This is a 90% complete draft specifications document for a shoreline protection construction project at Speelyi Beach near the Cle Elum Dam and Reservoir in Kittitas County, Washington, issued by the Bureau of Reclamation's Columbia Pacific Northwest Interior Region 9.

The work involves constructing shoreline protection along the Cle Elum Reservoir edge near the Speelyi Beach Day Use Area, approximately 8 miles northwest of Cle Elum. Key components include: earthwork, clearing and grubbing, removal of trees (130 individual trees plus 50 with root wads), construction of temporary access roads, trench excavation, installation of geotextile fabric (11,580 square yards), culvert installation (100 LF), site grading, riprap placement (21,910 tons), selective demolition of structures, fence replacement (60 LF), and removal of temporary access upon completion. Work hours are 7:00 AM to 6:30 PM Monday through Friday, with construction required to take place when the reservoir pool elevation is at or below elevation 2225. The price schedule includes 19 contract line items covering mobilization, site work, materials and installation. While marked as 90% complete specifications, no solicitation number is yet assigned, indicating this is still in draft form.

View the file

Other files

File Type Posted
B01_08_-_Sources_Sought_(140R1025B0006)_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior SPECIFICATIONS Bureau of Reclamation Columbia Pacific Northwest Interior Region 9 Boise, Idaho August 2024

Speelyi Beach Shoreline Protection 90% Specification

Solicitation Number:

Cle Elum Dam and Reservoir, Yakima Project, Washington

DRAFT 11

/5/ a Projecta Projec

This solicitation issued by Contracting Officer

Pacific Northwest Region Bureau of Reclamation

1150 North Curtis Road, Suite 100 Boise ID 83706-1234

Phone inquiries regarding this solicitation should be made to Regional Acquisition Management Officer

Telephone Number: (208) 378-5364 DRAFT oiseois

Ph rega rega

RegionRegion T

/5/ ssued by ssued by g OfficerOfficer thwest Regiohwest Regio of Reclamatof Reclama

Curtis Roaurtis Roa D 837037

SPEELYI BEACH SHORELINE PROTECTION

YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT - INTEGRATED PLAN

YAKIMA PROJECT - WASHINGTON

FOREWORD

Work is located on Cle Elum Reservoir, approximately 8 miles northwest of Cle Elum, Washington, in Kittitas County. Work is located near the Speelyi Beach Day Use Area. Work is constructing shoreline protection along the edge of the reservoir. Principal components of the work include earthwork, clearing and grubbing, removal and hauling of trees, construction of a temporary access road, trench excavation, installation of geotextile fabric, culvert installation, site grading, riprap placement, selective demolition of structures, in-kind replacement of a fence, and removal of the temporary access road upon completion.

PRE-BID SITE VISIT: SEE SECTION L FOR SITE VISIT INFORMATION.

ATTENDEES ARE TO PROVIDE AND WEAR SAFETY BOOTS, HARD HATS, AND

SAFETY VESTS.

FOR DATE AND PLACE FOR RECIEPT OF BIDS, SEE "SOLICITATION, OFFER,

AND AWARD," STANDARD FORM 1442.

FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S PUBLICATION

"RECLAMATION SAFETY AND HEALTH STANDARDS" (LATEST EDITION)

WHICH IS APPLICABLE TO WORK UNDER THIS CONTRACT, SEE CLAUSE AT

"WBR 1452.223-81 SAFETY AND HEALTH".

END OF SECTION

DRAFT

R RECIEPTR RECIEPT

RD FORM 14D FORM

ION REGAION RE

N SAFETN SAFET

CABLCABL

/5/

D cipal copal co ng of trees, cng of trees, tile fabric, cutile fabric, c ures, inures, i -kind kind

on. n.

R SITE VISR SITE VIS

WEAR SAFEWEAR SAF

This page intentionally left blank.

DRAFT 11

/5/ ntionally lefonally l

Speelyi Beach Shoreline Protection Cle Elum Dam and Reservoir, Yakima Project Solicitation No.

Price Schedule B - 1

SECTION B – SUPPLIES OR SERVICES AND PRICES

B.1 PRICE SCHEDULE

(a) Bids will be considered for award on the following Price Schedule, but no bid will be considered for award on only a part of the Price Schedule.

(b) Bids are subject to the terms and conditions of this solicitation.

(c) Quantities in the Price Schedule are estimated quantities for comparison of bids only.

Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.

(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.

(e) Definitions:

(1) CLIN – Contract Line Item Number

DRAFT Item NuItem 11 /5/

24or comparisoncompariso

1-18, -18, VariatioVariati ment for overment for over timated Quantimated Quan

-81, Payment-81, Payment b

Price Schedule B - 2

PRICE SCHEDULE

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

1 WBR

1452.232 -81

Mobilization and Preparatory Work

For the lump sum of $

2 01 51 00 Water for Dust Control For the lump sum of $

3 01 55 00 Construction Access Road For the lump sum of $

4 01 57 30 Temporary Erosion Control For the lump sum of $

5 02 41 13 Selective Demolition For the lump sum of $

6 04 40 00 Stone Staircases 1 Each $ $

7 31 11 00 Clearing and Grubbing For the lump sum of $

8 31 11 00 Tree Cutting and Removal 130 Each $ $

9 31 11 00 Tree Removal with Root Wad

50 Each $ $

10 31 23 11 Excavation 6,680 CY $ $

11 31 23 11 Common Fill 4,780 CY $ $

12 31 23 11 Beach Fill 300 CY $ $

13 31 23 11 Toe Armor 360 CY $ $

14 31 32 32 Geotextile 11,580 Square Yards

15 31 37 00 Riprap 21,910 tons $ $

16 31 37 00 Bedding Layer 1,970 CY $ $

17 32 31 30 Fence 60 LF $ $

18 32 92 20 Shredded Mulch 140 CY $ $

19 33 42 30 CMP Culvert 100 LF $ $

TOTAL FOR PRICE SCHEDULE $_________________

END OF SUPPLIES OR SERVICES AND PRICES

DRAFT T

Armorrmo FT

GeotextileGeotextileAF DRipRipDDDDD

/5/ m o p sum ofp sum of4$$2222402r the lump sumthe lump s020202 130130 EachEach/20550 Each50 Eac555/21/51/1/1/11

COLUMBIA-CASCADES AREA OFFICE

WRITTEN SPECIFICATIONS SIGNATURE SHEET

Specifications No:

Specifications Title: SPEELYI BEACH SHORELINE PROTECTION

Project Title: CLE ELUM POOL RAISE: SPEELYI BEACH SHORELINE PROTECTION

Region: PACIFIC NORTHWEST

Prepared: P.E.

Technical Approval: P.E.

AMD/MOD

No.

Technical Approval Signature:

Prepared By Signature:

Revised Specifications

DRAFT

AF

provaloval: : R

/5/

URER

PROTECTIOPROTECTIO/2YI BEACH YI BEACH /5/

DIVISION 01 - GENERAL REQUIREMENTS

DRAFT 11

/5/

Table of Contents 00 01 10 - 1

SECTION C - DESCRIPTION / SPECIFICATIONS

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 10 Use of Site 01 31 19 Project Management and Coordination 01 31 30 Contract Document Management System 01 32 10 Construction Program 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 46 20 Testing Agency Services 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 57 90 Preservation of Historical and Archeological Data 01 71 20 Surveying 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents

DIVISION 02 – EXISTING CONDITIONS

02 41 13 Selective Site Demolition

DIVISION 04 – MASONRY

04 40 00 Stone Staircases

DIVISION 31 - EARTHWORK

31 11 00 Clearing and Grubbing 31 23 02 Compacting Earth Materials 31 23 11 Earthwork 31 23 39 Disposal of Excavated Materials

DRAFTol ol storical and Astorical and

Waste ManaWaste Ma cord Documcord Docum

XISTING CXISTING

tive Stive S

/5/ tionstions ess

Table of Contents 00 01 10 - 2

31 32 32 Geotextile 31 37 00 Riprap

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 92 20 Seeding and Soil Improvements 32 31 30 Fence

DIVISION 33 – UTILITIES

33 42 30 Corrugated Metal Pipe Culverts

DIVISION 51 – INFORMATION AVAILABLE TO BIDDERS

51 00 50 Electronic Media Release

51 10 20 Hydrographs, Exceedance Curves, and Reservoir Time History

DIVISION 52 - DRAWINGS

52 00 00 Drawings

END OF CONTENTS

DRAFTEND OF END O

/5/

24rvoir voir TTime ime HH

Summary of Work 01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 LOCATION

A. Work is located on Cle Elum Reservoir, approximately 8 miles northwest of Cle Elum, Washington, in Kittitas County.

B. Work is located near the Speelyi Beach Day Use Area.

1.02 WORK HOURS

A. Work hours shall be between 7:00 am and 6:30 pm Monday through Friday, unless otherwise approved in advance by the Contracting Officer’s Representative. No work on Federal Holidays shall occur unless approved in advance. Federal Holidays are observed on: New Year’s Day, Birthday of Martin Luther King, Jr., Washington’s Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Thanksgiving Day, Christmas Day.

B. Work hours are subject to Industrial Fire Precaution Levels (IFPL). More information can be found at https://www.dnr.wa.gov/ifpl

1.03 PRINCIPAL COMPONENTS OF WORK

A. The work to be performed consists of the following:

1. Clearing and grubbing for staging areas and slopes to receive riprap.

2. Removal and hauling of trees.

3. Construction of a temporary access road to the work area.

4. Toe trench excavation and reshaping hillside.

5. Installation of geotextile filter fabric and riprap.

6. Construction of a “perched beach” area.

7. Culvert installation and site grading.

8. Selective demolition of structures.

9. In-kind replacement of a fence.

10. Removal of the temporary access road on completion.

1.04 SPECIFICATIONS REQUIREMENTS

A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 53.

DRAFT TS OF WTS O

ed consists od consists o d grubbing forubbing f and haulingand hauli struction of struction o trench extrench e

/5/

24day through Fthrough ficerer’s Repres’s Repres vance. Federance. Feder

King, Jr., Waing, Jr., W y, Labor Dayy, Labor Day

Fire PreFire Precautiocauti gov/ifpl ov/i

OR

Summary of Work 01 11 00 - 2

B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.

C. Where specifications are written in streamlined form, words “shall be” are included by inference where a colon (:) is used within sentence or phrase.

1.05 DEFINITIONS

A. When specifications use a word or term defined in Federal Acquisition Regulations (FAR), definition of the word or term shall be in accordance with FAR sections in effect at the time solicitation was issued.

1.06 ACRONYMS

A. The following acronyms apply to specifications Divisions 1 through 53:

1. CO: Contracting Officer.

2. COR: Contracting Officer’s Representative.

1.07 SEQUENCE OF THE WORK

A. Portions of the work require construction below the high-water line. Perform all work in the dry. Refer to Section 51 10 20 – Historic Water Elevations for data on the water level fluctuations of Cle Elum Reservoir. All work must take place when the reservoir pool elevation is at or below elevation 2225, which is typically either early spring or late summer to fall, and winter.

1.08 SITE MEASUREMENTS

A. All measurements provided in this Scope of Work are approximate and for reference only. The Contractor shall be responsible for verifying all measurements before starting work, and providing all materials required to meet the shoreline protection extent shown in the Drawings.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION

DRAFT ion 222ion 2

NTSNTS

ts provided ints provide ntractor shallntractor shall providing allproviding a wings. wings

/5/ hrough 53ugh 5 on below thebelow t Historic WatHistoric Wat All work All wo whh

File details come from the government source that posted it. Updated .