B.08_W9126G22Q0006_Solicitation.pdf
PDF 2 MB Posted
- Attached to
- Tree Maintenance Services in Capital Region, Texas in support of the US Army Corps of Engineers (USACE)
- Solicitation number
- W9126G22Q0006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.08 Solicitation W9126G22Q0006 Amend 0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9126G22Q0006 15-Oct-2021
b. TELEPHONE NUMBER
817 886 1110
8. OFFER DUE DATE/LOCAL TIME
04:00 PM 15 Nov 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9126G9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MATTHEW S DICKSON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
819 TAYLOR ST, CT OFC RM 2A17
FORT WORTH TX 76102-0300
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
(817) 886-6403FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$8,000,000
NAICS:
561730
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF168
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9126G22Q0006
Section SF 1449 - CONTINUATION SHEET
TASK ORDER OMBUDSMAN
The Task Order Ombudsman is responsible for reviewing complaints from contractors awarded multiple award contracts to ensure they are afforded a fair opportunity to be considered, consistent with the ordering procedures found in this contract. The USACE Ombudsman is:
Deputy Director of Contracting Task Order Ombudsman U.S. Army Corps of Engineers 441 G Street NW TCCA Documents Washington DC 20314-1000
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$2,500.00 $1,500,000.00
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
$2,500.00 $100,000.00
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 UNDEFINED
BELTON LAKE TREE MAINTENANCE
FFP
See Performance Work Statement FOB: Destination
PSC CD: S208
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 UNDEFINED
STILLHOUSE LAKE TREE MAINTENANCE
FFP
See Performance Work Statement
UNIT UNIT PRICE MAX AMOUNT
0003 UNDEFINED
GRANGER LAKE TREE MAINTENANCE
FFP
See Performance Work Statement
UNIT UNIT PRICE MAX AMOUNT
0004 UNDEFINED
GEORGETOWN LAKE TREE MAINTENANCE
FFP
See Performance Work Statement
UNIT UNIT PRICE MAX AMOUNT
0005 UNDEFINED
CANYON LAKE TREE MAINTENANCE
FFP
See Performance Work Statement
UNIT UNIT PRICE MAX AMOUNT
0006 UNDEFINED
SOMERVILLE LAKE TREE MAINTENANCE
FFP
See Performance Work Statement
UNIT UNIT PRICE MAX AMOUNT
1001 UNDEFINED
OPTION BELTON LAKE OPT YR 1
FFP
See Performance Work Statement
UNIT UNIT PRICE MAX AMOUNT
1002 UNDEFINED
OPTION STILLHOUSE LAKE OPT YR 1
FFP
See Performance Work Statement
UNIT UNIT PRICE MAX AMOUNT
1003 UNDEFINED
OPTION GRANGER LAKE OPT YR 1
FFP
See Performance Work Statement
UNIT UNIT PRICE MAX AMOUNT
1004 UNDEFINED
OPTION GEORGETOWN LAKE OPT YR 1
FFP
See Performance Work Statement
UNIT UNIT PRICE MAX AMOUNT
1005 UNDEFINED
OPTION CANYON LAKE OPT YR 1
FFP
See Performance Work Statement
UNIT UNIT PRICE MAX AMOUNT
1006 UNDEFINED
OPTION SOMERVILLE LAKE OPT YR 1
FFP
See Performance Work Statement
UNIT UNIT PRICE MAX AMOUNT
2001 UNDEFINED
OPTION BELTON LAKE OPT YR 2
FFP
See Performance Work Statement
UNIT UNIT PRICE MAX AMOUNT
2002 UNDEFINED
OPTION STILLHOUSE LAKE OPT YR 2
FFP
See Performance Work Statement
UNIT UNIT PRICE MAX AMOUNT
2003 UNDEFINED
OPTION GRANGER LAKE OPT YR 2
FFP
See Performance Work Statement
UNIT UNIT PRICE MAX AMOUNT
2004 UNDEFINED
OPTION GEORGETOWN LAKE OPT YR 2
FFP
See Performance Work Statement
UNIT UNIT PRICE MAX AMOUNT
2005 UNDEFINED
OPTION CANYON LAKE OPT YR 2
FFP
See Performance Work Statement
UNIT UNIT PRICE MAX AMOUNT
2006 UNDEFINED
OPTION SOMERVILLE LAKE OPT YR 2
FFP
See Performance Work Statement
BID SCHEDULE
BSCH
Capital Region Lakes Tree Maintenance Services
Belton, Stillhouse Hollow, Granger, Georgetown, Canyon and Somerville Lakes
Indefinite Delivery/Indefinite Quantities for BASE Year and Two Option Year Periods
CONTRACT BASE YEAR: 01 January 2022, or date of award, whichever is later, through 31 December 2022
FOR CAPITAL REGION LAKES TREE MAINTENANCE SERVICES
ITEM DESCRIPTION
ITEM
Tree Maintenance Services Belton Lake Items
EST.
QTY
U/M
UNIT
PRICE
AMOUNT
0001AA
Tree Trimming and Hazardous Limb Removal, 15 Feet and Lower Per Tree
75 EA
0001AB
Tree Trimming and Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
22 EA
0001AC Tree Removal, Less Than 8 Inches DBH
65 EA
0001AD Tree Removal, 8 to 15 Inches DBH
50 EA
0001AE Tree Removal, 15 to 24 Inches DBH
30 EA
0001AF Tree Removal, Greater Than 24 Inches DBH
13 EA
0001AG Tree Removal Pieced Down, All Sizes
60 EA
0001AH Tree Disposal, Chipping, On-site
100 EA
0001AJ Tree Disposal, Off-site 50 EA
Controlled by: USACE Controlled by: CEWSF-OPC
CUI Category: CTI Limited Dissemination Control: NOFORN
POC: Terri Beth Teaschner, 254-742-3065
0001AK Tree Stump Grinding, 24 Inches and Less
30 EA
0001AL Tree Stump Grinding, Greater than 24 Inches
13 EA
0001AM Chipping Existing Tree Debris Piles
20 CY
0001AN Contingency CLIN NA NA NA NA
0001AP Boundary Line Clearing 2 Miles
BELTON LAKE CAPACITY
FOR BASE YEAR
ITEM
Tree Maintenance Services Stillhouse Hollow Lake Items
EST
QTY
U/M
UNIT
PRICE
AMOUNT
0002AA
Tree Trimming and Hazardous Limb Removal, 15 Feet and Lower Per Tree
70 EA
0002AB
Tree Trimming and Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
22 EA
0002AC
Tree Removal, Less Than 8 Inches DBH
55 EA
0002AD
Tree Removal, 8 to 15 Inches DBH
50 EA
0002AE
Tree Removal, 15 to 24 Inches DBH 20 EA
0002AF
Tree Removal, Greater Than 24 Inches DBH
6 EA
0002AG
Tree Removal Pieced Down, All Sizes
70 EA
0002AH
Tree Disposal, Chipping, On-site
80 EA
0002AJ Tree Disposal, Off-site 40 EA
0002AK
Tree Stump Grinding, 24 Inches and Less
30 EA
0002AL
Tree Stump Grinding, Greater than 24 Inches
13 EA
0002AM
Chipping Existing Tree Debris Piles
20 CY
0002AN Contingency CLIN NA NA NA NA 0002AP Boundary Line Clearing 2 Mile
STILLHOUSE HOLLOW
LAKE CAPACITY FOR
BASE YEAR
ITEM DESCRIPTION
Tree Maintenance Services Granger Lake Items
EST.
QTY
U/M
UNIT
PRICE
AMOUNT
0003AA
Tree Trimming and Hazardous Limb Removal, 15 Feet and Lower Per Tree
70 EA
0003AB
Tree Trimming and Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
22 EA
0003AC Tree Removal, Less Than 8 Inches DBH
60 EA
0003AD Tree Removal, 8 to 15 Inches DBH
60 EA
0003AE Tree Removal, 15 to 24 Inches DBH
15 EA
0003AF Tree Removal, Greater Than 24 Inches DBH
6 EA
0003AG Tree Removal Pieced Down, All Sizes
70 EA
0003AH Tree Disposal, Chipping, On-site
100 EA
0003AJ Tree Disposal, Off-site 0 EA
0003AK Tree Stump Grinding, 24 Inches and Less
40 EA
0003AL Tree Stump Grinding, Greater than 24 Inches
20 EA
0003AM Chipping Existing Tree Debris Piles
20 CY
0003AN Contingency CLIN NA NA NA NA
0003AP Boundary Line Clearing 2 Mile
GRANGER LAKE
CAPACITY FOR BASE
YEAR
Tree Maintenance Services Georgetown Lake Items
EST
QTY
U/M
UNIT
PRICE
AMOUNT
0004AA
Tree Trimming and Hazardous Limb Removal, 15 Feet and Lower Per Tree
75 EA
0004AB
Tree Trimming and Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
22 EA
0004AC
Tree Removal, Less Than 8 Inches DBH
65 EA
0004AD
Tree Removal, 8 to 15 Inches DBH
60 EA
0004AE
Tree Removal, 15 to 24 Inches DBH 20 EA
0004AF
Tree Removal, Greater Than 24 Inches DBH
6 EA
0004AG
Tree Removal Pieced Down, All Sizes
70 EA
0004AH
Tree Disposal, Chipping, On-site
100 EA
0004AJ Tree Disposal, Off-site 0 EA
0004AK
Tree Stump Grinding, 24 Inches and Less
40 EA
0004AL
Tree Stump Grinding, Greater than 24 Inches
15 EA
0004AM
Chipping Existing Tree Debris Piles
30 CY
0004AN Contingency CLIN NA NA NA NA 0004AP Boundary Line Clearing 2 Mile
GEORGETOWN LAKE
ITEM DESCRIPTION
Tree Maintenance Services Canyon Lake Items
EST.
QTY
U/M
UNIT
PRICE
AMOUNT
0005AA
Tree Trimming and Hazardous Limb Removal, 15 Feet and Lower Per Tree
75 EA
0005AB
Tree Trimming and Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
27 EA
0005AC Tree Removal, Less Than 8 Inches DBH
65 EA
0005AD Tree Removal, 8 to 15 Inches DBH
70 EA
0005AE Tree Removal, 15 to 24
30 EA
0005AF Tree Removal, Greater Than 24 Inches DBH
6 EA
0005AG Tree Removal Pieced Down, All Sizes
70 EA
0005AH Tree Disposal, Chipping, On-site
100 EA
0005AJ Tree Disposal, Off-site 100 EA
0005AK Tree Stump Grinding, 24 Inches and Less
35 EA
0005AL Tree Stump Grinding, Greater than 24 Inches
10 EA
0005AM Chipping Existing Tree Debris Piles
20 CY
0005AN Contingency CLIN NA NA NA NA
0005AP Boundary Line Clearing 2 Mile
CANYON LAKE CAPACITY
FOR BASE YEAR
Tree Maintenance Services Somerville Lake Items
EST
QTY
U/M
UNIT
PRICE
AMOUNT
0006AA
Tree Trimming and Hazardous Limb Removal, 15 Feet and Lower Per Tree
75 EA
0006AB
Tree Trimming and Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
12 EA
0006AC
Tree Removal, Less Than 8 Inches DBH
55 EA
0006AD
Tree Removal, 8 to 15 Inches DBH
65 EA
0006AE
Tree Removal, 15 to 24 Inches DBH
30 EA
0006AF
Tree Removal, Greater Than 24 Inches DBH
11 EA
0006AG
Tree Removal Pieced Down, All Sizes
70 EA
0006AH
Tree Disposal, Chipping, On-site
100 EA
0006AJ Tree Disposal, Off-site 0 EA
0006AK
Tree Stump Grinding, 24 Inches and Less
40 EA
0006AL
Tree Stump Grinding, Greater than 24 Inches
16 EA
0006AM
Chipping Existing Tree Debris Piles
20 CY
0006AN Contingency CLIN NA NA NA NA 0006AP Boundary Line Clearing 2 Mile
SOMERVILLE LAKE
0001AA-
0006AP
Belton, Stillhouse Hollow, Granger, Georgetown, Canyon and Somerville Lakes Base Year
CONTRACT OPTION YEAR 1: 01 January 2023 through 31 December 2023
FOR CAPITAL REGION LAKES TREE MAINTENANCE SERVICES
ITEM DESCRIPTION
ITEM
Tree Maintenance Services Belton Lake Items
EST.
QTY
U/M
UNIT
PRICE
AMOUNT
1001AA
Tree Trimming and Hazardous Limb Removal, 15 Feet and Lower Per Tree
70 EA
1001AB
Tree Trimming and Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
17 EA
1001AC Tree Removal, Less Than 8 Inches DBH
65 EA
1001AD Tree Removal, 8 to 15 Inches DBH
50 EA
1001AE Tree Removal, 15 to 24 Inches DBH
30 EA
1001AF Tree Removal, Greater Than 24 Inches DBH
11 EA
1001AG Tree Removal Pieced Down, All Sizes
50 EA
1001AH Tree Disposal, Chipping, On-site
100 EA
1001AJ Tree Disposal, Off-site 40 EA
1001AK Tree Stump Grinding, 24 Inches and Less
25 EA
1001AL Tree Stump Grinding, Greater than 24 Inches
12 EA
1001AM Chipping Existing Tree Debris Piles
20 CY
1001AN Contingency CLIN NA NA NA NA
1001AP Boundary Line Clearing 2 Mile
FOR OPTION YEAR 1
Tree Maintenance Services Stillhouse Hollow Lake Items
EST
QTY
U/M
UNIT
PRICE
AMOUNT
1002AA
Tree Trimming and Hazardous Limb Removal, 15 Feet and Lower Per Tree
65 EA
1002AB
Tree Trimming and Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
17 EA
1002AC
Tree Removal, Less Than 8 Inches DBH
55 EA
1002AD
Tree Removal, 8 to 15 Inches DBH
50 EA
1002AE
Tree Removal, 15 to 24 Inches DBH 20 EA
1002AF
Tree Removal, Greater Than 24 Inches DBH
6 EA
1002AG
Tree Removal Pieced Down, All Sizes
60 EA
1002AH
Tree Disposal, Chipping, On-site
90 EA
1002AJ Tree Disposal, Off-site 30 EA
1002AK
Tree Stump Grinding, 24 Inches and Less
30 EA
1002AL
Tree Stump Grinding, Greater than 24 Inches
6 EA
1002AM
Chipping Existing Tree Debris Piles
20 CY
1002AN Contingency CLIN NA NA NA NA 1002AP Boundary Line Clearing 2 Mile
STILLHOUSE HOLLOW
LAKE CAPACITY FOR
OPTION YEAR 1
Tree Maintenance Services Granger Lake Items
EST.
QTY
U/M
UNIT
PRICE
AMOUNT
1003AA
Tree Trimming and Hazardous Limb Removal, 15 Feet and Lower Per Tree
70 EA
1003AB
Tree Trimming and Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
22 EA
1003AC Tree Removal, Less Than 8 Inches DBH
60 EA
1003AD Tree Removal, 8 to 15 Inches DBH
60 EA
1003AE Tree Removal, 15 to 24 Inches DBH
15 EA
1003AF Tree Removal, Greater Than 24 Inches DBH
6 EA
1003AG Tree Removal Pieced Down, All Sizes
70 EA
1003AH Tree Disposal, Chipping, On-site
90 EA
1003AJ Tree Disposal, Off-site 0 EA
1003AK Tree Stump Grinding, 24 Inches and Less
40 EA
1003AL Tree Stump Grinding, Greater than 24 Inches
6 EA
1003AM Chipping Existing Tree Debris Piles
25 CY
1003AN Contingency CLIN NA NA NA NA
1003AP Boundary Line Clearing 2 Mile
GRANGER LAKE
CAPACITY FOR OPTION
YEAR 1
Tree Maintenance Services Georgetown Lake Items
EST
QTY
U/M
UNIT
PRICE
1004AA
Hazardous Limb Removal, 15 Feet and Lower Per Tree
75 EA
1004AB
Tree Trimming and Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
22 EA
1004AC
Tree Removal, Less Than 8 Inches DBH
65 EA
1004AD Tree Removal, 8 to 15 Inches DBH
60 EA
1004AE Tree Removal, 15 to 24 Inches DBH 20 EA
1004AF Tree Removal, Greater Than 24 Inches DBH
6 EA
1004AG Tree Removal Pieced Down, All Sizes
70 EA
1004AH Tree Disposal, Chipping, On-site
100 EA
1004AJ Tree Disposal, Off-site 0 EA 1004AK Tree Stump Grinding, 24
Inches and Less
40 EA
1004AL Tree Stump Grinding, Greater than 24 Inches
6 EA
1004AM Chipping Existing Tree Debris Piles
40 CY
1004AN Contingency CLIN NA NA NA NA 1004AP Boundary Line Clearing 2 Mile
GEORGETOWN LAKE
Tree Maintenance Services Canyon Lake Items
EST.
QTY
U/M
UNIT
PRICE
AMOUNT
1005AA
Tree Trimming and Hazardous Limb Removal, 15 Feet and Lower Per Tree
75 EA
1005AB
Tree Trimming and Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
27 EA
1005AC Tree Removal, Less Than 8
65 EA
1005AD Tree Removal, 8 to 15
70 EA
1005AE Tree Removal, 15 to 24 Inches DBH
30 EA
1005AF Tree Removal, Greater Than 24 Inches DBH
6 EA
1005AG Tree Removal Pieced Down, All Sizes
70 EA
1005AH Tree Disposal, Chipping, On-site
100 EA
1005AJ Tree Disposal, Off-site 100 EA
1005AK Tree Stump Grinding, 24 Inches and Less
35 EA
1005AL Tree Stump Grinding, Greater than 24 Inches
6 EA
1005AM Chipping Existing Tree Debris Piles
30 CY
1005AN Contingency CLIN NA NA NA NA
1005AP Boundary Line Clearing 2 Mile
FOR OPTION YEAR 1
Tree Maintenance Services Somerville Lake Items
EST
QTY
U/M
UNIT
PRICE
AMOUNT
1006AA
Tree Trimming and Hazardous Limb Removal, 15 Feet and Lower Per Tree
75 EA
1006AB
Tree Trimming and Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
12 EA
1006AC
Tree Removal, Less Than 8 Inches DBH
55 EA
1006AD
Tree Removal, 8 to 15 Inches DBH
55 EA
1006AE
Tree Removal, 15 to 24 Inches DBH 30 EA
1006AF
Tree Removal, Greater Than 24 Inches DBH
11 EA
1006AG
Tree Removal Pieced Down, All Sizes
60 EA
1006AH
Tree Disposal, Chipping, On-site
100 EA
1006AJ Tree Disposal, Off-site 0 EA
1006AK
Tree Stump Grinding, 24 Inches and Less
40 EA
1006AL
Tree Stump Grinding, Greater than 24 Inches
11 EA
1006AM
Chipping Existing Tree Debris Piles
20 CY
1006AN Contingency CLIN NA NA NA NA 1006AP Boundary Line Clearing 2 Mile
SOMERVILLE LAKE
1001AA-
1006AP
Belton, Stillhouse Hollow, Granger, Georgetown, Lakes Option Year 1
CONTRACT OPTION YEAR 2: 01 January 2024 through 31 December 2024
FOR CAPITAL REGION LAKES TREE MAINTENANCE SERVICES
ITEM DESCRIPTION
ITEM
Tree Maintenance Services Belton Lake Items
EST.
QTY
U/M
UNIT
PRICE
AMOUNT
2001AA
Tree Trimming and Hazardous Limb Removal, 15 Feet and Lower Per Tree
70 EA
2001AB
Tree Trimming and Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
17 EA
2001AC Tree Removal, Less Than 8 Inches DBH
65 EA
2001AD Tree Removal, 8 to 15 Inches DBH
50 EA
2001AE Tree Removal, 15 to 24 Inches DBH
30 EA
2001AF Tree Removal, Greater Than 24 Inches DBH
11 EA
2001AG Tree Removal Pieced Down, All Sizes
50 EA
2001AH Tree Disposal, Chipping, On-site
100 EA
2001AJ Tree Disposal, Off-site 40 EA
2001AK Tree Stump Grinding, 24 Inches and Less
25 EA
2001AL Tree Stump Grinding, Greater than 24 Inches
12 EA
2001AM Chipping Existing Tree Debris Piles
20 CY
2001AN Contingency CLIN NA NA NA NA
2001AP Boundary Line Clearing 2 Mile
FOR OPTION YEAR 2
Tree Maintenance Services Stillhouse Hollow Lake Items
EST
QTY
U/M
UNIT
PRICE
AMOUNT
2002AA
Tree Trimming and Hazardous Limb Removal, 15 Feet and Lower Per Tree
65 EA
2002AB
Tree Trimming and Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
12 EA
2002AC
Tree Removal, Less Than 8 Inches DBH
55 EA
2002AD
Tree Removal, 8 to 15 Inches DBH
50 EA
2002AE
Tree Removal, 15 to 24 Inches DBH 20 EA
2002AF
Tree Removal, Greater Than 24 Inches DBH
6 EA
2002AG
Tree Removal Pieced Down, All Sizes
60 EA
2002AH
Tree Disposal, Chipping, On-site
90 EA
2002AJ Tree Disposal, Off-site 30 EA
2002AK
Tree Stump Grinding, 24 Inches and Less
30 EA
2002AL
Tree Stump Grinding, Greater than 24 Inches
6 EA
2002AM
Chipping Existing Tree Debris Piles
20 CY
2002AN Contingency CLIN NA NA NA NA 2002AP Boundary Line Clearing 2 Mile
STILLHOUSE HOLLOW
LAKE CAPACITY OPTION
FOR YEAR 2
Tree Maintenance Services Granger Lake Items
EST.
QTY
U/M
UNIT
PRICE
AMOUNT
2003AA
Tree Trimming and Hazardous Limb Removal, 15 Feet and Lower Per Tree
70 EA
2003AB
Tree Trimming and Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
22 EA
2003AC Tree Removal, Less Than 8 Inches DBH
60 EA
2003AD Tree Removal, 8 to 15 Inches DBH
60 EA
2003AE Tree Removal, 15 to 24 Inches DBH
15 EA
2003AF Tree Removal, Greater Than 24 Inches DBH
6 EA
2003AG Tree Removal Pieced Down, All Sizes
70 EA
2003AH Tree Disposal, Chipping, On-site
90 EA
2003AJ Tree Disposal, Off-site 0 EA
2003AK Tree Stump Grinding, 24 Inches and Less
40 EA
2003AL Tree Stump Grinding, Greater than 24 Inches
6 EA
2003AM Chipping Existing Tree Debris Piles
20 CY
2003AN Contingency CLIN NA NA NA NA
2003AP Boundary Line Clearing 2 Mile
GRANGER LAKE
YEAR 2
Tree Maintenance Services Georgetown Lake Items
EST
QTY
U/M
UNIT
PRICE
AMOUNT
2004AA
Tree Trimming and Hazardous Limb Removal, 15 Feet and Lower Per Tree
75 EA
2004AB
Tree Trimming and Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
22 EA
2004AC
Tree Removal, Less Than 8 Inches DBH
65 EA
2004AD
Tree Removal, 8 to 15 Inches DBH
60 EA
2004AE
Tree Removal, 15 to 24 Inches DBH 20 EA
2004AF
Tree Removal, Greater Than 24 Inches DBH
6 EA
2004AG
Tree Removal Pieced Down, All Sizes
70 EA
2004AH
Tree Disposal, Chipping, On-site
100 EA
2004AJ Tree Disposal, Off-site 0 EA
2004AK
Tree Stump Grinding, 24 Inches and Less
40 EA
2004AL
Tree Stump Grinding, Greater than 24 Inches
6 EA
2004AM
Chipping Existing Tree Debris Piles
40 CY
2004AN Contingency CLIN NA NA NA NA 2004AP Boundary Line Clearing 2 Mile
GEORGETOWN LAKE
Tree Maintenance Services Canyon Lake Items
EST.
QTY
U/M
UNIT
PRICE
AMOUNT
2005AA
Tree Trimming and Hazardous Limb Removal, 15 Feet and Lower Per Tree
75 EA
2005AB
Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
27 EA
2005AC Tree Removal, Less Than 8 Inches DBH
60 EA
2005AD Tree Removal, 8 to 15 Inches DBH
65 EA
2005AE Tree Removal, 15 to 24 Inches DBH
20 EA
2005AF Tree Removal, Greater Than 24 Inches DBH
6 EA
2005AG Tree Removal Pieced Down, All Sizes
70 EA
2005AH Tree Disposal, Chipping, On-site
100 EA
2005AJ Tree Disposal, Off-site 100 EA
2005AK Tree Stump Grinding, 24 Inches and Less
25 EA
2005AL Tree Stump Grinding, Greater than 24 Inches
3 EA
2005AM Chipping Existing Tree Debris Piles
25 CY
2005AN Contingency CLIN NA NA NA NA
2005AA Boundary Line Clearing 2 Mile
FOR OPTION YEAR 2
Tree Maintenance Services Somerville Lake Items
EST
QTY
U/M
UNIT
PRICE
AMOUNT
2006AA
Tree Trimming and Hazardous Limb Removal, 15 Feet and Lower Per Tree
70 EA
2006AB
Tree Trimming and Hazardous Limb Removal, Greater Than 15 Feet High Per Tree
12 EA
2006AC
Tree Removal, Less Than 8 Inches DBH
45 EA
2006AD
Tree Removal, 8 to 15
45 EA
2006AE
Tree Removal, 15 to 24 Inches DBH 20 EA
2006AF
Tree Removal, Greater Than 24 Inches DBH
6 EA
2006AG
Tree Removal Pieced Down, All Sizes
60 EA
2006AH
Tree Disposal, Chipping, On-site
100 EA
2006AJ Tree Disposal, Off-site 0 EA
2006AK
Tree Stump Grinding, 24 Inches and Less
30 EA
2006AL
Tree Stump Grinding, Greater than 24 Inches
6 EA
2006AM
Chipping Existing Tree Debris Piles
20 CY
2006AN Contingency CLIN NA NA NA NA 2006AA Boundary Line Clearing 2 Mile
SOMERVILLE LAKE
2001AA-
2006AP
Belton, Stillhouse Hollow, Granger, Georgetown, Lakes Option Year 1
0001AA-
2006AP
BASE AND ALL OPTIONS
GRAND TOTAL
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-JAN-2022 TO
30-DEC-2022
N/A BELTON LAKE OFFICE
JOSHUA BROWN
3110 FM 2271
BELTON TX 76513-9717
254-742-3056
9674CD
0002 POP 01-JAN-2022 TO
30-DEC-2022
N/A STILLHOUSE HOLLOW LAKE OFFICE
JEFF PHILLIPS
3740 FM 1670
BELTON TX 76513
254-760-1623
967441
0003 POP 01-JAN-2022 TO
N/A GRANGER LAKE OFC OFC
SCOTT BLANK
22350 FM 971
GRANGER TX 76530
512-879-9046
967472
0004 POP 01-JAN-2022 TO
N/A GEORGETOWN LAKE OFC OFC
SCOTT BLANK
500 LAKE OVERLOOK ROAD
GEORGETOWN TX 78628-4901
512-930-2283
967470
0005 POP 01-JAN-2022 TO
N/A CANYON PROJECT OFC ATTN CESWF-
OD-CN
JAVIER E PEREZ ORTIZ
601 COE ROAD
CANYON LAKE TX 78133
830-964-3341
967422
0006 POP 01-JAN-2022 TO
N/A SOMERVILLE PROJECT OFC
RUSSELL J. MEIER
1560 THORNBERRY DRIVE
SOMERVILLE TX 77879
979-596-1624
967454
1001 POP 01-JAN-2023 TO
30-DEC-2023
N/A BELTON LAKE OFFICE
JOSHUA BROWN
3110 FM 2271
BELTON TX 76513-9717
254-742-3056
1002 POP 01-JAN-2023 TO
N/A STILLHOUSE HOLLOW LAKE OFFICE
JEFF PHILLIPS
3740 FM 1670
BELTON TX 76513
254-760-1623
1003 POP 01-JAN-2023 TO
N/A GRANGER LAKE OFC OFC
SCOTT BLANK
22350 FM 971
GRANGER TX 76530
512-879-9046
1004 POP 01-JAN-2023 TO
N/A GEORGETOWN LAKE OFC OFC
SCOTT BLANK
500 LAKE OVERLOOK ROAD
GEORGETOWN TX 78628-4901
512-930-2283
1005 POP 01-JAN-2023 TO
N/A CANYON PROJECT OFC ATTN CESWF-
OD-CN
JAVIER E PEREZ ORTIZ
601 COE ROAD
CANYON LAKE TX 78133
830-964-3341
1006 POP 01-JAN-2023 TO
N/A SOMERVILLE PROJECT OFC
RUSSELL J. MEIER
1560 THORNBERRY DRIVE
SOMERVILLE TX 77879
979-596-1624
2001 POP 01-JAN-2024 TO
30-DEC-2024
N/A BELTON LAKE OFFICE
JOSHUA BROWN
3110 FM 2271
BELTON TX 76513-9717
254-742-3056
2002 POP 01-JAN-2024 TO
N/A STILLHOUSE HOLLOW LAKE OFFICE
JEFF PHILLIPS
3740 FM 1670
BELTON TX 76513
254-760-1623
2003 POP 01-JAN-2024 TO
N/A GRANGER LAKE OFC OFC
SCOTT BLANK
22350 FM 971
GRANGER TX 76530
512-879-9046
2004 POP 01-JAN-2024 TO
N/A GEORGETOWN LAKE OFC OFC
SCOTT BLANK
500 LAKE OVERLOOK ROAD
GEORGETOWN TX 78628-4901
512-930-2283
2005 POP 01-JAN-2024 TO
N/A CANYON PROJECT OFC ATTN CESWF-
OD-CN
JAVIER E PEREZ ORTIZ
601 COE ROAD
CANYON LAKE TX 78133
830-964-3341
2006 POP 01-JAN-2024 TO
N/A SOMERVILLE PROJECT OFC
RUSSELL J. MEIER
1560 THORNBERRY DRIVE
SOMERVILLE TX 77879
979-596-1624
INSTRUCTIONS TO OFFERORS
INSTRUCTIONS TO OFFERORS
OFFEROR DUE DATE/LOCAL TIME: SEE SF1449 BLOCK 8
POINT OF CONTACT: Bonifacio Magdelano Phone: (817)886-1906 Email address: CIV‐OPS.Proposals@usace.army.mil Furnish Copy To: Bonifacio.Magdaleno@usace.army.mil
Quotes shall be accepted via “EMAIL ONLY,” no fax, mail, express mail, or hands carry, “NO EXCEPTIONS.” EMAIL your proposal to: CIV‐OPS.Proposals@usace.army.mil Subject line of email must include the solicitation number and your Company Name
For additional help contact your local Procurement Technical Assistance Centers (PTAC).
Centers were created by Congress to assist businesses seeking to compete on federal contracts.
Services are generally free; however, a small fee may be charged for certain services. Please use website http://www.aptac-us.org/new/ to contact a center to assist you in the preparation for a federal contract, registering in SAM or other required systems.
SYSTEM FOR AWARD MANAGEMENT (SAM) is REQUIRED to receive an award on all federal government contracts. Therefore, contractors are encouraged to begin this process sooner rather than later. If already registered, please ensure your registration is ACTIVE. The website to register with SAM is: www.sam.gov.
DATA UNIVERSAL NUMBERING SYSTEM (DUNS) is REQUIRED. Dun & Bradstreet (D&B) provides a DUNS Number, a unique nine digit identification number, for each physical location of your business.
DUNS Number assignment is FREE for all businesses required to register with the US Federal government for contracts or grants in the System for Award Management (SAM see below).
Click here to request your D-U-N-S Number via the Web. The website to obtain your DUNS number:
http://fedgov.dnb.com/webform For technical difficulties, contact govt@dnb.com
ONLINE REPRESENTATIONS AND CERTIFICATIONS APPLICATIONS (ORCA)
allows contractors to complete a one-time certification and representations for your use on any solicitation. The website to complete ORCA is available at the System for Award Manager (SAM): www.sam.gov. The information previously maintained in CCR, FedReg and ORCA now is contained within the Entity Management area in SAM. Legacy EPLS information resides in the Performance Information area of SAM.
WAGE RATES: The Service Contract Act applies (see attached wage rates in Section J).
Note: Does not apply to Contractors registered in System for Award Management (SAM) as Sole Proprietorships.
Vendor Information Sheet
IN THE EVENT OF AWARD, ISSUE CONTRACT TO:
COMPANY NAME
POC
(Last, First Middle)
ADDRESS
(Number & Street) (City, State and Zip)
PHONE NUMBER MOBILE
(Area code and number) (Area code and number)
EMAIL ADDRESS___________________________________________
DUNS NUMBER CAGE CODE NUMBER________
SSN/TIN NUMBER or firm’s Tax ID Number (TIN) ______________________________
Vendor’s Online Representation and Certification Application (ORCA) are updated in SAM Yes No
Signature Date
Below is a checklist to ensure all the proper documents are returned for consideration on this solicitation.
Only those items checked below as “required” must be returned
Required Contractor Item
1. Submit Past Performance Questionnaire (PPQ), and Conceptual Work Plans IAW the evaluation factors outlined in 52.212-2.
2. Complete Quote(s)) See Attached Bid Schedule- Bid Schedule filled out completely is REQUIRED
Signed Amendments if Applicable (Blocks 15a -15c)
CHECK SCHEDULES FOR MATHEMATICAL ERRORS
3. Complete vendor information sheet or provide a document with similar information Remember to sign AND date.
4. The provisions at 52.212-1, 52.212-2, 52.212-3 Alt I, 52.212-5 and 52.212-5 apply to this acquisition. Confirm vendor’s 52.212-3 Alt I ORCA is updated in SAM on the vendor information sheet.
5. You must have an active SAM registration prior to award
6. Send the Past Performance Questionnaire to a former customer or person who can vouch for your past performance.
7. Scan all documents into a single.pdf file. PDF only authorized format
HAND WRITTEN BID SCHEDULES WILL NOT BE ACCEPTED!
8. EMAIL your quote to:
CIV-OPS.Proposals@usace.army.mil
Bonifacio.Magdaleno@usace.army.mil Subject line of email must include the solicitation number and Company Name.
9. NIST Certification Score in accordance with clause 252.204-7019
ATTACHMENT 1
NAVFAC/USACE PAST PERFORMANCE QUESTIONAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm name: CAGE Code:
Address: DUNS Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of Project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy) Explain Differences:
Original Contract Price (Award Amount):
Final contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNARIE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNARIE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATION. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM. AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil bonifacio.magdaleno@usace.army.mil Ensure the former employer references the solicitation number in the email subject line.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract
Rating will be neither positive or negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY
a) Quality of technical data/report preparation efforts E VG S M U
N
b) Ability to meet quality standards for technical performance E VG S M U
N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.
E VG S M U
N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U
N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U
N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U
N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? E VG S M U
N
d) Overall customer satisfaction E VG S M U
N
4. MANAGEMENT/PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force? E VG S M U
N
b) Ability to hire, apply, and retain qualified workforce to this effort E VG S M U
N
c) Government Property Control E VG S M U
N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U
N
e) Utilization of Small Business concerns E VG S M U
N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U
N
g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to Government changes
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) E VG S M U
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agree price(s)? E VG S M U
N
b) Contractor Proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports.
Budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. YES NO
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
YES
NO
f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below. YES NO
6. SAFETY/SECURITY
a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)
b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U
N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)
b) Compliance with contractual terms/provisions (explain if specific issues)
E VG S M U
N
c) Would you hire or work with this firm again? (If no, please explain below)
YES NO
d) In Summary, provide an overall rating for the work performed by this contractor. E VG S M U
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages in necessary):
SITE VIST
52.237-1 SITE VIST
Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Site visit attendees must provide the following information: Solicitation Number, Project Title, Name(s) of Individual(s) who will attend the site visit, Name of Company Represented, Phone Number of Company being represented. All attendees will be required to sign the attendance sheet. Due to COVID-19 restrictions, space availability will be limited to two (2) participants per company.
All personnel are required to wear masks when indoors, and maintain a distance of six (6) feet between individuals, where able. Contractors must provide their own masks.
A Virtual Site Visit will be held on 1 November 2021 at 0900am Central Time. In order to a receive a call in number please send your contact information to bonifacio.magdaleno@usace.army.mil NLT 28 October 2021.
Address:
U.S. Army Corps of Engineers Belton Lake Office
3110 FM 2271
Belton, TX 76513 (254)939-1829
FAX: (254)939-8061
Lake Manager: Joshua Brown Joshua.g.brown@usace.army.mil
Stillhouse Hollow Lake Office
3740 FM 1670
Belton, TX 76513 (254)939-2461
FAX: (254) 939-8150
Lake Manager: interim: Jeff Phillips Jeffrey.W.Phillips2@usace.army.mil Lead Ranger: Brad Ellis Bradley.d.ellis@usace.army.mil
Granger Lake Office 3100 Granger Dam Road Granger, TX 76530
(512) 859-2668
FAX: (512) 859-2934
Lake Manager: Scott Blank scott.w.blank@usace.army.mil Ranger: Brandon Randig Brandon.S.Randig@usace.army.mil
Georgetown Lake Office 500 Lake Overlook Drive Georgetown, TX 78633
(512) 930-2283
FAX: (512) 863-4769
Lake Manager: Scott Blank scott.w.blank@usace.army.mil
Somerville Lake Office 1560 Thornberry Drive Somerville, TX 77879
(979) 596-1622
FAX: (979) 596-1493
Lake Manager: Russell Meier Russell.j.meier@usace.army.mil
Canyon Lake Office 601 C.O.E. Road Canon Lake, TX 78133
(830) 964-3660
FAX: (210) 964-2215
Lake Manager: Javier Perez-Ortiz Javier.e.perez-ortiz@usace.army.mil
CT POC: Bonifacio Magdaleno Contact Info: 817-886-1906 Email: Bonifacio.Magdaleno@usace.army.mil
Date/Time/Lake: Monday, November 1st @ 10:00 am CST / Somerville Lake Tuesday, November 2nd @ 10:00 am CST / Georgetown/Granger Lakes Thursday, November 4th @ 10:00 am CST / Belton and Stillhouse Hollow Lakes Friday, November 5th @ 10:00 am CST / Canyon Lake
CLAUSES INCORPORATED BY FULL TEXT
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
Offers will be evaluated by performing a comparative evaluation in accordance with FAR 13.106-2(b)(3) to determine which response represents the “best” as a whole. Comparative Evaluations is the act of comparing two or more offers or proposal in response to the RFQ.
Quotes are first evaluated to ensure all RFQ submission requirements are met. Quotes will be evaluated by performing a direct comparison of one offer to another in a uniform manner to determine which best provides the Government with its needs, as identified in the RFQ. If the RFQ submission requirements have not been met, the Contracting Officer shall deem the offeror non-responsive.
The Government reserves the right to consider a response that offers more than the minimum, and select that response if it provides a benefit to the Government. The Government has the discretion to accept other than the lowest priced offeror that provides additional benefits. The Government also has the discretion to make an award based on whether the lowest priced of the quotations/offers having the highest past performance rating possible represents the best benefit to the Government.
The following factors shall be used to evaluate offers:
FACTOR 1: PRICE
Prices will be evaluated for fairness and reasonableness through a price analysis that compares the offered prices against each other and the Independent Government Estimate. Award shall not be made to an Offeror’s proposal for goods or services that is found to be unbalanced and/or unreasonably low or high.
FACTOR 2: PAST PERFORMANCE
Past Performance Questionnaire (PPQ) forms provided in the solicitation shall be completed and submitted as specified in the Instructions to Offerors. They will be evaluated to assess the degree of confidence the Government has in an Offeror's ability to supply products and services that meet users' needs based on a demonstrated record of recent and relevant work similar to the work described in this solicitation. Recent or relevant work is defined as similar work within the past four (4) years.
The Contracting Officer shall deem the offeror non-responsive if they fail to provide recent and relevant past performance prior to award IAW FAR 52.212-1(b)(10). The offeror must submit at least one (1) PPQ with a satisfactory or higher rating to be deemed eligible for award. Offerors may submit up to five (5) PPQs for consideration.
The Government reserves the right to evaluate past performance based on such information as the contracting officer’s knowledge and previous experience with the item or service being purchased, customer surveys, or other reasonable basis, without the existence of a formal database.
FACTOR 3 – TECHNICAL APPROACH AND UNDERSTANDING OF THE WORK
This factor considers whether the Offeror demonstrates an understanding of the complexity and magnitude of requirements set forth in the Performance Work Statement. At a minimum, the quote shall include a brief narrative (conceptual work plan) that clearly demonstrates an understanding of the requirements of the solicitation. The narrative shall address how the Offeror will perform, develop and implement the work plan. It shall not exceed two pages.
At a minimum, the quote for this factor shall include a brief narrative (conceptual work plan) that clearly demonstrates an understanding of the requirements of the solicitation. The narrative shall at minimum address:
1. Work in terms of coordination with outside agencies, contractors, and Government personnel to ensure safety and compliance with federal and state regulations and performance requirements in an efficient manner.
2. Offeror will demonstrate how to manage resources at the work sites during weekdays, weekends, and holidays when applicable.
3. How the contractor will prevent rework, and if rework is necessary how it will be addressed.
4. Resources (to include management and administrative) to perform requirements of the Performance Work Statement (PWS).
Technical and past performance, when combined, are EQUAL to price.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
FAILURE TO SUBMIT ALL REQUIREMENTS FOR SOLICTATION WILL RESULT IN A
NONRESPONSIVE RATING AND OFFEROR WILL NOT BE CONSIDERED FOR AWARD.
(End of provision)
PERFORMANCE WORK STATEMENT
US ARMY CORPS OF ENGINEERS
FORT WORTH DISTRICT
CAPITAL REGION
TREE MAINTENANCE SERVICES
INDEFINITE DELIVERY INDEFINITE QUANTITY
PERFORMANCE WORK STATEMENT
1. GENERAL: This is a non-personal services contract to provide all management, tools, equipment, materials, chemicals and labor required to achieve the desired results described herein to perform tree storm damage removal, trimming, dead tree removal, stump grinding, boundary line clearing and services described herein. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform tree storm damage removal, trimming, dead tree removal, stump grinding, boundary line clearing and services described herein at Capital Region Lakes as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract. These services shall be utilized at Belton, Canyon, Georgetown, Granger, Somerville and Stillhouse Hollow Lakes.
1.1.1 Definitions:
a. Contractor: Company structure, including all partners, officers and employees with interest in this contract.
b. Government: Government of the United States of America.
c. Contracting Officer (KO): Person executing this contract on behalf of the Government.
a) Contracting Officer’s Representative (COR): Person designated by letter of designation from KO. The COR monitors all technical aspects of the contract and assists in contract administration.
The COR is authorized to perform the following functions: assures that the Contractor performs the technical requirements of the contract, performs inspections necessary in connection with contract performance, maintains written and oral communications with the Contractor concerning technical aspects of the contract, issues written interpretations of technical requirements; including Government drawings, designs, specifications, monitors Contractor’s performance and notifies both the KO and Contractor of any deficiencies, coordinates availability of Government furnished property, and provides site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates.
The COR is not authorized to change any of the terms and conditions of the contract.
d. Safety Manual: EM 385-1-1, Corps of Engineers Safety and Health Requirements Manual, current edition available at pre-work conference.
e. Performance Standard: Describes the desired results that are to be achieved.
f. Quality Control: Action taken by the Contractor and/or their personnel to document, inspect and control performance of services to ensure specifications and requirements of this PWS are met.
g. Quality Assurance: Action taken by the Government to ensure the Contractor's quality control system is functioning and effective and that the Contractor is providing services which are in accordance with this PWS.
h. Quality Assurance Representative (QAR): Person designated by the Lake Manager to perform
Quality Assurance Inspections, review…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .