B - Enclosure 1.pdf
PDF 590 KB Posted
- Solicitation number
- N61331-22-T-JK14
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B - Redacted Brand Name Justification.docx | DOCX document | |
| M - Clauses.docx | DOCX document | |
| B - Enclosure 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The Q Drive is a servo‐electric driven gas booster providing a complete plug and play package with built‐in smart HMI technology
Complete PLC functionality with operator interface enables infinite controllability, with both remote and diagnostic monitoring.
Safety features include 47 Error, 33 Warning and 3 Information messages.
Simplified design with few moving parts, minimizing maintenance.
Quick‐change seal components which reduces down time 95 % power efficiency
Model Description
QGT‐90/63 Double Acting Two Stage Q‐Drive Booster System
HPS‐4.11G Oxygen Cleaning and Cleanliness Control Adder This procedure has been approved by the US Navy (NAVSEA Letter Ser 00C35/3093 of May 12, 2008) for MIL‐STD‐ 1330D, General Applications.
Third Pary Cleanliness Level Certifications Estimated Freight Charges
Post Compression Heat Exchanger ‐ 12 Pass
If ordered with the Q‐Drive, Post Compression Heat Exchanger will be installed and plumbed into the gas circuit inside the system frame
Boosters are supplied CE marked. Two stage Boosters include an interstage heat exchanger. Heat Exchangers for cooling after final compression are not standard and must be ordered as an accessory.
Application Performance
MODEL
Suppl y Press. Outlet
Max . Disp. Gas Compression Perf.
Coolin g
NUMBE
R Min Max press.Ma x CR
/Cycl e
CP
M Pin Pout Pint
Flowrat e
Flow Rate Reqd** psig psig psig (rec) cu.ins psi g psig psi g scfm Kg/Min Btu/hr
QGT-
90/63 50
0 6600 21 58 5 120
0 N/A 13.5
.3909 35,500
Replacement Parts A good practice is to stock replacement parts to avoid interruption of production. When ordering, specify the serial number of the system and the item number of the part.
Item Description
88321 Seal Kit for 150 mm Piston Assembly
88322 Seal Kit for 90 mm Piston Assembly
88323 Seal Kit for 63 mm Piston Assembly
88289 Check valve for inlet
88289 Check valve for outlet
88450 Servo Actuator Repair Kit
88449 Seal Kit for 150 mm Gas Section (includes Piston As. Seal Kit)
88448 Seal Kit for 90 mm Gas Section (includes Piston As. Seal Kit)
88447 Seal Kit for 63 mm Gas Section (includes Piston As. Seal Kit)
Specifications Physical Environment
Dimensions 94 in L x 34 in W x 65.1 in H
Weight 4500 lbs
Noise Level 77.0 dB(A) (in accordance with EHSR 1.7.4 of the MD.)
Connections (Haskel International recommends BuTech 3/4 in M/P fittings and tubing.)
Blow By 3/4 in tube OD, 316 SST
Purge 1/4 in tube OD, 316 SST
Vent Lines 3/8 in tube OD, 316 SST
Gas Outlet and Inlet 1/2 in tube OD, 316 SST
Air Supply 1/2 in NPT female, brass for 80-120 psi
Coolant Outlet and Inlet 1/2 in BSPP female Coolant System Maximum Pressure 150 psig (10.3 barg)
Coolant Ratio 80% glycol: 20% water by volume
Coolant Flow 14 usg/min (3.18 m3/hr)
Electrical System Heating Power 3-Phase 380-480 V
Supply Current 60 A
Frequency 50-60 Hz
Lubrication System Oil type Syn-Gear EP150
Capacity 30 litres (8 gallons) Gas Temperature
Maximum Temperature 370 °F (188 °C)
Minimum Temperature at Inlet 32 °F (0 °C)
Operating Environment Ambient Temperature 32—131 °F (0—55 °C)
Ambient Humidity 0-95%
Storage/Shipping Environment Ambient Temperature -13—158 °F (-25—70 °C)
Site Preparation and Inspection
Before delivery, plan the site for the system to avoid problems and expense of delays.
Choose an orientation that maintains alignment with machinery, power, and lines.
Allow a minimum of 2 ft of clearance space on all sides the system.
Allow a minimum of 7 ft of clearance space above the system.
Allow space for a catch tray and for access to plugs and to remove the system.
Plan the location and depth of the anchor bolts.
Prepare the electrical requirements listed in the “Specifications” table.
Air, Gas, and Coolant Lines Port Connection Port ID
Blow By 3/4 in tube OD, 316 SST 1
Purge 1/4 in tube OD, 316 SST 2
QGT Vent Lines (3) 3/8 in tube OD, 316 SST 3
QGD Vent Lines (2)
Gas Outlet 1/2 in tube OD, 316 SST 4
Gas Inlet 1/2 in tube OD, 316 SST 5
Air Supply 1/2 in NPT female, brass for 80-120 psi 6
Coolant Outlet 1/2 in BSPP female 7
Coolant Inlet 1/2 in BSPP female 8
Service
Setting Definition Threshold
Main Stroke Count Each push and return is 2 strokes, which is 1 cycle. This value cannot be reset.
18,000,000 at 30 CPM
Stroke Count Last Seal Change When you replace a seal, tap Reset Count to restart the count at zero.
1,000,000 20,000 hours
Start Blow By Test
Tap this button to pause the pump but keep the valve open. A meter senses if any gas is in the valve, indicating a leak. 700 SCCM
Pump Running Time
Running time
10,000 hours
Oil Change 2000 hours
Filter Change 2000 hours or 1 year
Rod Seal Change 2000 hours
Gas Inlet Valve Cycles Valves open when the system is powered on and close when it is powered off. One cycle is a valve opening and closing
2,000,000 cycles Gas Outlet Valve Cycles
When you exceed these limits, an alarm reminds you. The alarms create a maintenance record. Maintain the system to maintain the warranty. Replace parts according to the following schedule.
Part Frequency
Tie Rods Every 3 years.
Gas Barrels Every 7 years
Check Valves After 2,000,000 cycles
Seals After 2000 hours
Oil Filter After 2000 hours or 1 year
Oil After 2000 hours
File details come from the government source that posted it. Updated .