B01. Abstract - KO.pdf
PDF 766 KB Posted
- Attached to
- Solicitation USACE St. Louis W912P9 Rend Lake Dam Painting & Guardrail Modification - Bid Abstract
- Solicitation number
- W912P923B0012
About this file
This document is an abstract for bids received in response to Solicitation Number W912P923B0012 from the U.S. Army Corps of Engineers Engineering District St Louis. The solicitation seeks bids for guardrail modification and painting of Rend Lake Dam. Three bids were received by the September 21, 2023 due date from Dynamic Wallcovering LLC, Titan Construction Management LLC, and IGE Construction. The abstract lists 18 contract line items (CLINs) for containment, disposal, and painting of lead paint across six spillway bridge spans, as well as fabrication and installation of guardrails, removal of traffic barriers, and concrete curb construction. Prices range from $2.5 million to $4 million total across the three bids. The solicitation is a 100% small business set-aside and was issued on August 22, 2023, with amendments on September 8 and 14, 2023. The public bid opening is scheduled for September 21, 2023.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: W912P923B0012 I CERTIFY THAT I HAVE OPENED, READ AND RECORDED Date Issued: 8/22/2023 ON THIS ABSTRACT (AND CONTINUATION SHEETS, IF ANY) ALL OFFERS RECEIVED
IN RESPONSE TO THE SOLICITATION.Amendment 0001: 9/08/2023 Amendment 0002: 9/14/2023
Contracting OfficerBids Due: 9/21/2023 at 9AM CST Public Bid Opening: 9/21/23 at 2PM CST Kelsey Daniels
Bid Bond Guarantee Small Business, Set Aside 100%
NAICS: 238320
CLIN Description Quantity Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount
0001A Mobilization and Demobilization, Bridge Guardrail and Curb Construction
29,085.00$ 29,085.00$ 43,149.00$ 43,149.00$ 40,578.00$ 40,578.00$
0001B Mobilization and Demobilization, Bridge Painting
23,095.00$ 23,095.00$ 534,082.00$ 534,082.00$ 54,120.00$ 54,120.00$
0002 Bonds 1 63,000.00$ 63,000.00$ 51,565.00$ 51,565.00$ 118,500.00$ 118,500.00$
0003 Fabrication and Installation of Steel Bridge Railing
425.50$ 512,302.00$ 514.85$ 619,879.40$ 412.00$ 496,048.00$
0004 Removal of Existing Traffic Barrier Terminals
2,650.00$ 10,600.00$ 4,717.00$ 18,868.00$ 1,617.00$ 6,468.00$
Fabrication and Installation of Traffic Barrier Terminals
19,980.00$ 79,920.00$ 15,737.00$ 62,948.00$ 18,414.00$ 73,656.00$
0006 Concrete Curb Construciton 60 137.35$ 8,241.00$ 374.00$ 22,440.00$ 165.00$ 9,900.00$
Containment and Disposal of Lead Paint, Spillway Bridge Span 1
530,430.00$ 530,430.00$ 213,632.00$ 213,632.00$ 111,342.00$ 111,342.00$
Cleaning and Painting Bridge Steel, Spillway Bridge Span 1
40,275.00$ 40,275.00$ 142,421.00$ 142,421.00$ 180,760.80$ 180,760.80$
Containment and Disposal of Lead Paint, Spillway Bridge Span 2
480,000.00$ 480,000.00$ 213,632.00$ 213,632.00$ 111,342.00$ 111,342.00$
Cleaning and Painting Bridge Steel, Spillway Bridge Span 2
36,120.00$ 36,120.00$ 142,421.00$ 142,421.00$ 180,760.80$ 180,760.80$
Containment and Disposal of Lead Paint, Spillway Bridge Span 3
524,775.00$ 524,775.00$ 213,632.00$ 213,632.00$ 111,342.00$ 111,342.00$
Grand Total Prices 4,678,676.00$
Yes Yes
4,308,098.80$
Yes
Yes Yes
3,207,036.80$
Dynamic Wallcovering, LLC dba Ozark Constructors
Yes
Yes
Yes Yes
Rend Lake Spillway Bridge Guardrail Rehab and Bridge Painting IDIQ Bid Abstract - Construction
Amendments Acknowledged?
Bid received by due date/time? Yes
IGE Titan Construction Mgmt, LLC
Cleaning and Painting Bridge Steel, Spillway Bridge Span 3
39,775.00$ 39,775.00$ 142,421.00$ 142,421.00$ 180,760.80$ 180,760.80$
Containment and Disposal of Lead Paint, Spillway Bridge Span 4
524,600.00$ 524,600.00$ 213,632.00$ 213,632.00$ 111,342.00$ 111,342.00$
Cleaning and Painting Bridge Steel, Spillway Bridge Span 4
39,765.00$ 39,765.00$ 142,421.00$ 142,421.00$ 180,760.80$ 180,760.80$
Containment and Disposal of Lead Paint, Spillway Bridge Span 5
480,000.00$ 480,000.00$ 213,632.00$ 213,632.00$ 111,342.00$ 111,342.00$
Cleaning and Painting Bridge Steel, Spillway Bridge Span 5
36,120.00$ 36,120.00$ 142,421.00$ 142,421.00$ 180,760.80$ 180,760.80$
Containment and Disposal of Lead Paint, Spillway Bridge Span 6
530,500.00$ 530,500.00$ 213,632.00$ 213,632.00$ 111,342.00$ 111,342.00$
Cleaning and Painting Bridge Steel, Spillway Bridge Span 6
40,280.00$ 40,280.00$ 142,421.00$ 142,421.00$ 180,760.80$ 180,760.80$
TOTAL 4,028,883.00$ 3,489,249.40$ 2,551,886.80$
TASK ORDER
0001A Moblization and Demobilazation, Bridge Guardrail and Curb Construction
29,085.00$ 29,085.00$ 43,149.00$ 43,149.00$ 40,578.00$ 40,578.00$
0002 Bonds 1 9,645.00$ 9,645.00$ 51,565.00$ 51,565.00$ 28,500.00$ 28,500.00$
0003 Fabrication and Installation of Steel bridge Ralling
425.50$ 512,302.00$ 514.85$ 619,879.40$ 412.00$ 496,048.00$
0004 Removal of Existing Traffic Barrier Terminals
2,650.00$ 10,600.00$ 4,717.00$ 18,868.00$ 1,617.00$ 6,468.00$
Fabrication and Installation of Traffic Barrier Termainals
19,980.00$ 79,920.00$ 15,737.00$ 62,948.00$ 18,414.00$ 73,656.00$
0006 Concrete Curb Construction 60 137.35$ 8,241.00$ 374.00$ 22,440.00$ 165.00$ 9,900.00$
TOTAL TASK ORDER 649,793.00$ 818,849.40$ 655,150.00$
| 2023-09-22T10:48:32-0500 | |
| DANIELS.KELSEY.M.1404385140 |
File details come from the government source that posted it. Updated .