B.08 - Structural Drawings.pdf

PDF 6 MB Posted

Attached to
Bonneville Fish Guidance Efficiency Gatewell Improvement
Solicitation number
W9127N21B0002
Issued by

About this file

This document contains structural drawings and specifications for a federal construction contract opportunity for fish guidance efficiency gatewell improvements at Bonneville Dam along the Columbia River. The contract opportunity is solicitation number W9127N21B0002 from the U.S. Army Corps of Engineers, Portland District, and involves improvements to slots A, B, and C including demolition and forming of new concrete structures. The estimated value of the project is between $1 million and $5 million. Bids for the work were due on November 16, 2020. The drawings depict existing conditions and specify requirements for new concrete forms, reinforcement, and construction details.

View the file

Other files

File Type Posted
C.04 - signed Abstract - 7N21B0002 (002).pdf PDF
20201029_BN2_FGE_PreBidWebex_Attendance.docx DOCX document
B.08 - W9127N21B00020001.pdf PDF
B.08 - 20201029 Prebid Virtual Site Visit.pptx PPTX presentation
B.08 - Informational Drawings.pdf PDF
B.08 - W9127N21B0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DECK ACCESS BRIDGE

ELEV. 90 INTAKE

060' 60'

SCALE: 1"= 60'

BULKHEAD SLOT

HEADGATE SLOT

INTAKE DECK EL 90.0'

ACCESS

WORK

PROJECT

WORK

MANDATORY

WORK

OPTIONAL

STAGING AREA

OPTIONAL WORK

AND SUBJECT TO CHANGE

18 ARE OPTIONS IN THE CONTRACT

WORK IN UNITS 11, 12, 13, 14, 16, 17 AND

WORK IS BEING PERFORMED IN SLOT C

WORK IS IN SLOTS A AND B ONLY. NO

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

/2

/2

DRAWING PLOT SIZE: ANSI D DATE AND TIME PLOTTED: 9/24/2020 12:05:11 PM BY USERNAME: g2ecdrad Untitled Workspace SHEET NAME: Sheet Name

F L

O W

F L

O W

DOWNSTREAM POOL

COLUMBIA RIVER

UPSTREAM POOL

COLUMBIA RIVER

EB SB

BRIDGE

EL 55.0'

TAILRACE DECK,

F

IS

H L

A D

D E

R

F

IS

H L

A D

D E

R

M

AIN

A C C E S S

R O

A D

DAM ROAD

V

IS

IT

O R C

E N

T E

R P

A R

K

IN

G

M A

IN

A C

C E S S

R O

A D

BUILDING

STORAGE

/0

/2

G A

T E

W E

L L I

M P

R O

V E

M E

N T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

M A

T T

H E

W D

H A

N S

O N P .E

A N

S I

D B

D F -1 .1

G .d g n

G E

C D

R A

D G

E

C D

M H

P

L A

N P

O W

E R

H O

U S

E

G-004

:1

F

IS

H G

U

ID

A N

C E E

F F

IC

IE

N C

Y S

E C

O N

D P

O W

E R

H O

U

B O

N N

E V

IL

L E L

O C

K A

N D D

A M

G E

C D

C M

H

UNIT 18 UNIT 17 UNIT 16 UNIT 15 UNIT 14 UNIT 13 UNIT 12 UNIT 11

W

N

B

A D

V E

R T

IS

E

SCALE: 1"= 60'

WORK AND STAGING AREA

C B A

PORTLAND DISTRICT

"= 1'-0"2

1SCALE: 1

12" 9" 6" 3" 0 1'

12" 0

"= 1'-0"2

1SCALE:

1' 2' 3' 4'

1'-6"

EXIST. REINF.

EXIST. BEAM

FACE OF

T Y

P

U N

O

C

R

BEAM BELOW

FACE OF EXIST.

CONCRETE

EXISTING

BEAM BEYOND

TOP OF EXIST.

BEAM

CONCRETE

EXISTING

PER SECTION, TYP

LONGIT. BARS

PER SECTION, TYP

LONGIT. BARS

12" OC MAX, TYP.

#5 STIRRUPS @

CLR

5"

(12 LOCATIONS)

W/ STD HOOK EA. END

CONT. #5 LONGIT. BAR

A E C

O N

T R

A C

T O

R N

A M

E

A E C

O N

T R

A C

T O

R

C

IT

Y S

T A

T E

A E C

O N

T R

A C

T O

R I

D

A E C

O N

T R

A C

T O

R A

D D

R E

S S

/0

/2

G A

T E

W E

L L I

M P

R O

V E

M E

N T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

T T

H E

W D

H A

N S

O N

P .E

A N

S I

D B

D F .1

S -5

X X

X .d g n

G E

C D

R A

D G

E

C D

M

A

N E

L E

V A

T

IO

N A

N D S

E C

T

IO

N S

L O

S-503

:1

F

IS

H G

U

ID

A N

C E E

F F

IC

IE

N C

Y S

E C

O N

D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

2'-4"

ONLY END BARS SHOWN FOR CLARITY.2.

STIRRUPS AND HOOKS NOT SHOWN FOR CLARITY.1.

NOTES:

ONLY TOP MAT SHOWN FOR CLARITY.2.

STIRRUPS AND HOOKS NOT SHOWN FOR CLARITY.1.

NOTES:

C A

R L D

H A

R R

IS

TYP

" CHAMFER4

SECTION 03 31 01.00 25.

SHALL BE ROUGHENED AND CLEANED AS NOTED IN SPECIFICATION

PRIOR TO CASTING OF NEW CONCRETE, THE CONTACT SURFACE 3.

LAP SPLICE.

REFER TO GENERAL NOTES FOR CONCRETE STRENGTH AND2.

FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION.1.

NOTES:

W

N

B

MIN. 18" EMBED.

CONCRETE WITH

EPOXIED TO EXIST.

W/ STD HOOK. DRILLED AND

#5 DOWELS @ 12" OC

JOINT

CONSTRUCTION

EXISTING

A D

V E

R T

IS

NEW CONCRETE CORBEL

TYP

3" CLR

TYP

3" CLR

DEMOLITION PLAN

REFER TO SD001 FOR

VARIES 10"

T Y

P U

N O

C L

R

S-503

A

SCALE: 1/2"=1'-0"

PLAN - SLOT A

S-503

B

SCALE: 1/2"=1'-0"

ELEVATION

S-503

SCALE: 1 1/2"=1'-0"

SECTION

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

D A

T E

DRAWING PLOT SIZE: $BORDER$ DATE AND TIME PLOTTED: $$$DATE$$$$ $TIME BY USERNAME: $USER$ SHEET NAME: $SHEETN$

"= 1'-0"2

1SCALE: 1

12" 9" 6" 3" 0 1'

12" 0

"= 1'-0"2

1SCALE:

1' 2' 3' 4'

T Y

P

U N

O

C L

R

BEAM BELOW

FACE OF EXIST.

BEAM BEYOND

TOP OF EXIST.

BEAM

CONCRETE

EXISTING

JOINT

CONSTRUCTION

EXISTING

ONLY END BARS SHOWN FOR CLARITY.2.

STIRRUPS AND HOOKS NOT SHOWN FOR CLARITY.1.

NOTES:

ONLY TOP MAT SHOWN FOR CLARITY.2.

STIRRUPS AND HOOKS NOT SHOWN FOR CLARITY.1.

NOTES:

/0

/2

C A

R L M

H A

R R

IS

G A

T E

W E

L L I

M P

R O

V E

M E

N

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

P O

R T

L A

N D

O R

E G

O N

P O

R T

L A

N D D

IS

T R

IC

T T

H E

W D

H A

N S

O N P .E

A N

S I

D B

D F .1

S -5

X X

X .d g n

G E

C D

R A

D G

E

C D

M

A

N E

L E

V A

T

IO

N A

N D

S

E C

T

IO

N S

L O

S-504

:1

F

IS

H G

U

ID

A N

C E E

F F

IC

IE

N C

Y S

E C

O N

D P

O W

E R

H O

U

N N

E V

IL

L E L

O C

K A

N D D

A M

W

N

B

SECTION 03 31 01.00 25.

SHALL BE ROUGHENED AND CLEANED AS NOTED IN SPECIFICATION

PRIOR TO CASTING OF NEW CONCRETE, THE CONTACT SURFACE 3.

LAP SPLICE.

REFER TO GENERAL NOTES FOR CONCRETE STRENGTH AND2.

FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION.1.

NOTES:

TYP

3" CLR

TYP

3" CLR

CLR

5"

11"

2'-4"VARIES 10"

T Y

P U

N O

C L

R

PER SECTION, TYP

LONGIT. BARS

CONCRETE

EXISTING

MIN. 18" EMBED.

CONCRETE WITH

EPOXIED TO EXIST.

W/ STD HOOK. DRILLED AND

#5 DOWELS @ 12" OC

EXIST. BEAM

FACE OF

EXIST. REINF

(10 LOCATIONS)

W/ STD. HOOK EA END

CONT. #5 LONGIT BARS

DEMOLITION PLAN

REFER TO SD001 FOR

CORBEL

NEW CONCRETE

3/4" CHAMFER, TYPMAX, TYP

@ 12" OC

#5 STIRRUP

PER SECTION, TYP

LONGIT. BARS

A D

V E

R T

IS

E

S-504

C

SCALE: 1/2"=1'-0"

PLAN - SLOT B

S-504

D

SCALE: 1/2"=1'-0"

ELEVATION

S-504

SCALE: 1 1/2"=1'-0"

SECTION

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

D A

T E

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

C O

N T

R A

C T N

O

IDENTIFICATION

SHEET

D A

T E

A P

P R

D R

A W

IN

G N

U M

B E

R of Engineers

US Army Corps

P L

O T D

A T

E

54321

D

C

B

A

D A

T E

DRAWING PLOT SIZE: $BORDER$ DATE AND TIME PLOTTED: $$$DATE$$$$ $TIME BY USERNAME: $USER$ SHEET NAME: $SHEETN$

File details come from the government source that posted it. Updated .