B01. Abstract of Bids - KO.pdf
PDF 804 KB Posted
- Solicitation number
- W912P923B0008
About this file
This abstract of bids document outlines bids received for the W912P923B0008 federal contract opportunity issued by the Department of the Army Corps of Engineers Engineering District St Louis. Bids were received from two contractors for road, parking, and infrastructure work at Lake Shelbyville Park. The bids included line items for asphalt patching, removal, paving, sealing, striping, signage, drainage pipes, curbs, sidewalks, and site work. Pricing and quantities were provided for each line item, with the total bid prices being $12,891,961.60 for one contractor and $12,819,651.00 for the other. The document also lists several addendums released on the solicitation and details for public bid openings. Task orders were included for specific jobs such as access road repair and parking lot paving. This abstract summarizes the bids received in response to the solicitation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: W912P923B0008 Date Issued: 7/25/2023
Amendment 0001: 8/3/2023 Amendment 0002: 8/18/2023 Amendment 0003: 8/28/2023
Bids Due: 9/6/2023 @ 9AM CST Contracting Officer Public Bid Opening: 9/6/2023 @ 2PM CST Whitney Dee
CLIN Description Quantity Unit Price Extended Amount Unit Price Extended Amount
0001 Patching 150 143.00$ 21,450.00$ 90.00$ 13,500.00$ 0002 Bituminous Surface Removal
0002a Light 350 8.10$ 2,835.00$ 6.00$ 2,100.00$ 0002b Heavy 2,000 8.10$ 16,200.00$ 6.00$ 12,000.00$ 0003 Road Widening 1,000 58.80$ 58,800.00$ 75.00$ 75,000.00$ 0004 Bituminous Concrete; Leveling Binder 2,000 185.00$ 370,000.00$ 185.00$ 370,000.00$ 0005 Bituminous Concrete; Surface Course 2,000 206.00$ 412,000.00$ 185.00$ 370,000.00$ 0006 Tack Coat 1,000 22.70$ 22,700.00$ 7.00$ 7,000.00$ 0007 Prime Coat 200 14.50$ 2,900.00$ 7.00$ 1,400.00$ 0008 Seal Coat 8,000 5.00$ 40,000.00$ 4.50$ 36,000.00$ 0009 Crack Sealing 20 76.00$ 1,520.00$ 102.00$ 2,040.00$ 0100 Joint Sealing 20 76.00$ 1,520.00$ 112.00$ 2,240.00$ 0011 Curbing
0011a Bituminous 100 11.80$ 1,180.00$ 24.00$ 2,400.00$ 0011b Concrete 100 21.40$ 2,140.00$ 30.00$ 3,000.00$ 0012 Area Reflective Crack Control Treatment System A 3,000 4.20$ 12,600.00$ 7.75$ 23,250.00$ 0013 Guardrail
0013a Replacement 100 84.70$ 8,470.00$ 85.00$ 8,500.00$ 0013b Installation 100 78.20$ 7,820.00$ 95.00$ 9,500.00$ 0014 Parking Area and Traffic Striping 3,000 2.00$ 6,000.00$ 2.00$ 6,000.00$ 0015 Traffic Marking and Symbol 180 10.20$ 1,836.00$ 8.00$ 1,440.00$ 0016 Parking Block
0016a Replacement 25 170.00$ 4,250.00$ 150.00$ 3,750.00$ 0016b Installation 10 139.00$ 1,390.00$ 170.00$ 1,700.00$ 0017 Decorative Boulder 10 313.00$ 3,130.00$ 565.00$ 5,650.00$ 0018 Concrete
0018a Concrete Slab 4” 250 385.00$ 96,250.00$ 972.00$ 243,000.00$ 0018b Concrete Slab 6” 250 326.00$ 81,500.00$ 813.00$ 203,250.00$ 0018c Concrete Slab 8” 200 312.00$ 62,400.00$ 647.00$ 129,400.00$ 0018d Concrete Slab 10” 100 302.00$ 30,200.00$ 548.00$ 54,800.00$ 0018e Concrete Ditch 200 12.40$ 2,480.00$ 20.00$ 4,000.00$ 0018f Concrete Curb 50 21.40$ 1,070.00$ 30.00$ 1,500.00$ 0018g Reinforcement 500 1.70$ 850.00$ 2.00$ 1,000.00$ 0018h Misc. Concrete Work TBD 0019 Crushed Stone Placed and Stockpiled
0019a FA-4 25 51.30$ 1,282.50$ 42.00$ 1,050.00$ 0019b FA-20 25 56.10$ 1,402.50$ 43.00$ 1,075.00$ 0019c CA-6 100 45.50$ 4,550.00$ 38.00$ 3,800.00$ 0019d CA-10 100 46.10$ 4,610.00$ 45.00$ 4,500.00$ 0019e FA-2 Class A, Beach Sand Stockpiled 100 34.90$ 3,490.00$ 30.00$ 3,000.00$ 0019f FA-4 Stockpiled 25 32.00$ 800.00$ 30.00$ 750.00$ 0019g CA-6 Stockpiled 100 35.80$ 3,580.00$ 30.00$ 3,000.00$ 0019h CA-10 Stockpiled 100 36.40$ 3,640.00$ 35.00$ 3,500.00$ 0019i CA-16 Stockpiled 100 37.00$ 3,700.00$ 36.00$ 3,600.00$ 0020 Bedding Material
0020a Bedding Stone 300 33.70$ 10,110.00$ 38.00$ 11,400.00$ 0020b Geotextile Fabric 500 5.50$ 2,750.00$ 5.50$ 2,750.00$ 0021 Stone Rip Rap
0021a 50 LB 150 63.70$ 9,555.00$ 48.00$ 7,200.00$ 0021b 150 LB 150 75.10$ 11,265.00$ 62.00$ 9,300.00$
Amendments Acknowledged? Yes
Lake Shelbyville Park Roads & Parking Lot IDIQ & Task Order Bid Abstract - Construction
IGE Geotechnical Construction, Inc.
Bid received by due date/time? Yes Grand Total Prices 12,891,961.60$ 12,819,651.00$
0021c 400 LB 150 75.10$ 11,265.00$ 62.00$ 9,300.00$ 0022 Fill Material 30 37.20$ 1,116.00$ 33.00$ 990.00$ 0023 Top Soil 30 43.30$ 1,299.00$ 36.00$ 1,080.00$
24 Site Grading 0024a Light 50 33.50$ 1,675.00$ 16.00$ 800.00$ 0024b Heavy 200 35.50$ 7,100.00$ 20.00$ 4,000.00$ 0025 Establishment of Turf 5 5,260.00$ 26,300.00$ 4,500.00$ 22,500.00$ 0026 12" Corrugated Metal Pipe Replacement
0026a 12 Inch Diameter Pipe-0' - 4.9' 48 46.50$ 2,232.00$ 36.00$ 1,728.00$ 0026b 12 Inch Diameter Pipe-5' - 9.9' 48 56.40$ 2,707.20$ 39.00$ 1,872.00$ 0026b 12 Inch Diameter Pipe-10 - 15' 48 76.80$ 3,686.40$ 42.00$ 2,016.00$ 0027 18" Corrugated Metal Pipe Replacement
0027a 18 Inch Diameter Pipe-0' - 4.9' 48 57.40$ 2,755.20$ 41.00$ 1,968.00$ 0027b 18 Inch Diameter Pipe-5' - 9.9' 48 67.30$ 3,230.40$ 44.00$ 2,112.00$ 0027c 18 Inch Diameter Pipe-10 - 15' 48 87.70$ 4,209.60$ 44.00$ 2,112.00$ 0028 24" Corrugated Metal Pipe Replacement
0028a 24 Inch Diameter Pipe-0' - 4.9' 48 66.10$ 3,172.80$ 51.00$ 2,448.00$ 0028b 24 Inch Diameter Pipe-5' - 9.9' 48 77.80$ 3,734.40$ 56.00$ 2,688.00$ 0028c 24 Inch Diameter Pipe-10 - 15' 48 102.00$ 4,896.00$ 59.00$ 2,832.00$ 0029 30" Corrugated Metal Pipe Replacement
0029a 30 Inch Diameter Pipe-0' - 4.9' 48 94.90$ 4,555.20$ 62.00$ 2,976.00$ 0029b 30 Inch Diameter Pipe-5' - 9.9' 48 107.00$ 5,136.00$ 66.00$ 3,168.00$ 0029c 30 Inch Diameter Pipe-10 - 15' 48 131.00$ 6,288.00$ 74.00$ 3,552.00$ 0030 36" Corrugated Metal Pipe Replacement
0030a 36 Inch Diameter Pipe-0' - 4.9' 48 100.00$ 4,800.00$ 72.00$ 3,456.00$ 0030b 36 Inch Diameter Pipe-5' - 9.9' 48 114.00$ 5,472.00$ 79.00$ 3,792.00$ 0030c 36 Inch Diameter Pipe-10 - 15' 48 143.00$ 6,864.00$ 82.00$ 3,936.00$ 0031 48" Corrugated Metal Pipe Replacement
0031a 48 Inch Diameter Pipe-0' - 4.9' 48 125.00$ 6,000.00$ 93.00$ 4,464.00$ 0031b 48 Inch Diameter Pipe-5' - 9.9' 48 142.00$ 6,816.00$ 103.00$ 4,944.00$ 0031c 48 Inch Diameter Pipe-10 - 15' 48 174.00$ 8,352.00$ 113.00$ 5,424.00$ 0032 End Section Replacement
0032a 12 Inch Diameter End Section 4 261.00$ 1,044.00$ 176.00$ 704.00$ 0032b 18 Inch Diameter End Section 4 305.00$ 1,220.00$ 260.00$ 1,040.00$ 0032c 24 Inch Diameter End Section 4 488.00$ 1,952.00$ 316.00$ 1,264.00$ 0032d 30 Inch Diameter End Section 4 678.00$ 2,712.00$ 400.00$ 1,600.00$ 0032e 36 Inch Diameter End Section 4 886.00$ 3,544.00$ 460.00$ 1,840.00$ 0033 Site Improvements and Appurtences
0033a Concrete Removal and Disposal 500 116.00$ 58,000.00$ 87.00$ 43,500.00$ 0033b Concrete Removal and Disposal 500 137.00$ 68,500.00$ 113.00$ 56,500.00$
Structures and Foundations 0033c Asphalt Removal and Disposal 2,000 3.20$ 6,400.00$ 12.00$ 24,000.00$ 0033d Landscape Timber Removal 2,000 3.00$ 6,000.00$ 2.00$ 4,000.00$ 0033e Removal of Coarse Aggregate 500 2.30$ 1,150.00$ 11.00$ 5,500.00$ 0034 Equipment
0034a Backhoe Loader; 4WD 100 190.00$ 19,000.00$ 125.00$ 12,500.00$ 0034b Track Type Excavator 100 254.00$ 25,400.00$ 225.00$ 22,500.00$ 0034c Track Type Excavator Long Reach 100 302.00$ 30,200.00$ 265.00$ 26,500.00$ 0034d Track Type Bulldozer 100 221.00$ 22,100.00$ 185.00$ 18,500.00$ 0034e Padded Foot Roller; Self Propelled 100 217.00$ 21,700.00$ 160.00$ 16,000.00$ 0034f Skid Steer Loader 100 183.00$ 18,300.00$ 125.00$ 12,500.00$ 0034g Motor Grader 100 229.00$ 22,900.00$ 175.00$ 17,500.00$ 0034h Truck W/ Dump 100 146.00$ 14,600.00$ 125.00$ 12,500.00$ 0034i Street Sweeper Type Vehicle W/ Vacuum 100 135.00$ 13,500.00$ 125.00$ 12,500.00$ 0034j Semi-Tractor trailer w/ Operator 100 208.00$ 20,800.00$ 125.00$ 12,500.00$ 0035 Labor
0035a General Labor 200 91.50$ 18,300.00$ 93.00$ 18,600.00$ 0035b Misc. Service Activities TBD TBD 0035c Misc. Construction Activities TBD TBD 0036 Rental of Misc. Equipment with Operator TBD TBD 0037 Rental of Misc. Equipment without Operator TBD TBD 0038 Procurement & Delivery of Misc. Materials TBD TBD 0039 Disposal of Misc. and Special Waste TBD TBD 1001 Patching 150 148.00$ 22,200.00$ 90.00$ 13,500.00$ 1002 Bituminous Surface Removal
1002a Light 350 8.40$ 2,940.00$ 6.00$ 2,100.00$ 1002b Heavy 2,000 8.40$ 16,800.00$ 6.00$ 12,000.00$ 1003 Road Widening 1,000 62.30$ 62,300.00$ 75.00$ 75,000.00$ 1004 Bituminous Concrete; Leveling Binder 2,000 191.00$ 382,000.00$ 185.00$ 370,000.00$ 1005 Bituminous Concrete; Surface Course 2,000 228.00$ 456,000.00$ 185.00$ 370,000.00$ 1006 Tack Coat 1,000 23.60$ 23,600.00$ 7.00$ 7,000.00$ 1007 Prime Coat 200 15.10$ 3,020.00$ 7.00$ 1,400.00$ 1008 Seal Coat 8,000 5.20$ 41,600.00$ 4.50$ 36,000.00$ 1009 Crack Sealing 20 78.80$ 1,576.00$ 102.00$ 2,040.00$ 1010 Joint Sealing 20 78.80$ 1,576.00$ 112.00$ 2,240.00$ 1011 Curbing
1011a Bituminous 100 12.20$ 1,220.00$ 24.00$ 2,400.00$ 1011b Concrete 100 22.20$ 2,220.00$ 30.00$ 3,000.00$ 1012 Area Reflective Crack Control Treatment System A 3,000 4.40$ 13,200.00$ 7.75$ 23,250.00$ 1013 Guardrail
1013a Replacement 100 87.80$ 8,780.00$ 85.00$ 8,500.00$ 1013b Installation 100 81.10$ 8,110.00$ 95.00$ 9,500.00$ 1014 Parking Area and Traffic Striping 3,000 2.10$ 6,300.00$ 2.00$ 6,000.00$ 1015 Traffic Marking and Symbol 180 10.60$ 1,908.00$ 8.00$ 1,440.00$ 1016 Parking Block
1016a Replacement 25 176.00$ 4,400.00$ 150.00$ 3,750.00$ 1016b Installation 10 144.00$ 1,440.00$ 170.00$ 1,700.00$ 1017 Decorative Boulder 10 325.00$ 3,250.00$ 565.00$ 5,650.00$ 1018 Concrete
1018a Concrete Slab 4” 250 400.00$ 100,000.00$ 972.00$ 243,000.00$ 1018b Concrete Slab 6” 250 338.00$ 84,500.00$ 813.00$ 203,250.00$ 1018c Concrete Slab 8” 200 324.00$ 64,800.00$ 647.00$ 129,400.00$ 1018d Concrete Slab 10” 100 313.00$ 31,300.00$ 548.00$ 54,800.00$ 1018e Concrete Ditch 200 12.80$ 2,560.00$ 20.00$ 4,000.00$ 1018f Concrete Curb 50 22.20$ 1,110.00$ 30.00$ 1,500.00$ 1018g Reinforcement 500 1.80$ 900.00$ 2.00$ 1,000.00$ 1018h Misc. Concrete Work TBD 1019 Crushed Stone Placed and Stockpiled
1019a FA-4 25 53.20$ 1,330.00$ 42.00$ 1,050.00$ 1019b FA-20 25 58.20$ 1,455.00$ 43.00$ 1,075.00$ 1019c CA-6 100 47.10$ 4,710.00$ 38.00$ 3,800.00$ 1019d CA-10 100 47.80$ 4,780.00$ 45.00$ 4,500.00$ 1019e FA-2 Class A, Beach Sand Stockpiled 100 36.10$ 3,610.00$ 30.00$ 3,000.00$ 1019f FA-4 Stockpiled 25 33.10$ 827.50$ 30.00$ 750.00$ 1019g CA-6 Stockpiled 100 37.10$ 3,710.00$ 30.00$ 3,000.00$ 1019h CA-10 Stockpiled 100 37.70$ 3,770.00$ 35.00$ 3,500.00$ 1019i CA-16 Stockpiled 100 38.30$ 3,830.00$ 36.00$ 3,600.00$ 1020 Bedding Material
1020a Bedding Stone 300 34.90$ 10,470.00$ 38.00$ 11,400.00$ 1020b Geotextile Fabric 500 5.60$ 2,800.00$ 5.50$ 2,750.00$ 1021 Stone Rip Rap
1021a 50 LB 150 66.00$ 9,900.00$ 48.00$ 7,200.00$ 1021b 150 LB 150 77.90$ 11,685.00$ 62.00$ 9,300.00$ 1021c 400 LB 150 77.90$ 11,685.00$ 62.00$ 9,300.00$ 1022 Fill Material 30 38.50$ 1,155.00$ 33.00$ 990.00$ 1023 Top Soil 30 44.90$ 1,347.00$ 36.00$ 1,080.00$ 1024 Site Grading
1024a Light 50 34.70$ 1,735.00$ 16.00$ 800.00$ 1024b Heavy 200 36.80$ 7,360.00$ 20.00$ 4,000.00$ 1025 Establishment of Turf 5 5,460.00$ 27,300.00$ 4,500.00$ 22,500.00$ 1026 12" Corrugated Metal Pipe Replacement
1026a 12 Inch Diameter Pipe-0' - 4.9' 48 48.20$ 2,313.60$ 36.00$ 1,728.00$ 1026b 12 Inch Diameter Pipe-5' - 9.9' 48 58.50$ 2,808.00$ 39.00$ 1,872.00$ 1026b 12 Inch Diameter Pipe-10 - 15' 48 79.60$ 3,820.80$ 42.00$ 2,016.00$ 1027 18" Corrugated Metal Pipe Replacement
1027a 18 Inch Diameter Pipe-0' - 4.9' 48 59.50$ 2,856.00$ 41.00$ 1,968.00$ 1027b 18 Inch Diameter Pipe-5' - 9.9' 48 69.80$ 3,350.40$ 44.00$ 2,112.00$ 1027c 18 Inch Diameter Pipe-10 - 15' 48 90.90$ 4,363.20$ 47.00$ 2,256.00$ 1028 24" Corrugated Metal Pipe Replacement
1028a 24 Inch Diameter Pipe-0' - 4.9' 48 68.50$ 3,288.00$ 51.00$ 2,448.00$
1028b 24 Inch Diameter Pipe-5' - 9.9' 48 80.70$ 3,873.60$ 56.00$ 2,688.00$ 1028c 24 Inch Diameter Pipe-10 - 15' 48 106.20$ 5,097.60$ 59.00$ 2,832.00$ 1029 30" Corrugated Metal Pipe Replacement
1029a 30 Inch Diameter Pipe-0' - 4.9' 48 98.30$ 4,718.40$ 62.00$ 2,976.00$ 1029b 30 Inch Diameter Pipe-5' - 9.9' 48 110.00$ 5,280.00$ 66.00$ 3,168.00$ 1029c 30 Inch Diameter Pipe-10 - 15' 48 136.00$ 6,528.00$ 74.00$ 3,552.00$ 1030 36" Corrugated Metal Pipe Replacement
1030a 36 Inch Diameter Pipe-0' - 4.9' 48 104.00$ 4,992.00$ 72.00$ 3,456.00$ 1030b 36 Inch Diameter Pipe-5' - 9.9' 48 118.00$ 5,664.00$ 79.00$ 3,792.00$ 1030c 36 Inch Diameter Pipe-10 - 15' 48 148.00$ 7,104.00$ 82.00$ 3,936.00$ 1031 48" Corrugated Metal Pipe Replacement
1031a 48 Inch Diameter Pipe-0' - 4.9' 48 130.00$ 6,240.00$ 93.00$ 4,464.00$ 1031b 48 Inch Diameter Pipe-5' - 9.9' 48 146.00$ 7,008.00$ 103.00$ 4,944.00$ 1031c 48 Inch Diameter Pipe-10 - 15' 48 180.00$ 8,640.00$ 113.00$ 5,424.00$ 1032 End Section Replacement
1032a 12 Inch Diameter End Section 4 271.00$ 1,084.00$ 176.00$ 704.00$ 1032b 18 Inch Diameter End Section 4 316.00$ 1,264.00$ 260.00$ 1,040.00$ 1032c 24 Inch Diameter End Section 4 506.00$ 2,024.00$ 316.00$ 1,264.00$ 1032d 30 Inch Diameter End Section 4 704.00$ 2,816.00$ 400.00$ 1,600.00$ 1032e 36 Inch Diameter End Section 4 919.00$ 3,676.00$ 460.00$ 1,840.00$ 1033 Site Improvements and Appurtences
1033a Concrete Removal and Disposal 500 120.00$ 60,000.00$ 87.00$ 43,500.00$ 1033b Concrete Removal and Disposal 500 141.00$ 70,500.00$ 113.00$ 56,500.00$
Structures and Foundations 1033c Asphalt Removal and Disposal 2,000 3.30$ 6,600.00$ 12.00$ 24,000.00$ 1033d Landscape Timber Removal 2,000 3.20$ 6,400.00$ 2.00$ 4,000.00$ 1033e Removal of Coarse Aggregate 500 2.40$ 1,200.00$ 11.00$ 5,500.00$ 1034 Equipment
1034a Backhoe Loader; 4WD 100 197.00$ 19,700.00$ 125.00$ 12,500.00$ 1034b Track Type Excavator 100 263.00$ 26,300.00$ 225.00$ 22,500.00$ 1034c Track Type Excavator Long Reach 100 313.00$ 31,300.00$ 265.00$ 26,500.00$ 1034d Track Type Bulldozer 100 229.00$ 22,900.00$ 185.00$ 18,500.00$ 1034e Padded Foot Roller; Self Propelled 100 225.00$ 22,500.00$ 160.00$ 16,000.00$ 1034f Skid Steer Loader 100 189.00$ 18,900.00$ 125.00$ 12,500.00$ 1034g Motor Grader 100 237.00$ 23,700.00$ 175.00$ 17,500.00$ 1034h Truck W/ Dump 100 151.00$ 15,100.00$ 125.00$ 12,500.00$ 1034i Street Sweeper Type Vehicle W/ Vacuum 100 141.00$ 14,100.00$ 125.00$ 12,500.00$ 1034j Semi-Tractor trailer w/ Operator 100 216.00$ 21,600.00$ 125.00$ 12,500.00$ 1035 Labor
1035a General Labor 200 94.90$ 18,980.00$ 93.00$ 18,600.00$ 1035b Misc. Service Activities TBD 1035c Misc. Construction Activities TBD 1036 Rental of Misc. Equipment with Operator TBD 1037 Rental of Misc. Equipment without Operator TBD 1038 Procurement & Delivery of Misc. Materials TBD 1039 Disposal of Misc. and Special Waste TBD 2001 Patching 150 153.00$ 22,950.00$ 90.00$ 13,500.00$ 2002 Bituminous Surface Removal
2002a Light 350 8.70$ 3,045.00$ 6.00$ 2,100.00$ 2002b Heavy 2,000 8.70$ 17,400.00$ 6.00$ 12,000.00$ 2003 Road Widening 1,000 64.50$ 64,500.00$ 75.00$ 75,000.00$ 2004 Bituminous Concrete; Leveling Binder 2,000 198.00$ 396,000.00$ 185.00$ 370,000.00$ 2005 Bituminous Concrete; Surface Course 2,000 236.00$ 472,000.00$ 185.00$ 370,000.00$ 2006 Tack Coat 1,000 24.40$ 24,400.00$ 7.00$ 7,000.00$ 2007 Prime Coat 200 15.60$ 3,120.00$ 7.00$ 1,400.00$ 2008 Seal Coat 8,000 5.40$ 43,200.00$ 4.50$ 36,000.00$ 2009 Crack Sealing 20 81.60$ 1,632.00$ 102.00$ 2,040.00$ 2010 Joint Sealing 20 81.60$ 1,632.00$ 112.00$ 2,240.00$ 2011 Curbing
2011a Bituminous 100 12.60$ 1,260.00$ 24.00$ 2,400.00$ 2011b Concrete 100 23.00$ 2,300.00$ 30.00$ 3,000.00$ 2012 Area Reflective Crack Control Treatment System A 3,000 4.50$ 13,500.00$ 7.75$ 23,250.00$ 2013 Guardrail
2013a Replacement 100 90.90$ 9,090.00$ 85.00$ 8,500.00$ 2013b Installation 100 84.00$ 8,400.00$ 95.00$ 9,500.00$
2014 Parking Area and Traffic Striping 3,000 2.20$ 6,600.00$ 2.00$ 6,000.00$ 2015 Traffic Marking and Symbol 180 11.00$ 1,980.00$ 8.00$ 1,440.00$ 2016 Parking Block
2016a Replacement 25 182.00$ 4,550.00$ 150.00$ 3,750.00$ 2016b Installation 10 149.00$ 1,490.00$ 170.00$ 1,700.00$ 2017 Decorative Boulder 10 336.00$ 3,360.00$ 565.00$ 5,650.00$
2018 Concrete 2018a Concrete Slab 4” 250 414.00$ 103,500.00$ 972.00$ 243,000.00$ 2018b Concrete Slab 6” 250 350.00$ 87,500.00$ 813.00$ 203,250.00$ 2018c Concrete Slab 8” 200 335.00$ 67,000.00$ 647.00$ 129,400.00$ 2018d Concrete Slab 10” 100 324.00$ 32,400.00$ 548.00$ 54,800.00$ 2018e Concrete Ditch 200 13.30$ 2,660.00$ 20.00$ 4,000.00$ 2018f Concrete Curb 50 23.00$ 1,150.00$ 30.00$ 1,500.00$ 2018g Reinforcement 500 1.90$ 950.00$ 2.00$ 1,000.00$ 2018h Misc. Concrete Work TBD 2019 Crushed Stone Placed and Stockpiled
2019a FA-4 25 55.10$ 1,377.50$ 42.00$ 1,050.00$ 2019b FA-20 25 60.30$ 1,507.50$ 43.00$ 1,075.00$ 2019c CA-6 100 48.80$ 4,880.00$ 38.00$ 3,800.00$ 2019d CA-10 100 49.50$ 4,950.00$ 45.00$ 4,500.00$ 2019e FA-2 Class A, Beach Sand Stockpiled 100 37.40$ 3,740.00$ 30.00$ 3,000.00$ 2019f FA-4 Stockpiled 25 34.30$ 857.50$ 30.00$ 750.00$ 2019g CA-6 Stockpiled 100 38.40$ 3,840.00$ 30.00$ 3,000.00$ 2019h CA-10 Stockpiled 100 39.10$ 3,910.00$ 33.00$ 3,300.00$ 2019i CA-16 Stockpiled 100 39.70$ 3,970.00$ 33.00$ 3,300.00$ 2020 Bedding Material
2020a Bedding Stone 300 36.10$ 10,830.00$ 38.00$ 11,400.00$ 2020b Geotextile Fabric 500 5.80$ 2,900.00$ 5.50$ 2,750.00$ 2021 Stone Rip Rap
2021a 50 LB 150 68.40$ 10,260.00$ 48.00$ 7,200.00$ 2021b 150 LB 150 80.60$ 12,090.00$ 62.00$ 9,300.00$ 2021c 400 LB 150 80.60$ 12,090.00$ 62.00$ 9,300.00$ 2022 Fill Material 30 39.90$ 1,197.00$ 33.00$ 990.00$ 2023 Top Soil 30 46.50$ 1,395.00$ 36.00$ 1,080.00$ 2024 Site Grading
2024a Light 50 36.00$ 1,800.00$ 16.00$ 800.00$ 2024b Heavy 200 38.10$ 7,620.00$ 20.00$ 4,000.00$ 2025 Establishment of Turf 5 5,650.00$ 28,250.00$ 4,500.00$ 22,500.00$ 2026 12" Corrugated Metal Pipe Replacement
2026a 12 Inch Diameter Pipe-0' - 4.9' 48 49.90$ 2,395.20$ 36.00$ 1,728.00$ 2026b 12 Inch Diameter Pipe-5' - 9.9' 48 60.60$ 2,908.80$ 39.00$ 1,872.00$ 2026b 12 Inch Diameter Pipe-10 - 15' 48 82.50$ 3,960.00$ 42.00$ 2,016.00$ 2027 18" Corrugated Metal Pipe Replacement
2027a 18 Inch Diameter Pipe-0' - 4.9' 48 61.60$ 2,956.80$ 41.00$ 1,968.00$ 2027b 18 Inch Diameter Pipe-5' - 9.9' 48 72.30$ 3,470.40$ 44.00$ 2,112.00$ 2027c 18 Inch Diameter Pipe-10 - 15' 48 94.20$ 4,521.60$ 47.00$ 2,256.00$ 2028 24" Corrugated Metal Pipe Replacement
2028a 24 Inch Diameter Pipe-0' - 4.9' 48 70.90$ 3,403.20$ 51.00$ 2,448.00$ 2028b 24 Inch Diameter Pipe-5' - 9.9' 48 83.50$ 4,008.00$ 56.00$ 2,688.00$ 2028c 24 Inch Diameter Pipe-10 - 15' 48 110.00$ 5,280.00$ 59.00$ 2,832.00$ 2029 30" Corrugated Metal Pipe Replacement
2029a 30 Inch Diameter Pipe-0' - 4.9' 48 102.00$ 4,896.00$ 62.00$ 2,976.00$ 2029b 30 Inch Diameter Pipe-5' - 9.9' 48 114.00$ 5,472.00$ 66.00$ 3,168.00$ 2029c 30 Inch Diameter Pipe-10 - 15' 48 141.00$ 6,768.00$ 74.00$ 3,552.00$ 2030 36" Corrugated Metal Pipe Replacement
2030a 36 Inch Diameter Pipe-0' - 4.9' 48 108.00$ 5,184.00$ 72.00$ 3,456.00$ 2030b 36 Inch Diameter Pipe-5' - 9.9' 48 122.00$ 5,856.00$ 79.00$ 3,792.00$ 2030c 36 Inch Diameter Pipe-10 - 15' 48 153.00$ 7,344.00$ 82.00$ 3,936.00$ 2031 48" Corrugated Metal Pipe Replacement
2031a 48 Inch Diameter Pipe-0' - 4.9' 48 135.00$ 6,480.00$ 93.00$ 4,464.00$ 2031b 48 Inch Diameter Pipe-5' - 9.9' 48 152.00$ 7,296.00$ 103.00$ 4,944.00$ 2031c 48 Inch Diameter Pipe-10 - 15' 48 187.00$ 8,976.00$ 113.00$ 5,424.00$ 2032 End Section Replacement
2032a 12 Inch Diameter End Section 4 280.00$ 1,120.00$ 176.00$ 704.00$ 2032b 18 Inch Diameter End Section 4 327.00$ 1,308.00$ 260.00$ 1,040.00$ 2032c 24 Inch Diameter End Section 4 524.00$ 2,096.00$ 316.00$ 1,264.00$ 2032d 30 Inch Diameter End Section 4 729.00$ 2,916.00$ 400.00$ 1,600.00$ 2032e 36 Inch Diameter End Section 4 952.00$ 3,808.00$ 460.00$ 1,840.00$ 2033 Site Improvements and Appurtences
2033a Concrete Removal and Disposal 500 124.00$ 62,000.00$ 87.00$ 43,500.00$ 2033b Concrete Removal and Disposal 500 146.00$ 73,000.00$ 113.00$ 56,500.00$
Structures and Foundations 2033c Asphalt Removal and Disposal 2,000 3.40$ 6,800.00$ 12.00$ 24,000.00$ 2033d Landscape Timber Removal 2,000 3.30$ 6,600.00$ 2.00$ 4,000.00$ 2033e Removal of Coarse Aggregate 500 2.50$ 1,250.00$ 11.00$ 5,500.00$ 2034 Equipment
2034a Backhoe Loader; 4WD 100 204.00$ 20,400.00$ 125.00$ 12,500.00$ 2034b Track Type Excavator 100 272.00$ 27,200.00$ 225.00$ 22,500.00$ 2034c Track Type Excavator Long Reach 100 324.00$ 32,400.00$ 265.00$ 26,500.00$ 2034d Track Type Bulldozer 100 237.00$ 23,700.00$ 185.00$ 18,500.00$ 2034e Padded Foot Roller; Self Propelled 100 233.00$ 23,300.00$ 160.00$ 16,000.00$ 2034f Skid Steer Loader 100 196.00$ 19,600.00$ 125.00$ 12,500.00$ 2034g Motor Grader 100 246.00$ 24,600.00$ 175.00$ 17,500.00$ 2034h Truck W/ Dump 100 157.00$ 15,700.00$ 125.00$ 12,500.00$ 2034i Street Sweeper Type Vehicle W/ Vacuum 100 146.00$ 14,600.00$ 125.00$ 12,500.00$ 2034j Semi-Tractor trailer w/ Operator 100 224.00$ 22,400.00$ 125.00$ 12,500.00$ 2035 Labor
2035a General Labor 200 98.20$ 19,640.00$ 93.00$ 18,600.00$ 2035b Misc. Service Activities TBD 2035c Misc. Construction Activities TBD 2036 Rental of Misc. Equipment with Operator TBD 2037 Rental of Misc. Equipment without Operator TBD 2038 Procurement & Delivery of Misc. Materials TBD 2039 Disposal of Misc. and Special Waste TBD 3001 Patching 150 158.00$ 23,700.00$ 90.00$ 13,500.00$ 3002 Bituminous Surface Removal
3002a Light 350 9.00$ 3,150.00$ 6.00$ 2,100.00$ 3002b Heavy 750 9.00$ 6,750.00$ 6.00$ 4,500.00$ 3003 Road Widening 1,000 66.70$ 66,700.00$ 75.00$ 75,000.00$ 3004 Bituminous Concrete; Leveling Binder 2,000 205.00$ 410,000.00$ 185.00$ 370,000.00$ 3005 Bituminous Concrete; Surface Course 2,000 244.00$ 488,000.00$ 185.00$ 370,000.00$ 3006 Tack Coat 850 25.30$ 21,505.00$ 7.00$ 5,950.00$ 3007 Prime Coat 200 16.10$ 3,220.00$ 7.00$ 1,400.00$ 3008 Seal Coat 5,000 5.50$ 27,500.00$ 4.50$ 22,500.00$ 3009 Crack Sealing 20 84.40$ 1,688.00$ 102.00$ 2,040.00$ 3010 Joint Sealing 20 84.40$ 1,688.00$ 112.00$ 2,240.00$ 3011 Curbing
3011a Bituminous 100 13.10$ 1,310.00$ 24.00$ 2,400.00$ 3011b Concrete 100 23.80$ 2,380.00$ 30.00$ 3,000.00$ 3012 Area Reflective Crack Control Treatment System A 3,000 4.70$ 14,100.00$ 7.75$ 23,250.00$ 3013 Guardrail
3013a Replacement 100 94.10$ 9,410.00$ 85.00$ 8,500.00$ 3013b Installation 100 86.90$ 8,690.00$ 95.00$ 9,500.00$ 3014 Parking Area and Traffic Striping 3,000 2.30$ 6,900.00$ 2.00$ 6,000.00$ 3015 Traffic Marking and Symbol 180 11.40$ 2,052.00$ 8.00$ 1,440.00$ 3016 Parking Block
3016a Replacement 25 188.00$ 4,700.00$ 150.00$ 3,750.00$ 3016b Installation 10 155.00$ 1,550.00$ 170.00$ 1,700.00$ 3017 Decorative Boulder 10 348.00$ 3,480.00$ 565.00$ 5,650.00$ 3018 Concrete Installation
3018a Concrete Slab 4” 250 428.00$ 107,000.00$ 972.00$ 243,000.00$ 3018b Concrete Slab 6” 250 362.00$ 90,500.00$ 813.00$ 203,250.00$ 3018c Concrete Slab 8” 200 347.00$ 69,400.00$ 647.00$ 129,400.00$ 3018d Concrete Slab 10” 100 335.00$ 33,500.00$ 548.00$ 54,800.00$ 3018e Concrete Ditch 200 13.70$ 2,740.00$ 20.00$ 4,000.00$ 3018f Concrete Curb 50 23.80$ 1,190.00$ 30.00$ 1,500.00$ 3018g Reinforcement 500 2.00$ 1,000.00$ 2.00$ 1,000.00$ 3018h Misc. Concrete Work TBD
3019 Crushed Stone Placed and Stockpiled 3019a FA-4 25 57.00$ 1,425.00$ 42.00$ 1,050.00$ 3019b FA-20 25 62.40$ 1,560.00$ 43.00$ 1,075.00$ 3019c CA-6 100 50.50$ 5,050.00$ 38.00$ 3,800.00$ 3019d CA-10 100 51.20$ 5,120.00$ 45.00$ 4,500.00$ 3019e FA-2 Class A, Beach Sand Stockpiled 100 38.70$ 3,870.00$ 30.00$ 3,000.00$ 3019f FA-4 Stockpiled 25 35.40$ 885.00$ 30.00$ 750.00$ 3019g CA-6 Stockpiled 100 39.70$ 3,970.00$ 30.00$ 3,000.00$ 3019h CA-10 Stockpiled 100 40.40$ 4,040.00$ 33.00$ 3,300.00$ 3019i CA-16 Stockpiled 100 41.10$ 4,110.00$ 33.00$ 3,300.00$ 3020 Bedding Material
3020a Bedding Stone 300 37.40$ 11,220.00$ 38.00$ 11,400.00$ 3020b Geotextile Fabric 500 6.00$ 3,000.00$ 5.50$ 2,750.00$ 3021 Stone Rip Rap
3021a 50 LB 150 70.80$ 10,620.00$ 48.00$ 7,200.00$ 3021b 150 LB 150 83.40$ 12,510.00$ 62.00$ 9,300.00$ 3021c 400 LB 150 83.40$ 12,510.00$ 62.00$ 9,300.00$ 3022 Fill Material 30 41.30$ 1,239.00$ 33.00$ 990.00$ 3023 Top Soil 30 48.10$ 1,443.00$ 36.00$ 1,080.00$ 3024 Site Grading
3024a Light 50 37.20$ 1,860.00$ 16.00$ 800.00$ 3024b Heavy 200 39.50$ 7,900.00$ 20.00$ 4,000.00$ 3025 Establishment of Turf 5 5,840.00$ 29,200.00$ 4,500.00$ 22,500.00$ 3026 12" Corrugated Metal Pipe Replacement
3026a 12 Inch Diameter Pipe-0' - 4.9' 48 51.70$ 2,481.60$ 36.00$ 1,728.00$ 3026b 12 Inch Diameter Pipe-5' - 9.9' 48 62.70$ 3,009.60$ 39.00$ 1,872.00$ 3026b 12 Inch Diameter Pipe-10 - 15' 48 85.30$ 4,094.40$ 42.00$ 2,016.00$ 3027 18" Corrugated Metal Pipe Replacement
3027a 18 Inch Diameter Pipe-0' - 4.9' 48 63.80$ 3,062.40$ 41.00$ 1,968.00$ 3027b 18 Inch Diameter Pipe-5' - 9.9' 48 74.80$ 3,590.40$ 44.00$ 2,112.00$ 3027c 18 Inch Diameter Pipe-10 - 15' 48 97.40$ 4,675.20$ 47.00$ 2,256.00$ 3028 24" Corrugated Metal Pipe Replacement
3028a 24 Inch Diameter Pipe-0' - 4.9' 48 73.40$ 3,523.20$ 51.00$ 2,448.00$ 3028b 24 Inch Diameter Pipe-5' - 9.9' 48 86.40$ 4,147.20$ 56.00$ 2,688.00$ 3028c 24 Inch Diameter Pipe-10 - 15' 48 114.00$ 5,472.00$ 59.00$ 2,832.00$ 3029 30" Corrugated Metal Pipe Replacement
3029a 30 Inch Diameter Pipe-0' - 4.9' 48 105.00$ 5,040.00$ 62.00$ 2,976.00$ 3029b 30 Inch Diameter Pipe-5' - 9.9' 48 118.00$ 5,664.00$ 66.00$ 3,168.00$ 3029c 30 Inch Diameter Pipe-10 - 15' 48 146.00$ 7,008.00$ 74.00$ 3,552.00$ 3030 36" Corrugated Metal Pipe Replacement
3030a 36 Inch Diameter Pipe-0' - 4.9' 48 111.00$ 5,328.00$ 72.00$ 3,456.00$ 3030b 36 Inch Diameter Pipe-5' - 9.9' 48 126.00$ 6,048.00$ 79.00$ 3,792.00$ 3030c 36 Inch Diameter Pipe-10 - 15' 48 159.00$ 7,632.00$ 82.00$ 3,936.00$ 3031 48" Corrugated Metal Pipe Replacement
3031a 48 Inch Diameter Pipe-0' - 4.9' 48 139.00$ 6,672.00$ 93.00$ 4,464.00$ 3031b 48 Inch Diameter Pipe-5' - 9.9' 48 157.00$ 7,536.00$ 103.00$ 4,944.00$ 3031c 48 Inch Diameter Pipe-10 - 15' 48 193.00$ 9,264.00$ 113.00$ 5,424.00$ 3032 End Section Replacement
3032a 12 Inch Diameter End Section 4 290.00$ 1,160.00$ 176.00$ 704.00$ 3032b 18 Inch Diameter End Section 4 339.00$ 1,356.00$ 260.00$ 1,040.00$ 3032c 24 Inch Diameter End Section 4 542.00$ 2,168.00$ 316.00$ 1,264.00$ 3032D 30 Inch Diameter End Section 4 754.00$ 3,016.00$ 400.00$ 1,600.00$ 3032e 36 Inch Diameter End Section 4 984.00$ 3,936.00$ 460.00$ 1,840.00$ 3033 Site Improvements and Appurtences
3033a Concrete Removal and Disposal 500 129.00$ 64,500.00$ 87.00$ 43,500.00$ 3033b Concrete Removal and Disposal Building Structures 500 152.00$ 76,000.00$ 113.00$ 56,500.00$ 3033c Asphalt Removal and Disposal 2,000 3.50$ 7,000.00$ 12.00$ 24,000.00$ 3033d Landscape Timber Removal 2,000 3.40$ 6,800.00$ 2.00$ 4,000.00$ 3033e Removal of Coarse Aggregate 500 2.50$ 1,250.00$ 11.00$ 5,500.00$ 3034 Equipment
3034a Backhoe Loader; 4WD 100 211.00$ 21,100.00$ 125.00$ 12,500.00$ 3034b Track Type Excavator 100 282.00$ 28,200.00$ 225.00$ 22,500.00$ 3034c Track Type Excavator Long Reach 100 336.00$ 33,600.00$ 265.00$ 26,500.00$ 3034d Track Type Bulldozer 100 245.00$ 24,500.00$ 185.00$ 18,500.00$ 3034e Padded Foot Roller; Self Propelled 100 241.00$ 24,100.00$ 160.00$ 16,000.00$
3034f Skid Steer Loader 100 203.00$ 20,300.00$ 125.00$ 12,500.00$ 3034g Motor Grader 100 254.00$ 25,400.00$ 175.00$ 17,500.00$ 3034h Truck W/ Dump 100 162.00$ 16,200.00$ 125.00$ 12,500.00$ 3034i Street Sweeper Type Vehicle W/ Vacuum 100 151.00$ 15,100.00$ 125.00$ 12,500.00$ 3034j Semi-Tractor trailer w/ Operator 100 231.00$ 23,100.00$ 125.00$ 12,500.00$ 3035 Labor
3035a General Labor 200 102.00$ 20,400.00$ 93.00$ 18,600.00$ 3035b Misc. Service Activities TBD 3035c Misc. Construction Activities TBD 3036 Rental of Misc. Equipment with Operator TBD 3037 Rental of Misc. Equipment without Operator TBD 3038 Procurement & Delivery of Misc. Materials TBD 3039 Disposal of Misc. and Special Waste TBD 4001 Patching 150 164.00$ 24,600.00$ 90.00$ 13,500.00$ 4002 Bituminous Surface Removal
4002a Light 350 9.30$ 3,255.00$ 6.00$ 2,100.00$ 4002b Heavy 750 9.30$ 6,975.00$ 6.00$ 4,500.00$ 4003 Road Widening 1,000 69.00$ 69,000.00$ 75.00$ 75,000.00$ 4004 Bituminous Concrete; Leveling Binder 2,000 212.00$ 424,000.00$ 185.00$ 370,000.00$ 4005 Bituminous Concrete; Surface Course 2,000 252.00$ 504,000.00$ 185.00$ 370,000.00$ 4006 Tack Coat 850 26.10$ 22,185.00$ 7.00$ 5,950.00$ 4007 Prime Coat 200 16.70$ 3,340.00$ 7.00$ 1,400.00$ 4008 Seal Coat 5,000 5.70$ 28,500.00$ 4.50$ 22,500.00$ 4009 Crack Sealing 20 87.20$ 1,744.00$ 102.00$ 2,040.00$ 4010 Joint Sealing 20 87.20$ 1,744.00$ 112.00$ 2,240.00$ 4011 Curbing
4011a Bituminous 100 13.50$ 1,350.00$ 24.00$ 2,400.00$ 4011b Concrete 100 24.60$ 2,460.00$ 30.00$ 3,000.00$ 4012 Area Reflective Crack Control Treatment System A 3,000 4.90$ 14,700.00$ 7.75$ 23,250.00$ 4013 Guardrail
4013a Replacement 100 97.20$ 9,720.00$ 85.00$ 8,500.00$ 4013b Installation 100 89.80$ 8,980.00$ 95.00$ 9,500.00$ 4014 Parking Area and Traffic Striping 3,000 2.30$ 6,900.00$ 2.00$ 6,000.00$ 4015 Traffic Marking and Symbol 180 11.70$ 2,106.00$ 8.00$ 1,440.00$ 4016 Parking Block
4016a Replacement 25 195.00$ 4,875.00$ 150.00$ 3,750.00$ 4016b Installation 10 160.00$ 1,600.00$ 170.00$ 1,700.00$ 4017 Decorative Boulder 10 359.00$ 3,590.00$ 565.00$ 5,650.00$ 4018 Concrete Installation
4018a Concrete Slab 4” 250 442.00$ 110,500.00$ 972.00$ 243,000.00$ 4018b Concrete Slab 6” 250 374.00$ 93,500.00$ 813.00$ 203,250.00$ 4018c Concrete Slab 8” 200 358.00$ 71,600.00$ 647.00$ 129,400.00$ 4018d Concrete Slab 10” 100 346.00$ 34,600.00$ 548.00$ 54,800.00$ 4018e Concrete Ditch 200 14.20$ 2,840.00$ 20.00$ 4,000.00$ 4018f Concrete Curb 50 24.60$ 1,230.00$ 30.00$ 1,500.00$ 4018g Reinforcement 500 2.10$ 1,050.00$ 2.00$ 1,000.00$ 4018h Misc. Concrete Work TBD 4019 Crushed Stone Placed and Stockpiled
4019a FA-4 25 58.90$ 1,472.50$ 42.00$ 1,050.00$ 4019b FA-20 25 64.40$ 1,610.00$ 43.00$ 1,075.00$ 4019c CA-6 100 52.20$ 5,220.00$ 38.00$ 3,800.00$ 4019d CA-10 100 52.90$ 5,290.00$ 45.00$ 4,500.00$ 4019e FA-2 Class A, Beach Sand Stockpiled 100 40.00$ 4,000.00$ 30.00$ 3,000.00$ 4019f FA-4 Stockpiled 25 36.60$ 915.00$ 30.00$ 750.00$ 4019g CA-6 Stockpiled 100 41.10$ 4,110.00$ 30.00$ 3,000.00$ 4019h CA-10 Stockpiled 100 41.70$ 4,170.00$ 33.00$ 3,300.00$ 4019i CA-16 Stockpiled 100 42.40$ 4,240.00$ 33.00$ 3,300.00$ 4020 Bedding Material
4020a Bedding Stone 300 38.60$ 11,580.00$ 38.00$ 11,400.00$ 4020b Geotextile Fabric 500 6.20$ 3,100.00$ 5.50$ 2,750.00$ 4021 Stone Rip Rap
4021a 50 LB 150 73.10$ 10,965.00$ 48.00$ 7,200.00$ 4021b 150 LB 150 86.20$ 12,930.00$ 62.00$ 9,300.00$ 4021c 400 LB 150 86.20$ 12,930.00$ 62.00$ 9,300.00$ 4022 Fill Material 30 42.70$ 1,281.00$ 33.00$ 990.00$
4023 Top Soil 30 49.80$ 1,494.00$ 36.00$ 1,080.00$ 4024 Site Grading
4024a Light 50 38.40$ 1,920.00$ 16.00$ 800.00$ 4024b Heavy 200 40.80$ 8,160.00$ 20.00$ 4,000.00$ 4025 Establishment of Turf 5 6,040.00$ 30,200.00$ 4,500.00$ 22,500.00$ 4026 12" Corrugated Metal Pipe Replacement
4026a 12 Inch Diameter Pipe-0' - 4.9' 48 53.40$ 2,563.20$ 36.00$ 1,728.00$ 4026b 12 Inch Diameter Pipe-5' - 9.9' 48 64.80$ 3,110.40$ 39.00$ 1,872.00$ 4026b 12 Inch Diameter Pipe-10 - 15' 48 88.10$ 4,228.80$ 42.00$ 2,016.00$ 4027 18" Corrugated Metal Pipe Replacement
4027a 18 Inch Diameter Pipe-0' - 4.9' 48 65.90$ 3,163.20$ 41.00$ 1,968.00$ 4027b 18 Inch Diameter Pipe-5' - 9.9' 48 77.30$ 3,710.40$ 44.00$ 2,112.00$ 4027c 18 Inch Diameter Pipe-10 - 15' 48 101.00$ 4,848.00$ 47.00$ 2,256.00$ 4028 24" Corrugated Metal Pipe Replacement
4028a 24 Inch Diameter Pipe-0' - 4.9' 48 75.80$ 3,638.40$ 51.00$ 2,448.00$ 4028b 24 Inch Diameter Pipe-5' - 9.9' 48 89.30$ 4,286.40$ 56.00$ 2,688.00$ 4028c 24 Inch Diameter Pipe-10 - 15' 48 118.00$ 5,664.00$ 59.00$ 2,832.00$ 4029 30" Corrugated Metal Pipe Replacement
4029a 30 Inch Diameter Pipe-0' - 4.9' 48 109.00$ 5,232.00$ 62.00$ 2,976.00$ 4029b 30 Inch Diameter Pipe-5' - 9.9' 48 122.00$ 5,856.00$ 66.00$ 3,168.00$ 4029c 30 Inch Diameter Pipe-10 - 15' 48 151.00$ 7,248.00$ 74.00$ 3,552.00$ 4030 36" Corrugated Metal Pipe Replacement
4030a 36 Inch Diameter Pipe-0' - 4.9' 48 115.00$ 5,520.00$ 72.00$ 3,456.00$ 4030b 36 Inch Diameter Pipe-5' - 9.9' 48 131.00$ 6,288.00$ 79.00$ 3,792.00$ 4030c 36 Inch Diameter Pipe-10 - 15' 48 164.00$ 7,872.00$ 82.00$ 3,936.00$ 4031 48" Corrugated Metal Pipe Replacement
4031a 48 Inch Diameter Pipe-0' - 4.9' 48 144.00$ 6,912.00$ 93.00$ 4,464.00$ 4031b 48 Inch Diameter Pipe-5' - 9.9' 48 162.00$ 7,776.00$ 103.00$ 4,944.00$ 4031c 48 Inch Diameter Pipe-10 - 15' 48 200.00$ 9,600.00$ 113.00$ 5,424.00$ 4032 End Section Replacement
4032a 12 Inch Diameter End Section 4 300.00$ 1,200.00$ 176.00$ 704.00$ 4032b 18 Inch Diameter End Section 4 350.00$ 1,400.00$ 260.00$ 1,040.00$ 4032c 24 Inch Diameter End Section 4 560.00$ 2,240.00$ 316.00$ 1,264.00$ 4032D 30 Inch Diameter End Section 4 779.00$ 3,116.00$ 400.00$ 1,600.00$ 4032e 36 Inch Diameter End Section 4 1,020.00$ 4,080.00$ 460.00$ 1,840.00$ 4033 Site Improvements and Appurtences
4033a Concrete Removal and Disposal 500 133.00$ 66,500.00$ 87.00$ 43,500.00$ 4033b Concrete Removal and Disposal Building Structures 500 157.00$ 78,500.00$ 113.00$ 56,500.00$ 4033c Asphalt Removal and Disposal 2,000 3.70$ 7,400.00$ 12.00$ 24,000.00$ 4033d Landscape Timber Removal 2,000 3.50$ 7,000.00$ 2.00$ 4,000.00$ 4033e Removal of Coarse Aggregate 500 2.60$ 1,300.00$ 11.00$ 5,500.00$ 4034 Equipment
4034a Backhoe Loader; 4WD 100 218.00$ 21,800.00$ 125.00$ 12,500.00$ 4034b Track Type Excavator 100 291.00$ 29,100.00$ 225.00$ 22,500.00$ 4034c Track Type Excavator Long Reach 100 347.00$ 34,700.00$ 265.00$ 26,500.00$ 4034d Track Type Bulldozer 100 253.00$ 25,300.00$ 185.00$ 18,500.00$ 4034e Padded Foot Roller; Self Propelled 100 250.00$ 25,000.00$ 160.00$ 16,000.00$ 4034f Skid Steer Loader 100 210.00$ 21,000.00$ 125.00$ 12,500.00$ 4034g Motor Grader 100 262.00$ 26,200.00$ 175.00$ 17,500.00$ 4034h Truck W/ Dump 100 167.00$ 16,700.00$ 125.00$ 12,500.00$ 4034i Street Sweeper Type Vehicle W/ Vacuum 100 156.00$ 15,600.00$ 125.00$ 12,500.00$ 4034j Semi-Tractor trailer w/ Operator 100 239.00$ 23,900.00$ 125.00$ 12,500.00$ 4035 Labor
4035a General Labor 200 105.00$ 21,000.00$ 93.00$ 18,600.00$ 4035b Misc. Service Activities TBD 4035c Misc. Construction Activities TBD 4036 Rental of Misc. Equipment with Operator TBD 4037 Rental of Misc. Equipment without Operator TBD 4038 Procurement & Delivery of Misc. Materials TBD 4039 Disposal of Misc. and Special Waste TBD 5001 Patching 100 169.00$ 16,900.00$ 90.00$ 9,000.00$ 5002 Bituminous Surface Removal
5002a Light 200 9.60$ 1,920.00$ 6.00$ 1,200.00$ 5002b Heavy 150 9.60$ 1,440.00$ 6.00$ 900.00$ 5003 Road Widening 400 70.90$ 28,360.00$ 75.00$ 30,000.00$
5004 Bituminous Concrete; Leveling Binder 1500 219.00$ 328,500.00$ 185.00$ 277,500.00$ 5005 Bituminous Concrete; Surface Course 1500 260.00$ 390,000.00$ 185.00$ 277,500.00$ 5006 Tack Coat 600 27.00$ 16,200.00$ 7.00$ 4,200.00$ 5007 Prime Coat 200 17.20$ 3,440.00$ 7.00$ 1,400.00$ 5008 Seal Coat 3,000 5.90$ 17,700.00$ 4.50$ 13,500.00$ 5009 Crack Sealing 20 90.10$ 1,802.00$ 102.00$ 2,040.00$ 5010 Joint Sealing 20 90.10$ 1,802.00$ 112.00$ 2,240.00$ 5011 Curbing
5011a Bituminous 100 14.00$ 1,400.00$ 24.00$ 2,400.00$ 5011b Concrete 100 25.40$ 2,540.00$ 30.00$ 3,000.00$ 5012 Area Reflective Crack Control Treatment System A 1,000 5.00$ 5,000.00$ 7.75$ 7,750.00$ 5013 Guardrail
5013a Replacement 50 100.00$ 5,000.00$ 85.00$ 4,250.00$ 5013b Installation 50 92.70$ 4,635.00$ 95.00$ 4,750.00$ 5014 Parking Area and Traffic Striping 3,000 2.40$ 7,200.00$ 2.00$ 6,000.00$ 5015 Traffic Marking and Symbol 180 12.10$ 2,178.00$ 8.00$ 1,440.00$ 5016 Parking Block
5016a Replacement 25 201.00$ 5,025.00$ 150.00$ 3,750.00$ 5016b Installation 10 165.00$ 1,650.00$ 170.00$ 1,700.00$ 5017 Decorative Boulder 10 371.00$ 3,710.00$ 565.00$ 5,650.00$ 5018 Concrete Installation
5018a Concrete Slab 4” 100 457.00$ 45,700.00$ 972.00$ 97,200.00$ 5018b Concrete Slab 6” 100 386.00$ 38,600.00$ 813.00$ 81,300.00$ 5018c Concrete Slab 8” 30 370.00$ 11,100.00$ 647.00$ 19,410.00$ 5018d Concrete Slab 10” 30 357.00$ 10,710.00$ 548.00$ 16,440.00$ 5018e Concrete Ditch 200 14.70$ 2,940.00$ 20.00$ 4,000.00$ 5018f Concrete Curb 50 25.40$ 1,270.00$ 30.00$ 1,500.00$ 5018g Reinforcement 300 2.20$ 660.00$ 2.00$ 600.00$ 4018h Misc. Concrete Work TBD 5019 Crushed Stone Placed and Stockpiled
5019a FA-4 25 60.80$ 1,520.00$ 42.00$ 1,050.00$ 5019b FA-20 25 66.50$ 1,662.50$ 43.00$ 1,075.00$ 5019c CA-6 100 53.90$ 5,390.00$ 38.00$ 3,800.00$ 5019d CA-10 100 54.60$ 5,460.00$ 45.00$ 4,500.00$ 5019e FA-2 Class A, Beach Sand Stockpiled 100 41.30$ 4,130.00$ 30.00$ 3,000.00$ 5019f FA-4 Stockpiled 25 37.80$ 945.00$ 30.00$ 750.00$ 5019g CA-6 Stockpiled 100 42.40$ 4,240.00$ 30.00$ 3,000.00$ 5019h CA-10 Stockpiled 100 43.10$ 4,310.00$ 33.00$ 3,300.00$ 5019i CA-16 Stockpiled 100 43.80$ 4,380.00$ 33.00$ 3,300.00$ 5020 Bedding Material
5020a Bedding Stone 300 39.90$ 11,970.00$ 38.00$ 11,400.00$ 5020b Geotextile Fabric 500 6.40$ 3,200.00$ 5.50$ 2,750.00$ 5021 Stone Rip Rap
5021a 50 LB 150 75.50$ 11,325.00$ 48.00$ 7,200.00$ 5021b 150 LB 150 89.00$ 13,350.00$ 62.00$ 9,300.00$ 5021c 400 LB 150 89.00$ 13,350.00$ 62.00$ 9,300.00$ 5022 Fill Material 30 44.00$ 1,320.00$ 33.00$ 990.00$ 5023 Top Soil 30 51.40$ 1,542.00$ 36.00$ 1,080.00$ 5024 Site Grading
5024a Light 50 39.70$ 1,985.00$ 16.00$ 800.00$ 5024b Heavy 100 42.10$ 4,210.00$ 20.00$ 2,000.00$ 5025 Establishment of Turf 2 6,230.00$ 12,460.00$ 4,500.00$ 9,000.00$ 5026 12" Corrugated Metal Pipe Replacement
5026a 12 Inch Diameter Pipe-0' - 4.9' 48 55.10$ 2,644.80$ 36.00$ 1,728.00$ 5026b 12 Inch Diameter Pipe-5' - 9.9' 48 66.90$ 3,211.20$ 39.00$ 1,872.00$ 5026b 12 Inch Diameter Pipe-10 - 15' 48 91.00$ 4,368.00$ 42.00$ 2,016.00$ 5027 18" Corrugated Metal Pipe Replacement
5027a 18 Inch Diameter Pipe-0' - 4.9' 35 68.10$ 2,383.50$ 41.00$ 1,435.00$ 5027b 18 Inch Diameter Pipe-5' - 9.9' 35 79.50$ 2,782.50$ 44.00$ 1,540.00$ 5027c 18 Inch Diameter Pipe-10 - 15' 35 104.00$ 3,640.00$ 47.00$ 1,645.00$ 5028 24" Corrugated Metal Pipe Replacement
5028a 24 Inch Diameter Pipe-0' - 4.9' 35 78.60$ 2,751.00$ 51.00$ 1,785.00$ 5028b 24 Inch Diameter Pipe-5' - 9.9' 35 92.40$ 3,234.00$ 56.00$ 1,960.00$ 5028c 24 Inch Diameter Pipe-10 - 15' 35 122.00$ 4,270.00$ 59.00$ 2,065.00$ 5029 30" Corrugated Metal Pipe Replacement
5029a 30 Inch Diameter Pipe-0' - 4.9' 35 113.00$ 3,955.00$ 62.00$ 2,170.00$ 5029b 30 Inch Diameter Pipe-5' - 9.9' 35 126.00$ 4,410.00$ 66.00$ 2,310.00$ 5029c 30 Inch Diameter Pipe-10 - 15' 35 156.00$ 5,460.00$ 74.00$ 2,590.00$ 5030 36" Corrugated Metal Pipe Replacement
5030a 36 Inch Diameter Pipe-0' - 4.9' 35 119.00$ 4,165.00$ 72.00$ 2,520.00$ 5030b 36 Inch Diameter Pipe-5' - 9.9' 35 135.00$ 4,725.00$ 79.00$ 2,765.00$ 5030c 36 Inch Diameter Pipe-10 - 15' 35 169.00$ 5,915.00$ 82.00$ 2,870.00$ 5031 48" Corrugated Metal Pipe Replacement
5031a 48 Inch Diameter Pipe-0' - 4.9' 35 149.00$ 5,215.00$ 93.00$ 3,255.00$ 5031b 48 Inch Diameter Pipe-5' - 9.9' 35 167.00$ 5,845.00$ 103.00$ 3,605.00$ 5031c 48 Inch Diameter Pipe-10 - 15' 35 206.00$ 7,210.00$ 113.00$ 3,955.00$ 5032 End Section Replacement
5032a 12 Inch Diameter End Section 2 309.00$ 618.00$ 176.00$ 352.00$ 5032b 18 Inch Diameter End Section 2 361.00$ 722.00$ 260.00$ 520.00$ 5032c 24 Inch Diameter End Section 2 579.00$ 1,158.00$ 316.00$ 632.00$ 5032D 30 Inch Diameter End Section 2 804.00$ 1,608.00$ 400.00$ 800.00$ 5032e 36 Inch Diameter End Section 2 1,050.00$ 2,100.00$ 460.00$ 920.00$ 5033 Site Improvements and Appurtences
5033a Concrete Removal and Disposal 300 139.00$ 41,700.00$ 87.00$ 26,100.00$ 5033b Concrete Removal and Disposal Building Structures 300 164.00$ 49,200.00$ 113.00$ 33,900.00$ 5033c Asphalt Removal and Disposal 1,000 4.60$ 4,600.00$ 12.00$ 12,000.00$ 5033d Landscape Timber Removal 1,000 3.60$ 3,600.00$ 2.00$ 2,000.00$ 5033e Removal of Coarse Aggregate 300 2.70$ 810.00$ 11.00$ 3,300.00$ 5034 Equipment
5034a Backhoe Loader; 4WD 60 263.00$ 15,780.00$ 125.00$ 7,500.00$ 5034b Track Type Excavator 60 339.00$ 20,340.00$ 225.00$ 13,500.00$ 5034c Track Type Excavator Long Reach 60 396.00$ 23,760.00$ 265.00$ 15,900.00$ 5034d Track Type Bulldozer 60 299.00$ 17,940.00$ 185.00$ 11,100.00$ 5034e Padded Foot Roller; Self Propelled 60 295.00$ 17,700.00$ 160.00$ 9,600.00$ 5034f Skid Steer Loader 60 254.00$ 15,240.00$ 125.00$ 7,500.00$ 5034g Motor Grader 60 309.00$ 18,540.00$ 175.00$ 10,500.00$ 5034h Truck W/ Dump 60 173.00$ 10,380.00$ 125.00$ 7,500.00$ 5034i Street Sweeper Type Vehicle W/ Vacuum 60 161.00$ 9,660.00$ 125.00$ 7,500.00$ 5034j Semi-Tractor trailer w/ Operator 60 247.00$ 14,820.00$ 125.00$ 7,500.00$ 5035 Labor
5035a General Labor 200 108.00$ 21,600.00$ 93.00$ 18,600.00$ 5035b Misc. Service Activities TBD 5035c Misc. Construction Activities TBD 5036 Rental of Misc. Equipment with Operator TBD 5037 Rental of Misc. Equipment without Operator TBD 5038 Procurement & Delivery of Misc. Materials TBD 5039 Disposal of Misc. and Special Waste TBD
Task Order -$ Job 1: Bo Wood Access Road -$
002b Bit Surface Removal (Heavy) 14,500 8.10$ 117,450.00$ 6.00$ 87,000.00$ 0004 Bit Conc; Leveling Binder 200 185.00$ 37,000.00$ 185.00$ 37,000.00$ 0005 Bit Conc; Surface Course 1,300 206.00$ 267,800.00$ 185.00$ 240,500.00$ 0010 Joint Sealing 525 76.00$ 39,900.00$ 112.00$ 58,800.00$ 0006 Tack Coat 4,350 22.70$ 98,745.00$ 7.00$ 30,450.00$ 0014 Parking Area and Traffic Striping 600 2.00$ 1,200.00$ 2.00$ 1,200.00$ 0015 Traffic Marking and Symbol 50 10.20$ 510.00$ 8.00$ 400.00$
0016a Parking Block Replacement 18 170.00$ 3,060.00$ 150.00$ 2,700.00$
JOB 2: MAIN SHOWER HOUSE PARKING LOT (OPTIONAL)
0002b Bit. Surface Removal (Heavy) 4,000 8.10$ 32,400.00$ 6.00$ 24,000.00$ 0004 Bit Conc; Leveling Binder 100 185.00$ 18,500.00$ 185.00$ 18,500.00$ 0005 Bit Conc; Surface Course 375 206.00$ 77,250.00$ 185.00$ 69,375.00$ 0006 Tack Coat 1,200 22.70$ 27,240.00$ 7.00$ 8,400.00$ 0014 Parking Area and Traffic Striping 725 2.00$ 1,450.00$ 2.00$ 1,450.00$ 0015 Traffic Marking and Symbol 25 10.20$ 255.00$ 8.00$ 200.00$
JOB 3: Area 5 Parking Lot and Access Road (OPTIONAL) 0001 Patching 10 143.00$ 1,430.00$ 90.00$ 900.00$
0002b Bit. Surface Removal (Heavy) 1,800 8.10$ 14,580.00$ 6.00$ 10,800.00$ 0004 Bit Conc; Leveling Binder 125 185.00$ 23,125.00$ 185.00$ 23,125.00$ 0005 Bit Conc; Surface Course 500 206.00$ 103,000.00$ 185.00$ 92,500.00$
0006 Tack Coat 850 22.70$ 19,295.00$ 7.00$ 5,950.00$ 0014 Parking Area and Traffic Striping 425 2.00$ 850.00$ 2.00$ 850.00$ 0015 Traffic Marking and Symbol 10 10.20$ 102.00$ 8.00$ 80.00$
0016a Parking Block Replacement 15 170.00$ 2,550.00$ 150.00$ 2,250.00$ 0019c CA-6 Placed 15 45.50$ 682.50$ 38.00$ 570.00$
Job 4: Coon Creek Entrance and Dump Station (OPTIONAL) 0002b Bituminous Surface Removal Heavy 2,050 8.10$ 16,605.00$ 6.00$ 12,300.00$ 0004 Bituminous Concrete; Leveling binder 900 185.00$ 166,500.00$ 185.00$ 166,500.00$ 0005 Bituminous Concrete; Surface Course 650 206.00$ 133,900.00$ 185.00$ 120,250.00$ 0006 Tack Coat 500 22.70$ 11,350.00$ 7.00$ 3,500.00$
0011b Curbing; Concrete 200 21.40$ 4,280.00$ 30.00$ 6,000.00$ 0014 Parking Area and Traffic Striping 1,000 2.00$ 2,000.00$ 2.00$ 2,000.00$ 0015 Traffic Marking and Symbol 100 10.20$ 1,020.00$ 8.00$ 800.00$
0016a Parking Block Replacement 5 170.00$ 850.00$ 150.00$ 750.00$ 0018c Concrete Slab; Formed 8" 65 312.00$ 20,280.00$ 647.00$ 42,055.00$ 0018g Concrete Reinforcement 11,050 1.70$ 18,785.00$ 2.00$ 22,100.00$ 0019c CA-6 75 45.50$ 3,412.50$ 38.00$ 2,850.00$ 0034e Padded Foot Roller; Self Propelled 12 217.00$ 2,604.00$ -$ -$ 0020b Geotextile Fabric 500 5.50$ 2,750.00$ 5.50$ 2,750.00$ 0024b Site Grading Heavy 250 35.50$ 8,875.00$ 20.00$ 5,000.00$
Job 5: Lithia Springs Dump Station Road (OPTIONAL) 0003 Road Widening 100 58.80$ 5,880.00$ 75.00$ 7,500.00$ 0004 Bituminous Concrete; Leveling Binder 325 185.00$ 60,125.00$ 185.00$ 60,125.00$ 0005 Bituminous Concrete; Surface Course 180 206.00$ 37,080.00$ 185.00$ 33,300.00$ 0006 Tack Coat 300 22.70$ 6,810.00$ 7.00$ 2,100.00$ 0007 Prime Coat 150 14.50$ 2,175.00$ 7.00$ 1,050.00$
0011b Curbing; Concrete 100 21.40$ 2,140.00$ 30.00$ 3,000.00$ 0014 Parking Area and Traffic Striping 1,000 2.00$ 2,000.00$ 2.00$ 2,000.00$ 0015 Traffic Marking and Symbol 200 10.20$ 2,040.00$ 8.00$ 1,600.00$ 0018c Concrete Slab; Formed 8" 80 312.00$ 24,960.00$ 647.00$ 51,760.00$ 0018g Concrete Reinforcement 13,600 1.70$ 23,120.00$ 2.00$ 27,200.00$ 0019c CA-6 150 45.50$ 6,825.00$ 38.00$ 5,700.00$ 0034e Padded Foot Roller; Self Propelled 16 217.00$ 3,472.00$ -$ -$ 0020b Geotextile Fabric 200 5.50$ 1,100.00$ 5.50$ 1,100.00$ 0024b Site Grading Heavy 250 35.50$ 8,875.00$ 20.00$ 5,000.00$
JOB 6: LITHIA SPRINGS B LEG PARKING (OPTIONAL)
0011b Curbing; Concrete 100 21.40$ 2,140.00$ 30.00$ 3,000.00$ 0018b Concrete Slab; Formed 6" 25 326.00$ 8,150.00$ 813.00$ 20,325.00$ 0014 Parking Area and Traffic Striping 500 2.00$ 1,000.00$ 2.00$ 1,000.00$ 0015 Traffic Marking and Symbol 200 10.20$ 2,040.00$ 8.00$ 1,600.00$
0016b Parking Block Installation 4 139.00$ 556.00$ 170.00$ 680.00$ 0018g Concrete Reinforcement 4,250 1.70$ 7,225.00$ 2.00$ 8,500.00$ 0024b Site Grading Heavy 200 35.50$ 7,100.00$ 20.00$ 4,000.00$
| 2023-09-06T15:11:04-0500 | |
| DEE.WHITNEY.ROCHELLE.1384738334 |
File details come from the government source that posted it. Updated .