About this file
This document provides an amendment to a solicitation for the Zuni Wastewater Treatment Improvements project. Through a two-phase approach, the existing six cell lagoon facility located on the Zuni Indian Reservation will be renovated and expanded to a five cell treatment system totaling 49 acres. The contractor shall furnish all labor, materials, and equipment for the construction activities. Key details include extending the proposal due date to May 8, 2020 and providing responses to bidder questions to clarify project requirements such as pipe materials, elevations, and flow meter specifications. The acquisition is set aside for Indian Small Business Economic Enterprises in accordance with the Buy Indian Act. The Department of Health and Human Services Indian Health Service is the contracting agency.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
The reason for amendment 05 to this solicitation is to provide a list of answers and questions, the pre-bid agenda and attendance sheet, and replace the .dxf file provided in Amendment 04 with a corrected file. This amendment also extends the due date for proposals to May 8, 2020, 2:00 PM Pacific Time.
See attached list of Questions and Answers.
Indian Health Service - DES 701 5th Avenue, Suite 1650 Seattle, WA 98104
9A. AMENDMENT OF SOLICITATION NUMBER
75H70120R00029
1 4
EFFECTIVE DATE
4/23/2020
9B. DATED (SEE ITEM 11)
03/24/2020
AL-17-A77
X
QUESTIONS AND ANSWERS
Q1. On the transfer valve structures please confirm 18” DR18 is the pipe to be used with the MJxMJ Plug
Valves.
A1. Confirmed - the contractor shall install 18” diameter PVC C900, DR18 pipe with MJxMJ Plug
Valves to construct the transfer piping.
Q2. On the PVC pipe inlet 18” and 24” what type PVC is this to be?
A2. The 24” diameter inlet piping shall be C900 PVC pipe (in accordance with TP-4003.A.1)
The 18” diameter transfer piping shall be C900 PVC pipe (in accordance with TP-4003.A.1)
The 18” diameter gravity sewer pipe responsible for transferring the treated effluent flows from lagoon outlet to the Wetland Lift Station shall be SDR-35 pipe (in accordance with TP-603.A.1)
Q3. On sheet 17 it is calling out for a 3” sewer air release valve, standard on a 12” line is 2” please confirm this is acceptable, also there is reference to a sheet detail but that detail page isn’t provided.
There also isn’t a bid item for the ARV Assembly on the price schedule.
A3. This project will not include installing an ARV. Sheet 17 depicts the layout of the existing Wetland
Lift Station. The ARV shown on Sheet 17 is an existing ARV, which will remain untouched. The only prescribing actions at the Wetland Lift Station site (shown on Sheet 17) that the Bidders should consider executing are:
“Install New Dual Channel Utrasonic Flow Meter, Connect to Control Panel”
“Remove Ex. Flow Meter, Install Iron Force Main Pipe”
Q4. Do the materials have to be domestic?
A4. Yes. Unless specifically requested and approved otherwise. Approval of non-domestic materials/products will only be justified if non-domestic options are not non-existent.
Q5. On page 10 of the plans there is a note inside of Cell 4 Showing the HDPE Anchor Trench Detail. My question is are there HDPE Anchor pockets in the bottom of Ponds 2-5 of the plans and if so what are the locations and how many will be in each pond. The detail on page 10 shows the GGVL layout? If there are anchor trench pocket's in the bottom of Ponds 2-5 Will the GGVL go underneath the anchor trench pockets.
A5. HDPE anchor trenches will not be featured in New Cells 2, 3, 4 and 5. In New Cells 2 thru 5, the
GGVL system will be featured instead of the HDPE anchor trench. Only New Cell 1 will feature an
HDPE anchor trench. Please disregard the note that states “See HDPE Anchor Trench Detail on Sheet
16” depicted on Sheet 10 of 17.
Q6. Are bidders to submit offers electronically or by mail. Can you please confirm the email or mailing address for submission?
A6. All proposals shall be submitted electronically to matt.sanders@ihs.gov and Andrew.hart@ihs.gov.
Q7. On sheet 6 of 17 it states the existing cell floor is at an elevation of: 6,035.5, and on sheet 7 of 17 it states that the “new treatments cells floor elev. = 6,235.5. I would like to confirm that you don’t intend to lift the cells 200’ and that the existing cell floor will match the designed cell floor, except where noted otherwise.
A7. The elevations reported on Sheet 6 for the "Ex. Top of Berm" and "Ex. Cell Floor" are incorrect.
Please disregard the reported values and instead, consider these elevation values in preparing your bids and construction planning efforts:
mailto:matt.sanders@ihs.gov mailto:Andrew.hart@ihs.gov
Ex. Top of Berm Elev. = 6,244.0 (approx.)
Ex. Cell Floor Elevation Elev. = 6,235.5 (approx.)
Please note these values correlate with the existing surfaces depicted in the cross-sections.
Q8. The .dxf file provided doesn’t seem to contain any existing condition and only contains the proposed conditions. Would it be possible to include the existing conditions the .dxf version, or possibly send us the .dwg file?
A8. Please disregard the provided DXF file from Amendment 04, as it lacks sufficient data to define the existing surface conditions. It appears the existing surface features were lost when IHS converted the
DWG to DXF. A new (corrected) DXF file is provided along with Amendment 05.
Q9. The cross sections on the drawings through the existing cells show about 1’ +/- of sludge to remove.
We have visited the site and it appears that existing cell 1 and existing cell 4 have 3-5’ of sludge. Is it the contractor’s responsibility to quantify existing sludge to be removed above and beyond what is shown in the cross sections found in the solicitation?
A9. Yes, it is the responsibility of the contractors' to estimate the quantity of sludge in the existing cells.
It should be noted that the cross-sections do not portray the depth of accumulated sludge.
Q10. Will the Pueblo consider a draw – down, utilizing existing outlet system, of the existing cells prior to and during Phase 1 construction to reduce dewatering efforts by the contractor?
A10. Yes, the Zuni Utility Department will drain the Existing Cell 4 prior to the onset of Phase 1 construction activities. The successful contractor will be responsible for draining the Existing Cells 1, 2, 3, 5 and 6 to facilitate the prescribed Phase 2 construction activities.
Q11. Supplemental Technical Provisions found in the Scope of Work, page 11 indicates that TP-4004E be replaced with; The top of berms shall be covered with base course. What is the thickness of the base course? Is NMDOT base course acceptable?
A11. The required thickness of the base course applied to the top of the berms (berm access roads) is 3 inches.
Q12. AAIHS/OEHE Technical Provisions are very clear that Moxie 1800 Super Admix is required for sewer manholes. Will Moxie be required for the concrete Discharge Structure as well?
A12. The moxie admixture should not be incorporated to the concrete comprising the Discharge
Structure.
Q13. The AquaTrans AT600 Panametrics Ultrasonic Flow Meter as manufactured by GE is made in
China. Will this be acceptable?
A13. No. Please disregard the specification of the GE AquaTrans AT600 Panametrics Ultrasonic Flow
Meter. Instead, the AquaTrans AT868 Panametrics Liquid Flow Ultrasonic Transmitter as manufactured by GE (or equal) may be installed as a dual-channel flow metering system.
Q14. The AquaTrans AT600 Panametrics Ultrasonic Flow Meter is not available as a dual channel. The spec sheet as they only talk about using one pair of sensors instead of two pair. Will a Dual Channel meter required?
A14. Please disregard the specification of the GE AquaTrans AT600 Panametrics Ultrasonic Flow Meter.
Instead, the AquaTrans AT868 Panametrics Liquid Flow Ultrasonic Transmitter as manufactured by GE
(or equal) may be installed as a dual-channel flow metering system. This product is capable of being installed and operated as a dual channel system.
Q15. Please provide the following requirements for the flow meter: power supply, outputs, area ratings, submersibility, length of cables.
A15. It is the responsibility of the Contractor to determine and implement the necessary electrical controls to support the installation of the Ultrasonic Flow Meter.