This is a request for quote (RFQ) from the Department of the Army Corps of Engineers Fort Worth District for refuse collection services at Hords Creek Lake in Coleman County, Texas. The contractor shall provide all personnel, equipment, supplies, transportation, and other items necessary to perform refuse collection, disposal, and container cleaning services from March 2024 through February 2029. The services include weekly collection from dumpsters located at three parks and an office. The contractor must also clean all refuse containers and pads in April and July. Quotes are due by January 26, 2024. The government will award a firm fixed-price contract and will evaluate quotes based on past performance and price.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers Fort Worth District

REQUEST FOR QUOTE

Hords Creek Lake Refuse Services Coleman County, TX 76834 Three Rivers Region

W9126G24Q0017 Date Issued: 26 December 2023

Section SF 1449 - CONTINUATION SHEET

INSTRUCTIONS TO OFFERORS

Request for Quotes (RFQ) Solicitation Number: W9126G24Q0017 Solicitation is issued by: 22 December 2023

Solicitation is issued by:

US ARMY CORPS OF ENGINEERS

FORT WORTH 819 TAYLOR ST, CT OFC RM 2A17

FORT WORTH TX 76102-0300

PROJECT NAME: Three Rivers Region, Hords Creek Lake—Refuse Collection & Disposal Services

1. This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.

The U.S. Army Corps of Engineers (USACE), Fort Worth District intends to establish a Purchase Order (PO) Contract for non-personal serves to perform the services listed below in the description. The contract performance will consist of one (1) twelve-month base period and four (4) twelve-month option periods.

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform refuse collection services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

PLACE OF PERFORMANCE: The work to be performed under this contract will be performed at:

LOCATION – Hords Creek Lake’s Parks are in Coleman County. The Project Headquarters is located at 230 Friendship Park Road, Coleman, Texas 76834. The phone number is (325) 625-2322

The government reserves the right to limit and/or not respond to any further questions pertaining to this project received after January 12, 2024. Offerors should base their quotes on the information provided in the solicitation and all issued amendments thereto.

All answers to technical inquiries and questions are reviewed by the Contracting Officer prior to the response date. Answers to technical inquiries may result in amendment(s) to the solicitation. If an amendment is issued, it will be posted on the Government Point of Entry website https://piee.eb.mil/ and www.sam.gov.

2. This is a Request for Quote (RFQ) and incorporates FAR provisions and clauses in effect through the Federal Acquisition Circular (FAC) 220-07 (3 Aug 20). Solicitation document and incorporated provisions and clauses are those in effect through the Federal Acquisition Regulation (FAR) and Department of Defense FAR Supplement (DFARS).

a. The provision at 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition and a statement regarding any addenda to the provision. Offerors are also required to submit a completed copy of the Request for Quotation and a completed copy of the pricing schedule.

b. Offerors include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items, with its offer.

c. Clause at 52.212-4, Contract Terms and Conditions-Commercial Items, applies to this acquisition and a statement regarding any addenda to the clause.

d. Clause at 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive

Orders-Commercial Items, applies to this acquisition and a statement regarding which, if any, of the additional FAR clauses cited in the clause are applicable to the acquisition

3. This acquisition is SET ASIDE 100% for Small Business.

4. PSC: S205 – Housekeeping – Trash/Garbage Collection Services NAICS CODE: 562111 – Solid Waste Collection Services SIZE STANDARD: $47 Million

5. System for Awards Management (SAM): In accordance with FAR 52.204-7(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation and shall continue to be registered until time of award, during performance, and through final payment of any contract agreement resulting from this solicitation.

6. Evaluation Information: The Government intends to award a firm fixed price (FFP) Purchase Order resulting from this RFQ to the responsible offeror whose offer represents the best value in terms of price and past performance.

Quote Content – All quotation documents when printed shall fit on 8 x 11inch paper to include spreadsheets (with the appropriate page breaks). Ensure the quote is submitted in PDF format. In-order to be considered responsive to the RFQ, the prospective offeror’s quote shall consist of a Vendor Information Sheet, Complete and Defective Free Bid Sheet,, Screen Shot of the Offeror’s NIST/SPSRS Assessment, and completed provisions.

Quotes shall be responsive to and comply with the terms of the combined synopsis solicitation in order to be eligible to receive an award. All technical requirements shall be addressed in sufficient written detail for the Government to determine if the offeror understands each aspect of the Government’s requirement.

The Government will reject the proposal if determined to be materially non- responsive to include submissions that fail to conform to the terms of the combined synopsis/solicitation.

Quoters that fail to adhere to the submittal requirements will be determined non-responsive and will be considered ineligible for award. To be eligible to receive an award, the quote submitted in response to the combined synopsis/solicitation shall consist of the contents required in the sub-paragraphs described below:

a. Past Performance: The past performance evaluation results in an assessment of the offeror’s probability of meeting the solicitation requirement. The past performance evaluation considers each offeror’s demonstrated recent and relevant record of performing refuse collection & disposal services that meets the contract requirements. Recent or relevant work is defined as similar work in size and scope within the past four (4) years.

NAVFAC/USACE Past Performance Questionnaire (PPQ): The quoter is required to submit two (2) PPQs with an overall rating of satisfactory or higher to be considered eligible for award. Additional PPQs submitted for assessment will be discarded and not considered for evaluation. The Contracting Officer may use additional data obtained from any available sources such as the Past Performance Information Retrieval System (PPIRS) and personal knowledge to assess the contractor’s likelihood of success in performing the solicitation’s requirements as indicated by those offerors’ record of past performance.

Contractors will receive an adjectival rating that demonstrates how well the performance was performed IAW PPQ; which in return will be recorded in accordance with Table 2.

If for any reason, the contractor does NOT have recent or relevant past performance, the quoter is still required to submit a PPQ with a brief narrative explaining “No Recent or Relevant Past Performance”. In the case of a quoter without a record of recent or relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance.

Therefore, the quoter shall be determined to have unknown or (“neutral”) past performance. In the context of eligibility, a “Neutral” adjectival rating shall be considered eligible for award. Contractor’s that have proven past performance ratings with an adjectival rating below “Satisfactory” shall not be ineligible to receive consideration for award.

Table 2. Past Performance Adjectival Rating

Rating Description

(E) Exceptional

Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

(VG) Very Good

Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

(S) Satisfactory

Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

(M) Marginal

Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

(U) Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

(N) Neutral

In the case of a quoter without a record of recent or relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the quoter shall be determined to have unknown or (“neutral”) past performance.

A contractor’s past performance rating may be used at the Contracting Officer’s discretion to make an overall determination of the level of confidence the government has in the contractor’s capability to perform the service. The Contracting Officer may determine that a “Substantial Confidence” or “Satisfactory Confidence” past performance rating is worth more than a “Neutral Confidence” past performance rating as stated in the evaluation.

Table 3. Confidence Adjectival Rating Description

Substantial Confidence Based on the offeror's recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror's recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort

Neutral Confidence

No recent/relevant performance record is available or the offeror' s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence Based on the offeror' s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on. the offeror's recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

In performing the past performance factor evaluation, evaluators will apply the following relevance levels to assess the relevance of the prior contract effort(s) of offerors.

Past Performance Relevancy Ratings

Rating Definition

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

b. Price: Quotes shall be tailored towards a Firm Fixed Price contract type. The government will evaluate all aspects of the quote for reasonableness. Quotes found to be unreasonable may be rejected on that basis.

6. The offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers.

7. In accordance with FAR Part 29.3 – State and Local Taxes, and per Title 4 of US Code 104-07, the Government is exempt from paying state and local taxes.

8. Response Date: Quotes for this solicitation are due no later than (NLT) Friday, January 26, 2024, by 10:00 AM CST.

Electronic copies of each volume shall be submitted through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/. Quotes submitted by mail or hand carried will not be evaluated. Proposals sent through proprietary or third-party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. It is the responsibility of the Offeror to confirm receipt of proposals. All proposals received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the Federal Acquisition Regulation (FAR).

There are 10 general steps a vendor must follow in order to use PIEE application modules. A complete list can be viewed at the following site:

https://piee.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtml#step5

For instructions on how to post an offer, please refer to the Posting Offer demo:

https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf.

It is the Offeror’s responsibility to obtain written confirmation of receipt of all electronic files of the full proposal by the Fort Worth District Contracting office. In the event that the Solicitation Module is down, please contact the Contracting Officer (Jamauh D. Winston) or the Contract Specialist (Allen Holmes) Allen.L.Holmes@usace.army.mil for guidance. Offerors are responsible for ensuring electronic copies are virus-free and shall run an anti-virus scan before submission.

Electronic copies of each volume shall be compatible with the following software products: Adobe Acrobat Reader 11 and Microsoft Office Suite 2016. Narrative portions of the proposal shall be in Adobe Acrobat portable document file (pdf) searchable text format. The Offeror shall not embed sound or video (e.g., MPEG) files into the proposal files. Electronic files shall be clearly identified for each volume, section, and item.

7. Submittals: Offerors must submit representation and certifications in accordance with the provisions at FAR 52.212-3 Offeror Representation and Certifications – Commercial Item (Accessible at https://www.acquisition.gov) or the vendor may verify their Online Representation and Certification Application (ORCA) is updated in SAM by checking “Yes” on the Vendor information sheet. The contract specialist will verify the quoters FAR & DFAR Reports are updated in SAM.GOV prior to determining the quoter responsive.

Submit the following PDF files in the response to the RFQ:

a. Attach the Vendor Information Sheet and Priced Schedules. Compile the vendor information sheet and schedules and submit as one conformed document. Label Submittal: Company Name, Quote, Example: ABC, LLC Price Quote 24Q0017

b. Past Performance NAVFAC/USACE Past Performance Questionnaire (See Clause 52.212-2

Evaluation – Commercial Items). Recent or relevant work is defined as similar work in size and scope within the past four (4) years. The Contracting Officer shall deem an offeror non-responsive if the offeror fails to submit a PPQ IAW 52.212-1(b)(10). If for any reason the contractor does NOT have recent or relevant past performance, the offeror is still required to submit a PPQ with a brief narrative explaining, "No Recent or Relevant Past Performance in block 6 of the PPQ Contractor Information Sheet. An Offeror that submits a PPQ that is deemed neither recent nor relevant will be treated as “NEUTRAL”.

PPQ Submittals shall consist of the Contractor Information Sheet and the Completed Adjectival Rating Sheets. Compile the two (2) PPQs and submit them as one conformed document (2) Label Submittal:

Company Name, PPQ, Example: ABC, LLC PPQ 24Q0017

c. Screen Shot of the Offerors NIST/SPRS Assessment. Compile the assessments and submit as one conformed document. Label Submittal: Company Name, NIST/SPRS, Example: ABC, LLC

NIST/SPRS 24Q0017

d. Complete and return the provisions at 52.204-24 (p.38-40), and 52.204-26 (p.41), 52.212-3 Dev

(p.44-55), 52.219-1(p.59-62), and 52.219-28 (p.63-65). Compile the Provisions and submit as one conformed document. Label Submittal: Company Name, Provisions, Example: ABC, LLC Provisions 24Q0017

e. If applicable, acknowledge and return any amendments with your submittals. Compile the amendments and submit as one conformed document. Label Submittal: Company Name, AMD 0001 – 0004, Example: ABC, LLC AMD 0001 – 0004 24Q0017

f. Contractors that failure to adhere to the submittal requirements will be determined non-responsive and will be considered ineligible for award.

g. Please NOTE this solicitation requires offerors to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS) prior to responding to this solicitation. The NIST score is a responsiveness item. Bids/offers from contractors with a NIST score in SPRS will be considered qualified and eligible for award. * If the apparent awardee does not correct the omission by refusing to enter its NIST score within 14 days after the allotted time then it can be safely deemed “not responsive” and ineligible to receive the award.

Reference: 252.204-2019 - Notice of NIST SP 800-171 DoD Assessment Requirements Reference: 252.204-2020 - NIST SP 800-171 DoD Assessment Requirements See the Attached Quick Entry Guide to assists with entering NIST Assessment.

Contact Help Desk at (866)618-5988 for additional assistance

NIST SP 800-171

NIST SP 800-171 QUICK ENTRY GUIDE VERSION 3.3

NSLC PORTSMOUTH BLDG. 153-2 PORTSMOUTH NAVAL SHIPYARD, PORTSMOUTH, NH 03804-

Approved for public release, distribution is unlimited.

NIST SP 800-171 Quick Entry Guide SPRS Release V 3.3

1. NIST SP 800-171 Assessment Database: The purpose of the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 is to protect Controlled Unclassified Information (CUI) in Nonfederal Systems and Organizations. This database contains data associated with NIST SP 800-171 Assessments.

2. PIEE Access: A “SPRS Cyber Vendor User” role is required to enter Basic Assessment information.

Step-by-step PIEE Access Instructions can be found here.

https://www.sprs.csd.disa.mil/pdf/SPRS_Access_Instructions.pdf

3. SPRS Application Access: To Access SPRS, follow the below steps:

a. PIEE landing page: https://piee.eb.mil/piee-landing/

b. Click “log-in” and follow prompted log-in steps

Screenshot Dtd 2 NOV 2020

c. Select the SPRS Icon:

d. Select NIST 800-171 Assessment:

3.1 Creating a Header: A “Header” is required for each Highest Level Owner (HLO) CAGE. If a Basic Confidence Level header does not already exist for your HLO, it may be created by selecting “+ Create New HLO CAGE” from the Header View:

*Note: If you have SPRS access but do not see the create buttons, please confirm your “SPRS Cyber Vendor User” role has been activated in PIEE.

3.2 Header View: The header page only displays the HLO(s) for a company and will contain up to four rows per HLO, one for each Confidence Level (Basic, Medium, High Virtual, and High On-site). Basic is the only vendor self-assessed confidence level.

NIST SP 800-171 Quick Entry Guide SPRS 3.3

*Note: CAGE Hierarchy is imported from the System for Award Management (SAM). Contact your company’s CAGE hierarchy authority to have your data updated in SAM. Updates typically flow to SPRS within 48 hours.

3.3 Detail View: From the header view select “View Details” at the Basic confidence level to view, enter, and edit assessment summary results associated with any CAGE within that HLO’s hierarchy (see arrow above, section 3.2):

3.4 Assessment Entry: Select “+ Add New Assessment” button within Detail View (see arrow above, section 3.3), enter assessment summary results within the Enter Assessment Details page, and select “Save”:

*Note: The Assessment Methodology and System Security Plan should be completed prior to entering assessment summary results within SPRS.

*Note: Information related to each data field may be viewed by moving the cursor over the field title or column header.

3.5 Assessment Edit: The user may update as necessary to reflect the company’s current status. While viewing the NIST assessments in Details View (Section 3.3 abov

9. 52.237-1 SITE VIST

Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

Prospective offerors/quoters are required to contact the Contract Specialist via email to express their interests by 3:00 PM (CST) two business days prior to attending the site visit. Site visit attendees must provide the following information the Solicitation Number, Project Title, Name(s) of Individual(s) who will attend the site visit, Name of Company Represented, Phone Number of Company being represented. All attendees required sign attendance sheet.

Address: U.S. Army Corps of Engineers

Hords Creek Lake Project Office 230 Friendship Park Road Coleman, TX 76834

CT POC: Allen Holmes Contact Info: 817-886-1035 Email: allen.l.holmes@usace.army.mi

Conference: Tuesday January 4,2024 @ 10:30 am CST

VENDOR INFORMATION SHEET

3R Hords Creek Lake Refuse Collection & Disposal Services

COMPANY NAME

POC

(Last, First Middle)

ADDRESS

(Number & Street) (City, State and Zip)

PHONE NUMBER MOBILE ______________

(Area code and number) (Area code and number)

EMAIL ADDRESS___________________________________________

UNIQUE IDENTIFY NUMBER ____________________CAGE CODE NUMBER__________________

Vendor’s Online Representation and Certification Application (ORCA) are updated in SAM Yes No

Signature Date

ATTACHMENT 1

NAVFAC/USACE PAST PERFORMANCE QUESTIONAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm name: CAGE Code:

Address: DUNS Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of Project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy) Explain Differences:

Original Contract Price (Award Amount):

Final contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNARIE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNARIE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATION. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE

OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL

INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE

RATING NOTE DEFINITION

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable Equivalent to Neutral Adjectival Rating

No information or did not apply to your contract Rating will be neither positive or negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force?

E VG S M U N

b) Ability to hire, apply, and retain qualified workforce to this effort

E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to Government changes

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agree price(s)?

E VG S M U N

b) Contractor Proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports. Budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

YES NO

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

YES NO

f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below.

YES NO

6. SAFETY/SECURITY

a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)

b) Compliance with contractual terms/provisions (explain if specific issues)

c) Would you hire or work with this firm again? (If no, please explain below)

YES NO

d) In Summary, provide an overall rating for the work performed by this contractor.

E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages in necessary):

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Base: HC Refuse Collection & Disposal

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform refuse collection services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services.

Period of Performance: 01 March 2024 through 28 February 2025 FOB: Destination

PSC CD: S205

NET AMT

1001 1 Job OPTION Opt Yr 1 HC Refuse Collection & Disposal

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform refuse collection services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services.

Period of Performance: 01 March 2025 through 28 February 2026

2001 1 Job OPTION Opt Yr 2 HC Refuse Collection & Disposal

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform refuse collection services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services.

Period of Performance: 01 March 2026 through 28 February 2027

3001 1 Job OPTION Opt Yr 3 HC Refuse Collection & Disposal

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform refuse collection services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services.

Period of Performance: 01 March 2027 through 29 February 2028

4001 1 Job OPTION Opt Yr 4 HC Refuse Collection & Disposal

FFP

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform refuse collection services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services.

Period of Performance: 01 March 2028 through 28 February 2029

BID SHEET

SUPPORTIVE DOCUMANTATION FOR CLIN 0001

01 March 2024 - 28 February 2025)

DESCRIPTION Summer Season

Winter Season

TOTAL

EST.QTY

U/M UNIT

PRICE

PRICE

REFUSE COLLECTION AND DISPOSAL 440 420 860 EA

TOTAL

SUPPORTIVE DOCUMANTATION FOR CLIN 1001

01 March 2025 - 28 February 2026)

DESCRIPTION Summer Season

Winter Season

EST.QTY U/M UNIT

PRICE

PRICE

REFUSE COLLECTION AND DISPOSAL 440 420 860 EA

TOTAL

SUPPORTIVE DOCUMANTATION FOR CLIN 2001

01 March 2026 - 28 February 2027)

DESCRIPTION Summer Season

Winter Season

EST.QTY U/M UNIT

PRICE

PRICE

REFUSE COLLECTION AND DISPOSAL 440 420 860 EA

TOTAL

SUPPORTIVE DOCUMANTATION FOR CLIN 3001

01 March 2027 - 29 February 2028)

DESCRIPTION Summer Season

Winter Season

EST.QTY U/M UNIT

PRICE

PRICE

REFUSE COLLECTION AND DISPOSAL 440 420 860 EA

TOTAL

SUPPORTIVE DOCUMANTATION FOR CLIN 4001

01 March 2028 - 28 February 2029)

DESCRIPTION Summer Season

Winter Season

EST.QTY U/M UNIT

PRICE

PRICE

REFUSE COLLECTION AND DISPOSAL 440 420 860 EA

TOTAL

Total CLIN 0001 Total CLIN 1001 Total CLIN 2001 Total CLIN 3001 Total CLIN 4001

TOTAL

PERFORMANCE WORK STATEMENT

REFUSE COLLECTION SERVICES

Hords Creek Lake, Coleman, Texas

1. GENERAL: This is a non-personal services contract to provide Refuse Collection Services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform refuse collection services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.1.1 Basic Requirements: The following requirements for submitting a quote and receiving an award are now mandatory for conducting business with DOD Government.

1.1.2 All offerors are required to obtain a Data Universal Numbering System (DUNS) number by visiting www.dnb.com.

1.1.3 All prospective contractors must be registered in System for Award Management (SAM) database prior to any award resulting from this solicitation. If at time of award, contractor is not registered, award will be made to the next successful “registered” offer. Registration may be accomplished via the internet at www.sam.gov.

1.1.4 All payments shall be made by Electronic Funds Transfer (EFT) or “direct deposit”.

1.1.5 E-Verify Verification of Eligibility: The Contractor must use the U.S. Department of Homeland

Security E-Verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Contractor must provide to the Government two valid forms of Government-issued identification prior to beginning work to ensure the correct information is entered into the E-Verify system

1.1.6 Permits: The Contractor will, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor will comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

1.1.7 Veterans Employment Emphasis: In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS

222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S.

veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

U.S. Department of Labor Veterans employment, www.vets.gov/ Federal veteran employment information, www.fedshirevets.gov/index.aspx Veterans’ Employment and Training Service (VETS), http://www.dol.gov/vets/ Veterans Opportunity to Work (VOW) Program, http://benefits.va.gov/vow/

U.S. Army Warrior Transition Command Employment Index, wtc.army.mil/modules/employers/index.html Hiring Our Heroes initiative, www.uschamberfoundation.org/hiring-our-heroes Guide to Hiring Veterans, www.whitehouse.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0. pd

1.2. Scope: Refuse collection services. Services include all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform refuse collection, disposal, and container cleaning as defined in this PWS. The contractor shall accomplish refuse collection, disposal, and container cleaning per all attachments under paragraph 1.9, Technical Exhibit List. The location of dumpsters, tabulations and frequency of required services shall be accomplished per Attachment 3/Technical Exhibit 3 – Appendices, Item b, “Facility Tabulations and Frequency” and item c, “Maps”.

1.3 Period of Performance: Base Year, plus four (4) one-year options.

1.4 General Information

1.4.1 Award of Other Contracts - The services provided under this contract shall be independent of all services provided under other contracts, at this work site or any other work site, at which the Contractor may receive award. The Contractor shall be responsible for meeting all deadlines for services specified under this contract.

1.4.2 Cooperation with Other Contractors - The Government may undertake or award other contracts for additional work not related to the contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The Contractor shall not commit, direct, lead or permit any acts that will interfere with the performance of work by another Contractor, or by Government employees.

1.4.3 Payment: Payment for completed and accepted work will be done monthly. The Contractor shall only invoice at the end of the month.

1.4.4 Performance Evaluation Meetings: The Contractor, Contractor’s superintendent, and quality control inspectors shall meet with the QAR and Contracting Officer’s Representative (COR) once a quarter to discuss performance. However, a meeting shall not be held later than one normal working day after a Contract Deficiency Report (CDR) is issued. Mutual effort will be made to resolve all problems identified.

Written minutes of these meetings shall be prepared and signed by the QAR or COR, Contractor, and their respective employees.

1.4.5 Performance of Work Outside of Scope of this Contract: If the Contractor performs work above and beyond the scope of work (e.g., cleans more than required) the Government shall not be liable for additional cost.

1.4.6 Quality Control. The Contractor shall develop and maintain an effective quality control program and

Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program and plan are how he assures himself that his work complies with the requirements of the contract. The QCP is to be delivered within 30 calendar days after contract award or with the contractor’s proposal if it is an evaluation factor. Two copies of a comprehensive written QCP shall be submitted to the Contracting Officer (KO), Contracting Officer’s Representative (COR), or Lake Manager within 10 calendar days when changes are made thereafter. After acceptance of the QCP the Contractor shall receive the KO, COR, or Lake Manager’s acceptance in writing of any proposed change to his plan.

1.4.7 Quality Assurance: The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the PWS and the contract. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.4.8 Government Holidays: The contractor is required to perform services per Technical Exhibit 3 – Appendices, item b “Facility Tabulations and Frequency”, unless a change is requested in writing and approved by the KO, COR, or the Lake Manger for this contract.

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day

1.4.9 Hours of Operation: Office hours are from 8:00 a.m. to 4:30 p.m. Monday thru Friday. The Contractor’s operations shall be performed during these work hours to allow verification of services and accident reporting as needed.

1.4.10 Place of Performance: Hords Creek Lake’s Parks are in Coleman County. The Project Headquarters is located at 230 Friendship Park Road, Coleman, Texas 76834. The phone number is (325) 625-2322

1.4.11 Type of Contract: The government will award a Firm Fixed Price contract. The Contractor shall perform all services specified herein on an as-ordered basis. Accomplishment of work pertaining to this Contract shall be completed per the schedule in Technical Exhibit 3, Appendices item b.

1.4.12 Safety: The Contractor shall develop and execute an effective safety program to ensure all required services are performed safely. The Contractor shall develop and implement procedures to identify, minimize and prevent safety risks in the form of a Safety Plan. The Contractor’s Safety Plan is how he assures safety of personnel in the workplace. The Safety Plan is to be delivered with the Contractor’s proposal. Two (2) copies of a comprehensive written Safety Plan shall be submitted for approval by the KO. Any proposed changes to an approved plan shall be submitted, in writing, to the KO for review and approval. The Contractor shall exercise all applicable safety rules in accordance with the OSHA and all pertinent provisions of the EM 385-1-1, 15 September 2008. OSHA standards are subject to change and such changes may affect the Contractor in their performance during the contract period and shall be at no additional cost to the Government.

1.4.13 Special Qualifications: The Contractor shall, without additional expense to the Government, be responsible for obtaining all necessary licenses, permits, and letters of certification. All current federal, state and county rules and regulations shall be met and maintained throughout the performance of the work specified under this contract.

1.4.14 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The KO, COR or QAR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO, COR or QAR will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.4.15 Contracting Officer Representative (COR): The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially regarding changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract.

1.4.16 Contractor Key Personnel: The following personnel are considered key personnel by the

Government: The Contractor, Contractor’s Superintendent/Manager, or Quality Control Inspectors. The Contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the Contracting Officer. The Contract Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.

1.4.17 Contractor’s Employees: The Contractor shall be responsible for insuring employees strictly comply with all Federal, State, and Municipal laws. Any illegal or criminal activity shall result in the removal of the employee/employees and or may result in the termination of the contract. The KO, COR or the QAR may require the Contractor to immediately remove from work site any employee of the Contractor or Subcontractor, who, in the opinion of the KO, COR or QAR, endangers persons or property, or whose physical or mental conditions are such that it would impair the employee’s ability to satisfactorily perform work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit.

Otherwise, notification shall be verbal or by telephone, and shall be confirmed in writing as soon as possible. No such removal, however, shall reduce the obligation to perform all work required under the contract, and immediate replacement shall be made as required. This removal shall not be made the basis of any claim for compensation or damages against the United States or any of its employees, officers, or agents. All personnel shall maintain a clean, neat, and well-groomed appearance while performing work on the job site. Employee attire shall meet the requirements of the EM 385-1-1, “Safety and Health Requirements Manual”

1.4.18 General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)).

Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .