Amendment 0003- Cantonment Area Roads-Cooper Ave Road Widening
Solicitation number
W912DR23R0007P0003
Issued by

About this file

This is an amendment to a federal solicitation. The amendment provides responses to requests for information, revises documents based on the RFI responses, and extends the proposal due date from April 28, 2023 to May 5, 2023. The solicitation is for the Cantonment Area Roads-Cooper Ave Road Widening project for the U.S. Army Corps of Engineers Engineering District Baltimore. The amendment revises specifications, drawings, and instructions to offerors. Revisions include changes to specifications for regulatory notifications, aggregate base materials, and stormwater management requirements. Drawings are revised with updates to site plans, utility plans, grading, erosion and sediment control plans, and landscaping plans. Instructions to offerors are updated with evaluation criteria and a revised schedule approach submission requirement.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment (0003) is to:

1. Provide the responses to the submitted RFI's.

2. Provide the revised documents based on RFI responses.

3. Extend the proposal due date from 28 April 2023 to 05 May 2023.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 28

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Apr-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DR23R0007

X 9B. DATED (SEE ITEM 11)

16-Feb-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Apr-2023

CODE

USACE, BALTIMORE

2 HOPKINS PLAZA

BALTIMORE MD 21201

W912DR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DR23R0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 28-Apr-2023 11:00 AM to 05-May-2023 11:00 AM.

The following have been added by full text:

AMENDMENT 0003

reSPECIFICATIONS:

1. Specification 01 57 19: Paragraph 1.2 – Replace ‘Regulatory Notifications; G’ with ‘Regulatory Notifications; G, AO’. Replace ‘Environmental Protection; G’ with ‘Environmental Protection; G, AO’. Add ‘NPDES Transfer of Authority; G, AO’. Add ‘SD-05 Design Data Draft MDE SWM As-Built Data; G, AO’. Replace ‘Stormwater Notice of Termination (for NPDES coverage under the general permit for construction activities); G’ with ‘Storrmwater Notice of Termination (for NPDES coverage under the general permit for construction activities); G, AO’. Replace ‘Waste Determination Documentation; G’ with ‘Waste Determination Documentation; G, AO’. Replace ‘Solid Waste Management Permit, G’ with ‘Solid Waste Management Permit; G, AO’.

Paragraph 1.7 - Add:

a. The following permits have been obtained by the Government:

(1) MDE Joint Permit for Nontidal Wetlands and Waterways

b. The following permits will be obtained by the Government:

(1) Erosion and Sediment Control (E&S) and Stormwater Management (SWM) Plan

Approval: Plans and Report were submitted by the Government to the Maryland Department of Environment (MDE) State and federal Sediment and Stormwater Plan Review for approval. MDE number is 21-SF-0009. The approval letter and MDE electronic stamped drawings will be provided to the Contractor with the Notice to Proceed. Contractor shall be responsible for preparing and submitting all requests for modifications to Plan Approvals.

(2) NPDES Permit: The initial NPDES Notice of Intent will be completed and paid for by the Government and submitted to MDE. The NPDES permit will be provided to the Contractor with the Notice to Proceed. See Transfer of Authority paragraph below for additional instructions. MDE periodically reissues NPDES permits. Contractor shall be responsible for reapplication and all modifications to the project due to changes in NPDES permit conditions and modifications.

Paragraph 3.2 – Add subparagraph 3.2.1.2 NPDES Transfer of Authority for Construction Activities,

3.2.1.3 Inspection Reports, 3.2.1.4 Stormwater Pollution Prevention Plan Compliance Notebook,

3.2.1.5 MDE SWM As-Built Certification Package, and 3.2.1.6 Stormwater Notice of Termination for Construction Activities.

2. Specification 31 00 00: Paragraph 1.3.18 – Replace “Graded Aggregate Base” with “Crusher Run Aggregate CR-6”. Delete “Also refer to Specification Section 32 11 23 AGGREGATE BASE

COURSE”.

3. Specification 32 01 16.71: Delete Specification.

4. Specification 32 12 13: Delete Specification.

DRAWINGS:

1. Sheet GI002: Delete Sheet GI002 in its entirety as originally issued and substitute the attached like-number sheet, dated 03/31/23.

Summary: Notes have been added to Civil General Notes.

2. Sheet GI003: Delete Sheet GI003 in its entirety as originally issued and substitute the attached

Summary: Added sheets.

3. Sheet GI004: Delete Sheet GI004 in its entirety as originally issued and substitute the attached

Summary: Added sheets.

4. Sheet VF118: Delete Sheet VF118 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Updated existing contours.

5. Sheet CD106: Delete Sheet CD106 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Changed Demolition Keyed Note 8.

6. Sheet CD119: Delete Sheet CD119 in its entirety as originally issued and substitute the attached

Summary: Changed Demolition Keyed Note: 7.

7. Sheet CS001-CS083: New Sheets, dated 4/17/23

Summary: Cross section sheets added.

8. Sheet CS105A: New Sheet CS105A, dated 03/31/23.

Summary: New Site Layout Plan sheet with added LOD around manhole.

9. Sheet CG102: Delete Sheet CG102 in its entirety as originally issued and substitute the attached

Summary: Changed shape of underground tank in roundabout.

10. Sheet CG105: Delete Sheet CG105 in its entirety as originally issued and substitute the attached

Summary: Changed transparency of loading dock sand filter to existing.

11. Sheet CG106: Delete Sheet CG106 in its entirety as originally issued and substitute the attached

Summary: Removed label for Grass Swale.

12. Sheet CG108: Delete Sheet CG108 in its entirety as originally issued and substitute the attached

Summary: Changed shape of underground tank in roundabout.

13. Sheet CG109: Delete Sheet CG109 in its entirety as originally issued and substitute the attached

Summary: Changed shape of underground tank in roundabout.

14. Sheet B501: Delete Sheet B501 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised notes in Transition Section at Asphalt Pavement to Mill & Overlay (Existing) detail.

15. Sheet CU001: Delete Sheet CU001 in its entirety as originally issued and substitute the attached

Summary: Changed the alignment of electrical ducts and revised Electrical Ductbank Key Notes 2 and 3. Revised the riprap pad at ES-2-C.

16. Sheet CU002: Delete Sheet CU002 in its entirety as originally issued and substitute the attached

Summary: Adjusted the alignment of electrical ducts and the location of electrical switchgear, Revised Electrical Ductbank Key Notes 8 -11. Changed shape of underground tank in roundabout.

17. Sheet CU003: Delete Sheet CU003 in its entirety as originally issued and substitute the attached

Summary: Added soil boring locations.

18. Sheet CU004: Delete Sheet CU004 in its entirety as originally issued and substitute the attached

Summary: Adjusted the shape of Facility QMF-381 and removed the storm drain pipe from QMF-381 to I-4-E. Revised Electrical Ductbank Key Note 15.

19. Sheet CU005: Delete Sheet CU005 in its entirety as originally issued and substitute the attached like-number sheet, dated 03/24//23.

Summary: Adjusted the alignment of electrical ducts and revised Electrical Ductbank Key Notes 19 and 23.

20. Sheet CU005A: New Sheet CU005A, dated 03/31/23.

Summary: New Utility Plan sheet for underground communication conduit.

21. Sheet CU006: Delete Sheet CU006 in its entirety as originally issued and substitute the attached

Summary: Revised pipe between ES-1A-C and CU211. Revised Drainage Outfall Weir IT– 1–W2 and Revised Electrical Ductbank Key Notes 1 – 6.

22. Sheet CU007: Delete Sheet CU007 in its entirety as originally issued and substitute the attached

Summary: Adjusted the alignment of electrical ducts and revised Electrical Ductbank Key Notes 3-12.

23. Sheet CU008: Delete Sheet CU008 in its entirety as originally issued and substitute the attached

Summary: Adjusted the alignment of electrical ducts and added Manhole. Revised Electrical Ductbank Key Notes 8 - 11. Changed shape of underground tank in roundabout.

24. Sheet CU009: Delete Sheet CU009 in its entirety as originally issued and substitute the attached

Summary: Adjusted the alignment of electrical ducts and revised Electrical Ductbank Key Notes 8 – 11. Changed shape of underground tank in roundabout.

25. Sheet CU010: Delete Sheet CU010 in its entirety as originally issued and substitute the attached

Summary: Added soil boring locations.

26. Sheet CU011: Delete Sheet CU011 in its entirety as originally issued and substitute the attached

Summary: Revised Electrical Ductbank Key Note 14.

27. Sheet CU011A: New Sheet CU011A, dated 03/31/23.

Summary: New Utility Plan sheet for profiles.

28. Sheet CU012: Delete Sheet CU012 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised profile and plan of existing Manhole 74 location. Revised Sheet Key Note 5. Revised Electrical Ductbank Key Note 17.

29. Sheet CU013A: New Sheet CU013A, dated 03/31/23.

Summary: New Utility Plan sheet for profile.

30. Sheet CU016A: New Sheet CU016A, dated 03/31/23.

Summary: New Utility Plan sheet for profiles.

31. Sheet CU017: Delete Sheet CU017 in its entirety as originally issued and substitute the attached

Summary: Added utility profile.

32. Sheet CU020: Delete Sheet CU020 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Added soil boring locations.

33. Sheet CU021: Delete Sheet CU021 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Added soil boring locations.

34. Sheet CU101: Delete Sheet CU101 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Added soil boring locations.

35. Sheet CU101A: Delete Sheet CU101A in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Added soil boring locations

36. Sheet CU102: Delete Sheet CU102 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Added soil boring locations.

37. Sheet CU103: Delete Sheet CU103 in its entirety as originally issued and substitute the attached

Summary: Added soil boring locations

38. Sheet CU104: Delete Sheet CU104 in its entirety as originally issued and substitute the attached

Summary: Added soil boring locations

39. Sheet CU105: Delete Sheet CU105 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Added soil boring locations

40. Sheet CU106: Delete Sheet CU106 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Added soil boring locations

41. Sheet CU107: Delete Sheet CU107 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Added soil boring locations

42. Sheet CU107A: Delete Sheet CU107A in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Added label for aggregate base.

43. Sheet CU108: Delete Sheet CU108 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Added soil boring locations.

44. Sheet CU109: Delete Sheet CU109 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Added soil boring locations.

45. Sheet CU110: Delete Sheet CU110 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Added soil boring locations. Added alignment label.

46. Sheet CU120: Delete Sheet CU120 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Removed unnecessary table.

47. Sheet CU121: Delete Sheet CU121 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Removed Grass Swale table.

48. Sheet CU122: Delete Sheet CU122 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Updated Asbuilt with landscape sheet no.

49. Sheet CU123: Delete Sheet CU123 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Updated Asbuilt with landscape sheet no.

50. Sheet CU124: Delete Sheet CU124 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Updated Asbuilt with landscape sheet no.

51. Sheet CU125: Delete Sheet CU125 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Updated Asbuilt with landscape sheet no. Removed Grass Swale information.

52. Sheet CU126: Delete Sheet CU126 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Updated Asbuilt with landscape sheet no.

53. Sheet CU127: Delete Sheet CU127 in its entirety as originally issued and substitute the attached

Summary: Updated Asbuilt with landscape sheet no.

54. Sheet CU128: Delete Sheet CU128 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Updated Asbuilt with landscape sheet no.

55. Sheet CU202: Delete Sheet CU202 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Removed duplicate detail.

56. Sheet CU216: Delete Sheet CU216 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Updated structure table.

57. Sheet CU217: Delete Sheet CU217 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Updated structure table.

58. Sheet CU218: Delete Sheet CU218 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Updated structure table.

59. Sheet CU219: Delete Sheet CU219 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Updated structure table.

60. Sheet CU401: Delete Sheet CU401 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Added gabion berm in IF-1 facility, adjusted grading, added callout for headwall trash rack.

61. Sheet CU402: Delete Sheet CU402 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised IF-1 section in accordance with revisions to CU401.

62. Sheet CU404: Delete Sheet CU404 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Added gabion berm detail.

63. Sheet CE100: Delete Sheet CE100 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC legend and checked cut/fill values.

64. Sheet CE101: Delete Sheet CE101 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

65. Sheet CE102: Delete Sheet CE102 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

66. Sheet CE103: Delete Sheet CE103 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

67. Sheet CE104: Delete Sheet CE104 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

68. Sheet CE105: Delete Sheet CE105 in its entirety as originally issued and substitute the attached

Summary: Revised consistency of ESC plans.

69. Sheet CE106: Delete Sheet CE106 in its entirety as originally issued and substitute the attached

Summary: Revised consistency of ESC plans.

70. Sheet CE107: Delete Sheet CE107 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

71. Sheet CE108: Delete Sheet CE108 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

72. Sheet CE109: Delete Sheet CE109 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

73. Sheet CE110: Delete Sheet CE110 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

74. Sheet CE111: Delete Sheet CE111 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

75. Sheet CE112: Delete Sheet CE112 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

76. Sheet CE113: Delete Sheet CE113 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

77. Sheet CE114: Delete Sheet CE114 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

78. Sheet CE201: Delete Sheet CE201 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

79. Sheet CE202: Delete Sheet CE202 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

80. Sheet CE203: Delete Sheet CE203 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

81. Sheet CE204: Delete Sheet CE204 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

82. Sheet CE205: Delete Sheet CE205 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

83. Sheet CE2EA06: Delete Sheet CE2EA06 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

84. Sheet CE2EB06: Delete Sheet CE2EB06 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

85. Sheet CE2EB07: Delete Sheet CE2EB07 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

86. Sheet CE2EB08: Delete Sheet CE2EB08 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

87. Sheet CE2EB09: Delete Sheet CE2EB09 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

88. Sheet CE2EB10: Delete Sheet CE2EB10 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

89. Sheet CE2EB11: Delete Sheet CE2EB11 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

90. Sheet CE2EB12: Delete Sheet CE2EB12 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

91. Sheet CE213: Delete Sheet CE213 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

92. Sheet CE214: Delete Sheet CE214 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

93. Sheet CE301: Delete Sheet CE301 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

94. Sheet CE302: Delete Sheet CE302 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

95. Sheet CE303: Delete Sheet CE303 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

96. Sheet CE304: Delete Sheet CE304 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

97. Sheet CE305: Delete Sheet CE305 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

98. Sheet CE306: Delete Sheet CE306 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

99. Sheet CE307: Delete Sheet CE307 in its entirety as originally issued and substitute the attached

100. Sheet CE308: Delete Sheet CE308 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

101. Sheet CE309: Delete Sheet CE309 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

102. Sheet CE310: Delete Sheet CE310 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

103. Sheet CE311: Delete Sheet CE311 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

104. Sheet CE312: Delete Sheet CE312 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

105. Sheet CE313: Delete Sheet CE313 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

106. Sheet CE314: Delete Sheet CE314 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

107. Sheet CE315: Delete Sheet CE315 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised consistency of ESC plans.

108. Sheet CE402: Delete Sheet CE402 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Revised notes.

109. Sheet MTP01: New Sheet MTP01, dated 03/31/23.

Summary: New MOT sheet for pre-stage utility work.

110. Sheet MTP02: New Sheet MTP02, dated 03/31/23.

111. Sheet MTP03: New Sheet MTP03, dated 03/31/23.

112. Sheet MT104: Delete Sheet MT104 in its entirety as originally issued and substitute the attached

Summary: Deleted note.

113. Sheet MTP04: New Sheet MTP04, dated 03/31/23.

114. Sheet MTP05: New Sheet MTP05, dated 03/31/23.

115. Sheet MT207: Delete Sheet MT207 in its entirety as originally issued and substitute the attached

Summary: Realigned traffic lanes and barrier.

116. Sheet MTP06: New Sheet MTP06, dated 03/31/23.

Summary: New MOT sheet for pre-stage utility work.

117. Sheet MTP07: New Sheet MTP07, dated 03/31/23.

Summary: New MOT sheet for pre-stage utility work.

118. Sheet MTP08: New Sheet MTP08, dated 03/31/23.

Summary: New MOT sheet for pre-stage utility work.

119. Sheet MTP09: New Sheet MTP09, dated 03/31/23.

Summary: New MOT sheet for pre-stage utility work.

120. Sheet LS100: Delete Sheet LS100 in its entirety as originally issued and substitute the attached

Summary: Added new sheet locations to the key map. Added MDE Plan Number.

121. Sheet LS101: Delete Sheet LS101 in its entirety as originally issued and substitute the attached

Summary: Added MDE Plan Number. Added SWM facility call out to the plan.

122. Sheet LS102: Delete Sheet LS102 in its entirety as originally issued and substitute the attached

Summary: Added MDE Plan Number. Added SWM facility call out to the plan. Added no woody vegetation restriction line to facility SWM-3.

123. Sheet LS103: Delete Sheet LS103 in its entirety as originally issued and substitute the attached

124. Sheet LS104: Delete Sheet LS104 in its entirety as originally issued and substitute the attached

125. Sheet LS105: Delete Sheet LS105 in its entirety as originally issued and substitute the attached

126. Sheet LS106: Delete Sheet LS106 in its entirety as originally issued and substitute the attached

Summary: Added MDE Plan Number. Added SWM facility call out to the plan. Revised plantings for facility SWM-16 and revised plantings northwest corner of Mapes/Cooper intersection.Updated plant schedule.

127. Sheet LS107: Delete Sheet LS107 in its entirety as originally issued and substitute the attached

Summary: Added MDE Plan Number. Revised plantings for facility SWM-13 to add wet meadow establishment. Updated plant schedule.

128. Sheet LS108: Delete Sheet LS108 in its entirety as originally issued and substitute the attached

Summary: Added MDE Plan Number. Added no woody vegetation restriction line to facility SWM-3.

129. Sheet LS109: Delete Sheet LS109 in its entirety as originally issued and substitute the attached

Summary: Added MDE Plan Number. Added no woody vegetation restriction line to facility SWM-3.

130. Sheet LS110: Delete Sheet LS110 in its entirety as originally issued and substitute the attached

131. Sheet LS111: Delete Sheet LS111 in its entirety as originally issued and substitute the attached

132. Sheet LS112: Delete Sheet LS112 in its entirety as originally issued and substitute the attached

Summary: Added MDE Plan Number. Revised species selection for SWM-22; updated plant schedule.

133. Sheet LS113: Delete Sheet LS113 in its entirety as originally issued and substitute the attached

Summary: Added MDE Plan Number.

134. Sheet LS114: Delete Sheet LS114 in its entirety as originally issued and substitute the attached

135. Sheet LS115: Delete Sheet LS115 in its entirety as originally issued and substitute the attached

136. Sheet LS116: Delete Sheet LS116 in its entirety as originally issued and substitute the attached

137. Sheet LS117: Delete Sheet LS117 in its entirety as originally issued and substitute the attached

138. Sheet LS118: Delete Sheet LS118 in its entirety as originally issued and substitute the attached

139. Sheet LS119: Delete Sheet LS119 in its entirety as originally issued and substitute the attached

140. Sheet LS120: Delete Sheet LS120 in its entirety as originally issued and substitute the attached

Summary: Revised species selection for SWM-28; updated plant schedule. Removed two microbioretention facilities located at 306+50 RT. and 307+50 LT. Added no woody vegetation restriction line to SWM-28.

141. Sheet LS121: Delete Sheet LS121 in its entirety as originally issued and substitute the attached

Summary: Added MDE Plan Number. Added SWM facility call out to the plan; Added no woody vegetation restriction line to SWM-34 (INF-1).

142. Sheet LS122: Delete Sheet LS122 in its entirety as originally issued and substitute the attached

Summary: Revised sheet title. Added MDE Plan Number.

143. Sheet LS123: Delete Sheet LS123 in its entirety as originally issued and substitute the attached

Summary: Revised sheet title. Added MDE Plan Number.

144. Sheet LS124: New Sheet LS124, dated 03/31/23.

Summary: New Landscape Plan sheet for offsite reforestation planting – Site B.

145. Sheet LS125: New Sheet LS125, dated 03/31/23.

Summary: New Landscape Plan sheet for offsite reforestation planting – Site C.

146. Sheet LS126: New Sheet LS126, dated 03/31/23.

Summary: New Landscape Plan sheet for offsite reforestation planting – Site C.

147. Sheet LS127: New Sheet LS127, dated 03/31/23.

Summary: New Landscape Plan sheet for offsite reforestation planting – Site D.

148. Sheet LS128: New Sheet LS128, dated 03/31/23.

Summary: New Landscape Plan sheet for offsite reforestation planting – Site D.

149. Sheet LS129: New Sheet LS129, dated 03/31/23.

Summary: New Landscape Plan sheet for offsite reforestation planting – Site E.

150. Sheet LI501: New Sheet LI501, dated 03/31/23.

151. Sheet LI601: New Sheet LI601, dated 03/31/23.

Summary: Added seed specification for wet meadow establishment. Added MDE Plan Number.

152. Sheet LI602: New Sheet LI602, dated 03/31/23.

Summary: Updated plant schedule. Added MDE Plan Number.

153. Sheet LI603: New Sheet LI603, dated 03/31/23.

154. Sheet LI604: New Sheet LI604, dated 03/31/23.

Summary: Updated plant schedule. Added MDE Plan Number.

155. Sheet LI605: New Sheet LI605, dated 03/31/23.

Summary: Specific to offsite reforestation planting areas – provided notes for sequence of construction and invasive species management. Added MDE Plan Number.

156. Sheet S505: Delete Sheet S505 in its entirety as originally issued and substitute the attached like number sheet, dated 03/31/23.

Summary: Adjusted dimensions of QMF-3A such that structure is built within a single MOT phase.

157. Sheet S506: Delete Sheet S506 in its entirety as originally issued and substitute the attached like

158. Sheet S507: Delete Sheet S507 in its entirety as originally issued and substitute the attached like

159. Sheet S517: Delete Sheet S517 in its entirety as originally issued and substitute the attached like

Summary: Added volume to table, adjusted weir length of QMF-3B1, modified section, added notes.

Attachments:

Specifications

1. Revised Specification Section 01 57 19

2. Revised Specification Section 31 00 00

3. Deleted Specification Section 32 01 16.71

4. Deleted Specification Section 32 12 13

Drawings

1. Revised Sheet GI002

2. Revised Sheet GI003

3. Revised Sheet GI004

4. Revised Sheet VF118

5. Revised Sheet CD106

6. Revised Sheet CD119

7. New Sheet CS001

8. New Sheet CS002

9. New Sheet CS003

10. New Sheet CS004

11. New Sheet CS005

12. New Sheet CS006

13. New Sheet CS007

14. New Sheet CS008

15. New Sheet CS009

16. New Sheet CS010

17. New Sheet CS011

18. New Sheet CS012

19. New Sheet CS013

20. New Sheet CS014

21. New Sheet CS015

22. New Sheet CS016

23. New Sheet CS017

24. New Sheet CS018

25. New Sheet CS019

26. New Sheet CS020

27. New Sheet CS021

28. New Sheet CS022

29. New Sheet CS023

30. New Sheet CS024

31. New Sheet CS025

32. New Sheet CS026

33. New Sheet CS027

34. New Sheet CS028

35. New Sheet CS029

36. New Sheet CS030

37. New Sheet CS031

38. New Sheet CS032

39. New Sheet CS033

40. New Sheet CS034

41. New Sheet CS035

42. New Sheet CS036

43. New Sheet CS037

44. New Sheet CS038

45. New Sheet CS039

46. New Sheet CS040

47. New Sheet CS041

48. New Sheet CS042

49. New Sheet CS043

50. New Sheet CS044

51. New Sheet CS045

52. New Sheet CS046

53. New Sheet CS047

54. New Sheet CS048

55. New Sheet CS049

56. New Sheet CS050

57. New Sheet CS051

58. New Sheet CS052

59. New Sheet CS053

60. New Sheet CS054

61. New Sheet CS055

62. New Sheet CS056

63. New Sheet CS057

64. New Sheet CS058

65. New Sheet CS059

66. New Sheet CS060

67. New Sheet CS061

68. New Sheet CS062

69. New Sheet CS063

70. New Sheet CS064

71. New Sheet CS065

72. New Sheet CS066

73. New Sheet CS067

74. New Sheet CS068

75. New Sheet CS069

76. New Sheet CS070

77. New Sheet CS071

78. New Sheet CS072

79. New Sheet CS073

80. New Sheet CS074

81. New Sheet CS075

82. New Sheet CS076

83. New Sheet CS077

84. New Sheet CS078

85. New Sheet CS079

86. New Sheet CS080

87. New Sheet CS081

88. New Sheet CS082

89. New Sheet CS083

90. New Sheet CS105A

91. Revised Sheet CG102

92. Revised Sheet CG105

93. Revised Sheet CG106

94. Revised Sheet CG108

95. Revised Sheet CG109

96. Revised Sheet B501

97. Revised Sheet CU001

98. Revised Sheet CU002

99. Revised Sheet CU003

100. Revised Sheet CU004

101. Revised Sheet CU005

102. New Sheet CU005A

103. Revised Sheet CU006

104. Revised Sheet CU007

105. Revised Sheet CU008

106. Revised Sheet CU009

107. Revised Sheet CU010

108. Revised Sheet CU011

109. New Sheet CU011A

110. Revised Sheet CU012

111. New Sheet CU013A

112. New Sheet CU016A

113. Revised Sheet CU017

114. Revised Sheet CU020

115. Revised Sheet CU021

116. Revised Sheet CU101

117. Revised Sheet CU101A

118. Revised Sheet CU102

119. Revised Sheet CU103

120. Revised Sheet CU104

121. Revised Sheet CU105

122. Revised Sheet CU106

123. Revised Sheet CU107

124. Revised Sheet CU107A

125. Revised Sheet CU108

126. Revised Sheet CU109

127. Revised Sheet CU110

128. Revised Sheet CU120

129. Revised Sheet CU121

130. Revised Sheet CU122

131. Revised Sheet CU123

132. Revised Sheet CU124

133. Revised Sheet CU125

134. Revised Sheet CU126

135. Revised Sheet CU127

136. Revised Sheet CU128

137. Revised Sheet CU202

138. Revised Sheet CU216

139. Revised Sheet CU217

140. Revised Sheet CU218

141. Revised Sheet CU219

142. Revised Sheet CU401

143. Revised Sheet CU402

144. Revised Sheet CU404

145. Revised Sheet CE100

146. Revised Sheet CE101

147. Revised Sheet CE102

148. Revised Sheet CE103

149. Revised Sheet CE104

150. Revised Sheet CE105

151. Revised Sheet CE106

152. Revised Sheet CE107

153. Revised Sheet CE108

154. Revised Sheet CE109

155. Revised Sheet CE110

156. Revised Sheet CE111

157. Revised Sheet CE112

158. Revised Sheet CE113

159. Revised Sheet CE114

160. Revised Sheet CE201

161. Revised Sheet CE202

162. Revised Sheet CE203

163. Revised Sheet CE204

164. Revised Sheet CE205

165. Revised Sheet CE2A06

166. Revised Sheet CE2B06

167. Revised Sheet CE2B07

168. Revised Sheet CE2B08

169. Revised Sheet CE2B09

170. Revised Sheet CE2B10

171. Revised Sheet CE2B11

172. Revised Sheet CE2B12

173. Revised Sheet CE213

174. Revised Sheet CE214

175. Revised Sheet CE301

176. Revised Sheet CE302

177. Revised Sheet CE303

178. Revised Sheet CE304

179. Revised Sheet CE305

180. Revised Sheet CE306

181. Revised Sheet CE307

182. Revised Sheet CE308

183. Revised Sheet CE309

184. Revised Sheet CE310

185. Revised Sheet CE311

186. Revised Sheet CE312

187. Revised Sheet CE313

188. Revised Sheet CE314

189. Revised Sheet CE315

190. Revised Sheet CE402

191. New Sheet MTP01

192. New Sheet MTP02

193. New Sheet MTP03

194. Revised Sheet MT104

195. New Sheet MTP04

196. New Sheet MTP05

197. Revised Sheet MT207

198. New Sheet MTP06

199. New Sheet MTP07

200. New Sheet MTP08

201. New Sheet MTP09

202. Revised Sheet LS100

203. Revised Sheet LS101

204. Revised Sheet LS102

205. Revised Sheet LS103

206. Revised Sheet LS104

207. Revised Sheet LS105

208. Revised Sheet LS106

209. Revised Sheet LS107

210. Revised Sheet LS108

211. Revised Sheet LS109

212. Revised Sheet LS110

213. Revised Sheet LS111

214. Revised Sheet LS112

215. Revised Sheet LS113

216. Revised Sheet LS114

217. Revised Sheet LS115

218. Revised Sheet LS116

219. Revised Sheet LS117

220. Revised Sheet LS118

221. Revised Sheet LS119

222. Revised Sheet LS120

223. Revised Sheet LS121

224. Revised Sheet LS122

225. Revised Sheet LS123

226. New Sheet LS124

227. New Sheet LS125

228. New Sheet LS126

229. New Sheet LS127

230. New Sheet LS128

231. New Sheet LS129

232. Revised Sheet LI501

233. Revised Sheet LI601

234. Revised Sheet LI602

235. Revised Sheet LI603

236. Revised Sheet LI604

237. New Sheet LI605

238. Revised Sheet S505

239. Revised Sheet S506

240. Revised Sheet S507

241. Revised Sheet S517

SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS

The following have been modified:

BASIS OF AWARD & EVAL FACTORS

1. OVERVIEW.

Proposals received in response to this solicitation for theCantonment Aea Road project at Fort Meade, Maryland that will be evaluated on Lowest Price Technically Acceptable method of obtaining a best value. The Contracting Officer will award to the responsible offeror that represents the best value considering all non-price factors described herein.

2. BASIS OF AWARD.

2.1. ELIGIBILITY FOR CONTRACT AWARD

In accordance with the requirements of Part 9 of the Federal Acquisition Regulation (FAR), no contract shall be entered into unless the Contracting Officer ensures that all requirements of law, executive orders, regulations, and all other applicable procedures, including clearances and approvals, have been met. This includes the FAR requirement that no award shall be made unless the contracting officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must meet the general standards in FAR Part 9 and any special standards set forth in the solicitation.

2.2. SOURCE SELECTION USING THE LOW-PRICE, TECHNICALLY-

ACCEPABLE (LPTA) METHOD

The Government shall evaluate the lowest-priced offeror. Should that offeror’s proposal be found to be technically acceptable in all non-price factors, the Government shall stop evaluations and make direct award to said offeror, assuming their price is found to be fair and reasonable. Should the proposal not be technically acceptable in all non-price factors, or should the price offer not be found fair and reasonable, the Government shall evaluate the next lowest-price offeror. This process will repeat until a technically acceptable offeror whose price offer is fair and reasonable is selected.

The Government will award a firm fixed price contract to the responsible Offeror whose technically acceptable proposal represents the lowest price.

The basis of award will be the Government’s assessment as to which proposal is determined to be technically acceptable and is the lowest price determined fair and reasonable through price analysis. Offerors that do not receive an acceptable rating (technically acceptable), will not be selected, regardless of their price (lowest Offeror may not be selected).

Offerors are reminded to include their best technical and price terms in their offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. The Government may make award of an acceptable proposal without discussions, if deemed to be in the best interests of the Government.

3. GENERAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

For purposes of this RFP, an “Offeror” may include a group of two or more entities that have formed a “contractor team arrangement,” as that term is defined in the Federal Acquisition Regulation, Section 9.601. In the case of entities that have formed a contractor team arrangement, the experience and performance history of any member of the team, whether or not gained while working with the other member(s) of the currently-proposed contractor team arrangement, may be considered as a part of the evaluation of the Offeror’s proposal.

In the case of contractor team arrangements involving a prime contractor and subcontractor(s), where the prime contractor submits the proposal in response to this RFP, the prime contractor must have completed at least two of the total number of projects submitted for Factor 1 for consideration in response to the past performance requirements of this RFP. If information about a subcontractor is submitted and considered during the evaluation, the expectation is that this subcontractor will perform this work. Before utilizing another subcontractor for this work, the Government must consent.

An Offeror that relies upon the performance history of a member or members of a proposed contractor team arrangement will be expected to maintain that arrangement during performance of any contract awarded to that Offeror under this RFP. As a part of their proposal, the Offeror must provide a contractor team agreement signed by all parties, identifying the legal name(s) of all entities and describing the nature of each entity’s relationship (teaming/partnering, joint venture, etc.) and its role on this project. Past Performance information of other than the Offeror will not be considered without the teaming arrangements. In the case of joint ventures, at least one project will be submitted from each member to demonstrate past experience. This documentation shall be provided in applicable section of the Offeror's proposal.

3.1.1 Media, Page Size, Margins, Fonts, and Page Limitations.

Submit only the electronic files specifically authorized elsewhere in this section. Do not submit excess information, to include audio-visual materials, electronic media, etc. Do not include links to information on websites in lieu of incorporating the information physically into the proposal.

Except where another size is specifically authorized for a specific submission, use only 8 1/2” x 11” paper. Use at least 1-inch margins, which may include headers and footers. Do not justify the right margin. Ensure that all text and graphics are clearly legible. Do not use a font size smaller than 10, unusual font styles such as script, or condensed fonts. For submissions with page limitations, the pages will be counted as follows: One side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages. Where authorized, a foldout sheet will count as one page. Pages furnished for organizational purposes only, such as a “Table of Contents” or divider tabs, are excluded from page limitations.

3.1.2 Conditioning of Offer.

Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal volumes. Inclusion of any standard company terms and conditions that conflict with the terms and conditions of the solicitation may result in a determination that the offer is unacceptable and thus ineligible for award. Resolve questions about the terms and conditions or technical requirements of the solicitation prior to submission of the offer; see Section 7, located in Section 00 20 00, for instructions of how to submit inquiries.

3.1.3 Restrictions on Offeror-Provided Information.

“Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can nonetheless be provided to the Government as part of the offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must clearly mark the information in accordance with FAR 52.215-1, “Instructions to Offeror – Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data.” Files shall not contain classified data.

3.2 GENERAL PROPOSAL PREPARATION.

The proposal shall be submitted as summarized below and as required by the specifications.

1. Volume I – Technical Volume

a. Factor 1: Past Performance

b. Factor 2: Schedule Approach

2. Volume II – Price Volume

a. Proposal Cover Sheet

b. Standard Form 1442, Acknowledgement of Amendments, Joint Venture Agreement

c. Pricing Schedule

d. Completed 52.204-8, printed out and applicable checkmark applied.

e. Offer Guarantee

f. Pre-Award Survey Information

g. Sub-Contracting Plan

Each offeror must submit a proposal consisting of a “price” volume, and “technical” volume. The price volume includes the signed offer and the offeror’s proposed prices. The technical volume includes all required information relating to the “non-price” evaluation factors. The two volumes must be submitted as separate, physically distinct volumes. The information in the two volumes is evaluated separately and independently. Do not cross-reference similar material between the non-price and price volumes.

3.2.1 Marking of Proposal Volumes.

Mark each volume as either the “Price Volume” or “Technical Volume”. In addition, mark the outside front cover of each volume with the project title and location, solicitation number, name and address of the offeror, and volume copy number. (Markings which identify the offeror are not required on either the back cover or on the spine/binding.)

Offers are to be formatted and tabbed in accordance with the instructions that follow for each proposal volume.

Include a table of contents for each proposal volume.

4. TECHNICAL VOLUME

4.1 Tab 1 (Part 1) of the Technical Volume: Factor 1 –Relevant Experience

4.1.1 Submission Requirements

The Offeror shall submit information on three (3) projects that are relevant in scope and complexity. These projects must demonstrate roadway reconstruction and associated supporting facilities/site improvements. Each submitted project must demonstrate a minimum completion value of $10,000,000 considering adjustment for escalation from project completion to 2022. All escalation values are to be labeled as escalated and the Offeror must explain in detail their escalation rationale, which must include any formulas, calculations, assumptions, etc. and address the discussions requested on Attachment A, “Experience in Relevant Projects” while meeting the teaming agreement requirements above. All projects must have a construction completion date no earlier than seven (7) years preceding the original date of issuance of this Solicitation. Projects that have a Beneficial Occupancy Date (BOD) within the same date range will also be considered.

Each of the submitted projects must individually demonstrate the Offeror’s experience with all four (4) elements listed below:

Note: Experience may be demonstrated by the Prime Offeror or its proposed Subcontractor. Teaming agreements must be included.

1. Experience with road reconstruction (existing roadways) to include maintenance of traffic to demonstrate roadways remain operational during construction

2. Experience with roadway phasing for Maryland Department of the Environment (MDE) (or similar state environmental compliance agency for stormwater management permitting)

3. Experience with construction of roadway supporting facilities and site improvements (i.e., stormwater management best management practice (BMP) facilities, sidewalks, curbs and gutters, street lighting, landscaping, street furniture, replanting/reforestation)

4. Experience with privatized utilities

Each project example provided by the Offeror shall include a narrative containing the following information:

Project title and location Detailed description of the project and the work performed by the Prime Offeror Description of relevancy Original contract award amount and final construction cost Original contract finish date and actual finish date

Formatting Limitations:

Each example project description shall not exceed three (3) pages (8.5 x 11 inches page size) including any images, graphics, charts and tables. If Offeror submits more than three (3) pages for any example project description, the additional pages will not be evaluated. Start each example project on a new page.

Please number your project submissions and include a matrix similar to the one below for purposes of matching your submissions to their applicable experience areas.

4.1.2 Evaluation Criteria

Acceptable: The project portfolio will be deemed recent and relevant if it meets all of the following requirements:

(a) The proposal demonstrates that the Offeror (or any subcontractor(s) )the Offeror may choose to employ or partner with) performed three (3) relevant projects that independently demonstrate completion of each of the four (4) work elements listed above.

(b) All projects were substantially completed within the last seven (7) years. Projects that have a Beneficial Occupancy Date (BOD) within the same date range will also be considered.

(c) The projects are of relevant scope and complexity and demonstrate a minimum completion value of $10,000,000 considering adjustment for escalation from project completion to 2022 as described above.

4.2 Tab 1 (Part 2) of the Technical Proposal: Factor 1 Past Performance

Evaluation Areas

Experience 1 - Include Project No. that meets this requirement

Experience 2 - Include Project No. that meets this requirement

Experience 3 – Include Project No. that meets this requirement

1. Experience with road reconstruction (existing roadways) to include maintenance of traffic to demonstrate roadways remain operational during construction

2. Experience with roadway phasing for Maryland Department of the Environment (MDE) (or similar state environmental compliance agency for stormwater management permitting)

3. Experience with construction of…