This document is a Quantity Summary sheet for MRL Item 611-L, detailing a civil engineering project involving land development and infrastructure work. The project spans 4.3 miles with an 80.6-acre borrow area, involving extensive land clearing, excavation, and embankment activities. Key quantities include 237,000 cubic yards of uncompacted berm embankment, 9.3 miles of silt fence installation, culvert and water control structure work, and surface preparation across wooded and field areas. The project involves clearing 75.7 acres of wooded borrow area, 4.9 acres of field area, and includes specific infrastructure elements like a cattle guard replacement, 24" CMP (Corrugated Metal Pipe) installations, and riprap protection. The total in-place embankment is calculated at 237,150 cubic yards, with a material availability of 320,057 cubic yards from the borrow area.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MRL Item 611-L Quantity Summary 12/10/2025 9:32 AM

Project Length

Borrow Area Acres (total)

Borrow Area Description

Embankment Area (total)

Material Available in Borrow

Total In-Place Embankment

Quantity Notes

Mobilization and Demobilization

Mobilization 1 EA Demobilization 1 EA

Clearing and Grubbing

Borrow Area, Wooded 75.7 AC Clearing and grubbing areas were measured using closed shapes in CADD.

Borrow Area, Field 4.9 AC Clearing and grubbing areas were measured using closed shapes in CADD.

Berm Embankment, Wooded 16 AC Clearing and grubbing areas were measured using closed shapes in CADD.

Berm Embankment, Field 22 AC Clearing and grubbing areas were measured using closed shapes in CADD.

Excavation

Ditches 2,089 C.Y. The fill volume was calculated using the triangle method in CADD.

Embankment

Berm Embankment, Uncompacted 237,000 C.Y. The fill volume was calculated using the triangle method in CADD.

Culvert

24" CMP 76 FT 24" CMP in ditch

Excavation 100 CY Estimated based on past culvert excavations

Structural Backfill 100 CY Estimated based on past culvert backfills

Riprap Protection (R90 @12") 5 TN Measured from riprap limits in CADD

Bedding Stone (No. 2 @8") 3 TN Measured from riprap limits in CADD

Crushed Stone Surfacing

Levee Crown (Resurfacing) 8,514 TN Linear foot of the levee alignment times 0.375.

Water Control Structure

Pipe (24" CMP) 70 FT 24" CMP in structure

Stoplogs 1 EA 36" riser, 24" stub

Pipe Anchors (6"band, 8" double helix) 2 EA 1 on each side of pipe

Excavation 2830 CY Measured from drainage structure ditch terrain

Structural Backfill 165 CY Measured from ditch terrain and berm terrain

Riprap Protection (R200 @24") 201 TN Measured from riprap limits in CADD

Bedding Stone (No. 2 @ 9") 79 TN Measured from riprap limits in CADD

Cattle Guard

Cattle Guard 1 EA 3 Captured in Survey. Only one to be removed and replaced by contractor.

Turf Establishment and Maintenance

Berm Footprint 40 AC The area was measured using closed shapes in CADD.

Total Disturbed Area Footprint 122 AC The area was measured using closed shapes in CADD.

Ramp Transition

Ramp infill, Uncompacted 2000 C.Y. This fill volume was estimated from previous experince. 2 Ramp transition from Berm to Existing Ground.

Environmental Protection

Silt Fence 9.3 mi The length was measured using a closed shape in CADD.

IT IS EXPRESSLY UNDERSTOOD THAT THE ACCURACY OF THESE ESTIMATES IS IN NO WISE WARRENTED AND THAT THE FURNISHING OF THIS INFORMATION TO A BIDDER WILL NOT RELIEVE HIM/HERS RESPONSIBILITY TO ESTIMATE THE QUANTITIES INVOLVED. IT IS FURTHER TO BE EXPRESSLY UNDERSTOOD THAT IN NO CASE WILL SUCH ESTIMTE BE USED AS A BASIS OF A CLAIM AGAIST THE GOVERNMENT.

237,150 C.Y.

Description

General Project Info

MRL Item 611-L - Quantity Computations

Quantity Summary

4.3 MILES

80.6 AC

1 borrow area, ~ 2 mi haul

40 AC

320,057 C.Y.

https://usace-my.dps.mil/personal/crystal_d_huerta_usace_army_mil/Documents/Documents/_projects/615-611/RTA/ITEM 611-L Quantity Sheet Template for Contracting Page 1 of 1