B05 Amendment 07 SF30.pdf

PDF 212 KB Posted

Attached to
Zuni Wastewater Treatment Improvements
Solicitation number
75H70120R00029
Issued by

About this file

This document contains an amendment to a federal solicitation for construction services. The contractor shall renovate and expand an existing 32.6-acre, six cell wastewater lagoon facility located on Zuni Pueblo lands into a 49-acre, five cell treatment system. Services include furnishing all labor, materials, and equipment for improvements such as renovating existing cells and constructing a new cell. The acquisition is set aside for Indian Small Business Economic Enterprises in accordance with the Buy Indian Act. Offerors must acknowledge any amendments by the specified deadline. The amendment provides clarification on fencing details and corrects elevation data in the construction drawings. The successful contractor must obtain licensing from New Mexico and a business license from the Zuni Pueblo.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

The reason for amendment 07 to this solicitation is to provide a list of answers and questions.

The deadline for submitting RFIs for this solicitation is April 29, 2020.

See attached list of Questions and Answers.

Indian Health Service - DES 701 5th Avenue, Suite 1650 Seattle, WA 98104

9A. AMENDMENT OF SOLICITATION NUMBER

75H70120R00029

1 2

EFFECTIVE DATE

4/27/2020

9B. DATED (SEE ITEM 11)

03/24/2020

AL-17-A77

X

QUESTIONS AND ANSWERS

Q1. Per detail 60A on the plans, it states galvanized wire, depicts barbed wire, but then has a drawing depicting razor wire, typically in this application it would be barbed wire. Which should be used?

A1. Installation of three-stands of barbed wire (per TP-6002.D) will be required to form the (1-foot) upper portion of the new perimeter fence.

Q2. Also in the statement of work page 3 is calls for installation of 6 foot high chain link fencing, however on detail 60A it is depicting 8ft fencing plus 1’. If 8 foot is to be used 1 5/8” for the top rail is standard and 1 1/5” is standard for the brace and truss.

A2. The height of the chain-link fencing fabric shall be 6-feet; please disregard the note on Detail 60A indicating the height of the fencing fabric to be 8-feet.

Q3. Do we need to include the Zuni Pueblo Compliance agreement and the Zuni Pueblo Indian Preference agreement with our Proposal, or can this be submitted after award?

A3. Post award. Only the successful contractor will be required to enter into the agreements required by the Zuni TERO Department.

Q4. In the solicitation on page 16, section H.1.c it states the contractor shall obtain a Zuni business license. Is this in addition to the Zuni contractor’s license? Can it also be submitted after award?

A4. The successful contractor must (1.) be a licensed contractor within the State of New Mexico, and (2.)

obtain a Zuni business license from the Pueblo of Zuni. Bidders are not required to obtain the Zuni business license prior to award.

Q5. On sheet 6 of 17 in the construction drawings it states the existing cell floor is at an elevation of:

6,035.5, and on sheet 7 of 17 it states that the “new treatments cells floor elev. =6,235.5. Please confirm that there is not a 200 foot elevation difference and that the existing cell floor is at 6,235.5.

A5. The elevations reported on Sheet 6 for the "Ex. Top of Berm" and "Ex. Cell Floor" are incorrect – there is not a 200’ difference between existing and design elevations. Please disregard the reported values and instead, consider these elevation values in preparing your bids and construction planning efforts:

Ex. Top of Berm Elev. = 6,244.0 (approx.)

Ex. Cell Floor Elevation Elev. = 6,235.5 (approx.).