This document is a Request for Proposal (RFP) issued by the United States Army Contracting Command- Rock Island (ACC-RI) for the design, provision, and construction of sunshade structures, mooring eyes, grounding points, airfield markings, and tie-downs at the Khashm Al Ann Airfield (KAA) in Riyadh, Saudi Arabia. The scope includes installing 144 mooring eyes and 24 grounding points, constructing two 6-bay sunshades, and providing aircraft chains and turnbuckle tie-downs.
The Government intends to award a Firm-Fixed Price (FFP) contract to the responsive, responsible offeror who submits the lowest priced technically acceptable proposal. Proposals are due by June 2, 2024 at 3:00 PM Kingdom of Saudi Arabia Time. The contract will have a 120-day base period. The Government anticipates price competition and has not requested cost data, but reserves the right to do so. Offerors must provide a Saudi Arabian business license and VAT certificate, a technical plan demonstrating understanding of the requirements, and past performance references.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.08 RFP W519TC24R2036.pdf | ||
| Attachment 0001 KAA sunshade SOW 20240415.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W519TC24R2036 25-Apr-2024
b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME
08:00 AM 02 Jun 2024
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W519TC9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
LINDA A. MATOS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
ARMY CONTRACTING COMMAND - ROCK ISLAND
3055 RODMAN AVE
ROCK ISLAND IL 61299
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$19,000,000
NAICS:
238190
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF20
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W519TC24R2036
Section SF 30 - BLOCK 14 CONTINUATION PAGE
SOLICITATION NARRATIVE
1. The United States Army Contracting Command- Rock Island (ACC-RI) requests a proposal for design and construction, in accordance with Statement of Work (SOW), attachment 0001, at the Ministry of National Guard (MNG)-Khashm Al Ann Airfiled (KAA), Riyadh, Saudi Arabia. The scope of this project is to design, provide, and construct the following shade structures on the airfield’s aircraft parking apron in accordance with the SOW:
1.1.1 Install Twelve (12) mooring eyes and Two (2) grounding points per Sunshade-bay for a total of one-hundred and forty-four (144) mooring eyes and twenty (24) grounding points.
1.1.2 Construct two (2), six (6) bay sunshades at Hawk and Eagle parking pads.
1.1.3 Paint airfield markings and remove old markings as needed. Provide Aircraft Chains and turnbuckle tiedowns.
2. This Request for Proposal (RFP) is issued as a 100% full and open competition.
3. The Government intends to award a Firm Fixed Price (FFP) type of contract from this solicitation to the responsive, responsible offeror who submits the lowest priced technically acceptable proposal.
4. In order to align with current requirements of DoD Federal Acquisition Regulation Supplemental (DFARS)
201.304 and Army Federal Acquisition Regulation Supplemental (AFARS) 5101.304 there has been a change to the format of ACC-RI solicitations (and resultant contracts). This notice is to inform you of that format change and to advise you to review the entire solicitation thoroughly.
5. The Government anticipates price competition; therefore, cost data is not required to be submitted with the offeror’s proposal. However, the Government reserves the right to request cost data in the event competition does not exist.
6. Offerors are cautioned to ensure their proposals are fully complete, including all fill-ins and blanks in the RFP.
Any offeror submitting a proposal agrees by submission that their proposal and the prices contained therein will be valid for 60 days after receipt of final proposals.
7. The solicitation is issued subject to the availability of funds and the solicitation is currently unfunded. The Government reserves the right to not fund any work listed in the solicitation. See FAR clause 52.232-18.
8. Offerors should note the provision at FAR 52.215-1, “Instructions to Offerors – Competitive Acquisition”. The Government intends to award a contract resulting from this RFP without discussions with offerors (except clarifications described in FAR 15.306(a)). Therefore, offerors initial proposals should contain the best terms. The Government does however, reserve the right to conduct discussions if determined necessary by the Contracting Officer.
9. Offeror questions regarding solicitation and work contained in the SOW shall be submitted to the solicitation POC no later than 1700 (5:00PM) KSA on 15 May 2024 in order to ensure that all questions can be answered and posted for all Offeror’s knowledge prior to solicitation closing. All questions should be directed in writing to Ms. Shaniel Escoffery by email, shaniel.l.escoffery.civ@army.mil and Ms. Linda Matos, linda.a.matos.civ@army.mil, providing the RFP number, W519TC24R2036 in the subject line.
10. Proposal submission deadline is listed in BLOCK 13 of this solicitation. Proposal shall be sent electronically to Shaniel.l.escoffery.civ@army.mil and linda.a.matos.civ@army.mil. No hard copies will be accepted.
Offers shall reference solicitation number W519TC24R2036 and company name in the proposal email subject line.
In email body, please request receipt to confirm delivery.
There is no drop-box system for proposal submittal.
Our email system standard is an estimated limit of ten (10) megabytes per incoming email.
Please be aware that large files may require extra time to be delivered into our email system.
All proposal documents must be fully delivered into the email system, and time- stamped by the
Government server on 02 JUNE 2024 at 1500HRS (3:00PM) Kingdom of Saudi Arabia Time (KSA).
11. This executive summary is provided as an administrative convenience and is not intended to alter the terms and conditions of the solicitation in any way. Any inconsistencies between this executive summary and other solicitation provisions shall be resolved in favor of the other solicitation provisions.
12. Clauses and provisions from the FAR and supplements are incorporated into this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
13. This RFP should not be discussed with any Government employee except the Contracting Officer, Ms. Linda Matos, the Contract Specialist and Ms. Shaniel Escoffery. Failure to adhere to this restriction may be grounds to declare your firm ineligible for consideration of any award resulting from this competitive acquisition.
14. The Government representatives for the RFP is Ms. Shaniel Escoffery, shaniel.l.escoffery.civ@army.mil and Ms. Linda Matos linda.a.matos.civ@army.mil. Comments or questions should be directed in writing to Ms. Shaniel Escoffery and Ms. Linda Matos by email, providing the RFP number, W519TC24R2036 in the subject line.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
Sunshades Mooring Eyes, Grounding Points
FFP
Khashm Al Ann Airfield (KAA) requires additional shade structures, mooring eyes, and airfield markings for parking of the UH-60 Blackhawk Helicopter. The Contractor shall design, provide, and construct the following shade structures on the airfield’s aircraft parking apron: 1.1.1 Install Twelve (12) mooring eyes and Two (2) grounding points per Sunshade-bay for a total of one-hundred and forty-four (144) mooring eyes and twenty (24) grounding points.
FOB: Destination
PSC CD: 1730
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job
Hawk and Eagle Parking Pads Sunshades
FFP
Khashm Al Ann Airfield (KAA) requires additional shade structures, mooring eyes, and airfield markings for parking of the UH-60 Blackhawk Helicopter. The Contractor shall design, provide, and construct the following shade structures on the airfield’s aircraft parking apron: 1.1.2 Construct two (2), six (6) bay sunshades at Hawk and Eagle parking pads.
FOB: Destination
PSC CD: 1730
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 1 Job
Paint Airfield Markings, Remove Old Mark
FFP
Khashm Al Ann Airfield (KAA) requires additional shade structures, mooring eyes, and airfield markings for parking of the UH-60 Blackhawk Helicopter. The Contractor shall design, provide, and construct the following shade structures on the airfield’s aircraft parking apron: 1.1.3 Paint airfield markings and remove old markings as needed. Provide Aircraft Chains and turnbuckle tiedowns.
FOB: Destination
PSC CD: 1730
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 1 Job
Sunshades at KAA - VAT 15%
FFP
Khashm Al Ann Airfield (KAA) requires additional shade structures, mooring eyes, and airfield markings for parking of the UH-60 Blackhawk Helicopter. The Contractor shall design, provide, and construct the shade structures on the airfield’s aircraft parking apron.
FOB: Destination
PSC CD: 1730
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government N/A Government 0002 Destination Government N/A Government
0003 Destination Government N/A Government 0004 Destination Government N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 07-JUL-2024 TO
06-JUL-2025
N/A N/A FOB: Destination
0002 POP 07-JUL-2024 TO
06-JUL-2025
N/A N/A FOB: Destination
0003 POP 07-JUL-2024 TO
06-JUL-2025
N/A N/A FOB: Destination
0004 POP 07-JUL-2024 TO
06-JUL-2025
N/A N/A FOB: Destination
CLAUSES INCORPORATED BY REFERENCE
52.212-1 Instructions to Offerors--Commercial Products and Commercial Services
SEP 2023
52.212-2 Evaluation - Commercial Items NOV 2021 52.212-3 Offeror Representations and Certifications--Commercial
Products and Commercial Services
FEB 2024
52.212-4 Contract Terms and Conditions--Commercial Products and Commercial Services
NOV 2023
52.212-5 (Dev) Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Products and Commercial Services (Deviation 2023-O0008)
FEB 2024
52.233-3 Protest After Award AUG 1996 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.204-7006 Billing Instructions--Cost Vouchers MAY 2023 252.204-7015 Notice of Authorized Disclosure of Information for Litigation
Support
JAN 2023
252.204-7016 Covered Defense Telecommunications Equipment or Services -- Representation
DEC 2019
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
CLAUSES INCORPORATED BY FULL TEXT
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB 2024)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services: [Contracting Officer check as appropriate.]
___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
X (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).
___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
___ (4) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) (41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community--see FAR 3.900(a).
___ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L.
109-282) (31 U.S.C. 6101 note).
___ (6) [Reserved]
___ (7) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div.
C).
___ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub.
L. 111-117, section 743 of Div. C).
X (9) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub.
L. 117-328).
___ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders--Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (DEC 2023) (Pub. L. 115-390, title II).
___ (11)(i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders--Prohibition. (DEC 2023) (Pub. L.
115-390, title II).
___ (ii) Alternate I (DEC 2023) of 52.204-30.
X (12) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) (31 U.S.C. 6101 note).
X (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).
____ (14) [Reserved]
____ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) (15 U.S.C. 657a).
____ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (17) [Reserved]
____ (18)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020) of 52.219-6.
____ (19)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020) of 52.219-7.
____ (20) 52.219-8, Utilization of Small Business Concerns (FEB 2024) (15 U.S.C. 637(d)(2) and (3)).
____ (21)(i) 52.219-9, Small Business Subcontracting Plan (SEP 2023) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (NOV 2016) of 52.219-9.
____ (iii) Alternate II (NOV 2016) of 52.219-9.
____ (iv) Alternate III (JUN 2020) of 52.219-9.
____ (v) Alternate IV (SEP 2023) of 52.219-9.
____ (22) (i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
____ (ii) Alternate I (MAR 2020) of 52.219-13.
____ (23) 52.219-14, Limitations on Subcontracting (OCT 2022) (15 U.S.C. 657s).
____ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C. 637(d)(4)(F)(i)).
____ (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024) (15 U.S.C. 657f).
____ (26) (i) 52.219-28, Post-Award Small Business Program Rerepresentation (FEB 2024) (15 U.S.C. 632(a)(2)).
____ (ii) Alternate I (MAR 2020) of 52.219-28.
____ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women- Owned Small Business Concerns (OCT 2022) (15 U.S.C. 637(m)).
____ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022) (15 U.S.C. 637(m)).
____ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).
____ (30) 52.219-33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 657s).
____ (31) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
____ (32) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (FEB 2024) (E.O. 13126).
____ (33) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
X (34)(i) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).
____ (ii) Alternate I (FEB 1999) of 52.222-26.
____ (35)(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
____ (ii) Alternate I (JUL 2014) of 52.222-35.
____ (36)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
____ (ii) Alternate I (JUL 2014) of 52.222-36.
____ (37) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
____ (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.
13496).
X (39)(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).
____ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
____ (40) 52.222-54, Employment Eligibility Verification (MAY 2022). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
____ (41)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).
____ (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners
(JUN 2016) (E.O. 13693).
____ (44)(i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (OCT 2015) of 52.223-13.
____ (45)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-14.
____ (46) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).
____ (47)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-16.
X (48) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O.
13513).
____ (49) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
____ (50) 52.223-21, Foams (JUN 2016) (E.O. 13693).
X (51)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
____ (ii) Alternate I (JAN 2017) of 52.224-3.
____ (52) (i) 52.225-1, Buy American--Supplies (OCT 2022) (41 U.S.C. chapter 83).
____ (ii) Alternate I (OCT 2022) of 52.225-1.
____ (53)(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) (19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
____ (ii) Alternate I [Reserved].
____ (iii) Alternate II (DEC 2022) of 52.225-3.
____ (iv) Alternate III (FEB 2024) of 52.225-3.
____ (v) Alternate IV (OCT 2022) of 52.225-3.
____ (54) 52.225-5, Trade Agreements (NOV 2023) 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
X (55) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (56) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
____ (57) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150
____ (58) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C.
5150).
____ (59) 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).
____ (60) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
____ (61) 52.232-30, Installment Payments for Commercial Products and Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
X (62) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (OCT 2018) (31 U.S.C.
3332).
____ (63) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (JUL 2013) (31 U.S.C. 3332).
____ (64) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
____ (65) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).
____ (66) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).
____ (67)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) (46 U.S.C.
55305 and 10 U.S.C. 2631).
____ (ii) Alternate I (APR 2003) of 52.247-64.
____ (iii) Alternate II (NOV 2021) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services: [Contracting Officer check as appropriate.]
X (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).
X (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.
chapter 67).
X (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_____ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
_____ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____ (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022) (E.O.
13658).
_____ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706).
_____ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph
(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial products or commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).
(ii) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) (41 U.S.C. 4712).
(iii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iv) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115-91).
(v) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(vi) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L.
117-328).
(vii)(A) 52.204-30, Federal Acquisition Supply Chain Security Act Orders--Prohibition. (DEC 2023) (Pub. L. 115- 390, title II).
(B) Alternate I (DEC 2023) of 52.204-30.
(viii) 52.219-8, Utilization of Small Business Concerns (FEB 2024) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(ix) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
(x) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).
(xi) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
(xii) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
(xiii) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
(xiv) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.
13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(xv) 52.222-41, Service Contract Labor Standards (AUG 2018), (41 U.S.C. chapter 67).
(xvi) _____ (A) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).
_____ (B) Alternate I (MAR 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xvii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67.)
(xviii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67)
(xix) 52.222-54, Employment Eligibility Verification (MAY 2022) (E. O. 12989).
(xx) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022) (E.O. 13658).
(xxi) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706).
(xxii) (A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
(B) Alternate I (JAN 2017) of 52.224-3.
(xxiii) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
(xxiv) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (JUN 2020) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xxv) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801). Flow down required in accordance with paragraph (c) of 52.232-40.
(xxvi) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (NOV 2021) (46 U.S.C. 55305 and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial products and commercial services a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of clause)
INSTRUCTIONS TO OFFERORS (L)
1. Instructions to Offerors
A. GENERAL INSTRUCTIONS. These instructions are a guide for preparing quotes. These instructions generally describe the type and extent of information the Offeror should provide and emphasize the significant topic areas the Offeror should address in the quote. The Offeror is expected to review the Statement of Work (SOW) contained in Section C of the Request for Quote (RFQ) for further insight into the areas that the quote must address.
The Offeror should include sufficient information to enable the evaluators to determine the Offeror’s understanding of the requirements in each of the evaluated areas. Data requested for evaluation has been clearly identified in this solicitation. Offerors should note the provision at FAR 52.215-1, “Instructions to Offerors – Competitive Acquisition”. The Government intends to award a contract resulting from Request for Quote without discussions with offerors (except clarifications described in FAR 15.306(a)). Therefore, offerors initial quotes should contain the best terms. The Government does however, reserve the right to conduct discussions if determined necessary by the Contracting Officer.
Discussions will not be opened for the sole purpose of allowing an Offeror to submit data. Therefore, quotes lacking information may be considered unacceptable and may be eliminated from any further consideration. The Government reserves the right to not open discussions to allow for the submission of data that should have been submitted with the initial quote.
The Offeror shall provide information by addressing each Factor and Subfactor in the format and sequence identified in this solicitation. The Offeror must provide information in sufficient detail to allow the Government to make an assessment of technical acceptability of the quote.
B. QUOTE FORMAT. The Offeror shall submit a quote for this requirement as outlined in paragraph IV.
below. All quote submissions shall be sent electronically to Ms. Shaniel L. Escoffery at Shaniel.l.escoffery.civ@mail.mil and Ms. Linda A. Matos at linda.a.matos.civ@army.mil and must be received by – 02 JUNE 2024 at 1500HRS (3:00PM) Kingdom of Saudi Arabia Time (KSA). The Offeror is responsible for ensuring that a full and complete quote is received by the date and time established for receipt of timely quotes and should take into consideration file size and firewalls when submitting a quote. Any quote, or partial quote, received after the time and date established for receipt of timely quotes will be considered late and will not be considered for award. Absent the opening of discussions, if required, the Government will not accept any changes, additions, or deletions for evaluation purposes.
I. PAGE LIMITATIONS AND LAYOUT. Quotes must be submitted in electronic form as attachments. The Government does not assume the duty to search for data or information to cure problems discovered in quotes. The burden of providing complete and thorough information to address the elements below remains with the Offeror. Each quote shall include clear references to the corresponding paragraphs of the SOW or RFQ that apply, as applicable.
II. VOLUME I - Technical Capability Factor. The volume is limited to no more than 50 pages.
III. VOLUME II – Past Performance Factor. The volume is limited to no more than 10 pages.
IV. VOLUME III - Price Factor. The Offeror shall submit pricing in the form of a .pdf or excel document. There is no limitation on the size of this volume.
V. VOLUME STRUCTURE. Each volume shall have an Introduction and Table of Contents.
Each volume must be clearly labeled on a cover page with a cross-reference to each evaluation factor as detailed below.
a. Introductory Volume Introduction Table of Contents Executive Summary
Executed RFQ and any amendments (signed by an individual authorized to bind the company)
b. Technical Capability Factor Introduction
Table of Contents (Outlined in paragraph C.II below.)
c. Past Performance Factor Introduction Table of Contents
d. Price Factor
C. QUOTE PREPARATION. The Offeror's quote shall be prepared and authored by a person or persons regularly employed by the Offeror. The quote should be prepared in a clear, legible, practical manner. In addition, the quote shall be written in English and should be specific and complete as described in these instructions. No samples or descriptive literature are to be specially prepared for submission with your quote. Adherence to the prescribed formats will simplify the review process for the evaluators.
I. Introductory Volume. A cover page containing company’s business name, the name of each person contributing to the authorship of the quote, the person's position title, and the position the person will hold in relation to the quote should a contract be awarded. Include an Executive Summary - a concise narrative summary of the entire quote. The Offeror shall submit executed copies of the RFQ and all amendments.
II. Volume I – Technical Capability.
Subfactor 1 – Saudi Arabian Business License conforming with the Kingdom of Saudi Arabia’s Vision 2030 and VAT Certificate. In order to be considered for award your quote submission shall contain legible copies of your business license and VAT certificate for the Kingdom of Saudi Arabia. (KSA) Failure to provide the copies of the KSA business license and VAT certificate with your quote submission, shall deem your quote non-responsive and ineligible for award.
Subfactor 2 – Technical Plan.
The Technical Plan will include the proposed technical approach and understanding of the requirement. The Technical Plan shall be specific, detailed, and complete enough to clearly and fully demonstrate a sound technical approach, and a thorough understanding of the necessary methods and techniques for meeting performance standards and customer requirements in accordance with (IAW) the statement of work (SOW). The quote shall include a plan to provide all labor personnel, equipment, supplies, transportation, tools, material, supervision, insurance, services, and other items and services necessary to perform the required services, and ensure the established standards, specifications, and regulations referenced in the SOW are met. The Technical Plan shall provide specific milestones to be met starting with the Notice to Proceed being issued and may not exceed 90 calendar days, IAW the SOW. The Quote will mark these milestones referencing the numbering system established in the SOW. The plan shall address SOW-required equipment, materials, and program knowledge/experience IAW applicable Saudi Arabian regulations as well as US Department of Defense (DoD) and Army statutes and regulations, that demonstrate the Offeror’s ability to perform the requirements in accordance with the SOW.
III. Volume II – Past Performance.
Your quote shall include three references from USG organizations that your company has provided the same or similar support to. Reference submission shall include name, title, company, email address, phone number, and supply or services provided.
IV. Volume III – Price Factor.
The Offeror may submit one total evaluated price or breakout of costs to arrive at a firm-fixed price. This contract will not be separately priced and Offeror is responsible for completing all work as outlined in the SOW. The Government reserves the right to require the submission of any data necessary to validate the reasonableness of an offer.
Proposed prices will be used by the Government to calculate the Total Evaluated Price (TEP). For each proposal, the Government will calculate a Total Evaluated Price by adding the total of the Base Period and VAT. The Offeror shall complete the Price Matrix (Attachment 0011) as detailed below.
Offerors shall submit their proposals using the MS Excel Price Matrix (Attachment 0011). Failure to propose prices for all blue highlighted cells may result in the Offeror’s proposal being considered unacceptable and ineligible for award. The Price Matrix consists of one tab, the Price Matrix Summary tab, which requires an entry for CLIN 0001 – 0004 (FFP). All proposed firm-fixed prices will be binding.
Please note that on CLIN 0004 - Kingdom of Saudi Arabia (KSA) Value Added Tax (VAT), the Government has calculated that at a rate of 15%. Make sure the VAT is not included in your FFP proposed cost.
All prices for this acquisition shall be stated in current U.S. dollars, rounded and displayed to two decimal places. (Current U.S. dollars shall be interpreted to include escalation where appropriate.)
It is noted that the terms of FAR 52.222‐43, Fair Labor Standards Act and Service Contract Act – Price Adjustment (Multiple Year and Option Contracts shall be considered when proposing rates).
The Contractor warrants that the prices in this contract do not include allowance for any contingency to cover increased costs for which adjustment is provided under this clause.
The Price Matrix is locked to prevent inadvertent changes. Offerors shall not alter the Price Matrix in any way. If an Offeror changes the price matrix, its proposal may be considered unacceptable and ineligible for award. The Price Matrix shall be completed as follows:
Offerors shall complete the Price Matrix Summary tab by entering its Offeror Name, Unique Entity ID, Cage Code, and proposal date in the blue highlighted cells. Offerors shall also enter amounts for the CLIN 0001 – 0004 (FFP) CLIN in the blue highlighted cell.
For all cells on the Summary tab that are not highlighted in blue, they are either pre‐populated, or they will populate automatically as they include formulas that will sum values of other cells from within the Price Matrix Summary tab.
Price proposals are assumed to represent the Offeror’s best efforts, as final proposal revisions may not be requested. Any additional information considered necessary to explain the proposed pricing shall be submitted at the time of proposal submission.
Price Information: All information relating to the proposed price including all required supporting documentation must be included in the section of the proposal designated as the Price Volume.
Under no circumstances shall this information and documentation be included elsewhere in the proposal.
The Government reserves the right to request data other than certified cost or pricing data or certified cost or pricing data when necessary to validate the price reasonableness of an offer.
EVALUATION OF PROPOSALS (M)
EVALUATION OF PROPOSALS (Section M)
A. EVALUATION OF QUOTES. This acquisition will utilize a Lowest Price Technically Acceptable Selection Approach authorized at FAR 15.101-2. SAM registration is preferred but not required. Upon receipt of a responsive offer, three factors will be evaluated:
(I) Technical, (II) Past Performance, and (III) Price Upon completing the evaluation of the two factors, award will be made to the offeror whose quote is the lowest priced technically acceptable. The Government expects to award one Firm-Fixed Price Contract with a 120 Day base period from the issuance of the Notice to Proceed. The Government reserves the right to: limit the Competitive Range for the purposes of efficiency; award without discussions; and make no award should no Offeror prove to submit an acceptable offer based on the criteria set forth in the solicitation.
B. CORRECTION POTENTIAL OF QUOTES. The Government will consider, throughout the evaluation, the "correction potential" of any quote uncertainty or deficiency. Uncertainty is any aspect of a non-cost/price factor quote for which the intent of the Offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the quote indicating that there may have been an error, omission or mistake).
Deficiency is a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001. The judgment of such "correction potential" is within the sole discretion of the Government. If an aspect of an Offeror's quote not meeting the Government's requirements is not considered correctable, the Offeror may be eliminated from the Competitive Range.
C. NUMBER OF CONTRACT AWARDS. The Government reserves the right to award no contract at all, depending on the quality of the quotes, prices submitted, and the availability of funds. The Government intends to make one award.
D. EVALUATION METHODOLOGY AND AWARD DECISION. Quotes will be rated only on their content. Assumptions, preconceived ideas, and personal knowledge or opinions not supported by material provided in the quote will not be considered or used as a basis for evaluation. Each quote will be evaluated against the solicitation criteria included below. The Government intends to make one award without discussions.
I. Technical Capability Factor. The Technical Quote will be evaluated and an Acceptable or Unacceptable rating will be assigned to all Subfactors. An Unacceptable rating for any Subfactor will result in an overall Unacceptable rating for the Technical Capability Factor. The evaluation of the Technical Capability Factor Quote will consist of an evaluation of the following Subfactors:
a. Saudi Arabian Business License and VAT Certificate.
• Quote submission contains legible copies of the offeror’s business license and VAT certificate for the Kingdom of Saudi Arabia. (KSA)
b. Technical Plan. When evaluating the Offeror’s Technical Plan, the
Government will determine if:
• The Technical Plan demonstrates a sound technical approach and a thorough understanding of the necessary methods and techniques required to meet performance standards and customer requirements in accordance with the SOW.
• The plan is detailed and comprehensive making clear references to requirements outlined in the SOW.
• The quote demonstrates an ability to provide all the resources (personnel, equipment, supplies, transportation, tools, material, supervision, insurance and other items and services) necessary to perform the SOW.
• The plan addresses how established standards, specifications, and regulations referenced in the SOW will be met.
• The plan shall display a thorough understanding of applicable (if any) Saudi Arabian regulations as well as US Department of Defense (DoD) and Army statutes and regulations, that demonstrates the Offeror’s ability to perform the requirements in accordance with the SOW.
• The plan conveys an understanding of how to perform the mission within the environment for which these operations will occur.
• The plan describes an effective approach for ensuring clear communication between the contractor and Government, measures customer satisfaction, and includes a customer feedback program.
• The Technical Plan describes appropriate and defined timelines and milestones for sequence of work, assumptions, and constraints that demonstrate a clear understanding of the SOW.
Table 1.The following ratings and associated definitions will be used to rate the Saudi Arabian Business License and VAT Certificate and Technical Plan.
Rating Definition Acceptable Quote clearly meets the minimum requirements of the solicitation.
Unacceptable Quote does not clearly meet the minimum requirements of the solicitation.
II. Past Performance Factor. The Government will ensure that at least three references were included with the Offeror’s quote submission. Past Performance information will be evaluated, and an Acceptable or Unacceptable rating will be assigned. Sources of Past Performance information for Evaluation are as follows:
i. Past Performance information may be provided by the Offeror, as solicited.
ii. Past Performance information may be obtained from any other sources available to the
Government to include, but not limited to, the Contractor Performance Assessment Reporting System (CPARS), Electronic Subcontract Reporting System (eSRS), or other databases;
interviews with Program Managers, Contracting Officers, and Fee Determining Officials; the Defense Contract Management Agency, etc.
Table 2. The following ratings and associated definitions will be used to rate the Past Performance of Offerors
Rating Definition Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note below.)
Unacceptable Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.
Note: In the case of an offeror without a reference from a USG organization, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”
III. Price Factor. The Total Evaluated Price (TEP) will be evaluated and ranked, but will not be assigned a rating. Quotes will be evaluated based on price reasonableness IAW FAR 15.404-1(b), Proposal Analysis Techniques, relative to total evaluated price.
The Government will evaluate price; however, it will not assign an adjectival rating. The FAR requires the Government to award contracts at fair and reasonable prices. The Government will evaluate and assess the Contractor’s price proposal to determine the reasonableness of the offer. The Contracting Officer may determine it necessary to utilize additional analysis techniques. These methods of evaluation may include information and input from sources such as, but not limited to, other Government agencies and personnel.
The Government will evaluate the FFP CLINs in accordance with FAR 15.404-1, Proposal Analysis Techniques; the Government may use any one or a combination of the techniques listed at FAR 15.404-1 to determine the Contractor’s proposal fair and reasonable. The Government reserves the right to require submission of data other than cost or pricing data adequate to determine the reasonableness of an offer if competition is inadequate for that purpose.
The Government will evaluate the Total Evaluated Price utilizing the proposal analysis techniques IAW with FAR 15.404-1, Proposal Analysis Techniques.
Unbalanced Pricing – As part of the cost…