About this file

This combined synopsis/solicitation from the Department of the Army Corps of Engineers Engineering District Jacksonville seeks proposals for a multiple-award blanket purchase agreement to provide various heavy and civil construction materials, tools, and ancillary services. Eligible offerors must be small businesses and will be evaluated on technical approach, past performance, and individual call pricing.

The agreement aims to establish no less than three and no more than six awards for a five-year period to fulfill requirements across Florida and Georgia. Required supplies include silt fencing, turbidity curtain, floating boom, safety materials, concrete, reinforcing steel, coatings, lighting, erosion controls, drainage products, aggregates, masonry, landscaping materials, and related delivery. Proposals are due by April 26th and should demonstrate the ability to meet specifications, provide performance histories, and describe standard offerings and pricing processes to be evaluated at the call level. Awards are anticipated to be made on May 14th.

View the file

Other files for this federal contract opportunity

Other files attached to OD Materials BPA, newest first.
File Type Posted
B.08 Past Performance Questionnaire.pdf PDF
B.08 BPA Agreement_OD Materials BPA.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Description of Supplies

MATERIAL BLANKET PURCHASE AGREEMENT (BPA)

Each Call Order will incorporate a defined list of supplies, delivery schedule, and period of performance

Standards of Basic Services Unless specified otherwise in a Call Order, all materials to be delivered as scheduled within 5 business days of notification of award. All material will be brought to site in undamaged condition in the specified quantities, type and sizes.

SCOPE OF WORK

The U.S. Army Corps of Engineers, Jacksonville District (USACE) is requesting heavy and civil construction materials purchasing for various locations in the State of Florida and the State of Georgia in the form of a Blanket Purchase Agreement. The USACE is in need of various project materials, tools and services to perform a variety of projects throughout these locations.

This BPA shall cover all heavy and Civil construction materials, tools and services associated with heavy and Civil construction functions. The Corps may choose to perform any of the work identified in these specifications. A description of the work to be performed will be given in the specifications of each call.

Protection of Government Owed Property, Material, and Work The contractor shall protect and preserve all government materials, supplies, and equipment while in their possession. The contractor shall comply with all reasonable requests of the Contracting Officer’s Representative (COR) to enclose or to specially protect such property. If the COR determines that material, equipment, supplies, and work performed are not adequately protected by the contractor, such property may be protected by the government and the cost thereof may be charged to the contractor or deducted from any payment due him. If any damages are made by the contractor to any government owed property, the contractor shall repair at no cost; or the price to fix shall be deducted from the contract price.

Quality Assurance The Government will evaluate the quality of the Contractor's work through the inspection of the contractor’s performance of each call. If the quality of performance is not acceptable on any call, the contractor shall make necessary deficiencies at no cost; or the price to fix shall be deducted from the call price.

Transportation Transportation will be addressed on a per call basis.

Possible materials, services and fabricated items, this list is neither inclusive nor exclusive:

o Silt fencing o Turbidity curtain o Floating boom o Safety supplies o Oil spill containment materials o Cast in place Structural Concrete for Civil Works, grout mix, delivery as specified o Formwork materials o Concrete accessories o Concrete reinforcing steel o Concrete finishing products o Concrete Curing products o Metal accessories o Paint o Painting supplies o Coatings o Coating supplies o Electrical safety supplies o Exterior lighting fixtures and supplies o Interior lighting fixtures and supplies o Geotextile material o Geotextile installation tools o Erosion Control materials and tools o Erosion Control installation contractors o Sheet metal piling as specified o Limerock road base material as specified o Topsoil as specified o Sod and Sod installation materials o Concrete storm drain culverts o Concrete storm drainpipe o Corrugated galvanized steel drainpipes o Embankment material as specified o Select fill material as specified o Filter gravel as specified o #57 stone as available o Bedding stone, various sizes, as specified o Rip Rap material, various sizes, as specified o Gangway platforms o Pier construction materials

Delivery Unless otherwise specified the contractor is responsible for transporting all materials. to the work site.

All material will be delivered securely and protected to avoid damage to materials. Unless specified otherwise, all materials will be unloaded IAW EM 385-1-1 (NOV 14) LHE avoiding injury of personnel and damage to equipment and materials. If required by the manufacture, materials will be protected from direct sunlight, moisture or weather conditions that will adversely affect the quality of the delivered materials in transit to site. All materials will be inspected jointly by the contractor and a government representative.