B.08 Kutaisi_Att#3_Conceptual Architecture Drawings.pdf
PDF 367 KB Posted
- Attached to
- IEU-25-0025 Bauska Fire Station, Latvia Federal contract opportunity
- Solicitation number
- IEU-25-0025
- Issued by
- Department of the Army European Command
About this file
These are conceptual architectural drawings showing floor plans, roof plans, and exterior elevations for what appears to be a rehabilitation/medical facility. The ground floor plan shows a layout with approximately 20 rehab rooms (each around 14.9 m²), 4 group rehab rooms (24.5 m² each), 2 ABA rehab rooms (17.3-17.4 m²), offices, a training room, sports activity area, storage, restrooms, a kitchen/breakroom, and support spaces like a lobby and waiting room. The building has a U-shaped configuration with a central corridor (197.1 m²) and two wings.
The drawings include a detailed roof plan showing overhangs and seismic joints, as well as north, south, east and west exterior elevations indicating a single-story structure. The building dimensions are approximately 42.23m x 39.8m. The drawings appear to be part of a design-build solicitation package, as indicated by notes referencing contractor requirements and statement of work compliance. The drawings were produced by the US Army Corps of Engineers as shown by their logo.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15.0 m²
Rehab Room Shower
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
24.5 m²
Group Rehab Room
24.5 m²
Group Rehab Room
15.0 m²
Office
21.7 m²
Storage Room
15.5 m²
Office
23.7 m²
Training Room
33.8 m²
Sports Activity
16.3 m²
Evaluation Room
20.0 m²
Lobby
16.2 m²
Waiting Room
15.6 m²
Office
23.5 m²
Kitchen / Breakroom
24.5 m²
Group Rehab Room
24.6 m²
Group Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.2 m²
Conference Room
16.7 m²
Padding Room
16.6 m²
Sensory Room
12.3 m²
Utility Room
17.3 m²
Rehab Room ABA
17.4 m²
Rehab Room ABA
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
14.9 m²
Rehab Room
11.3 m²
Restrooms
15.7 m²
Restrooms
15.7 m²
Restrooms
197.1 m²
Corridor
.8
42.230
11.300 19.630 11.300
11.340 19.550 11.340
42.230
.4
.1
1.
Room Legend
Conference Room
Corridor
Evaluation Room
Group Rehab Room
Kitchen / Breakroom
Lobby
Office
Padding Room
Rehab Room
Rehab Room ABA
Rehab Room Shower
Restrooms
Sensory Room
Sports Activity
Storage Room
Training Room
Utility Room
Waiting Room
ROOF OVERHANGROOF OVERHANG
ROOF OVERHANG
ROOF OVERHANG ROOF OVERHANG
SEISMIC
JOINT
SEISMIC
JOINT
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
A-101
G R
O U
N D
F
LO
O R
P
LA
N
KU
TA
IS
I, G
EO
R G
IA
EU
R O
PE
D
IS
TR
IC
T
W
IE
SB
AD
EN
, G
ER
M
AN
Y
D
ES
IG
N
S
EC
TI
O
N
FI
R
ST
T
IT
LE
SE
C
O N
D T
IT
LE
DESIGN-BUILD SOLICITATION
KU
TA
IS
I M
EN
TA
L H
EA
LT
H C
EN
TE
R F
O R
C H
IL
D
R
EN
PR
O
JE
C
T N
U M
BE
R
# NOTE
1 -
1 : 100A-101
1 GROUND FLOOR PLAN
G. FLOOR ROOM SCHEDULE
ROOM
NUMBER ROOM NAME
NET AREA
(SQM)
01 Rehab Room 14.9 m² 02 Rehab Room 14.9 m² 03 Rehab Room 14.9 m² 04 Rehab Room 14.9 m² 05 Rehab Room 14.9 m² 06 Rehab Room 14.9 m² 07 Rehab Room 14.9 m² 08 Rehab Room 14.9 m² 09 Rehab Room Shower 15.0 m² 10 Rehab Room 14.9 m² 11 Rehab Room 14.9 m² 12 Rehab Room 14.9 m² 13 Group Rehab Room 24.5 m² 14 Group Rehab Room 24.5 m² 15 Restrooms 15.7 m² 16 Sensory Room 16.6 m² 17 Padding Room 16.7 m² 18 Kitchen / Breakroom 23.5 m² 19 Rehab Room ABA 17.3 m² 20 Office 15.6 m² 21 Office 15.0 m² 22 Waiting Room 16.2 m² 23 Conference Room 14.2 m² 24 Lobby 20.0 m² 25 Storage Room 21.7 m² 26 Evaluation Room 16.3 m² 27 Utility Room 12.3 m² 28 Office 15.5 m² 29 Restrooms 11.3 m² 30 Training Room 23.7 m² 31 Rehab Room ABA 17.4 m² 32 Sports Activity 33.8 m² 33 Restrooms 15.7 m² 34 Group Rehab Room 24.6 m² 35 Group Rehab Room 24.5 m² 36 Rehab Room 14.9 m² 37 Rehab Room 14.9 m² 38 Rehab Room 14.9 m² 39 Rehab Room 14.9 m² 40 Rehab Room 14.9 m² 41 Rehab Room 14.9 m² 42 Rehab Room 14.9 m² 43 Rehab Room 14.9 m² 44 Rehab Room 14.9 m² 45 Rehab Room 14.9 m² 46 Rehab Room 14.9 m² 47 Rehab Room 14.9 m² 48 Corridor 197.1 m²
NOTE: DRAWINGS ARE PROVIDED FOR REFERENCE ONLY. THE CONTRACTOR
IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS. THE
CONTRACTOR IS RESPONSIBLE FOR PROVIDING A DESIGN THAT MEETS ALL
APPLICABLE CODES AND THE REQUIREMENTS OF THE STATEMENT OF WORK.
N
0 1 5 m
1:100
SCALE
ATTACHMENT #3 CONCEPTUAL FLOOR PLANS
A-202
A-201
A-202
A-201
AN201
AN201
AN201
AN201
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
A-104
R O
O F
PL
AN
KU
TA
IS
I, G
EO
R G
IA
EU
R O
PE
D
IS
TR
IC
T
W
IE
SB
AD
EN
, G
ER
M
AN
Y
D
ES
IG
N
S
EC
TI
O
N
FI
R
ST
T
IT
LE
SE
C
O N
D T
IT
LE
DESIGN-BUILD SOLICITATION
KU
TA
IS
I M
EN
TA
L H
EA
LT
H C
EN
TE
R F
O R
C H
IL
D
R
EN
PR
O
JE
C
T N
U M
BE
R
1 : 100A-104
1 ROOF PLAN
# NOTE
1 -
NOTE: DRAWINGS ARE PROVIDED FOR REFERENCE ONLY. THE CONTRACTOR
IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS. THE
CONTRACTOR IS RESPONSIBLE FOR PROVIDING A DESIGN THAT MEETS ALL
APPLICABLE CODES AND THE REQUIREMENTS OF THE STATEMENT OF WORK.
N
0 1 5 m
1:100
SCALE
ATTACHMENT #3 CONCEPTUAL ROOF PLANS
G. FLOOR
0.000
1.FLOOR
3.000
ROOF
9.000
2. FLOOR
6.000
G. FLOOR
0.000
1.FLOOR
3.000
ROOF
9.000
2. FLOOR
6.000
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
A-201
EX
TE
R
IO
R E
LE
VA
TI
O
N S
N O
R
TH
SO
U
TH
KU
TA
IS
I, G
EO
R G
IA
EU
R O
PE
D
IS
TR
IC
T
W
IE
SB
AD
EN
, G
ER
M
AN
Y
D
ES
IG
N
S
EC
TI
O
N
FI
R
ST
T
IT
LE
SE
C
O N
D T
IT
LE
DESIGN-BUILD SOLICITATION
KU
TA
IS
I M
EN
TA
L H
EA
LT
H C
EN
TE
R F
O R
C H
IL
D
R
EN
PR
O
JE
C
T N
U M
BE
R
1 : 100A-201
1 NORTH ELEVATION
1 : 100A-201
3 SOUTH ELEVATION
# NOTE
1 -
NOTE: DRAWINGS ARE PROVIDED FOR REFERENCE ONLY. THE CONTRACTOR
IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS. THE
CONTRACTOR IS RESPONSIBLE FOR PROVIDING A DESIGN THAT MEETS ALL
APPLICABLE CODES AND THE REQUIREMENTS OF THE STATEMENT OF WORK.
0 1 5 m
1:100
SCALE
ATTACHMENT #3 CONCEPTUAL EXTERIOR ELEVATIONS NORTH & SOUTH
# NOTE
G. FLOOR
0.000
1.FLOOR
3.000
ROOF
9.000
2. FLOOR
6.000
G. FLOOR
0.000
1.FLOOR
3.000
ROOF
9.000
2. FLOOR
6.000
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
A-202
EX
TE
R
IO
R E
LE
VA
TI
O
N S
EA
ST
W
ES
T
KU
TA
IS
I, G
EO
R G
IA
EU
R O
PE
D
IS
TR
IC
T
W
IE
SB
AD
EN
, G
ER
M
AN
Y
D
ES
IG
N
S
EC
TI
O
N
FI
R
ST
T
IT
LE
SE
C
O N
D T
IT
LE
DESIGN-BUILD SOLICITATION
KU
TA
IS
I M
EN
TA
L H
EA
LT
H C
EN
TE
R F
O R
C H
IL
D
R
EN
PR
O
JE
C
T N
U M
BE
R
# NOTE
1 -
NOTE: DRAWINGS ARE PROVIDED FOR REFERENCE ONLY. THE CONTRACTOR
IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS. THE
CONTRACTOR IS RESPONSIBLE FOR PROVIDING A DESIGN THAT MEETS ALL
APPLICABLE CODES AND THE REQUIREMENTS OF THE STATEMENT OF WORK.
0 1 5 m
1:100
SCALE
ATTACHMENT #4 CONCEPTUAL EXTERIOR ELEVATIONS EAST & WEST
# NOTE
1 : 100A-202
1 WEST ELEVATION
1 : 100A-202
3 EAST ELEVATION
| ge47_R22_v1 - Sheet - A-101 - GROUND FLOOR PLAN |
| Sheets |
| A-101 - GROUND FLOOR PLAN |
| ge47_Att#3_Conceptual Architecture Drawings |
| 20240911_ge47_drafts - Sheet - A-101 - GROUND FLOOR PLAN |
| Sheets |
| A-101 - GROUND FLOOR PLAN |
| A-104 - ROOF PLAN |
| A-201 - EXTERIOR ELEVATIONS NORTH / SOUTH |
| A-202 - EXTERIOR ELEVATIONS EAST / WEST |
| 20240911_ge47_drafts - Sheet - A-104 - ROOF PLAN |
| Sheets |
| A-101 - GROUND FLOOR PLAN |
| A-104 - ROOF PLAN |
| A-201 - EXTERIOR ELEVATIONS NORTH / SOUTH |
| A-202 - EXTERIOR ELEVATIONS EAST / WEST |
| 20240911_ge47_drafts - Sheet - A-201 - EXTERIOR ELEVATIONS NORTH - SOUTH |
| Sheets |
| A-101 - GROUND FLOOR PLAN |
| A-104 - ROOF PLAN |
| A-201 - EXTERIOR ELEVATIONS NORTH / SOUTH |
| A-202 - EXTERIOR ELEVATIONS EAST / WEST |
| 20240911_ge47_drafts - Sheet - A-202 - EXTERIOR ELEVATIONS EAST - WEST |
| Sheets |
| A-101 - GROUND FLOOR PLAN |
| A-104 - ROOF PLAN |
| A-201 - EXTERIOR ELEVATIONS NORTH / SOUTH |
| A-202 - EXTERIOR ELEVATIONS EAST / WEST |
File details come from the government source that posted it. Updated .