B.08.02 W912DQ22Q1029 OFSM Mowing.pdf
PDF 1 MB Posted
- Solicitation number
- W912DQ22Q1029
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912DQ22Q1029 06-May-2022
b. TELEPHONE NUMBER
816-3893566
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 19 May 2022
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912DQ9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
SETH BALSTERS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USACE, KANSAS CITY +
FEDERAL BLDG, CT-C +
601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 966454 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
USACE, KANSAS CITY +
DEREK DORSEY
SMITHVILLE LAKE PROJECT OFFICE PO BOX 428
SMITHVILLE MO 64089-0428
TEL: 816-389-3947 FAX: 816-532-4986
816-389-2029/2030FAX:
TEL: 816-389-3812 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$8,000,000
NAICS:
561730
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF66
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section A - Solicitation/Contract Form
SYNOPSIS / SOLICITATION
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart
12.603 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation, quotes are being requested and a written solicitation will not be issued.
The solicitation number for this acquisition is W912DQ22Q1029 and it is being issued as a Request for Quote
(RFQ).
Offers are due ON THE DATE AND TIME SPECIFIED IN BOX 8. Offers shall be submitted in PDF via e-mail to seth.b.balsters@usace.army.mil. All offers must be good for at least 60 days from offer due date.
If you have any questions please contact Mr. Seth Balsters, seth.b.balsters@usace.army.mil , 816-389-3566.
The solicitation documents and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2005-84.
This synopsis/solicitation will be awarded as a 100% Small Business Set-aside and the associated North American Industry Classification system (NAICS) code is 561730 for “Landscaping Contractors”
Manufacturing and the business size standard is: $8,000,000.00.
Product/Service Code: S208 for “Housekeeping- Landscaping/Groundskeeping”
Description of Services Required: The U.S. Army Corps of Engineers Kansas City District has a need for Mowing and Trimming services to support Smithville Lake in the Operations Division of the Kansas City District. The contractors shall perform all services in accordance with the Performance Work Statement. The Contractor shall comply with all Federal, state, and local laws, ordinances, statutes and regulations pertaining to the provided services.
Place of Contract Performance: Smithville Lake Project, Smithville, MO.
Far 52.212-1, Instructions to Offerors- Commercial does apply to this acquisition with no addenda to the provision and is located in Section L of this combined synopsis/solicitation.
Far 52.212-2, Evaluation - Commercial Edited does apply to this acquisition with no addenda to the provision and is located in Section M of this combined synopsis/solicitation.
FAR 52.212-3, Offeror Representations and Certifications -- Commercial Items, does apply to this acquisition with no addenda to the provision, and is located in Section K of this combined synopsis/solicitation.
FAR 52.212-4, Contract Terms and Conditions - Commercial Items, does apply to this acquisition with no addenda to the provision. These specific clauses required are located in Section I of this combined synopsis/solicitation.
FAR 52.212-5, Contract Terms and Conditions - Required to Implement Statutes or Executive Orders- Commercial Items, applies to this acquisition. These specific clauses required are located in Section I of this combined synopsis/solicitation.
Additional contract requirement(s) or terms and conditions are located in Section J of this combined synopsis/ solicitation.
In accordance with FAR 52.212-1(k) the prospective awardee shall be registered and active in https://sam.gov/ for their System Award Management (SAM).
PLEASE NOTE: SAM.GOV procedures have been changed as of 8 November 2019. Interested vendors must go to SAM.gov to register in SAM and to review current notices or announcements.
Contractors may obtain information on registration and annual confirmation requirements via the Internet at https://sam.gov/ or by calling (866) 606-8220.
The System for Award Management (SAM) is a Federal Government owned and operated free web site. If you are a small business needing assistance with registering or help with navigating through the website you may contact the Association for Procurement Technical Assistance Centers for help with actions such as SAM.gov registration.
If you have questions about Government procurements in general or need assistance in the preparation of your proposal, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to http://www.aptac-us.org/sam-registration/
(End)
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 24 Job Mowing and Trimming Services 2022
FFP
The Government's payment for mowing services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.
FOB: Destination
PSC CD: S208
NET AMT
0002 24 Job OPTION Mowing and Trimming Services 2023
FFP
The Government's payment for mowing services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.
0003 24 Job OPTION Mowing and Trimming Services 2024
FFP
The Government's payment for mowing services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.
0004 24 Job OPTION Mowing and Trimming Services 2025
FFP
The Government's payment for mowing services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.
0005 24 Job OPTION Mowing and Trimming Services 2026
FFP
The Government's payment for mowing services shall constitute full compensation to the Contractor for furnishing all labor, equipment, and materials; and performing all operations required to complete the work in conformity with Performance Work Statement (PWS) located in section C.
Section C - Descriptions and Specifications
PWS
PERFORMANCE WORK STATEMENT
ADMINISTRATIVE AREAS
MOWING AND TRIMMING SERVICES
U.S. Army Corps of Engineers Smithville Lake Project, Missouri
SECTION TITLE
C-1 GENERAL INFORMATION
C-2 DEFINITIONS & ACRONYMS
C-3 GOVERNMENT-FURNISHED PROPERTY AND SUPPLIES
C-4 CONTRACTOR-FURNISHED ITEMS AND SERVICES
C-5 SPECIFIC TASKS IN MOWING AREAS
TECHNICAL EXHIBIT #1 “PERFORMANCE REQUIREMENTS SUMMARY”
TECHNICAL EXHIBIT #2 “AREAS, FREQUENCIES, AND ACREAGES”
TECHNICAL EXHIBIT #3 “AREA MAPS”
ATTACHMENT #1 “ACTIVITY HAZARD ANALYSIS”
ATTACHMENT #2 “WAGE RATES”
C.1 GENERAL INFORMATION. Any resulting contract shall become effective on date of award (estimated 01 June 2022) and shall remain in effect through 31 March 2023 (this period constitutes “base year” of contracts). Effective dates of renewal options, IF EXERCISED, shall be from 01 April 2023 through 31 March of 2024; 01 April 2024 through 31 March 2025; 01 April 2025 through 31 March 2026, and 01 April 2026 through 31 March 2027, (up to 4 renewal options). Exercise of options is at the discretion of the Government, not of the Contractor.
C.1.1 BACKGROUND. Smithville Lake is a flood control reservoir in Missouri, with numerous parks and access areas managed by or leased from the U.S. Army Corps of Engineers. Park areas at Smithville Lake Project offer a wide variety of recreation facilities including boat launching ramps, campgrounds, full service marinas, picnic areas, and sand swimming beaches. Many routine maintenance items are contracted to the private sector. Mowing, refuse collection, and facility cleanup are just a few of the activities that are performed by private contractors for the Corps of Engineers at Smithville Lake Project.
Award will be an Indefinite Delivery, Indefinite Quantity (IDIQ), performance-based service contract.
C.1.2 SCOPE OF WORK. The Contractor shall provide all manpower, labor, equipment, materials/supplies, transportation, fuel, tools, supervision and other items and services necessary to provide mowing and trimming of designated areas at the Jerry Litton Visitor Center at Smithville Lake. The Contractor shall perform to the standards in this contract. Services also consist of attending annual pre-work conferences and meetings as necessary at Smithville Project office, and preparing quality control worksheets, invoices, and inputting contractor man hours online at https://cmra.army.mil/default.aspx. A map of Smithville Lake can be found on the Internet at:
http://www.nwk.usace.army.mil/Portals/29/docs/lakesites/Smithville/Smithville-LakeMap.pdf
C.1.3 PERIOD OF PERFORMANCE. The Contractor shall perform services as ordered by the Government.
The maximum duration of the contract is through 31 March 2027, if all options are exercised.
C.1.4 REQUIRED INSURANCE. In accordance with the FAR Clause 52.228-5 titled “Insurance-Work on a
Government Installation” the Contractor shall obtain and maintain during the period of performance under this contract the following kinds and minimum amounts of insurance*:
Workmen’s Compensation . . . . . . Coverage complying with applicable State statute** Employer’s Liability . . . . . . . . . . . Minimum $100,000 General Liability/Bodily Injury. . . Minimum $500,000 per occurrence Automobile Liability . . . . . . . . . . . Minimum $200,000 per person $500,000 per occurrence $ 20,000 property per occurrence
* Reference FAR 28.307-2 Liability, subparagraphs (a), (b), and (c).
** Missouri Division of Insurance, telephone #(573) 751-4126 Division of Workers Compensation, telephone #(800) 775-2667
NOTE: Coverage listed above are minimums only. If higher limits of coverage are required by State statute, the Contractor shall be responsible for obtaining such additional coverage.
C.1.5 POST-AWARD (“PRE-WORK”) CONFERENCE. After award, but prior to start of services, the
Project Office will arrange a Post-Award/Pre-Work conference to be held at the Visitor Center. The purpose of the conference is to discuss contract requirements and details of contract performance, in order to develop a mutual understanding of both. A Pre-Work conference will likely be held each year in the spring prior to start of services under any renewal options that may be exercised. In addition, other meetings may be held as necessary. The Government reserves the right to schedule meetings with the Contractor. Meetings shall be scheduled to take place at the Visitor Center as necessary to ensure strict compliance with the terms of the contract, to coordinate work schedules in compliance with the contract specifications, and to arrange a satisfactory operating agreement.
C.1.6 DOCUMENTS AND CORRESPONDENCE. After award, all documents and related correspondence shall be routed through the Contracting Officer’s Representative (COR) at Smithville Lake Visitor Center.
C.1.7 PAYMENT. Payment will not be made for services not performed. The Contractor shall provide the
Project Office with an invoice for each task order, after performance of the services ordered, requesting payment for ordered services. Payment shall be made in accordance with the Prompt Payment Act.
Payment shall be made via Electronic Funds Transfer (EFT) into the Contractor’s banking account approximately 30 days after the last day of services received for the billing period, or 30 days after receipt of the invoice, whichever is later.
C.1.8 CONTRACTOR PERSONNEL.
C.1.8.1 MINIMUM MANPOWER REQUIREMENT: The Contractor and employees/staff shall personally perform, or provide personal superintendence of the performance of, duties under this contract (no subcontracting). The Contractor shall maintain a sufficient number of staff/employees to perform the required services. In the event the Contractor is unable to perform contract duties as required, the Government reserves the right to terminate the contract.
C.1.8.2 CONTRACTOR PERSONNEL: Contractor personnel shall present a neat appearance and be fully clothed at all times while performing services ordered under the contract. “Fully clothed” shall be deemed to mean that a sleeved shirt (or T-shirt), trousers, and shoes shall be worn at all times: except that this requirement shall not be construed to replace or eliminate the necessity for the wearing of appropriate protective clothing or devices as may be required for the safe performance of services or for the application of various approved chemicals (if any). The Contractor shall provide own attire. Contractor personnel shall utilize tact, diplomacy, and courtesy at all times during contact with the public and with Government personnel. The Contracting Officer’s Representative reserves the right to disapprove any individual whom he/she considers to be incompetent to perform the work required. Such disapproval will be given to the Contractor by written notice. Any such decision is final. Any illegal or criminal activity on the part of the Contractor or staff, employees, or other personnel may result in termination of the contract. In order to assure that the required services be performed at an acceptable level, the Contractor shall designate in writing a responsible on-site representative of each work crew, who shall serve as a contact for matters involving quality, performance, or nonperformance of required services assigned to that crew. In the absence of a designated on-site representative, or if the designated on-site representative is not present, the Contractor warrants that any and all members of each work crew are qualified and fully competent with full authority to act for, and on behalf of, the Contractor, to insure the required work is performed in strict accordance with the contract specifications. The Government reserves the right to discuss mowing and trimming matters with any Contractor employee on-site and currently employed by the Contractor.
C.1.8.3 SECURITY REQUIREMENTS:
C.1.8.3.1 GENERAL. To assist the visiting public in reclaiming lost articles, the Contractor shall turn in to the Project Office all property left by visitors and found during the performance of duties. The Contractor shall report any instance of vandalism, facilities not operating property, or facilities in need of repair to the Project Office. The Contractor shall open and close gates within the contract boundary areas. The Contractor shall securely lock any gate that is opened by him/her, upon completion of the required work, or upon completion of the workday.
C.1.8.3.2 KEYS. The Contractor shall safeguard all Government property.
Government-furnished keys may be provided to the Contractor. The Contractor shall establish and implement methods of making sure all keys issued by the Government to the Contractor for Contractor’s use are not lost or misplaced, and are not used by unauthorized persons. The Contractor shall immediately report to the Contracting Officer or the COR any occurrences of loss, unauthorized use, or unauthorized duplication of keys. In the event keys, other than master keys, are lost or duplicated, the Contractor may be required upon written direction of the Contracting Officer, to rekey or replace the affected lock or locks without cost to the Government. The Contractor shall safeguard keys issued to them to perform the services required by this contract. All keys shall be returned to the Government upon request and/or completion of the contract. Failure to return keys can result in withholding of payment.
C.1.8.3.3 DAM ROADWAY. The road across the dam may be closed from time to time during the life of this contract. The closure of the dam may continue for several months under certain construction and/or maintenance circumstances.
The Contractor shall be prepared to take an alternate route during these times, at no additional cost to the government.
C.1.9 EQUIPMENT BREAKDOWN: Equipment breakdown shall not relieve the Contractor of the responsibility of performing the work as specified. It shall be the responsibility of the Contractor to assure that he or she has, or can obtain on short notice, sufficient backup equipment to continue the services as specified without interruption in the event of mechanical failure of primary equipment.
C.1.10 QUALITY CONTROL (CONTRACTOR’S RESPONSIBILITY).
C.1.10.1 Contractor shall develop a Quality Control Plan designed to demonstrate how the Contractor will meet the needs of the Project. The Quality Control Plan shall document how the Contractor will identify and correct performance shortfalls. Complete records of all inspection work performed by the Contractor must be maintained and made available to the Government during contract performance.
C.1.10.2 The Contractor shall designate, in writing, a responsible on-site representative of each work crew who shall serve as a contact for matters involving quality, performance or non-performance of the required work assigned to that crew. The representative shall have the authority to correct non-performance. The Contracting Officer may disapprove any individual whom he considers to be incompetent to perform the work required. Such disapproval will be given to the Contractor by written notice, and the Contracting Officer’s decision shall represent a final decision.
C.1.10.3 The Contractor shall furnish to the Smithville Lake Operations Project Manager, a telephone number attended during normal business hours (7:30 a.m. – 4:00 p.m. CST) to which calls concerning performance or other contractual matters can be placed. For the purpose of time and date, a message will be deemed delivered to the Contractor, at such time as it is delivered to the number provided by the Contractor.
C.1.10.4 As each item of work is completed, the Contractor's representative at the job site shall enter the time that the item of work was completed onto a Contractor's Daily Worksheet (furnished by the Government). Completed and signed worksheets shall be delivered each day work is performed, as directed by the Contracting Officer's Representative.
C.1.11 QUALITY ASSURANCE (GOVERNMENT’S RESPONSIBILITY).
C.1.11.1 QUALITY ASSURANCE PLAN (QAP). A Quality Assurance Plan will be used during the life of the contract to ensure that the Contractor is performing the services required by this PWS in an acceptable manner. The Government develops the QAP, and the Project Office administers the plan through Quality Assurance Evaluators (QAEs).
C.1.11.2 GOVERNMENT SURVEILLANCE PLAN. The Government will monitor the Contractor’s performance under this contract using quality assurance procedures developed by the Government.
Typical procedures might include random sampling, checklists and customer complaints. This should not be considered an exhaustive list. A primary objective of Government Quality Assurance will be to determine the effectiveness of the Contractor’s quality control system.
C.1.11.3 INSPECTIONS. According to the Inspection of Services clause (52.246-4 Inspection of
Services-Fixed Price), the Government reserves the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work.
C.1.11.4 UNSATISFACTORY PERFORMANCE. If any of the services do not conform to contract requirements, the Government may request the Contractor to perform the services again, where appropriate, in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by re-performance, the Government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements, and (2) reduce the contract price to reflect the reduced value of the services performed. NOTE: If the contractor fails to promptly re-perform the services or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may by contract, or otherwise: (1) perform the services and charge to the Contractor any cost incurred by the government that is directly related to the performance of such service, or (2) terminate the contract in whole or in part. The Government reserves the right to cause the specified work to be performed by a third party or Government personnel and the cost incurred thereby will be levied against the Contractor. Any time Government personnel are used because of Contractor's nonperformance, the cost levied against the Contractor will include all direct costs associated with the performance of the specified work the direct cost to the Government for substitution of the Government personnel removed from their normal duties is computed on an hourly basis at the applicable wage rate. Government personnel will be used only when time is of the essence and the interests of the Government would not be served by securing a third party to perform the specified work.
C.1.12 OTHER CONTRACTS. The Contractor shall not commit or permit any act which may interfere with the performance of work by another Contractor or Government employee(s).
C.1.13 VOLUNTEERS. Volunteers may be utilized in the parks. Volunteers receive and follow instructions from a Government representative, not the Contractor. The Contractor should not consider any volunteer as his/her employee. Volunteers may staff the Park Attendant booth outside of the Contractor’s normal scheduled hours, or may perform other duties, as instructed by Government representative.
C.1.14 CONTRACTOR PETS. The Contractor shall be liable for any damages or injuries caused by their pets.
When outside, pets shall be on a leash at all times.
C.1.15 SMOKING POLICY. Smoking is not allowed in Government buildings, including shower buildings, vault toilets, etc. Smoking is also not allowed by the Contractor while in direct contact with the public.
C.1.16 FIREARMS AND WEAPONS. The Contractor shall not possess, during the performance of this contract, any item, including firearms, that can be used as a weapon. Title 36 regulates firearms on Federal property.
C.1.17 SAFETY.
C.1.17.1 Appropriate measures shall be taken to protect the general public from accidental injury. All services shall be performed in accordance with applicable safety requirements set forth in Corps of Engineers Manual EM-385-1-1, “Safety and Health Requirements Manual” and supplements thereto (copies are available from the Project Office). ANY EQUIPMENT OR
MATERIALS NOT IN CONFORMITY WITH THE SAFETY MANUAL SHALL BE
REMOVED FROM GOVERNMENT PROPERTY IMMEDIATELY.
C.1.17.2 Prior to beginning work on this contract the Contractor shall have an approved Accident
Prevention Plan. This plan shall be in accordance with the most recent EM 385-1-1. The plan is intended to be a viable document and enhance the safety of Project staff and visitors. The Contractor will be expected to take a vital interest in safety, hazard, and educate their employees to work and plan their work safely. Proper driving techniques and defensive driving will be practiced to prevent vehicle accidents and property damage.
C.1.17.3 In order to provide safety controls for protection to the life and health of employees and other persons; for prevention of damage to property, materials, supplies and equipment; and for avoidance of work interruptions in the performance of this contract, the Contractor shall comply with all pertinent provisions of the Federal, State, and local regulations and shall take or cause to be taken such additional measures as the Contracting Officer may determine to be reasonable and necessary for the purpose.
C.1.17.4 Contractor vehicles shall be equipped with 4-way flashers and turn signals in operating condition. Flashers shall be activated when vehicles are parked on, or traveling slowly along roadways.
C.1.17.5 Any injury, property damage, equipment malfunction, or safety hazard observed by the
Contractor shall be immediately reported to the Project personnel.
C.1.17.6 Tractors and self-propelled mowers over twenty (20) drawbar horsepower and/or exceeding 1,000 pounds gross weight shall be equipped with an approved rollover - protection system, flashers, and seatbelts. Seatbelts shall be worn and flashers activated at all times when equipment is in operation. The Contractor's tractors and other slow-moving equipment shall be equipped with the slow-moving vehicle sign. All mowers and trimming equipment shall be equipped and maintained with safety chains, discharge-deflection devices, and/or other approved safety devices in accordance with EM 385-1-1 to prevent accidental damage or injury from objects thrown by mowers.
C.1.17.7 The Contractor shall take such measures to protect the public and property from foreign materials thrown from rotary mowers and other rotating equipment while operating in public use areas and on public roadways.
C.1.18 ENVIRONMENTAL CONTROLS.
C.1.18.1 COMPLIANCE WITH LAWS AND REGULATIONS: The Contractor shall be knowledgeable of, and shall comply with, all applicable Federal, State, and Local laws, environmental requirements, and instructions. The Contractor shall ensure policies and procedures are established that protect the health and safety of employees and the community to minimize or eliminate the risk of environmental pollution.
C.1.18.2 HAZARDOUS MATERIALS: The Contractor is responsible for advising his/her employees of all Environmental and Hazardous Materials Handling, and is also required to provide to the COR the Material Safety Data Sheets (MSDS) for all materials used by the Contractor in accordance with Federal and State laws and/or regulations.
C.1.18.3 NOTIFICATION OF ENVIRONMENTAL SPILLS: If the Contractor or employee(s) of the
Contractor spills or releases any substance into the environment, the Contractor shall immediately report the incident to the Environmental Compliance Coordinator in accordance with local procedures, and shall also notify the Contracting Officer’s Representative (COR), or in his or her absence the Contracting Officer. The Contractor shall be liable for containment and environmental cleanup of the spill or release of such substance.
C.1.19 ORDERING OF SERVICES.
C.1.19.1 Mowing orders (referred to as “mowings”) may be placed by the Smithville Lake Project Office verbally Monday through Friday, between the hours of 7:30 am and 4:00 p.m., and then will be followed-up in writing (faxed, mailed, or e-mailed). The Contractor shall commence mowing on the date specified in the order, and shall complete all ordered services that day. The entire area shall be mowed within a one-day period. Work will not be permitted on weekends or holidays, and shall not begin prior to 7:00 a.m. nor continue past 8:00 p.m., unless these restrictions are specifically waived in writing by the Contracting Officer’s or his Representative. The Contractor shall assure that all work be accomplished within the time frames specified above. Services rendered outside these time periods will not be compensated unless specific written approval has been given by the Contracting Officer’s Representative. Payment will not be made for services not performed for any reason, including but not limited to inclement or wet weather conditions.
C.1.19.2 In the event adverse weather or ground conditions occur after placement of an order for services that would create unsafe working conditions or result in damage to vegetation or turf, the Contractor shall cease operations and contact project personnel. Work affected by adverse conditions shall be stopped, restarted, or rescheduled at a mutually agreed upon time, to the extent possible. Payment will not be made for work not performed as a result of wet weather conditions unless an alternate date for services can be arranged, and services are performed.
C.2 GENERAL DEFINITIONS. The following definitions and descriptions apply wherever the word, phrase, or acronym is used in this Performance Work Statement:
Acceptable Level of Performance: The maximum percent defective, the maximum number of defects per hundred units, or the number of defects in a lot that can be considered satisfactory on the average. The allowable leeway or variance from a standard before the Government will reject the specific service.
Contracting Officer's Representative (COR): An individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions.
Fully-Clothed: Deemed to mean that a sleeved shirt (or T-shirt), trousers, and shoes shall be worn at all times: except that this requirement shall not be construed to replace or eliminate the necessity for the wearing of appropriate protective clothing or devices as may be required for the application of various chemicals.
Performance-Based Contract: (FAR 2.101) Structuring all aspects of an acquisition around the purpose of the work to be performed with the contract requirements set forth in clear, specific, and objective terms with measurable outcomes as opposed to either the manner by which the work is to be performed or broad and imprecise.
Performance Requirements Summary (PRS): The PRS shows contract requirements, the component requirements related to each contract requirement, the price of each work requirement as a percentage of the associated contract requirement (Fixed Price Contracts), the standard of performance, and the acceptable quality level (AQL) for each work requirement.
Quality Assurance Surveillance Plan (QASP): An organized written document used by Government for quality assurance surveillance. Document contains sampling/ evaluation guides, checklists, and the performance requirements summary (PRS).
Quality Control (QC): A method used by the Contractor to control the quality of goods and services provided.
Quality Assurance (QA): A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
Service Contract: A contract that directly engages the time and effort of a contractor whose primary purpose is to perform an identifiable task rather than to furnish an end item of supply. A service contract may cover services performed by either professional or nonprofessional personnel whether on an individual or organizational basis. Some of the areas in which service contracts are found include the following:
(a) Maintenance, overhaul, repair, servicing, rehabilitation, salvage, modernization, or modification of supplies, systems, or equipment.
(b) Routine recurring maintenance of real property.
(c) Housekeeping and base services.
(d) Operation of Government-owned equipment facilities, and systems.
Shall: Means the imperative.
C.2.1 DEFINITIONS OF MOWING AREAS. Mowing areas shall be as designated by the Contracting
Officer's Representative, hence the importance of a site-visit prior to bidding. An aerial photo of area to be mowed will be provided by Smithville Lake Project Office. The definition below serves to indicate general mowing areas and boundaries. In addition, the Contractor should refer to the aerial photo of area.
Ultimately and above all else, mowing and trimming areas shall be as determined by the COR or other designated Government representative. Such determinations shall prevail over definitions, descriptions, photos, drawings, or maps.
Areas to be mowed include:
Administration Area lawn, Lake View Shelter House and Privy area.
Mowing around the Administration Building (Jerry Litton Visitor Center), Lake View Shelter House and Privy includes the following special requirements:
The minimum allowable mowing height for all areas shall be 4 inches.
Contractor shall mow the Administrative Building lawn areas on a diagonal bias, alternating directions with each mowing.
C.3 GOVERNMENT-FURNISHED PROPERTY & SUPPLIES: The Government shall furnish necessary keys and Contractor “Quality Control” Worksheets for the use of the Contractor.
C.4 CONTRACTOR-FURNISHED ITEMS & SERVICES: The Contractor shall furnish all equipment, supplies, items, labor, materials, insurance, services, etc. to accomplish the services specified in this PWS.
All equipment must be approved by the Contracting Officer or the Contracting Officer's Representative prior to initial use. Equipment breakdown shall not relieve the Contractor of the responsibility of performing the work as specified. The Contractor shall assure that he has, or can obtain on short notice, sufficient backup equipment to continue the services as specified without interruption in the event of mechanical failure of his primary equipment.
C.4.1 Mowers shall be multiple spindle (lawn type) with adjustable side-mounted skids, capable of producing a smooth even cut, with a cutting height adjustable from 3½ to 6 inches. Blades shall be sharpened and/or replaced often enough to assure smooth grass cut. All mowers shall be constructed to distribute grass clipping evenly to prevent clumps or windrows.
C.4.2 Trimming equipment shall consist of power hand mowers, "weed-eaters" or other type power trimmers, weed whips, and other equipment and tools as may be appropriate for the task.
C.5 SPECIFIC TASKS IN MOWING AREAS. All acreages are ESTIMATED. The Contractor shall be responsible for determining exact acreage and conditions affecting performance of work. Many areas consist of rocky terrain and heavily wooded areas, and may require an extensive amount of trimming and hand mowing where larger mowers cannot maneuver satisfactorily. Trimming shall include the removal of sprouts and heavily weeded growth. Prospective bidders are encouraged to visit and fully inspect all areas, accesses, locations, terrain, etc. prior to bidding. The Government shall not be held accountable for conditions at the site which were not taken into account by prospective bidders. Mowing shall be accomplished to within, but not closer than, 24 inches (+/- 6 inches) of the trunk of any tree, bush, or shrub;
and to within, but not closer than, 12 inches (+/- 6 inches) of any inanimate objects, such as walls, posts, signs, park equipment, or other such objects. Height of cut and exact limits of mowing and trimming areas shall be as directed by the Contracting Officer or his Representative. Mowing and trimming operations around buildings and roadsides shall be performed so grass clippings are thrown away from buildings and away from the road whenever possible.
C.5.1 Mowing.
C.5.1.1 WET CONDITIONS: Mowing operations shall not be performed when the ground is so wet that mowing would cause rutting or would otherwise disturb existing turf; or when grass is so wet it will not cut. Tractors shall be operated in such a manner as to protect against the sod being torn by the tractor wheels on turns.
C.5.1.4 MOWERS: All mowers (large and small) shall be compatible with each other in mowing height and appearance of cut grass. After mowing, areas serviced under this contract shall present a neat, well-cared-for, and evenly mowed appearance, free from ruts or any unmowed strips or streaks.
C.5.1 Trimming.
C.5.2.1 AREAS: Trimming is required in all areas. Grass and weeds shall be trimmed around trees, shrubs, buildings, fences, poles, posts, fire hydrants, parking lots, curbs, parking lot bumper blocks (both sides), sidewalks, boulders, and other fixed obstacles.
C.5.2.2 HEIGHT: Trimming height shall match surrounding area grass heights. All areas shall be trimmed simultaneously, or immediately following mowing.
C.5.2.3 CLIPPING REMOVAL: Immediately following trimming, the Contractor shall remove grass clippings or debris deposited as a result of mowing and trimming operations from all sidewalks, entrances into buildings, building interiors, and shelter floor.
C.5.2.4 TREES/SHRUBS: Extreme care shall be exercised when mowing and trimming around trees, bushes, shrubs, buildings, and other objects to insure that equipment does not come in contact with the object. Trees or other objects shall NOT be bumped or scraped by equipment.
Trimming will not be required closer than two (2) inches around trunks of trees, bushes, or shrubs. However, trimming around buildings and inanimate objects shall be accomplished to the last blade of grass. Moveable objects shall be moved and the area around and under such objects shall be mowed and/or trimmed. Immediately following mowing/trimming, such objects shall be returned to their original position. All costs of repair or replacement in size, kind and type resulting from damage by the Contractor's equipment shall be borne by the Contractor. Repair or replacement shall occur within 30 calendar days of noticed damage.
C.6 ANTITERRORISM/OPERATION SECURITY REQUIREMENTS
All contractor and all associated sub-contractors’ employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of
Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
The contractor and all associated sub-contractors shall receive a brief/training (CorpsWatch) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
Per the E-Verify Website the following exemptions apply:
Employers whose contracts are exempt from the E-Verify federal contractor rule are not required to enroll in E-Verify. A contract is considered exempt if any one of the following applies: (1) It is for fewer than 120 days.
(2) It is valued at less than Simplified Acquisition Threshold ($250,000), the simplified acquisition threshold. (3) All work is performed outside the United States. (4) It includes only commercially available off-the-shelf (COTS) items and related services. (Source: https://www.e-verify.gov/employers/federal-contractors/exemptions-and-exceptions).
TECHNICAL EXHIBIT #1
Performance Requirements Summary (PRS)
Section (Para.)
Contract Requirement
Performance Standard Lot Desc.
ALP
Method of Surveillance
C.5.1 Mowing Area presents even appearance of uniform height; turf not rutted
Acres 4% Random Sample & Inspection
C.5.2 Trimming Grass and weeds are trimmed around fixed objects at the same time as mowing and to the same height standard. Fixed objects not damaged
Linear feet or # fixed objects
4% Random Sample & Inspection
TECHNICAL EXHIBIT #2
Areas, Frequencies, & Acreages
ESTIMATED ESTIMATED # MAXIMUM # MINIMUM #
AREA ACREAGE OF MOWINGS OF MOWINGS OF MOWINGS
Administration Area and 4.53 24 NA NA Lake View Shelter and Privy
Acreage shown are estimated. The Contractor shall be responsible for determining all acreage and conditions affecting the performance of the work. The Contractor shall satisfy himself/herself that government estimated acreages are acceptable within 30 days of first mowing.
TECHNICAL EXHIBIT #3
Area Maps and/or Photos
Maps/aerial photographs will be provided by the Smithville Project Office located by Smithville Dam. Office hours are 7:30 – 4:00 Mon-Fri. Telephone # is 816-532-0174.
W912DQ22Q1029
ITEM NO SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
0001AA MOWING & TRIMMING SERVICES 24 Each
0002 FY 2023 OPTION (IF EXERCISED)
OPTION If 2023 option is exercised, contractor shall furnish all labor, equipment, supplies, insurance, and fuel necessary to accomplish mowing and trimming services in accordance with specifications, at the Administration Area of Smithville Lake Project, Missouri. Applicable prevailing wage rates will be provided at time option is exercised.
Period of performance: April 01, 2023, through March 31, 2024. Firm Fixed Price.
0002AA
MOWING & TRIMMING SERVICES 24 Each
0003 FY 2024 OPTION (IF EXERCISED)
OPTION If 2024 option is exercised, contractor shall furnish all labor, equipment, supplies, insurance, and fuel necessary to accomplish mowing and trimming services in accordance with specifications, at the Administration Area of Smithville Lake Project, Missouri. Applicable prevailing wage rates will be provided at time option is exercised.
Period of performance: April 01, 2024, through March 31, 2025. Firm Fixed Price.
0003AA
MOWING & TRIMMING SERVICES
24 Each
0004 FY 2025 OPTION (IF EXERCISED)
OPTION If 2025 option is exercised, contractor shall furnish all labor, equipment, supplies, insurance, and fuel necessary to accomplish mowing and trimming services in accordance with specifications, at the Administration Area of Smithville Lake Project, Missouri. Applicable prevailing wage rates will be provided at time option is exercised.
Period of performance: April 01, 2025, through March 31, 2026. Firm Fixed Price.
ITEM NO
SUPPLIES/SERVICES
QTY
UNIT
UNIT PRICE
AMOUNT
0004AA
0005 FY 2026 OPTION (IF EXERCISED)
OPTION If 2026 option is exercised, contractor shall furnish all labor, equipment, supplies, insurance, and fuel necessary to accomplish mowing and trimming services in accordance with specifications, at the Administration Area of Smithville Lake Project, Missouri. Applicable prevailing wage rates will be provided at time option is exercised.
Period of performance: April 01, 2026, through March 31, 2027. Firm Fixed Price.
0005AA
Company: _______________________________ Address: _______________________________ Phone: _____________________________ Signature:__________________________________
FY 2022 BASE MOWING, TRIMMING SERVICES FOR SMITHVILLE LAKE ADMIN AREA
Contractor shall furnish all labor, equipment, supplies, insurance, and fuel necessary to accomplish mowing and trimming services in accordance with specifications, at the Administration Area of Smithville Lake Project, Missouri. Applicable prevailing wage rates are included herein. Period of performance: June 01, 2022, through March 31, 2023. Firm Fixed Price.
Jerry Litton Visitor Center and Administrative Area, Lake View Shelter and Privy 16311 County Rd DD
Smithville Lake Mo. 64089 816-532-0174
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-APR-2022 TO
31-MAR-2023
N/A USACE, KANSAS CITY +
DEREK DORSEY
SMITHVILLE LAKE PROJECT OFFICE PO
BOX 428
SMITHVILLE MO 64089-0428
816-389-3947
966454
0002 POP 01-APR-2023 TO
31-MAR-2024
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 01-APR-2024 TO
31-MAR-2025
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 01-APR-2025 TO
31-MAR-2026
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 01-APR-2026 TO
31-MAR-2027
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.247-34 F.O.B. Destination NOV 1991
Section H - Special Contract Requirements
SERVICE WAGE RATE
Smithville Lake Project, Smithville, MO:
Service Contract Act WD # 2015-5105 Clay County https://sam.gov/wage-determination/2015-5105/17
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions JUN 2020 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.215-22 Limitations on Pass-Through Charges--Identification of Subcontract Effort
OCT 2009
52.215-23 Limitations on Pass-Through Charges JUN 2020 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-6 Drug-Free Workplace MAY 2001 52.223-10 Waste Reduction Program MAY 2011 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
AUG 2018
52.228-5 Insurance - Work On A Government Installation JAN 1997 52.232-1 Payments APR 1984 52.232-11 Extras APR 1984 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2021
52.233-1 Disputes MAY 2014 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.246-4 Inspection Of Services--Fixed Price AUG 1996 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019 252.204-7007 Alternate A, Annual Representations and Certifications MAY 2021 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .