B.08 Solicitation_Somerville Mowing_21Q0009_Final.pdf

PDF 4 MB Posted

Attached to
Somerville Mowing
Solicitation number
W9126G21Q0009
Issued by

About this file

This document provides details for an anticipated federal contract solicitation for mowing services. The U.S. Army Corps of Engineers Fort Worth District intends to award a firm fixed price contract between $1 million and $5 million for providing personnel, equipment, supplies, and other services necessary to perform mowing at Somerville Lake in Texas. The performance period is an initial 12-month base period followed by up to four 12-month option periods and a final six-month option period, not to exceed 66 months total. The North American Industry Classification System code is 561730 for lawn mowing services, and the small business size standard is $8 million. The point of contact is listed as Karen Harkins for any questions regarding solicitation W9126G21Q0009, anticipated to be issued on or about 19 March 2021 with proposals due approximately 30 days later.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W9126G21Q0009 19-Mar-2021

b. TELEPHONE NUMBER

(817) 886-1289

8. OFFER DUE DATE/LOCAL TIME

11:59 PM 16 Apr 2021

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W9126G9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

KAREN M HARKINS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, CT OFC RM 2A17

FORT WORTH TX 76102-0300

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 967454 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

SOMERVILLE PROJECT OFC

RUSSELL J. MEIER

1560 THORNBERRY DRIVE

SOMERVILLE TX 77879

TEL: 979-596-1624 FAX: 979-596-1624

(817) 886-6403FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

X 8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$8,000,000

NAICS:

561730

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF115

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W9126G21Q0009

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 15

Mowing Somerville Lake

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.

Period of Performance: 16 JUN 2021 through 15 JUN 2022

FOB: Destination

PSC CD: S208

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 6 Park Periodic Mowing (REC)

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.

Period of Performance: 16 JUN 2021 through 15 JUN 2022

FOB: Destination

0003 5 Embankment and Periodic (FRM)

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the

Period of Performance: 16 JUN 2021 through 15 JUN 2022

1001 15 OPTION Park Facility Mowing (REC)

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the

Period of Performance: 16 JUN 2022 through 15 JUN 2023

1002 6 OPTION Park Periodic Mowing (REC)

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the

1003 5 OPTION Embankment and Periodic (FRM)

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the

2001 15 OPTION Park Facility Mowing (REC)

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.

Period of Performance: 16 JUN 2023 through 15 JUN 20234

2002 6 OPTION Park Periodic Mowing (REC)

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.

Period of Performance: 16 JUN 2023 through 15 JUN 20234

2003 5 OPTION Embankment & Periodic (FRM)

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.

Period of Performance: 16 JUN 2023 through 15 JUN 20234

3001 15 OPTION Park Facility Mowing (REC)

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the

Period of Performance: 16 JUN 2024 through 15 JUN 2025

3002 6 OPTION Park Periodic Mowing (REC)

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the

3003 5 OPTION Embankment & Periodic (FRM)

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the

4001 15 OPTION Park Facility Mowing (REC)

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the

Period of Performance: 16 JUN 2025 through 15 JUN 2026

4002 6 OPTION Park Periodic Mowing (REC)

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the

4003 5 OPTION Embankment & Periodic (FRM)

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the

5001 7 OPTION Park Facility Mowing (REC)

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the

Period of Performance: 16 JUN 2026 through 15 JDEC 2026

5002 3 OPTION Park Periodic Mowing (REC)

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the

5003 3 OPTION Embankment & Periodic (FRM)

FFP

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the

KO STATEMENT

Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government 5001 Destination Government Destination Government 5002 Destination Government Destination Government 5003 Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 16-JUN-2021 TO

15-JUN-2022

N/A SOMERVILLE PROJECT OFC

RUSSELL J. MEIER

1560 THORNBERRY DRIVE

SOMERVILLE TX 77879

979-596-1624

967454

0002 POP 16-JUN-2021 TO

15-JUN-2022

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 16-JUN-2021 TO

15-JUN-2022

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 16-JUN-2022 TO

15-JUN-2023

N/A (SAME AS PREVIOUS LOCATION)

1002 POP 16-JUN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

1003 POP 16-JUN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 16-JUN-2023 TO

15-JUN-2024

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 16-JUN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

2003 POP 16-JUN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 16-JUN-2024 TO

15-JUN-2025

N/A (SAME AS PREVIOUS LOCATION)

3002 POP 16-JUN-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

3003 POP 16-JUN-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 16-JUN-2025 TO

15-JUN-2026

N/A (SAME AS PREVIOUS LOCATION)

4002 POP 18-JUN-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

4003 POP 18-JUN-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

5001 POP 18-JUN-2024 TO

15-DEC-2026

N/A (SAME AS PREVIOUS LOCATION)

5002 POP 18-JUN-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

5003 POP 18-JUN-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

Section G - Contract Administration Data

SITE VISIT

52.237-1 SITE VIST

Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

Prospective offerors/quoters are required to contact the Contract Specialist via email to express their interests by 3:00 PM (CST) two business days prior to attending the site visit. At that time, the Contract Specialist will assign an appointment time for the day of the Site Visit. Each appointment will allow a total of 10 people and will be limited to two (2) hours each. Site visit attendees must provide the following information: Solicitation Number, Project Title, Name(s) of Individual(s) who will attend the site visit, Name of Company Represented, Phone Number of Company being represented. All attendees will be required to sign the attendance sheet. Due to COVID-19 restrictions, space availability will be limited to two (2) participants per company.

All personnel are required to wear masks during site visits, and maintain a distance of six (6) feet between individuals, where able. Contractors must provide their own masks.

Address: U.S. Army Corps of Engineers

Somerville Lake Project Office 1560 Thornberry Dr Somerville, Texas 77879-6347

CT POC: Karen Harkins Contact Info: 817-886-1289 Email: karen.harkins@usace.army.mil

Date/Time: Wednesday, March 31, 2021 @ 10:00 am CST

VIRTUAL SITE VISIT INFORMATION

52.237-1 SITE VISIT

There will be a Virtual Site Visit performed in order to clarify expectations and answer any questions concerning the requirements of the specified work. Prospective offerors are required to contact the Contract Specialist via email to express their interests by 3:00 PM (CST) two business days prior to attending the virtual site visit. At a minimum, the email should reference the Solicitation Number, Project Title, Name(s) of Individual(s) who will attend the site visit, Name of Company Represented, Phone Number of Company being represented. An e-mail containing the dial-in information will be sent to all prospective attendees who have expressed interest.

CT POC: Karen Harkins Contact Info: 817-886-1289 Email: karen.harkins@usace.army.mil

Conference: Wednesday, March 31, 2021 @ 09:00 am CST

INSTRUCTIONS TO OFFERERS

INSTRUCTIONS TO OFFERORS

OFFEROR DUE DATE/LOCAL TIME: _ SEE SF1449 BLOCK 8

POINT OF CONTACT: _Karen Harkins_ Phone: (817)886-1289 Email address: CIV-OPS.Proposals@usace.army.mil Furnish Copy To: Karen Harkins@usace.army.mil

Quotes shall be accepted via “EMAIL ONLY,” no fax, mail, express mail, or hands carry, “NO EXCEPTIONS.” EMAIL your proposal to: CIV-OPS.Proposals@usace.army.mil Subject line of email must include the solicitation number and your Company Name.

Offers will be evaluated in accordance with the factors listed in 52.212-2 Evaluation on page 86.

The factors to be evaluated are: Price, Past Performance, and Technical Approach.

For additional help contact your local Procurement Technical Assistance Centers (PTAC).

Centers were created by Congress to assist businesses seeking to compete on federal contracts.

Services are generally free; however, a small fee may be charged for certain services. Please use website http://www.aptac-us.org/new/ to contact a center to assist you in the preparation for a federal contract, registering in SAM or other required systems.

SYSTEM FOR AWARD MANAGEMENT (SAM) is REQUIRED to receive an award on all federal government contracts. Therefore, contractors are encouraged to begin this process sooner rather than later. If already registered, please ensure your registration is ACTIVE. The website to register with SAM is: www.sam.gov.

DATA UNIVERSAL NUMBERING SYSTEM (DUNS) is REQUIRED. Dun & Bradstreet (D&B) provides a DUNS Number, a unique nine digit identification number, for each physical location of your business.

DUNS Number assignment is FREE for all businesses required to register with the US Federal government for contracts or grants in the System for Award Management (SAM see below).

Click here to request your D-U-N-S Number via the Web. The website to obtain your DUNS number:

http://fedgov.dnb.com/webform For technical difficulties, contact govt@dnb.com

ONLINE REPRESENTATIONS AND CERTIFICATIONS APPLICATIONS (ORCA)

allows contractors to complete a one-time certification and representations for your use on any solicitation. The website to complete ORCA is available at the System for Award Manager (SAM): www.sam.gov. The information previously maintained in CCR, FedReg and ORCA now is contained within the Entity Management area in SAM. Legacy EPLS information resides in the Performance Information area of SAM.

WAGE RATES: The Service Contract Act applies: page 109. Note: Does not apply to Contractors registered in System for Award Management (SAM) as Sole Proprietorships.

Contractor Information Sheet

IN THE EVENT OF AWARD, ISSUE CONTRACT TO:

NAME

(Last, First Middle)

ADDRESS

(Number & Street) (City, State and Zip)

HOME PHONE NUMBER MOBILE

(Area code and number) (Area code and number)

EMAIL ADDRESS________________________________________________________________

DUNS NUMBER CAGE CODE NUMBER

NAVFAC/USACE PAST PERFORMANCE QUESTIONAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm name: CAGE Code:

Address: DUNS Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of Project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy) Explain Differences:

Original Contract Price (Award Amount):

Final contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNARIE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNARIE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATION. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT

RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil Ensure the former employer references the solicitation number in the email subject line.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract

Rating will be neither positive or negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY

a) Quality of technical data/report preparation efforts E VG S M U

N

b) Ability to meet quality standards for technical performance E VG S M U

N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.

E VG S M U

N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U

N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U

N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U

N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U

N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force?

E VG S M U

N

b) Ability to hire, apply, and retain qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines

E VG S M U

N

g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to Government changes

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agree price(s)?

E VG S M U

N

b) Contractor Proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports.

Budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

YES NO

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

YES

NO

f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below.

YES NO

6. SAFETY/SECURITY

a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U

N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)

b) Compliance with contractual terms/provisions (explain if specific issues)

E VG S M U

N

c) Would you hire or work with this firm again? (If no, please explain below)

YES NO

d) In Summary, provide an overall rating for the work performed by this contractor. E VG S M U

N AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages in necessary):

INSURANCE

INSURANCE

Prior to commencement of work, the Contractor shall furnish the original of his Insurance Certificate directly to the Contracting Officer, Fort Worth District, Corps of Engineers, ATTN: CESWF-CT-S, P.O.

Box 17300, Fort Worth, Texas 76102-0300 and one copy directly to the Lake and Project Office. The Contractor shall maintain, during the entire period of his performance under this contract, the following minimum insurance requirements:

Submit a copy of Insurance Certificate directly to:

US Army Corp of Engineers Somerville Lake Office ATTN: Russell Meier 1560 Thornberry Drive Somerville, Texas 77879

Or email to: Karen Harkins@usace.army.mil Phone: (817) 886-1289 Fax: (817)886-6403

(a) Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. No property damage liability is required.

(b) Comprehensive automobile liability insurance covering the operation of all automobiles used in connection with the performance of the contract in the minimum limits of $200,000 per person and $100,000 per accident for bodily injury and $20,000 per accident for property damage.

(c) Workmen's Compensation and Employer's Liability Insurance in the minimum amount of $100,000.00 or in compliance with applicable State statutes.

(d) An endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer.

NOTE:

(1) It is recommended that the contractor furnish a copy of the foregoing requirements to his insurance company in order to assure that an Insurance Certificate is issued meeting the minimum requirements shown. The Insurance Certificate shall also show the contract number to which it applies as well as a brief description and location of the work.

PWS

PERFORMANCE WORK STATEMENT (PWS)

Somerville Mowing Services

Park & Flood Risk Management Mowing Services For Somerville Lake

1. GENERAL: This is a non-personal services contract to provide mowing services at the US Army Corps of Engineers (USACE) managed recreational parks and the Flood Risk Management (FRM) features at Somerville Lake, Texas. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform FRM mowing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the

1.1.1 Definitions:

(a) Contractor: Company structure, including all partners, officers and employees with interest in this contract.

(b) Government: Government of the United States of America.

(c) Contracting Officer (KO): Person executing this contract on behalf of the

Government.

(d) Contracting Officer’s Representative (COR): If applicable, the (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance:

maintain written and oral communications with the contractor concerning technical aspects of the contract: issue written interpretations of technical requirements;

including Government drawings, designs, specifications: monitor Contractor’s performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract.

(e) Designated Individual (DI): Person designated in writing by Capital Regional Office

Operations Project Manager to monitor and act as liaison with the Contractor.

(f) Safety Manual: EM 385-1-1, Corps of Engineers Safety and Health Requirements

Manual, current edition available at pre-work meeting.

(g) Performance Standard: Describes the desired results that are to be achieved.

(h) Quality Control: Action taken by the Contractor and/or their personnel to document, inspect and control performance of services to assure specifications and requirements of this PWS are met.

(i) Quality Assurance: Action taken by the Government to insure the Contractor's quality control system is functioning and effective and that the Contractor is providing services which are in accordance with this PWS.

(j) Quality Assurance Representative (QAR): Person designated by the Lake Manager to perform Quality Assurance Inspections, review invoices, and perform strict contract oversight. The QAR does not have authority to change any terms of the contract.

(k) Quality Assurance Surveillance Plan (QASP): Plan developed by the Government depicting means Quality Assurance will be controlled.

(l) Contract Discrepancy Report (CDR): Written record of unsatisfactory performance by the Contractor as observed by the Quality Assurance Representative, issued to the Contractor when the performance threshold does not meet the minimum requirements.

1.1.2 Basic Requirements: The following requirements for submitting a quote and receiving an award are now mandatory for conducting business with the DOD Government.

1.1.2.1 All offerors are required to obtain a Data Universal Numbering System (DUNS) number by visiting www.dnb.com.

1.1.2.2 All prospective contractors must be registered in System for Award Management (SAM) database prior to any award resulting from this solicitation. If at time of award, contractor is not registered, award will be made to the next successful “registered” offer.

Registration may be accomplished via the internet at www.sam.gov.

1.1.2.3 All payments shall be made by Electronic Funds Transfer (EFT) or “direct deposit”.

1.1.2.4 E-Verify Verification of Eligibility: The Contractor must use the U.S.

Department of Homeland Security E-Verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Contractor must provide to the Government two valid forms of Government-issued identification prior to beginning work to ensure the correct information is entered into the E-Verify system.

1.1.2.5 Permits: The Contractor will, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor will comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

1.1.2.6 Veterans Employment Emphasis: In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222- 35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S.

Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract.

The following resources are available to assist USACE contractors in their outreach efforts: U.S. Department of Labor Veterans employment, www.vets.gov/

Federal veteran employment information , www.fedshirevets.gov/index.aspx Veterans’ Employment and Training Service (VETS) , http://www.dol.gov/vets/ Veterans Opportunity to Work (VOW) Program , http://benefits.va.gov/vow/ U.S. Army Warrior Transition Command Employment Index , wtc.army.mil/modules/employers/index.html Hiring Our Heroes initiative , www.uschamberfoundation.org/hiring-our-heroes Guide to Hiring Veterans , www.whitehouse.gov/sites/default/files/docs/white_house_business_counc il_-_guide_to_hiring_veterans_0.pdf

1.2 SCOPE: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials (except those specified to be provided by the Government), supervision, and other items and non-personal services necessary to perform mowing services as specified in this PWS at two (2) recreation areas, embankment, uncontrolled spillway and access roads on Somerville Lake, Texas (reference Attachment 5-Maps for Parks Facility/Area Mowing, Park Periodic Mowing and Embankment & Periodic Mowing).

1.2.1 Sustainability Requirements: The Contractor shall meet the recycled content requirements set forth by the Environmental Protection Agency (EPA) and shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired;

(1) Competitively within a timeframe providing for compliance with the contract performance schedule;

(2) Meeting contract performance requirements; or

(3) At a reasonable price.

Information about this requirement is available at EPA’s Comprehensive Procurement Guidelines web site, https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program. The list of EPA-designated items is available at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products. Items may include, but are not limited to the following products used on-site in execution of this contract: absorbents, engine coolants and traffic cones.

1.2.2 The Contractor shall meet the Bio-Preferred Program requirements set forth by the USDA at https://www.biopreferred.gov/BioPreferred/faces/Welcome.xhtml. The list of USDA-designated product categories may be found at https://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml#. Items may include, but are not limited to the following products used on-site in execution of this contract: 2-cycle engine oil, lubricants and grease.

1.2.3 As required by the Resource Conservation and Recovery Act of 1976 (42 U.S.C. 6962(c)(3)(A)(i)), the Offeror certifies, by signing this offer, that the percentage of recovered materials content for EPA-designated items to be delivered or used in the performance of the contract will be at least the amount required by the applicable contract specifications or other contractual requirements.

1.2.4 References: FAR Provision 52.223-1 – Bio-based Product Certification, FAR Clause 52.223-2 – Affirmative Procurement of Bio-based Products Under Service and Construction Contracts, FAR Provision 52.223-4 – Recovered Material Certification, FAR Clause 52.223-9 – Estimate of Percentage of Recovered Material Content for EPA-Designated Items, and FAR Clause 52.223-17 – Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts.

1.3 Period of Performance: This contract is for a base year and four (4) option years and one (1) six month Option. The base contract awarded as a result of this solicitation shall remain in full force and effect from June 16, 2021 or date of the award (whichever is later) through June 15, 2022. Option years, if exercised, shall be for 12 months each and the option six month period, if exercised for up to six months. It is anticipated that parks will be open during the period of performance for this contract; however, parks may be closed at any time for construction, floods, budget reductions, etc. and that part or all of required services may be cancelled. No such action shall be cause for a claim against the Government under this contract.

1.4. General Information:

1.4.1 Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is the means by which the Contractor ensures Contractor’s work complies with the requirements of the contract. The Contractor’s Quality Control Plan shall be submitted to the Government for approval at least fifteen (15) days prior to work and must be approved before the Contractor provides any services under this contract. After acceptance of the Quality Control Plan, proposed changes to the approved plan by the Contractor must be submitted to the Lake Office POC for approval and if approved, the Contractor will receive the Contracting Officer’s acceptance in writing.

1.4.1.1 Content of the CQC Plan

Include, as a minimum, the following to cover all operations:

a. A description of the quality control organization, including a chart showing lines of authority.

b. The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function.

c. Requirement for CQC personnel to be on site when work is ongoing.

d. Procedures for tracking deficiencies from identification through acceptable corrective action. Establish verification procedures that identified deficiencies have been corrected.

e. Reporting procedures, including proposed reporting formats.

f. A list of the definable features of work. A definable feature of work is a task which is separate and distinct from other tasks, has separate control requirements, and may be identified by different trades or disciplines, or it may be work by the same trade in a different environment.

1.4.1.2 Acceptance of Plan

Acceptance of the Contractor's plan is required prior to the start of work. All on-site CQC personnel shall possess a copy of the awarded contract, applicable Letter of Instruction, and all maps associated with contract line items specified on the Letter of Instruction. The Government reserves the right to require the Contractor to make changes in his CQC Plan and operations including removal of personnel, as necessary, to obtain the quality specified.

1.4.1.3 Notification of Changes

After acceptance of the CQC Plan, notify the Contracting Officer’s Representative in writing of any proposed change. Proposed changes are subject to acceptance by the Contracting Officer.

1.4.2 Quality Assurance: The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused upon the means utilized by the Government to ensure that the Contractor has performed in accordance with the performance standards.

1.4.2.1 Inspection and Contract Performance: The service performed by the Contractor under the provisions of this contract shall be subject to inspections by the Contracting Officer or Government Quality Assurance Representative (QAR) to insure strict compliance with the terms of the contract.

1.4.2.1.1 Notification of Deficiencies: The Contractor shall be notified verbally and/or in writing of any serious or recurring minor deficiency in service observed by the Contracting Officer or his/her authorized representative. Verbal notification will be recorded in a memorandum for record.

1.4.2.1.2 Documentation of Deficiencies: Written notifications and memoranda for the record shall be prepared by the Contracting Officer’s Representative or Lake Manager

1.4.2.1.3 Correction of Contract Deficiencies: Upon receipt of notification of deficiency in service, Contractors will immediately correct deficiencies and /or take steps to prevent recurrence of the deficiency.

1.4.2.1.4 Deficiencies of Service: In the event a Contract Discrepancy Report (CDR) ATTACHMENT 3 is issued, a meeting shall be scheduled within two (2) Government working days after the CDR was issued. Mutual effort will be made to resolve any and all problems identified. Written minutes of these meetings shall be prepared and signed by the QAR, Contractor and their respective employees.

This contract may be terminated by the Contracting Officer upon receipt of any CDRs. Termination will be based upon the seriousness of the deficiency.

1.4.2.1.5 Evaluation of Performance: All Contractors will have their performance evaluated no less than mid-term and at the conclusion of their contract.

1.4.3 Government Holidays: The Lake Office will be closed on the following Government Holidays. Due to high visitation during these holidays, mowing will not be allowed on holidays.

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

1.4.4 Place of Performance: The work to be performed under this contract will be performed at Somerville Lake (Washington County &Burleson Counties), TX. The Lake Office address is 1560 Thornberry Drive, Somerville, TX 77879.

1.4.5 Hours of Operation: Office hours of operation are Monday-Friday, 8:00 a.m. to 4:30 p.m.

1.4.6 Type of Contract: The Government will award a Firm Fixed Price Contract.

1.4.7 Security Requirements:

1.4.7.1 General Security Requirements:

(a.) All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.

(b.) All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

(c.) Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

(e.) The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the…

This is the start of the file's text. The full file is on GovTribe.