiling - Coarse Aggregate CA-16 100 TN 37.70$ 3,770.00$ 34.00$ 3,400.00$ 89.55$ 8,955.00$ 8,955.29$ 37.13$ 3,713.00$ 0053 Stockpiling - 3/8" Pea Gravel 100 TN 41.90$ 4,190.00$ 36.00$ 3,600.00$ 93.75$ 9,375.00$ 9,374.53$ 33.23$ 3,323.00$

CSD Environmental Services, Inc

Yes

IGE Geotechnical Construction Industria Construction Services

Lake Shelbyville Infrastructure Base IDIQ Bid Abstract - Construction

Amendments Acknowledged?

80,020,847.02$

Yes Yes

42,549,141.77$

Yes

Grand Total Prices 19,548,574.00$

Yes Yes

12,399,064.00$ Bid received by due date/time?

0054 Placement - Fine Aggregate FA-2 1000 TN 48.00$ 48,000.00$ 35.00$ 35,000.00$ 126.21$ 126,210.00$ 12,620.95$ 67.08$ 67,080.00$ 0055 Placement - Coarse Aggregate CA-1 1000 TN 49.20$ 49,200.00$ 39.00$ 39,000.00$ 98.38$ 98,380.00$ 98,376.53$ 73.94$ 73,940.00$ 0056 Placement - Coarse Aggregate CA-6 1000 TN 48.60$ 48,600.00$ 36.00$ 36,000.00$ 105.94$ 105,940.00$ 105,943.95$ 73.32$ 73,320.00$ 0057 Placement - Coarse Aggregate CA-7 1000 TN 49.80$ 49,800.00$ 40.00$ 40,000.00$ 98.38$ 98,380.00$ 98,376.53$ 74.57$ 74,570.00$ 0058 Placement - Coarse Aggregate CA-16 1000 TN 49.80$ 49,800.00$ 41.00$ 41,000.00$ 107.46$ 107,460.00$ 107,457.44$ 74.57$ 74,570.00$ 0059 Placement - 3/8" Pea Gravel 500 TN 53.50$ 26,750.00$ 46.00$ 23,000.00$ 113.51$ 56,755.00$ 113,511.38$ 70.70$ 35,350.00$ 0060 Stockpiling - IDOT Bedding 500 TN 35.90$ 17,950.00$ 37.00$ 18,500.00$ 113.51$ 56,755.00$ 56,755.69$ 36.50$ 18,250.00$ 0061 Stockpiling - USACE 3" Bedding 500 TN 35.90$ 17,950.00$ 37.00$ 18,500.00$ 78.97$ 39,485.00$ 39,486.82$ 36.50$ 18,250.00$ 0062 Stockpiling - IDOT RR3 Rip Rap 500 TN 46.20$ 23,100.00$ 38.00$ 19,000.00$ 79.96$ 39,980.00$ 39,978.71$ 47.80$ 23,900.00$ 0063 Stockpiling - IDOT RR4 Rip Rap 500 TN 58.20$ 29,100.00$ 53.00$ 26,500.00$ 121.78$ 60,890.00$ 60,887.50$ 60.28$ 30,140.00$ 0064 Stockpiling - IDOT RR5 Rip Rap 500 TN 59.50$ 29,750.00$ 53.00$ 26,500.00$ 132.07$ 66,035.00$ 66,033.35$ 61.53$ 30,765.00$ 0065 Stockpiling - IDOT RR6 Rip Rap 500 TN 64.30$ 32,150.00$ 54.00$ 27,000.00$ 134.02$ 67,010.00$ 67,009.55$ 65.27$ 32,635.00$ 0066 Stockpiling - IDOT RR7 Rip Rap 500 TN 64.30$ 32,150.00$ 54.00$ 27,000.00$ 135.99$ 67,995.00$ 67,993.31$ 66.56$ 33,280.00$ 0067 Stockpiling - USACE 50lb Rip Rap 500 TN 46.20$ 23,100.00$ 38.00$ 19,000.00$ 137.94$ 68,970.00$ 68,969.51$ 47.80$ 23,900.00$ 0068 Stockpiling - USACE 90lb Rip Rap 500 TN 58.20$ 29,100.00$ 46.00$ 23,000.00$ 159.20$ 79,600.00$ 79,601.74$ 60.28$ 30,140.00$ 0069 Stockpiling - USACE 140lb Rip Rap 500 TN 58.20$ 29,100.00$ 53.00$ 26,500.00$ 161.16$ 80,580.00$ 80,577.94$ 60.28$ 30,140.00$ 0070 Stockpiling - USACE 400lb Rip Rap 500 TN 59.50$ 29,750.00$ 53.00$ 26,500.00$ 165.08$ 82,540.00$ 82,537.90$ 61.53$ 30,765.00$ 0071 Stockpiling - USACE 650lb Rip Rap 500 TN 64.30$ 32,150.00$ 54.00$ 27,000.00$ 266.83$ 133,415.00$ 133,413.70$ 65.27$ 32,635.00$ 0072 Stockpiling - USACE 1000lb Rip Rap 500 TN 64.30$ 32,150.00$ 54.00$ 27,000.00$ 272.43$ 136,215.00$ 136,213.65$ 66.56$ 33,280.00$ 0073 Placement - IDOT Bedding 1000 TN 48.00$ 48,000.00$ 44.00$ 44,000.00$ 756.74$ 756,740.00$ 378,371.25$ 73.94$ 73,940.00$ 0074 Placement - USACE 3" Bedding 1000 TN 48.00$ 48,000.00$ 36.00$ 36,000.00$ 299.03$ 299,030.00$ 299,034.37$ 73.94$ 73,940.00$ 0075 Placement - IDOT RR3 Rip Rap 1000 TN 62.20$ 62,200.00$ 45.00$ 45,000.00$ 134.00$ 134,000.00$ 134,003.96$ 93.56$ 93,560.00$ 0076 Placement - IDOT RR4 Rip Rap 1000 TN 74.20$ 74,200.00$ 61.00$ 61,000.00$ 147.37$ 147,370.00$ 147,368.03$ 106.04$ 106,040.00$ 0077 Placement - IDOT RR5 Rip Rap 1000 TN 75.40$ 75,400.00$ 61.00$ 61,000.00$ 193.01$ 193,010.00$ 193,014.74$ 107.29$ 107,290.00$ 0078 Placement - IDOT RR6 Rip Rap 1000 TN 80.30$ 80,300.00$ 64.00$ 64,000.00$ 192.56$ 192,560.00$ 192,560.70$ 111.03$ 111,030.00$ 0079 Placement - IDOT RR7 Rip Rap 1000 TN 80.30$ 80,300.00$ 64.00$ 64,000.00$ 194.53$ 194,530.00$ 194,528.23$ 112.32$ 112,320.00$ 0080 Placement - USACE 50lb Rip Rap 1000 TN 62.20$ 62,200.00$ 45.00$ 45,000.00$ 200.96$ 200,960.00$ 200,960.54$ 93.56$ 93,560.00$ 0081 Placement - USACE 90lb Rip Rap 1000 TN 74.20$ 74,200.00$ 54.00$ 54,000.00$ 198.05$ 198,050.00$ 198,054.65$ 106.04$ 106,040.00$ 0082 Placement - USACE 140lb Rip Rap 1000 TN 74.20$ 74,200.00$ 58.00$ 58,000.00$ 150.41$ 150,410.00$ 150,410.14$ 106.04$ 106,040.00$ 0083 Placement - USACE 400lb Rip Rap 1000 TN 75.40$ 75,400.00$ 58.00$ 58,000.00$ 152.36$ 152,360.00$ 152,362.53$ 107.29$ 107,290.00$ 0084 Placement - USACE 650lb Rip Rap 1000 TN 80.30$ 80,300.00$ 64.00$ 64,000.00$ 156.28$ 156,280.00$ 156,282.46$ 111.03$ 111,030.00$ 0085 Placement - USACE 1000lb Rip Rap 1000 TN 80.30$ 80,300.00$ 64.00$ 64,000.00$ 292.84$ 292,840.00$ 292,844.21$ 118.56$ 118,560.00$ 0086 Establishment of Turf - Large Scale 20 ACRE 4,340.00$ 86,800.00$ 4,500.00$ 90,000.00$ 756.74$ 15,134.80$ 756,742.50$ 7,280.00$ 145,600.00$ 0087 Establishment of Turf - Small Scale 100 SY 30.30$ 3,030.00$ 6.00$ 600.00$ 45,404.55$ 4,540,455.00$ 908,091.00$ 52.00$ 5,200.00$ 0088 Road Bore Drill Setup & Staging 1 JOB 3,620.00$ 3,620.00$ 2,500.00$ 2,500.00$ 45.40$ 45.40$ 4,540.46$ 23,400.00$ 23,400.00$ 0089 Road Bore Sleeve 2-inch Dia. HDPE 30 LF 104.00$ 3,120.00$ 31.00$ 930.00$ 20,722.58$ 621,677.40$ 20,722.58$ 520.00$ 15,600.00$ 0090 Road Bore Sleeve 3-inch Dia. HDPE 30 LF 105.00$ 3,150.00$ 33.00$ 990.00$ 828.12$ 24,843.60$ 24,843.55$ 520.00$ 15,600.00$ 0091 Road Bore Sleeve 4-inch Dia. HDPE 30 LF 107.00$ 3,210.00$ 34.00$ 1,020.00$ 836.52$ 25,095.60$ 25,095.55$ 624.00$ 18,720.00$ 0092 Road Bore Sleeve 6-inch Dia. HDPE 30 LF 113.00$ 3,390.00$ 44.00$ 1,320.00$ 849.13$ 25,473.90$ 25,473.77$ 624.00$ 18,720.00$ 0093 Road Bore Sleeve 8-inch Dia. HDPE 30 LF 121.00$ 3,630.00$ 54.00$ 1,620.00$ 878.52$ 26,355.60$ 26,355.53$ 780.00$ 23,400.00$ 0094 Frost Proof Yard Hydrant Replacement 5 EA 2,440.00$ 12,200.00$ 800.00$ 4,000.00$ 922.62$ 4,613.10$ 27,678.61$ 3,120.00$ 15,600.00$ 0095 Frost Proof Yard Hydrant Installation 5 EA 1,600.00$ 8,000.00$ 800.00$ 4,000.00$ 6,197.51$ 30,987.55$ 30,987.55$ 6,240.00$ 31,200.00$ 0096 Water Valve Replacement - 1" curb stop ball valve 2 EA 1,020.00$ 2,040.00$ 86.00$ 172.00$ 6,197.51$ 12,395.02$ 30,987.55$ 6,760.00$ 13,520.00$ 0097 Water Valve Replacement - 1.5" curb stop ball valve 2 EA 1,360.00$ 2,720.00$ 105.00$ 210.00$ 4,228.31$ 8,456.62$ 8,456.63$ 6,760.00$ 13,520.00$ 0098 Water Valve Replacement - 2" square nut ball valve 2 EA 1,410.00$ 2,820.00$ 206.00$ 412.00$ 4,670.71$ 9,341.42$ 9,341.41$ 6,760.00$ 13,520.00$ 0099 Water Valve Replacement - 3" square nut ball valve 2 EA 1,640.00$ 3,280.00$ 330.00$ 660.00$ 3,734.33$ 7,468.66$ 7,468.65$ 7,800.00$ 15,600.00$ 0100 Water Valve Replacement - 4" square nut ball valve 2 EA 2,490.00$ 4,980.00$ 598.00$ 1,196.00$ 4,036.21$ 8,072.42$ 8,072.41$ 7,800.00$ 15,600.00$ 0101 3/4 Inch Water Line Tap 2 EA 2,050.00$ 4,100.00$ 206.00$ 412.00$ 4,369.45$ 8,738.90$ 8,738.89$ 1,560.00$ 3,120.00$ 0102 1 Inch Water Line Tap 2 EA 2,050.00$ 4,100.00$ 225.00$ 450.00$ 8,876.12$ 17,752.24$ 17,752.24$ 1,560.00$ 3,120.00$ 0103 1-1/2 Inch Water Line Tap 2 EA 2,380.00$ 4,760.00$ 270.00$ 540.00$ 8,876.12$ 17,752.24$ 17,752.24$ 1,560.00$ 3,120.00$ 0104 2 Inch Water Line Tap 2 EA 2,490.00$ 4,980.00$ 360.00$ 720.00$ 8,876.12$ 17,752.24$ 17,752.24$ 2,860.00$ 5,720.00$ 0105 3 Inch Water Line Tap 2 EA 3,040.00$ 6,080.00$ 540.00$ 1,080.00$ 8,876.12$ 17,752.24$ 17,752.24$ 2,860.00$ 5,720.00$ 0106 4 Inch Water Line Tap 2 EA 3,230.00$ 6,460.00$ 765.00$ 1,530.00$ 13,282.72$ 26,565.44$ 26,565.45$ 3,640.00$ 7,280.00$ 0107 6 Inch Water Line Tap 2 EA 3,770.00$ 7,540.00$ 1,080.00$ 2,160.00$ 13,674.78$ 27,349.56$ 27,349.55$ 4,160.00$ 8,320.00$ 0108 3/4 Inch Water Line Installation 100 LF 22.50$ 2,250.00$ 9.00$ 900.00$ 14,066.83$ 1,406,683.00$ 28,133.66$ 44.20$ 4,420.00$ 0109 1 Inch Water Line Installation 100 LF 23.00$ 2,300.00$ 14.00$ 1,400.00$ 380.38$ 38,038.00$ 38,038.42$ 50.44$ 5,044.00$ 0110 1-1/2 Inch Water Line Installation 100 LF 25.00$ 2,500.00$ 15.00$ 1,500.00$ 381.46$ 38,146.00$ 38,145.88$ 52.00$ 5,200.00$ 0111 2 Inch Water Line Installation 100 LF 25.90$ 2,590.00$ 17.00$ 1,700.00$ 381.85$ 38,185.00$ 38,185.23$ 57.20$ 5,720.00$ 0112 2-1/2 Inch Water Line Installation 100 LF 27.30$ 2,730.00$ 23.00$ 2,300.00$ 384.11$ 38,411.00$ 38,410.74$ 67.60$ 6,760.00$ 0113 3 Inch Water Line Installation 100 LF 45.90$ 4,590.00$ 27.00$ 2,700.00$ 386.17$ 38,617.00$ 38,616.57$ 72.80$ 7,280.00$ 0114 4 Inch Water Line Installation 50 LF 54.30$ 2,715.00$ 30.00$ 1,500.00$ 386.14$ 19,307.00$ 38,613.54$ 104.00$ 5,200.00$ 0115 6 Inch Water Line Installation 50 LF 55.50$ 2,775.00$ 36.00$ 1,800.00$ 679.57$ 33,978.50$ 33,978.49$ 156.00$ 7,800.00$ 0116 Sewer Line Tap 2-5 Feet Deep 2 EA 1,850.00$ 3,700.00$ 810.00$ 1,620.00$ 793.31$ 1,586.62$ 39,665.41$ 7,800.00$ 15,600.00$ 0117 Sewer Line Tap 5.1-10 Feet Deep 2 EA 2,220.00$ 4,440.00$ 1,080.00$ 2,160.00$ 2,951.30$ 5,902.60$ 5,902.59$ 9,880.00$ 19,760.00$ 0118 Sewer Line Tap 10.1-15 Feet Deep 1 EA 2,810.00$ 2,810.00$ 1,350.00$ 1,350.00$ 4,464.78$ 4,464.78$ 8,929.56$ 17,680.00$ 17,680.00$

4 Inch Dia. Gravity Sewer Install 0-4 Feet Deep 100 LF 56.70$ 5,670.00$ 36.00$ 3,600.00$ 5,297.20$ 529,720.00$ 5,297.20$ 509.60$ 50,960.00$ 0120 4 Inch Dia. Gravity Sewer Install 4.1-10 Feet

Deep 50 LF 64.50$ 3,225.00$ 41.00$ 2,050.00$ 128.65$ 6,432.50$ 12,864.62$ 1,352.00$ 67,600.00$

0121 4 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep 20 LF 81.00$ 1,620.00$ 50.00$ 1,000.00$ 158.92$ 3,178.40$ 7,945.80$ 1,768.00$ 35,360.00$

6 Inch Dia. Gravity Sewer Install 0-4 Feet Deep 100 LF 99.50$ 9,950.00$ 38.00$ 3,800.00$ 211.89$ 21,189.00$ 4,237.76$ 520.00$ 52,000.00$

0123 6 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep 50 LF 107.00$ 5,350.00$ 44.00$ 2,200.00$ 151.35$ 7,567.50$ 15,134.85$ 1,404.00$ 70,200.00$

0124 6 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep 20 LF 124.00$ 2,480.00$ 54.00$ 1,080.00$ 189.19$ 3,783.80$ 9,459.28$ 1,820.00$ 36,400.00$

8 Inch Dia. Gravity Sewer Install 0-4 Feet Deep 100 LF 142.00$ 14,200.00$ 45.00$ 4,500.00$ 264.86$ 26,486.00$ 5,297.20$ 624.00$ 62,400.00$

0126 8 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep 50 LF 150.00$ 7,500.00$ 50.00$ 2,500.00$ 189.19$ 9,459.50$ 18,918.56$ 1,456.00$ 72,800.00$

0127 8 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep 20 LF 166.00$ 3,320.00$ 59.00$ 1,180.00$ 227.02$ 4,540.40$ 11,351.14$ 1,872.00$ 37,440.00$

0128 2 Inch Dia. Pressure Sewer Force Main Install 50 LF 36.20$ 1,810.00$ 32.00$ 1,600.00$ 302.70$ 15,135.00$ 6,053.94$ 1,040.00$ 52,000.00$ 0129 3 Inch Dia. Pressure Sewer Force Main Install 50 LF 44.90$ 2,245.00$ 36.00$ 1,800.00$ 227.02$ 11,351.00$ 11,351.14$ 1,040.00$ 52,000.00$ 0130 4 Inch Dia. Pressure Sewer Force Main Install 50 LF 53.90$ 2,695.00$ 44.00$ 2,200.00$ 264.86$ 13,243.00$ 13,242.99$ 1,040.00$ 52,000.00$ 0131 6 Inch Dia. Pressure Sewer Force Main Install 20 LF 96.30$ 1,926.00$ 50.00$ 1,000.00$ 302.70$ 6,054.00$ 15,134.85$ 2,080.00$ 41,600.00$ 0132 Manhole Install 1-4 Feet Deep 2 EA 4,020.00$ 8,040.00$ 3,240.00$ 6,480.00$ 348.10$ 696.20$ 6,962.03$ 6,240.00$ 12,480.00$ 0133 Manhole Install 4.1-10 Feet Deep 2 EA 4,660.00$ 9,320.00$ 4,140.00$ 8,280.00$ 11,351.14$ 22,702.28$ 22,702.28$ 15,600.00$ 31,200.00$ 0134 Manhole Install 10.1-15 Feet Deep 2 EA 5,780.00$ 11,560.00$ 5,850.00$ 11,700.00$ 12,486.25$ 24,972.50$ 24,972.50$ 18,720.00$ 37,440.00$

CMP 12 Inch Dia. Pipe Replace, 0-4.9 Ft Depth 20 LF 90.90$ 1,818.00$ 33.00$ 660.00$ 15,134.85$ 302,697.00$ 30,269.70$ 312.00$ 6,240.00$

CMP 12 Inch Dia. Pipe Replace, 5-9.9 Ft Depth 20 LF 104.00$ 2,080.00$ 36.00$ 720.00$ 567.56$ 11,351.20$ 11,351.14$ 494.00$ 9,880.00$

CMP 12 Inch Dia. Pipe Replace, 10-15 Ft Depth 20 LF 131.00$ 2,620.00$ 38.00$ 760.00$ 643.23$ 12,864.60$ 12,864.62$ 832.00$ 16,640.00$

CMP 18 Inch Dia. Pipe Replace, 0-4.9 Ft Depth 20 LF 107.00$ 2,140.00$ 37.00$ 740.00$ 718.91$ 14,378.20$ 14,378.11$ 312.00$ 6,240.00$

CMP 18 Inch Dia. Pipe Replace, 5-9.9 Ft Depth 20 LF 120.00$ 2,400.00$ 40.00$ 800.00$ 605.39$ 12,107.80$ 12,107.88$ 500.00$ 10,000.00$

CMP 18 Inch Dia. Pipe Replace, 10-15 Ft Depth 20 LF 146.00$ 2,920.00$ 43.00$ 860.00$ 681.07$ 13,621.40$ 13,621.37$ 600.00$ 12,000.00$

CMP 24 Inch Dia. Pipe Replace, 0-4.9 Ft Depth 20 LF 125.00$ 2,500.00$ 46.00$ 920.00$ 756.74$ 15,134.80$ 15,134.85$ 500.00$ 10,000.00$

CMP 24 Inch Dia. Pipe Replace, 5-9.9 Ft Depth 20 LF 140.00$ 2,800.00$ 51.00$ 1,020.00$ 681.07$ 13,621.40$ 13,621.37$ 700.00$ 14,000.00$

CMP 24 Inch Dia. Pipe Replace, 10-15 Ft Depth 20 LF 173.00$ 3,460.00$ 54.00$ 1,080.00$ 756.74$ 15,134.80$ 15,134.85$ 852.80$ 17,056.00$

CMP 30 Inch Dia. Pipe Replace, 0-4.9 Ft Depth 20 LF 190.00$ 3,800.00$ 56.00$ 1,120.00$ 832.42$ 16,648.40$ 16,648.34$ 416.00$ 8,320.00$

CMP 30 Inch Dia. Pipe Replace, 5-9.9 Ft Depth 20 LF 205.00$ 4,100.00$ 60.00$ 1,200.00$ 718.91$ 14,378.20$ 14,378.11$ 520.00$ 10,400.00$

CMP 30 Inch Dia. Pipe Replace, 10-15 Ft Depth 20 LF 237.00$ 4,740.00$ 67.00$ 1,340.00$ 794.58$ 15,891.60$ 15,891.59$ 884.00$ 17,680.00$

CMP 36 Inch Dia. Pipe Replace, 0-4.9 Ft Depth 20 LF 196.00$ 3,920.00$ 65.00$ 1,300.00$ 908.09$ 18,161.80$ 18,161.82$ 436.80$ 8,736.00$

CMP 36 Inch Dia. Pipe Replace, 5-9.9 Ft Depth 20 LF 214.00$ 4,280.00$ 72.00$ 1,440.00$ 756.74$ 15,134.80$ 15,134.85$ 535.60$ 10,712.00$

CMP 36 Inch Dia. Pipe Replace, 10-15 Ft Depth 20 LF 252.00$ 5,040.00$ 74.00$ 1,480.00$ 832.42$ 16,648.40$ 16,648.34$ 899.60$ 17,992.00$

CMP 48 Inch Dia. Pipe Replace, 0-4.9 Ft Depth 20 LF 240.00$ 4,800.00$ 84.00$ 1,680.00$ 908.09$ 18,161.80$ 18,161.82$ 452.40$ 9,048.00$

CMP 48 Inch Dia. Pipe Replace, 5-9.9 Ft Depth 20 LF 261.00$ 5,220.00$ 93.00$ 1,860.00$ 832.42$ 16,648.40$ 16,648.34$ 551.20$ 11,024.00$

CMP 48 Inch Dia. Pipe Replace, 10-15 Ft Depth 20 LF 305.00$ 6,100.00$ 102.00$ 2,040.00$ 908.09$ 18,161.80$ 18,161.82$ 936.00$ 18,720.00$ 0153 CMP 12 Inch Dia. Pipe New Install, 0-4.9 Ft

Depth 20 LF 59.40$ 1,188.00$ 33.00$ 660.00$ 983.77$ 19,675.40$ 19,675.31$ 312.00$ 6,240.00$ 0154 CMP 12 Inch Dia. Pipe New Install, 5-9.9 Ft

Depth 20 LF 72.40$ 1,448.00$ 36.00$ 720.00$ 340.53$ 6,810.60$ 6,810.68$ 494.00$ 9,880.00$ 0155 CMP 12 Inch Dia. Pipe New Install, 10-15 Ft

Depth 20 LF 99.10$ 1,982.00$ 38.00$ 760.00$ 416.21$ 8,324.20$ 8,324.17$ 832.00$ 16,640.00$ 0156 CMP 18 Inch Dia. Pipe New Install, 0-4.9 Ft

Depth 20 LF 71.90$ 1,438.00$ 37.00$ 740.00$ 491.88$ 9,837.60$ 9,837.65$ 312.00$ 6,240.00$ 0157 CMP 18 Inch Dia. Pipe New Install, 5-9.9 Ft

Depth 20 LF 84.90$ 1,698.00$ 40.00$ 800.00$ 378.37$ 7,567.40$ 7,567.43$ 390.00$ 7,800.00$ 0158 CMP 18 Inch Dia. Pipe New Install, 10-15 Ft

Depth 20 LF 112.00$ 2,240.00$ 43.00$ 860.00$ 454.05$ 9,081.00$ 9,080.91$ 499.20$ 9,984.00$ 0159 CMP 24 Inch Dia. Pipe New Install, 0-4.9 Ft

Depth 20 LF 83.50$ 1,670.00$ 46.00$ 920.00$ 529.72$ 10,594.40$ 10,594.40$ 500.00$ 10,000.00$ 0160 CMP 24 Inch Dia. Pipe New Install, 5-9.9 Ft

Depth 20 LF 98.60$ 1,972.00$ 51.00$ 1,020.00$ 454.05$ 9,081.00$ 9,080.91$ 832.00$ 16,640.00$ 0161 CMP 24 Inch Dia. Pipe New Install, 10-15 Ft

Depth 20 LF 132.00$ 2,640.00$ 54.00$ 1,080.00$ 529.72$ 10,594.40$ 10,594.40$ 852.80$ 17,056.00$ 0162 CMP 30 Inch Dia. Pipe New Install, 0-4.9 Ft

Depth 20 LF 120.00$ 2,400.00$ 56.00$ 1,120.00$ 605.39$ 12,107.80$ 12,107.88$ 416.00$ 8,320.00$ 0163 CMP 30 Inch Dia. Pipe New Install, 5-9.9 Ft

Depth 20 LF 125.00$ 2,500.00$ 60.00$ 1,200.00$ 529.72$ 10,594.40$ 10,594.40$ 520.00$ 10,400.00$ 0164 CMP 30 Inch Dia. Pipe New Install, 10-15 Ft

Depth 20 LF 168.00$ 3,360.00$ 67.00$ 1,340.00$ 605.39$ 12,107.80$ 12,107.88$ 884.00$ 17,680.00$ 0165 CMP 36 Inch Dia. Pipe New Install, 0-4.9 Ft

Depth 20 LF 126.00$ 2,520.00$ 65.00$ 1,300.00$ 643.23$ 12,864.60$ 12,864.62$ 436.80$ 8,736.00$

0166 CMP 36 Inch Dia. Pipe New Install, 5-9.9 Ft Depth 20 LF 144.00$ 2,880.00$ 72.00$ 1,440.00$ 605.39$ 12,107.80$ 12,107.88$ 535.60$ 10,712.00$

0167 CMP 36 Inch Dia. Pipe New Install, 10-15 Ft Depth 20 LF 182.00$ 3,640.00$ 74.00$ 1,480.00$ 681.07$ 13,621.40$ 13,621.37$ 899.60$ 17,992.00$

0168 CMP 48 Inch Dia. Pipe New Install, 0-4.9 Ft Depth 20 LF 156.00$ 3,120.00$ 84.00$ 1,680.00$ 756.74$ 15,134.80$ 15,134.85$ 452.40$ 9,048.00$

0169 CMP 48 Inch Dia. Pipe New Install, 5-9.9 Ft Depth 20 LF 177.00$ 3,540.00$ 93.00$ 1,860.00$ 681.07$ 13,621.40$ 13,621.37$ 551.20$ 11,024.00$

0170 CMP 48 Inch Dia. Pipe New Install, 10-15 Ft Depth 20 LF 221.00$ 4,420.00$ 102.00$ 2,040.00$ 756.74$ 15,134.80$ 15,134.85$ 936.00$ 18,720.00$

0171 12 Inch Dia. End Section Replace 4 EA 511.00$ 2,044.00$ 138.00$ 552.00$ 832.42$ 3,329.68$ 16,648.34$ 520.00$ 2,080.00$ 0172 18 Inch Dia. End Section Replace 4 EA 596.00$ 2,384.00$ 205.00$ 820.00$ 1,816.18$ 7,264.72$ 7,264.73$ 540.80$ 2,163.20$ 0173 24 Inch Dia. End Section Replace 4 EA 933.00$ 3,732.00$ 248.00$ 992.00$ 2,118.88$ 8,475.52$ 8,475.52$ 728.00$ 2,912.00$ 0174 30 Inch Dia. End Section Replace 4 EA 1,150.00$ 4,600.00$ 315.00$ 1,260.00$ 3,178.32$ 12,713.28$ 12,713.27$ 1,248.00$ 4,992.00$ 0175 36 Inch Dia. End Section Replace 4 EA 1,470.00$ 5,880.00$ 360.00$ 1,440.00$ 4,389.11$ 17,556.44$ 17,556.43$ 1,560.00$ 6,240.00$ 0176 12 Inch Dia. End Section New Install 4 EA 323.00$ 1,292.00$ 138.00$ 552.00$ 6,507.99$ 26,031.96$ 26,031.94$ 520.00$ 2,080.00$ 0177 18 Inch Dia. End Section New Install 4 EA 376.00$ 1,504.00$ 205.00$ 820.00$ 1,513.49$ 6,053.96$ 6,053.94$ 540.80$ 2,163.20$ 0178 24 Inch Dia. End Section New Install 4 EA 598.00$ 2,392.00$ 248.00$ 992.00$ 1,816.18$ 7,264.72$ 7,264.73$ 728.00$ 2,912.00$ 0179 30 Inch Dia. End Section New Install 4 EA 811.00$ 3,244.00$ 315.00$ 1,260.00$ 2,875.62$ 11,502.48$ 11,502.49$ 1,248.00$ 4,992.00$ 0180 36 Inch Dia. End Section New Install 4 EA 1,050.00$ 4,200.00$ 360.00$ 1,440.00$ 4,086.41$ 16,345.64$ 16,345.64$ 1,560.00$ 6,240.00$ 0181 EQUIPMENT RENTAL WITH OPERATOR TBD JOB TBD 6,205.29$ 6,205.29$ 24,821.15$ TBD 0181a Track-Type Bulldozers 90HP w/OP 100 HR 231.00$ 23,100.00$ 119.00$ 11,900.00$ $ - 100.00$ $ - 348.14$ 34,814.00$ 0181b Track-Type Bulldozers 190HP w/OP 100 HR 355.00$ 35,500.00$ 143.00$ 14,300.00$ 302.70$ 30,270.00$ 30,269.70$ 449.54$ 44,954.00$ 0181c Motor Grader w/OP 100 HR 232.00$ 23,200.00$ 119.00$ 11,900.00$ 454.05$ 45,405.00$ 45,404.55$ 496.34$ 49,634.00$ 0181d Backhoe 60HP w/OP 100 HR 205.00$ 20,500.00$ 119.00$ 11,900.00$ 481.41$ 48,141.00$ 48,140.93$ 246.74$ 24,674.00$ 0181e Backhoe 95HP w/OP 100 HR 214.00$ 21,400.00$ 119.00$ 11,900.00$ 365.66$ 36,566.00$ 36,565.80$ 254.54$ 25,454.00$ 0181f Rubber Tire Front End Loader 120HP w/OP 100 HR 237.00$ 23,700.00$ 119.00$ 11,900.00$ 391.96$ 39,196.00$ 39,196.23$ 340.34$ 34,034.00$ 0181g Rubber Tire Front End Loader 275HP w/OP 100 HR 300.00$ 30,000.00$ 119.00$ 11,900.00$ 409.88$ 40,988.00$ 40,988.20$ 472.94$ 47,294.00$ 0181h Dump Truck (Tandem) w/OP 100 HR 199.00$ 19,900.00$ 99.00$ 9,900.00$ 489.95$ 48,995.00$ 48,994.54$ 168.48$ 16,848.00$ 0181i Dump Truck (Single) w/OP 100 HR 145.00$ 14,500.00$ 89.00$ 8,900.00$ 214.52$ 21,452.00$ 21,452.14$ 145.60$ 14,560.00$ 0181j Semi-Tractor Trailer w/OP 100 HR 206.00$ 20,600.00$ 119.00$ 11,900.00$ 214.52$ 21,452.00$ 21,452.14$ 187.20$ 18,720.00$ 0181k Bucket Truck w/OP. 100 HR 224.00$ 22,400.00$ 119.00$ 11,900.00$ 244.11$ 24,411.00$ 24,411.00$ 246.74$ 24,674.00$ 0181l Truck Crane w/OP 100 HR 208.00$ 20,800.00$ 119.00$ 11,900.00$ 389.00$ 38,900.00$ 38,899.59$ 468.00$ 46,800.00$ 0181m Mini-Excavator w/OP 100 HR 198.00$ 19,800.00$ 114.00$ 11,400.00$ 389.00$ 38,900.00$ 38,899.59$ 246.74$ 24,674.00$ 0181n Excavator 50hp w/OP 100 HR 207.00$ 20,700.00$ 119.00$ 11,900.00$ 359.41$ 35,941.00$ 35,940.73$ 246.74$ 24,674.00$ 0181o Excavator 155hp w/OP 100 HR 254.00$ 25,400.00$ 119.00$ 11,900.00$ 389.78$ 38,978.00$ 38,978.29$ 391.04$ 39,104.00$ 0181p Excavator 242hp w/OP 100 HR 301.00$ 30,100.00$ 143.00$ 14,300.00$ 432.51$ 43,251.00$ 43,250.86$ 441.74$ 44,174.00$ 0181q Self-propelled Drum Vibrating Roller w/OP 100 HR 218.00$ 21,800.00$ 119.00$ 11,900.00$ 510.83$ 51,083.00$ 51,083.15$ 284.18$ 28,418.00$ 0181r Self-propelled Sheepsfoot Roller w/OP 100 HR 346.00$ 34,600.00$ 119.00$ 11,900.00$ 390.74$ 39,074.00$ 39,073.64$ 284.18$ 28,418.00$ 0181s Skid Steer Loader w/OP 100 HR 186.00$ 18,600.00$ 119.00$ 11,900.00$ 390.74$ 39,074.00$ 39,073.64$ 246.74$ 24,674.00$ 0181t Tractor with Boom Mower w/OP 100 HR 200.00$ 20,000.00$ 119.00$ 11,900.00$ 390.74$ 39,074.00$ 39,073.64$ 332.54$ 33,254.00$ 0181u Small Tractor w/OP 100 HR 177.00$ 17,700.00$ 114.00$ 11,400.00$ 389.00$ 38,900.00$ 38,899.59$ 231.14$ 23,114.00$ 0181v Large Tractor w/OP 100 HR 284.00$ 28,400.00$ 119.00$ 11,900.00$ 362.89$ 36,289.00$ 36,288.83$ 260.00$ 26,000.00$ 0181w Tractor & Pan w/OP 100 HR 259.00$ 25,900.00$ 143.00$ 14,300.00$ 423.81$ 42,381.00$ 42,380.61$ 494.00$ 49,400.00$

Rental of Miscellaneous Equipment with Operator TBD TBD TBD 667.48$ 667.48$ 66,747.72$ TBD

0183 SPECIALTY EQUIPMENT TBD JOB TBD $ - -$ $ - TBD

0183a Trailer Mounted Concrete Pump 100 HR 97.80$ 9,780.00$ 34.00$ 3,400.00$ $ - 100.00$ $ - 312.00$ 31,200.00$ 0183b Trencher 100 HR 47.60$ 4,760.00$ 19.00$ 1,900.00$ 756.74$ 75,674.00$ 75,674.25$ 104.00$ 10,400.00$ 0183c Vibratory Plate Tamper 100 HR 37.80$ 3,780.00$ 5.00$ 500.00$ 121.08$ 12,108.00$ 12,107.88$ 52.00$ 5,200.00$ 0184 Rental of Miscellaneous Equipment without

Operator TBD TBD TBD 105.94$ 105.94$ 10,594.40$ TBD

0185 LABOR SUPPORT TBD JOB TBD $ - -$ $ - TBD

0185a Surveyor 100 HR 125.00$ 12,500.00$ 105.00$ 10,500.00$ $ - 100.00$ $ - 91.52$ 9,152.00$ 0185b General Engineer 100 HR 161.00$ 16,100.00$ 167.00$ 16,700.00$ 249.73$ 24,973.00$ 24,972.50$ 171.60$ 17,160.00$ 0185c Drafter/CADD Technician 100 HR 98.50$ 9,850.00$ 91.00$ 9,100.00$ 198.27$ 19,827.00$ 19,826.65$ 122.72$ 12,272.00$ 0185d Plumber 100 HR 93.10$ 9,310.00$ 91.00$ 9,100.00$ 136.21$ 13,621.00$ 13,621.37$ 215.00$ 21,500.00$ 0185e Electrician 100 HR 101.00$ 10,100.00$ 91.00$ 9,100.00$ 166.48$ 16,648.00$ 16,648.34$ 156.00$ 15,600.00$ 0185f HVAC Technician 100 HR 53.10$ 5,310.00$ 89.00$ 8,900.00$ 168.00$ 16,800.00$ 16,799.68$ 135.20$ 13,520.00$ 0185g Laborer 100 HR 91.50$ 9,150.00$ 89.00$ 8,900.00$ 174.05$ 17,405.00$ 17,405.08$ 114.40$ 11,440.00$ 0185h Iron Worker 100 HR 106.00$ 10,600.00$ 89.00$ 8,900.00$ 166.48$ 16,648.00$ 16,648.34$ 150.80$ 15,080.00$ 0185i Carpenter 100 HR 100.00$ 10,000.00$ 89.00$ 8,900.00$ 234.59$ 23,459.00$ 23,459.02$ 140.40$ 14,040.00$ 0185j Cement Mason 100 HR 85.30$ 8,530.00$ 89.00$ 8,900.00$ 168.74$ 16,874.00$ 16,873.84$ 145.60$ 14,560.00$ 0185k Welder Type I with Welding Equipment 100 HR 106.00$ 10,600.00$ 89.00$ 8,900.00$ 211.89$ 21,189.00$ 21,188.79$ 182.00$ 18,200.00$ 0185l Welder Type II with Welding Equipment 100 HR 111.00$ 11,100.00$ 89.00$ 8,900.00$ 264.86$ 26,486.00$ 26,485.99$ 208.00$ 20,800.00$ 0186 Procurement and Delivery of Miscellaneous

Materials TBD TBD TBD 302.70$ 302.70$ 30,269.70$ TBD ORDERING PERIOD 1 TOTAL 3,226,769.00$ 2,234,555.00$ 16,731,820.52$ 10,884,456.79$ 6,104,058.40$

1001 Concrete Slab: 4-inch 200 SF 25.30$ 5,060.00$ 14.00$ 2,800.00$ 78.25$ 15,650.00$ 15,649.43$ 51.19$ 10,238.00$ 1002 Concrete Slab: 6-inch 200 SF 26.60$ 5,320.00$ 16.00$ 3,200.00$ 86.57$ 17,314.00$ 17,314.27$ 53.36$ 10,672.00$ 1003 Concrete Slab: 8-inch 100 SF 28.10$ 2,810.00$ 18.00$ 1,800.00$ 113.21$ 11,321.00$ 11,320.87$ 111.06$ 11,106.00$ 1004 Concrete Slab: 10-inch 100 SF 29.60$ 2,960.00$ 20.00$ 2,000.00$ 129.86$ 12,986.00$ 12,985.70$ 115.39$ 11,539.00$ 1005 Concrete Ditch: 4-inch 200 SF 25.30$ 5,060.00$ 20.00$ 4,000.00$ 94.90$ 18,980.00$ 18,979.10$ 73.01$ 14,602.00$ 1006 Barrier Concrete Curb & Gutter 1000 LF 55.60$ 55,600.00$ 21.00$ 21,000.00$ 158.16$ 158,160.00$ 158,159.18$ 81.43$ 81,430.00$ 1007 Mountable Concrete Curb & Gutter 1000 LF 44.00$ 44,000.00$ 21.00$ 21,000.00$ 133.19$ 133,190.00$ 133,186.68$ 81.43$ 81,430.00$

1008 Reinforcement 500 LB 1.80$ 900.00$ 3.00$ 1,500.00$ 4.99$ 2,495.00$ 2,497.25$ 8.42$ 4,210.00$ 1009 Miscellaneous Concrete Work TBD TBD TBD $ - -$ $ - $ - $ - 1010 Clearing and Grubbing: Light 5000 SY 2.00$ 10,000.00$ 1.00$ 5,000.00$ 16.65$ 83,250.00$ 83,241.68$ 3.37$ 16,850.00$ 1011 Clearing and Grubbing: Heavy 5000 SY 4.70$ 23,500.00$ 3.00$ 15,000.00$ 33.30$ 166,500.00$ 166,483.35$ 5.56$ 27,800.00$ 1012 Fill Material 1000 CY 39.00$ 39,000.00$ 33.00$ 33,000.00$ 139.85$ 139,850.00$ 139,846.01$ 53.91$ 53,910.00$ 1013 Earthwork - Light Field/Site Grading 2000 CY 23.70$ 47,400.00$ 16.00$ 32,000.00$ 24.97$ 49,940.00$ 49,945.01$ 78.30$ 156,600.00$ 1014 Earthwork - Heavy Field/Site Grading 2000 CY 25.40$ 50,800.00$ 19.00$ 38,000.00$ 33.30$ 66,600.00$ 66,593.34$ 57.95$ 115,900.00$ 1015 Earthwork - Pavement Subgrade 1000 CY 35.00$ 35,000.00$ 16.00$ 16,000.00$ 49.95$ 49,950.00$ 49,945.01$ 67.39$ 67,390.00$ 1016 Excess Earthwork Disposal 200 CY 37.30$ 7,460.00$ 14.00$ 2,800.00$ 139.85$ 27,970.00$ 27,969.20$ 46.05$ 9,210.00$ 1017 Top Soil 800 CY 42.80$ 34,240.00$ 35.00$ 28,000.00$ 99.89$ 79,912.00$ 79,912.01$ 112.32$ 89,856.00$ 1018 Geotextile Installation - Woven 100 SY 1.60$ 160.00$ 5.00$ 500.00$ 24.97$ 2,497.00$ 2,497.25$ 44.93$ 4,493.00$ 1019 Geotextile Installation - Non Woven 100 SY 5.20$ 520.00$ 5.00$ 500.00$ 31.63$ 3,163.00$ 3,163.18$ 44.93$ 4,493.00$ 1020 Concrete Removal 200 CY 126.00$ 25,200.00$ 72.00$ 14,400.00$ 391.24$ 78,248.00$ 78,247.17$ 224.64$ 44,928.00$ 1021 Concrete Removal Structures & Foundations 200 CY 144.00$ 28,800.00$ 100.00$ 20,000.00$ 407.88$ 81,576.00$ 81,576.84$ 280.80$ 56,160.00$ 1022 Asphalt Removal 200 CY 58.80$ 11,760.00$ 12.00$ 2,400.00$ 274.70$ 54,940.00$ 54,939.51$ 95.47$ 19,094.00$ 1023 Removal of Aggregates 200 CY 47.20$ 9,440.00$ 11.00$ 2,200.00$ 249.73$ 49,946.00$ 49,945.01$ 89.86$ 17,972.00$ 1024 Disposal of Misc. 500 LB 7.50$ 3,750.00$ 3.00$ 1,500.00$ 26.64$ 13,320.00$ 13,318.67$ 22.46$ 11,230.00$ 1025 Landscape Timbers Installation 50 LF 24.40$ 1,220.00$ 25.00$ 1,250.00$ 73.25$ 3,662.50$ 3,662.63$ 252.72$ 12,636.00$ 1026 Landscape Timber Removal 20 LF 11.40$ 228.00$ 4.00$ 80.00$ 66.59$ 1,331.80$ 1,331.87$ 168.48$ 3,369.60$ 1027 Sand Supply 100 TN 33.60$ 3,360.00$ 31.00$ 3,100.00$ 74.92$ 7,492.00$ 7,491.75$ 32.01$ 3,201.00$ 1028 Beach Sand Supply & Install 200 TN 46.20$ 9,240.00$ 38.00$ 7,600.00$ 188.13$ 37,626.00$ 37,625.24$ 84.24$ 16,848.00$ 1029 Dam West Beach - Maintenance 1 JB 3,810.00$ 3,810.00$ 500.00$ 500.00$ 116,538.35$ 116,538.35$ 116,538.35$ 7,862.40$ 7,862.40$ 1030 Sullivan Beach - Maintenance 1 JB 6,550.00$ 6,550.00$ 500.00$ 500.00$ 189,791.02$ 189,791.02$ 189,791.02$ 7,862.40$ 7,862.40$ 1031 Wilbourn Creek Beach - Maintenance 1 JB 3,760.00$ 3,760.00$ 500.00$ 500.00$ 109,879.01$ 109,879.01$ 109,879.01$ 7,862.40$ 7,862.40$ 1032 Lithia Springs Beach - Maintenance 1 JB 2,760.00$ 2,760.00$ 500.00$ 500.00$ 29,967.00$ 29,967.00$ 29,967.00$ 4,773.60$ 4,773.60$ 1033 Wolf Creek Beach - Maintenance 1 JB 2,940.00$ 2,940.00$ 500.00$ 500.00$ 70,755.42$ 70,755.42$ 70,755.42$ 4,212.00$ 4,212.00$ 1034 Coon Creek Beach Maintenance 1 JB 1,820.00$ 1,820.00$ 500.00$ 500.00$ 13,318.67$ 13,318.67$ 13,318.67$ 4,212.00$ 4,212.00$ 1035 Entrance Gate - Double Arm Installation 2 EA 2,350.00$ 4,700.00$ 3,550.00$ 7,100.00$ 6,659.33$ 13,318.66$ 13,318.67$ 6,177.60$ 12,355.20$ 1036 Entrance Gate - Single Arm Installation 2 EA 1,830.00$ 3,660.00$ 3,210.00$ 6,420.00$ 6,659.33$ 13,318.66$ 13,318.67$ 5,616.00$ 11,232.00$ 1037 Entrance Gate - Double Arm Replacement 2 EA 3,820.00$ 7,640.00$ 3,625.00$ 7,250.00$ 6,659.33$ 13,318.66$ 13,318.67$ 9,547.20$ 19,094.40$ 1038 Entrance Gate - Single Arm Replacement 2 EA 2,540.00$ 5,080.00$ 3,285.00$ 6,570.00$ 6,659.33$ 13,318.66$ 13,318.67$ 8,985.60$ 17,971.20$ 1039 Entrance Gate - Painting Double Arm 5 EA 596.00$ 2,980.00$ 750.00$ 3,750.00$ 832.42$ 4,162.10$ 4,162.08$ 2,471.04$ 12,355.20$ 1040 Entrance Gate - Painting Single Arm 5 EA 411.00$ 2,055.00$ 750.00$ 3,750.00$ 832.42$ 4,162.10$ 4,162.08$ 3,369.60$ 16,848.00$ 1041 Concrete Dome Post Installation 5 EA 989.00$ 4,945.00$ 220.00$ 1,100.00$ 4,994.50$ 24,972.50$ 24,972.50$ 4,492.80$ 22,464.00$ 1042 Decorative Boulder Supply and Placement 3 EA 540.00$ 1,620.00$ 565.00$ 1,695.00$ 2,774.72$ 8,324.16$ 8,324.17$ 4,492.80$ 13,478.40$

Sign Removal, Post Replacement, and Sign Installation Double 4" x 4" 10 EA 928.00$ 9,280.00$ 230.00$ 2,300.00$ 832.42$ 8,324.20$ 8,324.17$ 6,177.60$ 61,776.00$

Sign Removal, Post Replacement, and Sign Installation Double 6" x 6" 10 EA 1,120.00$ 11,200.00$ 280.00$ 2,800.00$ 832.42$ 8,324.20$ 8,324.17$ 8,143.20$ 81,432.00$

1045 Seamless Epoxy Coatings - Flooring 100 SF 28.90$ 2,890.00$ 12.00$ 1,200.00$ 110.48$ 11,048.00$ 11,048.44$ 505.44$ 50,544.00$ 1046 Seamless Epoxy Coatings - Walls & Ceiling 100 SF 13.40$ 1,340.00$ 12.00$ 1,200.00$ 110.48$ 11,048.00$ 11,048.44$ 617.76$ 61,776.00$ 1047 Pavement Raising Portland Cement 200 LB 42.00$ 8,400.00$ 12.00$ 2,400.00$ 832.42$ 166,484.00$ 166,483.35$ 73.01$ 14,602.00$ 1048 Stockpiling - Fine Aggregate FA-2 100 TN 37.20$ 3,720.00$ 30.00$ 3,000.00$ 86.97$ 8,697.00$ 8,697.09$ 32.01$ 3,201.00$ 1049 Stockpiling - Coarse Aggregate CA-1 100 TN 38.50$ 3,850.00$ 31.00$ 3,100.00$ 97.28$ 9,728.00$ 9,727.62$ 39.42$ 3,942.00$ 1050 Stockpiling - Coarse Aggregate CA-6 100 TN 37.80$ 3,780.00$ 30.00$ 3,000.00$ 89.27$ 8,927.00$ 8,926.84$ 38.75$ 3,875.00$ 1051 Stockpiling - Coarse Aggregate CA-7 100 TN 39.10$ 3,910.00$ 32.00$ 3,200.00$ 98.51$ 9,851.00$ 9,850.82$ 40.10$ 4,010.00$ 1052 Stockpiling - Coarse Aggregate CA-16 100 TN 39.10$ 3,910.00$ 34.00$ 3,400.00$ 103.12$ 10,312.00$ 10,311.98$ 40.10$ 4,010.00$ 1053 Stockpiling - 3/8" Pea Gravel 100 TN 43.50$ 4,350.00$ 36.00$ 3,600.00$ 138.83$ 13,883.00$ 13,883.05$ 35.89$ 3,589.00$ 1054 Placement - Fine Aggregate FA-2 1000 TN 49.80$ 49,800.00$ 35.00$ 35,000.00$ 108.21$ 108,210.00$ 108,214.18$ 72.45$ 72,450.00$ 1055 Placement - Coarse Aggregate CA-1 1000 TN 51.00$ 51,000.00$ 39.00$ 39,000.00$ 116.54$ 116,540.00$ 116,538.35$ 79.86$ 79,860.00$ 1056 Placement - Coarse Aggregate CA-6 1000 TN 50.40$ 50,400.00$ 36.00$ 36,000.00$ 108.21$ 108,210.00$ 108,214.18$ 79.19$ 79,190.00$ 1057 Placement - Coarse Aggregate CA-7 1000 TN 51.60$ 51,600.00$ 40.00$ 40,000.00$ 118.20$ 118,200.00$ 118,203.18$ 80.54$ 80,540.00$ 1058 Placement - Coarse Aggregate CA-16 1000 TN 51.60$ 51,600.00$ 41.00$ 41,000.00$ 124.86$ 124,860.00$ 124,862.51$ 80.54$ 80,540.00$ 1059 Placement - 3/8" Pea Gravel 500 TN 55.50$ 27,750.00$ 46.00$ 23,000.00$ 124.86$ 62,430.00$ 62,431.26$ 76.36$ 38,180.00$ 1060 Stockpiling - IDOT Bedding 500 TN 37.20$ 18,600.00$ 37.00$ 18,500.00$ 86.87$ 43,435.00$ 43,435.51$ 39.42$ 19,710.00$ 1061 Stockpiling - USACE 3" Bedding 500 TN 37.20$ 18,600.00$ 37.00$ 18,500.00$ 87.95$ 43,975.00$ 43,976.58$ 39.42$ 19,710.00$ 1062 Stockpiling - IDOT RR3 Rip Rap 500 TN 47.90$ 23,950.00$ 38.00$ 19,000.00$ 133.95$ 66,975.00$ 66,976.25$ 51.62$ 25,810.00$ 1063 Stockpiling - IDOT RR4 Rip Rap 500 TN 60.40$ 30,200.00$ 53.00$ 26,500.00$ 145.27$ 72,635.00$ 72,636.69$ 65.10$ 32,550.00$ 1064 Stockpiling - IDOT RR5 Rip Rap 500 TN 61.70$ 30,850.00$ 53.00$ 26,500.00$ 147.42$ 73,710.00$ 73,710.50$ 66.45$ 33,225.00$ 1065 Stockpiling - IDOT RR6 Rip Rap 500 TN 66.70$ 33,350.00$ 54.00$ 27,000.00$ 149.59$ 74,795.00$ 74,792.64$ 70.49$ 35,245.00$ 1066 Stockpiling - IDOT RR7 Rip Rap 500 TN 66.70$ 33,350.00$ 54.00$ 27,000.00$ 151.73$ 75,865.00$ 75,866.46$ 71.88$ 35,940.00$ 1067 Stockpiling - USACE 50lb Rip Rap 500 TN 47.90$ 23,950.00$ 38.00$ 19,000.00$ 175.12$ 87,560.00$ 87,561.92$ 51.62$ 25,810.00$ 1068 Stockpiling - USACE 90lb Rip Rap 500 TN 60.40$ 30,200.00$ 46.00$ 23,000.00$ 177.27$ 88,635.00$ 88,635.74$ 65.10$ 32,550.00$ 1069 Stockpiling - USACE 140lb Rip Rap 500 TN 60.40$ 30,200.00$ 53.00$ 26,500.00$ 181.58$ 90,790.00$ 90,791.69$ 65.10$ 32,550.00$ 1070 Stockpiling - USACE 400lb Rip Rap 500 TN 61.70$ 30,850.00$ 53.00$ 26,500.00$ 293.51$ 146,755.00$ 146,755.07$ 66.45$ 33,225.00$ 1071 Stockpiling - USACE 650lb Rip Rap 500 TN 66.70$ 33,350.00$ 54.00$ 27,000.00$ 299.67$ 149,835.00$ 149,835.02$ 70.49$ 35,245.00$ 1072 Stockpiling - USACE 1000lb Rip Rap 500 TN 66.70$ 33,350.00$ 54.00$ 27,000.00$ 832.42$ 416,210.00$ 416,208.38$ 71.88$ 35,940.00$ 1073 Placement - IDOT Bedding 1000 TN 49.80$ 49,800.00$ 44.00$ 44,000.00$ 328.94$ 328,940.00$ 328,937.80$ 79.86$ 79,860.00$ 1074 Placement - USACE 3" Bedding 1000 TN 49.80$ 49,800.00$ 36.00$ 36,000.00$ 147.40$ 147,400.00$ 147,404.36$ 79.86$ 79,860.00$ 1075 Placement - IDOT RR3 Rip Rap 1000 TN 64.50$ 64,500.00$ 45.00$ 45,000.00$ 162.10$ 162,100.00$ 162,104.84$ 101.04$ 101,040.00$ 1076 Placement - IDOT RR4 Rip Rap 1000 TN 77.00$ 77,000.00$ 61.00$ 61,000.00$ 212.32$ 212,320.00$ 212,316.22$ 114.52$ 114,520.00$

1077 Placement - IDOT RR5 Rip Rap 1000 TN 78.20$ 78,200.00$ 61.00$ 61,000.00$ 211.82$ 211,820.00$ 211,816.77$ 115.87$ 115,870.00$ 1078 Placement - IDOT RR6 Rip Rap 1000 TN 83.20$ 83,200.00$ 64.00$ 64,000.00$ 213.98$ 213,980.00$ 213,981.05$ 119.91$ 119,910.00$ 1079 Placement - IDOT RR7 Rip Rap 1000 TN 83.20$ 83,200.00$ 64.00$ 64,000.00$ 221.06$ 221,060.00$ 221,056.59$ 121.31$ 121,310.00$ 1080 Placement - USACE 50lb Rip Rap 1000 TN 64.50$ 64,500.00$ 45.00$ 45,000.00$ 217.86$ 217,860.00$ 217,860.11$ 101.04$ 101,040.00$ 1081 Placement - USACE 90lb Rip Rap 1000 TN 77.00$ 77,000.00$ 54.00$ 54,000.00$ 165.45$ 165,450.00$ 165,451.15$ 114.52$ 114,520.00$ 1082 Placement - USACE 140lb Rip Rap 1000 TN 77.00$ 77,000.00$ 58.00$ 58,000.00$ 167.60$ 167,600.00$ 167,598.79$ 114.52$ 114,520.00$ 1083 Placement - USACE 400lb Rip Rap 1000 TN 78.20$ 78,200.00$ 58.00$ 58,000.00$ 171.91$ 171,910.00$ 171,910.71$ 115.87$ 115,870.00$ 1084 Placement - USACE 650lb Rip Rap 1000 TN 83.20$ 83,200.00$ 64.00$ 64,000.00$ 322.13$ 322,130.00$ 322,128.63$ 119.91$ 119,910.00$ 1085 Placement - USACE 1000lb Rip Rap 1000 TN 83.20$ 83,200.00$ 64.00$ 64,000.00$ 832.42$ 832,420.00$ 832,416.75$ 128.04$ 128,040.00$ 1086 Establishment of Turf - Large Scale 20 ACRE 4,500.00$ 90,000.00$ 4,500.00$ 90,000.00$ 49,945.01$ 998,900.20$ 998,900.10$ 7,862.40$ 157,248.00$ 1087 Establishment of Turf - Small Scale 100 SY 31.40$ 3,140.00$ 6.00$ 600.00$ 49.95$ 4,995.00$ 4,994.50$ 56.16$ 5,616.00$ 1088 Road Bore Drill Setup & Staging 1 JOB 3,750.00$ 3,750.00$ 2,500.00$ 2,500.00$ 22,794.83$ 22,794.83$ 22,794.83$ 25,272.00$ 25,272.00$ 1089 Road Bore Sleeve 2-inch Dia. HDPE 30 LF 107.00$ 3,210.00$ 31.00$ 930.00$ 910.93$ 27,327.90$ 27,327.91$ 561.60$ 16,848.00$ 1090 Road Bore Sleeve 3-inch Dia. HDPE 30 LF 109.00$ 3,270.00$ 33.00$ 990.00$ 920.17$ 27,605.10$ 27,605.10$ 561.60$ 16,848.00$ 1091 Road Bore Sleeve 4-inch Dia. HDPE 30 LF 111.00$ 3,330.00$ 34.00$ 1,020.00$ 934.04$ 28,021.20$ 28,021.15$ 673.92$ 20,217.60$ 1092 Road Bore Sleeve 6-inch Dia. HDPE 30 LF 117.00$ 3,510.00$ 44.00$ 1,320.00$ 966.37$ 28,991.10$ 28,991.08$ 673.92$ 20,217.60$ 1093 Road Bore Sleeve 8-inch Dia. HDPE 30 LF 125.00$ 3,750.00$ 54.00$ 1,620.00$ 1,014.88$ 30,446.40$ 30,446.48$ 842.40$ 25,272.00$ 1094 Frost Proof Yard Hydrant Replacement 5 EA 2,530.00$ 12,650.00$ 800.00$ 4,000.00$ 6,817.26$ 34,086.30$ 34,086.30$ 3,369.60$ 16,848.00$ 1095 Frost Proof Yard Hydrant Installation 5 EA 1,660.00$ 8,300.00$ 800.00$ 4,000.00$ 6,817.26$ 34,086.30$ 34,086.30$ 6,739.20$ 33,696.00$

Water Valve Replacement - 1" curb stop ball valve 2 EA 1,050.00$ 2,100.00$ 86.00$ 172.00$ 4,651.15$ 9,302.30$ 9,302.29$ 7,300.80$ 14,601.60$

Water Valve Replacement - 1.5" curb stop ball valve 2 EA 1,410.00$ 2,820.00$ 105.00$ 210.00$ 5,137.78$ 10,275.56$ 10,275.55$ 7,300.80$ 14,601.60$

Water Valve Replacement - 2" square nut ball valve 2 EA 1,460.00$ 2,920.00$ 206.00$ 412.00$ 4,107.76$ 8,215.52$ 8,215.52$ 7,300.80$ 14,601.60$

Water Valve Replacement - 3" square nut ball valve 2 EA 1,700.00$ 3,400.00$ 330.00$ 660.00$ 4,439.83$ 8,879.66$ 8,879.66$ 8,424.00$ 16,848.00$

Water Valve Replacement - 4" square nut ball valve 2 EA 2,580.00$ 5,160.00$ 598.00$ 1,196.00$ 4,806.39$ 9,612.78$ 9,612.78$ 8,424.00$ 16,848.00$

1101 3/4 Inch Water Line Tap 2 EA 2,120.00$ 4,240.00$ 206.00$ 412.00$ 9,763.73$ 19,527.46$ 19,527.46$ 1,684.80$ 3,369.60$ 1102 1 Inch Water Line Tap 2 EA 2,130.00$ 4,260.00$ 225.00$ 450.00$ 9,763.73$ 19,527.46$ 19,527.46$ 1,684.80$ 3,369.60$ 1103 1-1/2 Inch Water Line Tap 2 EA 2,460.00$ 4,920.00$ 270.00$ 540.00$ 9,763.73$ 19,527.46$ 19,527.46$ 1,684.80$ 3,369.60$ 1104 2 Inch Water Line Tap 2 EA 2,590.00$ 5,180.00$ 360.00$ 720.00$ 9,763.73$ 19,527.46$ 19,527.46$ 3,088.80$ 6,177.60$ 1105 3 Inch Water Line Tap 2 EA 3,150.00$ 6,300.00$ 540.00$ 1,080.00$ 14,611.00$ 29,222.00$ 29,221.99$ 3,088.80$ 6,177.60$ 1106 4 Inch Water Line Tap 2 EA 3,350.00$ 6,700.00$ 765.00$ 1,530.00$ 15,042.25$ 30,084.50$ 30,084.51$ 3,931.20$ 7,862.40$ 1107 6 Inch Water Line Tap 2 EA 3,910.00$ 7,820.00$ 1,080.00$ 2,160.00$ 15,473.51$ 30,947.02$ 30,947.02$ 4,492.80$ 8,985.60$ 1108 3/4 Inch Water Line Installation 100 LF 23.30$ 2,330.00$ 9.00$ 900.00$ 418.42$ 41,842.00$ 41,842.26$ 47.74$ 4,774.00$ 1109 1 Inch Water Line Installation 100 LF 23.80$ 2,380.00$ 14.00$ 1,400.00$ 419.60$ 41,960.00$ 41,960.46$ 54.48$ 5,448.00$ 1110 1-1/2 Inch Water Line Installation 100 LF 25.90$ 2,590.00$ 15.00$ 1,500.00$ 420.04$ 42,004.00$ 42,003.75$ 56.16$ 5,616.00$ 1111 2 Inch Water Line Installation 100 LF 26.90$ 2,690.00$ 17.00$ 1,700.00$ 422.52$ 42,252.00$ 42,251.81$ 61.78$ 6,178.00$ 1112 2-1/2 Inch Water Line Installation 100 LF 28.40$ 2,840.00$ 23.00$ 2,300.00$ 424.78$ 42,478.00$ 42,478.23$ 73.01$ 7,301.00$ 1113 3 Inch Water Line Installation 100 LF 47.60$ 4,760.00$ 27.00$ 2,700.00$ 424.75$ 42,475.00$ 42,474.90$ 78.62$ 7,862.00$ 1114 4 Inch Water Line Installation 50 LF 56.30$ 2,815.00$ 30.00$ 1,500.00$ 747.53$ 37,376.50$ 37,376.34$ 112.32$ 5,616.00$ 1115 6 Inch Water Line Installation 50 LF 57.50$ 2,875.00$ 36.00$ 1,800.00$ 872.64$ 43,632.00$ 43,631.96$ 168.48$ 8,424.00$ 1116 Sewer Line Tap 2-5 Feet Deep 2 EA 1,920.00$ 3,840.00$ 810.00$ 1,620.00$ 3,246.43$ 6,492.86$ 6,492.85$ 8,424.00$ 16,848.00$ 1117 Sewer Line Tap 5.1-10 Feet Deep 2 EA 2,300.00$ 4,600.00$ 1,080.00$ 2,160.00$ 4,911.26$ 9,822.52$ 9,822.52$ 10,670.40$ 21,340.80$ 1118 Sewer Line Tap 10.1-15 Feet Deep 1 EA 2,920.00$ 2,920.00$ 1,350.00$ 1,350.00$ 5,826.92$ 5,826.92$ 5,826.92$ 19,094.40$ 19,094.40$

1119 4 Inch Dia. Gravity Sewer Install 0-4 Feet Deep 100 LF 58.80$ 5,880.00$ 36.00$ 3,600.00$ 141.51$ 14,151.00$ 14,151.08$ 550.37$ 55,037.00$

1120 4 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep 50 LF 66.90$ 3,345.00$ 41.00$ 2,050.00$ 174.81$ 8,740.50$ 8,740.38$ 1,460.16$ 73,008.00$

4 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep 20 LF 84.00$ 1,680.00$ 50.00$ 1,000.00$ 233.08$ 4,661.60$ 4,661.53$ 1,909.44$ 38,188.80$

1122 6 Inch Dia. Gravity Sewer Install 0-4 Feet Deep 100 LF 103.00$ 10,300.00$ 38.00$ 3,800.00$ 166.48$ 16,648.00$ 16,648.34$ 561.60$ 56,160.00$

1123 6 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep 50 LF 111.00$ 5,550.00$ 44.00$ 2,200.00$ 208.10$ 10,405.00$ 10,405.21$ 1,516.32$ 75,816.00$

6 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep 20 LF 128.00$ 2,560.00$ 54.00$ 1,080.00$ 291.35$ 5,827.00$ 5,826.92$ 1,965.60$ 39,312.00$

1125 8 Inch Dia. Gravity Sewer Install 0-4 Feet Deep 100 LF 147.00$ 14,700.00$ 45.00$ 4,500.00$ 208.10$ 20,810.00$ 20,810.42$ 673.92$ 67,392.00$

1126 8 Inch Dia. Gravity Sewer Install 4.1-10 Feet Deep 50 LF 156.00$ 7,800.00$ 50.00$ 2,500.00$ 249.73$ 12,486.50$ 12,486.25$ 1,572.48$ 78,624.00$

8 Inch Dia. Gravity Sewer Install 10.1-15 Feet Deep 20 LF 173.00$ 3,460.00$ 59.00$ 1,180.00$ 332.97$ 6,659.40$ 6,659.33$ 2,021.76$ 40,435.20$

1128 2 Inch Dia. Pressure Sewer Force Main Install 50 LF 37.50$ 1,875.00$ 32.00$ 1,600.00$ 249.73$ 12,486.50$ 12,486.25$ 1,123.20$ 56,160.00$

1129 3 Inch Dia. Pressure Sewer Force Main Install 50 LF 46.50$ 2,325.00$ 36.00$ 1,800.00$ 291.35$ 14,567.50$ 14,567.29$ 1,123.20$ 56,160.00$

1130 4 Inch Dia. Pressure Sewer Force Main Install 50 LF 55.90$ 2,795.00$ 44.00$ 2,200.00$ 332.97$ 16,648.50$ 16,648.34$ 1,123.20$ 56,160.00$

1131 6 Inch Dia. Pressure Sewer Force Main Install 20 LF 99.80$ 1,996.00$ 50.00$ 1,000.00$ 382.91$ 7,658.20$ 7,658.23$ 2,246.40$ 44,928.00$ 1132 Manhole Install 1-4 Feet Deep 2 EA 4,170.00$ 8,340.00$ 3,240.00$ 6,480.00$ 12,486.25$ 24,972.50$ 24,972.50$ 6,739.20$ 13,478.40$

1133 Manhole Install 4.1-10 Feet Deep 2 EA 4,830.00$ 9,660.00$ 4,140.00$ 8,280.00$ 13,734.88$ 27,469.76$ 27,469.75$ 16,848.00$ 33,696.00$ 1134 Manhole Install 10.1-15 Feet Deep 2 EA 6,000.00$ 12,000.00$ 5,850.00$ 11,700.00$ 16,648.34$ 33,296.68$ 33,296.67$ 20,217.60$ 40,435.20$

1135 CMP 12 Inch Dia. Pipe Replace, 0-4.9 Ft Depth 20 LF 94.30$ 1,886.00$ 33.00$ 660.00$ 624.31$ 12,486.20$ 12,486.25$ 336.96$ 6,739.20$

1136 CMP 12 Inch Dia. Pipe Replace, 5-9.9 Ft Depth 20 LF 108.00$ 2,160.00$ 36.00$ 720.00$ 707.55$ 14,151.00$ 14,151.08$ 533.52$ 10,670.40$

1137 CMP 12 Inch Dia. Pipe Replace, 10-15 Ft Depth 20 LF 135.00$