B.08 Kutaisi_Att#3_Conceptual Architecture Drawings.pdf

PDF 367 KB Posted

Attached to
IEU-25-0025 Bauska Fire Station, Latvia Federal contract opportunity
Solicitation number
IEU-25-0025
Issued by
Department of the Army European Command

About this file

These are conceptual architectural drawings showing floor plans, roof plans, and exterior elevations for what appears to be a rehabilitation/medical facility. The ground floor plan shows a layout with approximately 20 rehab rooms (each around 14.9 m²), 4 group rehab rooms (24.5 m² each), 2 ABA rehab rooms (17.3-17.4 m²), offices, a training room, sports activity area, storage, restrooms, a kitchen/breakroom, and support spaces like a lobby and waiting room. The building has a U-shaped configuration with a central corridor (197.1 m²) and two wings.

The drawings include a detailed roof plan showing overhangs and seismic joints, as well as north, south, east and west exterior elevations indicating a single-story structure. The building dimensions are approximately 42.23m x 39.8m. The drawings appear to be part of a design-build solicitation package, as indicated by notes referencing contractor requirements and statement of work compliance. The drawings were produced by the US Army Corps of Engineers as shown by their logo.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15.0 m²

Rehab Room Shower

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

24.5 m²

Group Rehab Room

24.5 m²

Group Rehab Room

15.0 m²

Office

21.7 m²

Storage Room

15.5 m²

Office

23.7 m²

Training Room

33.8 m²

Sports Activity

16.3 m²

Evaluation Room

20.0 m²

Lobby

16.2 m²

Waiting Room

15.6 m²

Office

23.5 m²

Kitchen / Breakroom

24.5 m²

Group Rehab Room

24.6 m²

Group Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.2 m²

Conference Room

16.7 m²

Padding Room

16.6 m²

Sensory Room

12.3 m²

Utility Room

17.3 m²

Rehab Room ABA

17.4 m²

Rehab Room ABA

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

14.9 m²

Rehab Room

11.3 m²

Restrooms

15.7 m²

Restrooms

15.7 m²

Restrooms

197.1 m²

Corridor

.8

42.230

11.300 19.630 11.300

11.340 19.550 11.340

42.230

.4

.1

1.

Room Legend

Conference Room

Corridor

Evaluation Room

Group Rehab Room

Kitchen / Breakroom

Lobby

Office

Padding Room

Rehab Room

Rehab Room ABA

Rehab Room Shower

Restrooms

Sensory Room

Sports Activity

Storage Room

Training Room

Utility Room

Waiting Room

ROOF OVERHANGROOF OVERHANG

ROOF OVERHANG

ROOF OVERHANG ROOF OVERHANG

SEISMIC

JOINT

SEISMIC

JOINT

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

A-101

G R

O U

N D

F

LO

O R

P

LA

N

KU

TA

IS

I, G

EO

R G

IA

EU

R O

PE

D

IS

TR

IC

T

W

IE

SB

AD

EN

, G

ER

M

AN

Y

D

ES

IG

N

S

EC

TI

O

N

FI

R

ST

T

IT

LE

SE

C

O N

D T

IT

LE

DESIGN-BUILD SOLICITATION

KU

TA

IS

I M

EN

TA

L H

EA

LT

H C

EN

TE

R F

O R

C H

IL

D

R

EN

PR

O

JE

C

T N

U M

BE

R

# NOTE

1 -

1 : 100A-101

1 GROUND FLOOR PLAN

G. FLOOR ROOM SCHEDULE

ROOM

NUMBER ROOM NAME

NET AREA

(SQM)

01 Rehab Room 14.9 m² 02 Rehab Room 14.9 m² 03 Rehab Room 14.9 m² 04 Rehab Room 14.9 m² 05 Rehab Room 14.9 m² 06 Rehab Room 14.9 m² 07 Rehab Room 14.9 m² 08 Rehab Room 14.9 m² 09 Rehab Room Shower 15.0 m² 10 Rehab Room 14.9 m² 11 Rehab Room 14.9 m² 12 Rehab Room 14.9 m² 13 Group Rehab Room 24.5 m² 14 Group Rehab Room 24.5 m² 15 Restrooms 15.7 m² 16 Sensory Room 16.6 m² 17 Padding Room 16.7 m² 18 Kitchen / Breakroom 23.5 m² 19 Rehab Room ABA 17.3 m² 20 Office 15.6 m² 21 Office 15.0 m² 22 Waiting Room 16.2 m² 23 Conference Room 14.2 m² 24 Lobby 20.0 m² 25 Storage Room 21.7 m² 26 Evaluation Room 16.3 m² 27 Utility Room 12.3 m² 28 Office 15.5 m² 29 Restrooms 11.3 m² 30 Training Room 23.7 m² 31 Rehab Room ABA 17.4 m² 32 Sports Activity 33.8 m² 33 Restrooms 15.7 m² 34 Group Rehab Room 24.6 m² 35 Group Rehab Room 24.5 m² 36 Rehab Room 14.9 m² 37 Rehab Room 14.9 m² 38 Rehab Room 14.9 m² 39 Rehab Room 14.9 m² 40 Rehab Room 14.9 m² 41 Rehab Room 14.9 m² 42 Rehab Room 14.9 m² 43 Rehab Room 14.9 m² 44 Rehab Room 14.9 m² 45 Rehab Room 14.9 m² 46 Rehab Room 14.9 m² 47 Rehab Room 14.9 m² 48 Corridor 197.1 m²

NOTE: DRAWINGS ARE PROVIDED FOR REFERENCE ONLY. THE CONTRACTOR

IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS. THE

CONTRACTOR IS RESPONSIBLE FOR PROVIDING A DESIGN THAT MEETS ALL

APPLICABLE CODES AND THE REQUIREMENTS OF THE STATEMENT OF WORK.

N

0 1 5 m

1:100

SCALE

ATTACHMENT #3 CONCEPTUAL FLOOR PLANS

A-202

A-201

A-202

A-201

AN201

AN201

AN201

AN201

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

A-104

R O

O F

PL

AN

KU

TA

IS

I, G

EO

R G

IA

EU

R O

PE

D

IS

TR

IC

T

W

IE

SB

AD

EN

, G

ER

M

AN

Y

D

ES

IG

N

S

EC

TI

O

N

FI

R

ST

T

IT

LE

SE

C

O N

D T

IT

LE

DESIGN-BUILD SOLICITATION

KU

TA

IS

I M

EN

TA

L H

EA

LT

H C

EN

TE

R F

O R

C H

IL

D

R

EN

PR

O

JE

C

T N

U M

BE

R

1 : 100A-104

1 ROOF PLAN

# NOTE

1 -

NOTE: DRAWINGS ARE PROVIDED FOR REFERENCE ONLY. THE CONTRACTOR

IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS. THE

CONTRACTOR IS RESPONSIBLE FOR PROVIDING A DESIGN THAT MEETS ALL

APPLICABLE CODES AND THE REQUIREMENTS OF THE STATEMENT OF WORK.

N

0 1 5 m

1:100

SCALE

ATTACHMENT #3 CONCEPTUAL ROOF PLANS

G. FLOOR

0.000

1.FLOOR

3.000

ROOF

9.000

2. FLOOR

6.000

G. FLOOR

0.000

1.FLOOR

3.000

ROOF

9.000

2. FLOOR

6.000

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

A-201

EX

TE

R

IO

R E

LE

VA

TI

O

N S

N O

R

TH

SO

U

TH

KU

TA

IS

I, G

EO

R G

IA

EU

R O

PE

D

IS

TR

IC

T

W

IE

SB

AD

EN

, G

ER

M

AN

Y

D

ES

IG

N

S

EC

TI

O

N

FI

R

ST

T

IT

LE

SE

C

O N

D T

IT

LE

DESIGN-BUILD SOLICITATION

KU

TA

IS

I M

EN

TA

L H

EA

LT

H C

EN

TE

R F

O R

C H

IL

D

R

EN

PR

O

JE

C

T N

U M

BE

R

1 : 100A-201

1 NORTH ELEVATION

1 : 100A-201

3 SOUTH ELEVATION

# NOTE

1 -

NOTE: DRAWINGS ARE PROVIDED FOR REFERENCE ONLY. THE CONTRACTOR

IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS. THE

CONTRACTOR IS RESPONSIBLE FOR PROVIDING A DESIGN THAT MEETS ALL

APPLICABLE CODES AND THE REQUIREMENTS OF THE STATEMENT OF WORK.

0 1 5 m

1:100

SCALE

ATTACHMENT #3 CONCEPTUAL EXTERIOR ELEVATIONS NORTH & SOUTH

# NOTE

G. FLOOR

0.000

1.FLOOR

3.000

ROOF

9.000

2. FLOOR

6.000

G. FLOOR

0.000

1.FLOOR

3.000

ROOF

9.000

2. FLOOR

6.000

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

A-202

EX

TE

R

IO

R E

LE

VA

TI

O

N S

EA

ST

W

ES

T

KU

TA

IS

I, G

EO

R G

IA

EU

R O

PE

D

IS

TR

IC

T

W

IE

SB

AD

EN

, G

ER

M

AN

Y

D

ES

IG

N

S

EC

TI

O

N

FI

R

ST

T

IT

LE

SE

C

O N

D T

IT

LE

DESIGN-BUILD SOLICITATION

KU

TA

IS

I M

EN

TA

L H

EA

LT

H C

EN

TE

R F

O R

C H

IL

D

R

EN

PR

O

JE

C

T N

U M

BE

R

# NOTE

1 -

NOTE: DRAWINGS ARE PROVIDED FOR REFERENCE ONLY. THE CONTRACTOR

IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS. THE

CONTRACTOR IS RESPONSIBLE FOR PROVIDING A DESIGN THAT MEETS ALL

APPLICABLE CODES AND THE REQUIREMENTS OF THE STATEMENT OF WORK.

0 1 5 m

1:100

SCALE

ATTACHMENT #4 CONCEPTUAL EXTERIOR ELEVATIONS EAST & WEST

# NOTE

1 : 100A-202

1 WEST ELEVATION

1 : 100A-202

3 EAST ELEVATION

ge47_R22_v1 - Sheet - A-101 - GROUND FLOOR PLAN
Sheets
A-101 - GROUND FLOOR PLAN
ge47_Att#3_Conceptual Architecture Drawings
20240911_ge47_drafts - Sheet - A-101 - GROUND FLOOR PLAN
Sheets
A-101 - GROUND FLOOR PLAN
A-104 - ROOF PLAN
A-201 - EXTERIOR ELEVATIONS NORTH / SOUTH
A-202 - EXTERIOR ELEVATIONS EAST / WEST
20240911_ge47_drafts - Sheet - A-104 - ROOF PLAN
Sheets
A-101 - GROUND FLOOR PLAN
A-104 - ROOF PLAN
A-201 - EXTERIOR ELEVATIONS NORTH / SOUTH
A-202 - EXTERIOR ELEVATIONS EAST / WEST
20240911_ge47_drafts - Sheet - A-201 - EXTERIOR ELEVATIONS NORTH - SOUTH
Sheets
A-101 - GROUND FLOOR PLAN
A-104 - ROOF PLAN
A-201 - EXTERIOR ELEVATIONS NORTH / SOUTH
A-202 - EXTERIOR ELEVATIONS EAST / WEST
20240911_ge47_drafts - Sheet - A-202 - EXTERIOR ELEVATIONS EAST - WEST
Sheets
A-101 - GROUND FLOOR PLAN
A-104 - ROOF PLAN
A-201 - EXTERIOR ELEVATIONS NORTH / SOUTH
A-202 - EXTERIOR ELEVATIONS EAST / WEST

File details come from the government source that posted it. Updated .