B01 Abstract of Bids - W912ES20B0021 Harpers Slough Repair.pdf

PDF 294 KB Posted

Attached to
Harper's Slough Flood Damage Repair
Solicitation number
W912ES20B0021
Issued by

About this file

This document is an abstract of bids received in response to Solicitation Number W912ES20B0021 issued by the Department of the Army Corps of Engineers Engineering District St Paul for the Harper's Slough Flood Damage Repair project. The solicitation sought bids for base work including placement of granular fill, random fill, fine fill, construction pads, excess material disposal, riprap, bedding, turf establishment, willow supply and planting, and temporary construction fencing. It also included two option items for additional work on berms and excavation. Four bids were received by the April 20, 2021 deadline ranging from $1,394,272.56 to $4,366,700 for the base work and from $1,846,033.62 to $5,953,190 when the option items were included. Pricing was provided on a per unit basis for each line item. The apparent low bidder for the base work and total project including options was Dubuque Barge and Fleeting Service Company. The document identifies the bidders and provides a breakdown of proposed pricing for evaluation purposes.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Harpers Slough Islands Repair Solicitation Number: W912ES20B0021 US Army Corps of Engineers. 180 East 5th Street, Suite 700. Saint Paul, Minnesota 55101 BID OPENING: April 20, 2021; 2:00pm local

Contracting Officer: Ken Eshom Contract Specialist: Scott Hendrix

Unit Unit Unit Unit Item Description Quantity Unit Price Amount Price Amount Price Amount Price Amount

ITEMS (CLINS 0001 - 2011)

BASE BID: W2 and W1 0001 Bonds (Performance and Payment) for Base Bid 1 Job $37,310.00 $37,310.00 $8,350.00 $8,350.00 $25,000.00 $25,000.00 $30,700.00 $30,700.00 0002 Granular Fill

0002AA First 8,000 8,000 CY $42.67 $341,360.00 $24.14 $193,120.00 $63.00 $504,000.00 $57.00 $456,000.00 0002AB Over 8,000 1,900 CY $42.67 $81,073.00 $9.94 $18,886.00 $46.00 $87,400.00 $57.00 $108,300.00

0003 Random Fill 0003AA First 6,000 6,000 CY $42.67 $256,020.00 $9.94 $59,640.00 $63.00 $378,000.00 $48.00 $288,000.00 0003AB Over 6,000 1,200 CY $42.67 $51,204.00 $9.94 $11,928.00 $46.00 $55,200.00 $48.00 $57,600.00

0004 Fine Fill 0004AA First 6,000 6,000 CY $98.65 $591,900.00 $49.98 $299,880.00 $86.00 $516,000.00 $53.00 $318,000.00 0004AB Over 6,000 1,000 CY $98.65 $98,650.00 $31.05 $31,050.00 $69.00 $69,000.00 $53.00 $53,000.00

0005 Construction Pads 0005AA First 5,000 5,000 CY $49.29 $246,450.00 $9.94 $49,700.00 $15.00 $75,000.00 $53.00 $265,000.00 0005AB Over 5,000 1,800 CY $49.29 $88,722.00 $9.94 $17,892.00 $0.00 $0.00 $53.00 $95,400.00

0006 Excess Material Disposal 0006AA First 3,000 3,000 CY $27.18 $81,540.00 $9.94 $29,820.00 $0.00 $0.00 $81.00 $243,000.00 0006AB Over 3,000 1,000 CY $27.18 $27,180.00 $9.94 $9,940.00 $0.00 $0.00 $71.00 $71,000.00

0007 Riprap 0007AA First 6,000 6,000 TON $72.38 $434,280.00 $84.29 $505,740.00 $125.00 $750,000.00 $84.00 $504,000.00 0007AB Over 6,000 1,350 TON $72.38 $97,713.00 $65.35 $88,222.50 $125.00 $168,750.00 $74.00 $99,900.00

0008 Riprap from Recovery 600 CY $65.15 $39,090.00 $48.53 $29,118.00 $85.00 $51,000.00 $61.00 $36,600.00 0009 Bedding 200 TON $72.38 $14,476.00 $80.12 $16,024.00 $118.00 $23,600.00 $150.00 $30,000.00 0010 Geotextile 650 SY $2.34 $1,521.00 $3.54 $2,301.00 $25.00 $16,250.00 $18.00 $11,700.00 0011 Turf Establishment 4.3 ACRE $5,000.00 $21,500.00 $2,676.99 $11,511.06 $4,500.00 $19,350.00 $5,300.00 $22,790.00 0012 Willow Supply 3,000 EA $1.50 $4,500.00 $1.50 $4,500.00 $7.00 $21,000.00 $4.00 $12,000.00 0013 Willow Planting 3,000 EA $3.00 $9,000.00 $2.00 $6,000.00 $7.00 $21,000.00 $4.00 $12,000.00 0014 Temporary Construction Fence 130 LF $10.00 $1,300.00 $5.00 $650.00 $40.00 $5,200.00 $15.00 $1,950.00

TOTAL BASE $2,524,789.00 $1,394,272.56 $2,785,750.00 $2,716,940.00

OPTION 1: M2, EW Berm and EW Excavation 1 1001 Bonds (Performance and Payment) for Option 1 1 Job $19,800.00 $19,800.00 $2,713.00 $2,713.00 $5,000.00 $5,000.00 $19,400.00 $19,400.00 1002 Granular Fill

1002AA First 150 150 CY $42.67 $6,400.50 $9.94 $1,491.00 $105.00 $15,750.00 $57.00 $8,550.00 1002AB Over 150 50 CY $42.67 $2,133.50 $9.94 $497.00 $105.00 $5,250.00 $57.00 $2,850.00

1003 Random Fill 1003AA First 600 600 CY $42.67 $25,602.00 $9.94 $5,964.00 $105.00 $63,000.00 $48.00 $28,800.00 1003AB Over 600 200 CY $42.67 $8,534.00 $9.94 $1,988.00 $105.00 $21,000.00 $48.00 $9,600.00

1004 Fine Fill 1004AA First 4,500 4,500 CY $98.65 $443,925.00 $31.05 $139,725.00 $50.00 $225,000.00 $53.00 $238,500.00 1004AB Over 4,500 1,200 CY $98.65 $118,380.00 $31.05 $37,260.00 $50.00 $60,000.00 $53.00 $63,600.00

1005 Construction Pads 1005AA First 5,200 5,200 CY $49.29 $256,308.00 $9.94 $51,688.00 $0.00 $0.00 $53.00 $275,600.00

Stoddard, WI 54658-9013 5 Jones St. Ste 2

Dubuque, IA 52001-7674 Anchorage, AK 99508 1001 East Benson Blvd, Suite 201

Government Estimate Water Works Dock & Boat

Lifts, Inc.

Dubuque Barge and Fleeting Service Company DBA: Newt

Marine Service Kaiyuh Services, LLC

N3350 State Hwy 35

1005AB Over 5,200 1,400 CY $49.29 $69,006.00 $9.94 $13,916.00 $0.00 $0.00 $53.00 $74,200.00 1006 Excess Material Disposal

1006AA First 8,000 8,000 CY $27.18 $217,440.00 $9.94 $79,520.00 $0.00 $0.00 $81.00 $648,000.00 1006AB Over 8,000 2,000 CY $27.18 $54,360.00 $9.94 $19,880.00 $0.00 $0.00 $71.00 $142,000.00

1007 Riprap 1007AA First 800 800 TON $72.38 $57,904.00 $65.35 $52,280.00 $100.00 $80,000.00 $84.00 $67,200.00 1007AB Over 800 400 TON $72.38 $28,952.00 $65.35 $26,140.00 $100.00 $40,000.00 $74.00 $29,600.00

1008 Turf Establishment 3.3 ACRE $5,000.00 $16,500.00 $2,676.99 $8,834.07 $4,500.00 $14,850.00 $5,300.00 $17,490.00 1009 Willow Supply 2,090 EA $1.50 $3,135.00 $1.50 $3,135.00 $7.00 $14,630.00 $4.00 $8,360.00 1010 Willow Planting 2,090 EA $3.00 $6,270.00 $2.00 $4,180.00 $7.00 $14,630.00 $4.00 $8,360.00 1011 Temporary Construction Fence 510 LF $10.00 $5,100.00 $5.00 $2,550.00 $10.00 $5,100.00 $15.00 $7,650.00

TOTAL OPTION 1 $1,339,750.00 $451,761.07 $564,210.00 $1,649,760.00

TOTAL BASE AND OPTION 1 $3,864,539.00 $1,846,033.62 $3,349,960.00 $4,366,700.00

OPTION 2: M5 and EW2 Excavation 2 & 3 2001 Bonds (Performance and Payment) for Option 1 1 Job $21,100.00 $21,100.00 $3,050.00 $3,050.00 $8,000.00 $8,000.00 $19,000.00 $19,000.00 2002 Granular Fill

2002AA First 700 700 CY $42.67 $29,869.00 $9.94 $6,958.00 $105.00 $73,500.00 $57.00 $39,900.00 2002AB Over 700 150 CY $42.67 $6,400.50 $9.94 $1,491.00 $105.00 $15,750.00 $57.00 $8,550.00

2003 Random Fill 2003AA First 1,500 1,500 CY $42.67 $64,005.00 $9.94 $14,910.00 $105.00 $157,500.00 $48.00 $72,000.00 2003AB Over 1,500 500 CY $42.67 $21,335.00 $9.94 $4,970.00 $105.00 $52,500.00 $48.00 $24,000.00

2004 Fine Fill 2004AA First 5,200 5,200 CY $98.65 $512,980.00 $31.05 $161,460.00 $50.00 $260,000.00 $53.00 $275,600.00 2004AB Over 5,200 1,300 CY $98.65 $128,245.00 $31.05 $40,365.00 $50.00 $65,000.00 $53.00 $68,900.00

2005 Construction Pads 2005AA First 4,500 4,500 CY $49.29 $221,805.00 $9.94 $44,730.00 $0.00 $0.00 $53.00 $238,500.00 2005AB Over 4,500 1,000 CY $49.29 $49,290.00 $9.94 $9,940.00 $0.00 $0.00 $53.00 $53,000.00

2006 Excess Material Disposal 2006AA First 6,000 6,000 CY $27.18 $163,080.00 $9.94 $59,640.00 $0.00 $0.00 $81.00 $486,000.00 2006AB Over 6,000 1,500 CY $27.18 $40,770.00 $9.94 $14,910.00 $0.00 $0.00 $71.00 $106,500.00

2007 Riprap 2007AA First 1,200 1,200 TON $72.38 $86,856.00 $65.35 $78,420.00 $100.00 $120,000.00 $84.00 $100,800.00 2007AB Over 1,200 700 TON $72.38 $50,666.00 $65.35 $45,745.00 $100.00 $70,000.00 $74.00 $51,800.00

2008 Turf Establishment 3.7 ACRE $5,000.00 $18,500.00 $2,676.99 $9,904.86 $4,500.00 $16,650.00 $5,300.00 $19,610.00 2009 Willow Supply 2,360 EA $1.50 $3,540.00 $1.50 $3,540.00 $7.00 $16,520.00 $4.00 $9,440.00 2010 Willow Planting 2,360 EA $3.00 $7,080.00 $2.00 $4,720.00 $7.00 $16,520.00 $4.00 $9,440.00 2011 Temporary Construction Fence 230 LF $10.00 $2,300.00 $5.00 $1,150.00 $10.00 $2,300.00 $15.00 $3,450.00

TOTAL OPTION 2 $1,427,821.50 $505,903.86 $874,240.00 $1,586,490.00

TOTAL BASE AND OPTIONS 1 & 2 $5,292,360.50 $2,351,937.49 $4,224,200.00 $5,953,190.00

Note: Upon reviewing the bids, a mathamatical error was discovered for the highlighted items. The highlighted amounts and subsequent totals are correct.

I certify that I have opened, read, and recorded on this abstract all bids received in response to this solicitation.

Kenneth J. Eshom Contracting Officer

2021-04-20T16:45:31-0500