B01 Attachment 03 Price Schedule.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Zuni Wastewater Treatment Improvements
Solicitation number
75H70120R00029
Issued by

About this file

This price schedule and related federal contract opportunity provide details for the Zuni Wastewater Treatment Improvements project. The price schedule outlines 25 line items for the base construction and one optional line item, with descriptions, quantities, units, unit prices, and total prices. It includes two-phase construction to renovate and expand the existing 32.6-acre, six cell lagoon facility to a 49-acre, five cell treatment system. The related federal contract opportunity posted on SAM.gov with solicitation number 75H70120R00029 further describes the requirement for the Contractor to furnish all labor, materials, and equipment for the construction improvements. This acquisition is set aside for Indian Small Business Economic Enterprises in accordance with the Buy Indian Act. The Department of Health and Human Services Indian Health Service is the contracting agency.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

Zuni Wastewater Treatment Improvements
IHS PROJECT No. AL-17-A77
PRICE SCHEDULE

Contractor: _____________________________________ Date: ________________________________________

BASE CONSTRUCTION SCHEDULE

ITEMDESCRIPTIONQTYUNITUNIT PRICETOTAL PRICE
1Mobilization/Demobilization
(TP-119.D)1LS
2Storm Water Pollution Prevention Plan, Preparation & Implementation
(TP-113.E)1LS
3Removal and disposal of existing wire fencing, including posts - approx. length = 7,150 LF
(TP-6007.C)1LS
4Removal & disposal of existing piping structures (i.e. transfer, inlet & outlet), including D.I. pipe & concrete supports (TP-4012.I)
8EA
5Wastewater Lagoon Construction, New Cell 1 - Phase 1
(TP-4012.A)1LS
6Wastewater Lagoon Construction, New Cells 2, 3, 4 & 5 - Phase 2
(TP-4012.A)1LS
7Clearing & Grubbing, Expanded New Cell 1 (Undisturbed) Area
(Tp-4012.H)17.9Acre
8Sludge Removal, Blending, & Placement
(TP-4012.B)1LS
9Lagoon Liner, HDPE, 60 mil, with gas vents & anchor trenching, New Cell 1 - Phase 1
(TP-4012.F)23.5Acre
10Lagoon Liner, HDPE, 60 mil, with gas vents in New Cells 2, 3, 4, & 5 - Phase 2
(TP-4012.F)30.8Acre
11Geocomposite Gas Venting Layer (GGVL), installation in New Cells 2, 3, 4, & 5 - Phase 2
(TP-4012.G)1LS
12New Transfer Piping Structure, TYPE A, standard length*
(TP-4012.C)5EA
13New Transfer Piping Structure, TYPE A, extended length, between new Cells 4 & 5
(TP-4012.C)1EA
14New Transfer Piping Structure, TYPE B, at secondary cell discharge**
(TP-4012.C.)3EA
15Gravity Sewer Pipe, 18" PVC
(TP-612.A)778LF
16Connection of New Sewer Pipe to Existing 18" PVC Gravity Sewer Main
(TP-612.K)3EA
17Discharge Structure & Piping to Lift Station, New Cell 5 - Phase 2
(TP-4012.J)1LS
18Inlet Structure, 24" PVC to New Cell No. 1, Phase 1
(TP-4012.D)1EA
19Inlet Structure, 24" PVC to New Cell No. 4, Phase 2
(TP-4012.D)1EA
20Connection of New Inlet Piping to Existing Flow Diversion Structure
(TP-4012.K)2EA
21Chain Link Fencing, 6' Height, Lagoon Perimeter Including 2 double access gates and signage
(TP-6007.A)7,060LF
22Rip-rap, lagoon embankement - East Berm Face
(TP-4012.L)400SY
23Rip-rap, lagoon embankement - South Berm Face
(TP-4012.L)2,960SY
24

Slape, Genna M (IHS/ALB/ASU): Slape, Genna M (IHS/ALB/ASU):

Are these necessary since we have the flow monitoring station

Dual-Channel Electromagnetic Flow Meter, for Existing Lift Station
(TP-42.13.C)1LS
25Removal of Flow Meter from Existing Meter Vault
(TP-42.13.D)1LS
Base Price Subtotal =
Zuni TERO (5%) =
BASE PRICE TOTAL =
OPTION PRICING ITEM
ITEMDESCRIPTIONQTYUNITUNIT PRICETOTAL PRICE
26Portable Monitoring Kit
(TP-9304)1LS
Option Price Subtotal =
Zuni TERO (5%) =
Option Price TOTAL =

TOTAL CONSTRUCTION COST (Base Price + Option No. 1) =

&10PRICE SCHEDULE

Zuni WW Treatment Improvements Project Page &P of &N

File details come from the government source that posted it. Updated .